Block 3720, lot 009
415 Mission St
- City’s use
- Commercial Office
- Built
- 2018
- Stories
- 63
- Building
- 1,420,430 sq ft
- Lot
- 50,514 sq ft
- Zoning
- C3OSD
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 19, 2026 | In progress issued Oct 2026 | 415 Mission St | Bcci Construction Company | to obtain final inspection for work approved under pa#: 202309156685, 202309156665, and 202306230736. all work is complete.Details
to obtain final inspection for work approved under pa#: 202309156685, 202309156665, and 202306230736. all work is complete. | |
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 415 Mission St | stair removal from floor 33, slab opening infill on floor 34 and associated structural improvements. no change to existing or occupancy.Details
stair removal from floor 33, slab opening infill on floor 34 and associated structural improvements. no change to existing or occupancy. | $195,000 | |
| Jul 22, 2026 | In progress issued Jul 2026 | 415 Mission St | Novo Construction Inc | 57th and 58th floors:mechanical upgrades to existing system. add under floor terminal fan units with heating coil. add 2 fire/smoke dampers in passenger elevator lobbies.Details
57th and 58th floors:mechanical upgrades to existing system. add under floor terminal fan units with heating coil. add 2 fire/smoke dampers in passenger elevator lobbies. | $100,000 |
| Jul 22, 2026 | Completed final sign-off Aug 2026 | 415 Mission St | Hathaway Dinwiddie Co. | revision to phone booths under ref#: 202505287418. floors 25. is area of work focus pod addition.Details
revision to phone booths under ref#: 202505287418. floors 25. is area of work focus pod addition. | |
| Jul 16, 2026 | Completed final sign-off Aug 2026 | 415 Mission St | Hathaway Dinwiddie Co. | revision phone booths under 202505287420 floors 16. area of work fl 16, add focus podsDetails
revision phone booths under 202505287420 floors 16. area of work fl 16, add focus pods | |
| Jul 16, 2026 | Completed final sign-off Aug 2026 | 415 Mission St | Hathaway Dinwiddie Co. | 8th floor: phone booth revision per pa #202509125222.Details
8th floor: phone booth revision per pa #202509125222. | |
| Mar 27, 2026 | Completed final sign-off Jul 2026 | 415 Mission St | Gci, Inc | 50th fl - electrical & office retrofit lighting fixtures & associated circuiting/controls, power & signal devices & associated wiring; mechanical: demo & revise existing ductwork & under floor diffusers to accommodate new floor plan layout. furnish & install new duct & diffusers ref pa 202508294227Details
50th fl - electrical & office retrofit lighting fixtures & associated circuiting/controls, power & signal devices & associated wiring; mechanical: demo & revise existing ductwork & under floor diffusers to accommodate new floor plan layout. furnish & install new duct & diffusers ref pa 202508294227 | $149,000 |
| Dec 19, 2025 | In progress issued Dec 2025 | 415 Mission St | Bcci Construction Company | to obtain final inspection for work approved under pa# 202401023324 & 202408088259. all work is complete.Details
to obtain final inspection for work approved under pa# 202401023324 & 202408088259. all work is complete. | |
| Dec 19, 2025 | In progress issued Dec 2025 | 415 Mission St | Bcci Construction Company | to obtain final inspection for work approved under pa# 202310118444 & 202401315007. all work is complete.Details
to obtain final inspection for work approved under pa# 202310118444 & 202401315007. all work is complete. | |
| Sep 12, 2025 | Completed final sign-off Aug 2026 | 415 Mission St | Hathaway Dinwiddie Co. | revision to 202506096173. remove 1 focus pod on floor 8,9,10, and 11.Details
revision to 202506096173. remove 1 focus pod on floor 8,9,10, and 11. | |
| Aug 29, 2025 | Completed final sign-off Jul 2026 | 415 Mission St | 50/f: commercial tenant improvement including new load bearing partition doors, ceilings, lighting and finishes. mep deferred for new mechanical, electrical and plumbing work.Details
50/f: commercial tenant improvement including new load bearing partition doors, ceilings, lighting and finishes. mep deferred for new mechanical, electrical and plumbing work. | $2,382,902 | |
| Aug 18, 2025 | In progress filed Aug 2025, not yet issued | 415 Mission St | 36/fl:tenant improvement of (e) space.no exterior work conference room , new storefront and dodor. no change of use. executive office new door/hardware demo of millwork and shelving interior finished. install millwork with acess door,signage around (e) electrical panel. install hinged acoustic andDetails
36/fl:tenant improvement of (e) space.no exterior work conference room , new storefront and dodor. no change of use. executive office new door/hardware demo of millwork and shelving interior finished. install millwork with acess door,signage around (e) electrical panel. install hinged acoustic and | $75,000 | |
| Jun 5, 2025 | In progress issued Jun 2025 | 415 Mission St | Siemens Industry, Inc. | 1st fl - fire only work to upgrade thedisplay modules on 14 existing fire alarm panels. no field devices are added and there is no ref pa #Details
1st fl - fire only work to upgrade thedisplay modules on 14 existing fire alarm panels. no field devices are added and there is no ref pa # | $56,952 |
| May 28, 2025 | Completed final sign-off Aug 2026 | 415 Mission St | Hathaway Dinwiddie Co. | floors 12-19: install focus pods.Details
floors 12-19: install focus pods. | $25,000 |
| May 28, 2025 | Completed final sign-off Aug 2026 | 415 Mission St | Hathaway Dinwiddie Co. | floors 21-25, 27-30: install focus pods.Details
floors 21-25, 27-30: install focus pods. | $25,000 |
| May 9, 2025 | Completed final sign-off Aug 2026 | 415 Mission St | Hathaway Dinwiddie Co. | install focus pods on floors 8,9.10, & 11Details
install focus pods on floors 8,9.10, & 11 | $60,000 |
| May 2, 2025 | Completed final sign-off Oct 2025 | 415 Mission St | Hathaway Dinwiddie Co. | 11/f: ref 202504174648: structure - new elevated concrete slab.Details
11/f: ref 202504174648: structure - new elevated concrete slab. | $20,000 |
| Apr 17, 2025 | Completed final sign-off Jun 2025 | 415 Mission St | Hathaway Dinwiddie Co. | 11th fl: new multi-faith room. new finishes, mechanical & electricalDetails
11th fl: new multi-faith room. new finishes, mechanical & electrical | $243,000 |
| Mar 11, 2025 | In progress issued Mar 2025 | 415 Mission St | Siemens Industry, Inc. | 44th & 45th fl - fire only work to relocate 2 speaker/strobes for the tenant stairwell infill work on floors 44 and 45 ref pa 202306129861Details
44th & 45th fl - fire only work to relocate 2 speaker/strobes for the tenant stairwell infill work on floors 44 and 45 ref pa 202306129861 | $1,922 |
| Mar 3, 2025 | In progress issued Mar 2025 | 415 Mission St | Hathaway Dinwiddie Co. | 44 and 45/fl-revision to 202306129861 to revise smoke control of operationsDetails
44 and 45/fl-revision to 202306129861 to revise smoke control of operations | |
| Feb 28, 2025 | Completed final sign-off Mar 2025 | 415 Mission St | Siemens Industry, Inc. | 38th fl - fire only work to add a module for interface into the "coinbase" tenant security panel on floor no ref pa # (no remodel work)Details
38th fl - fire only work to add a module for interface into the "coinbase" tenant security panel on floor no ref pa # (no remodel work) | $600 |
| Feb 7, 2025 | Completed final sign-off Mar 2025 | 415 Mission St | Eco Fire Sprinklers Inc | 44th floor: add 2 new pendent sprinklers for t.i. for stair removal. ref. building pa #202306129861Details
44th floor: add 2 new pendent sprinklers for t.i. for stair removal. ref. building pa #202306129861 | $3,000 |
| Nov 25, 2024 | Completed final sign-off Jan 2025 | 415 Mission St | Hathaway Dinwiddie Co. | deferred structural permit for application 202404220495Details
deferred structural permit for application 202404220495 | |
| Sep 24, 2024 | Completed final sign-off Oct 2024 | 415 Mission St | Siemens Industry, Inc. | fire only work for the bt lab conversion on flr 4; 2 smoke detectors and 1 module are added. ref pa#: 202404220495Details
fire only work for the bt lab conversion on flr 4; 2 smoke detectors and 1 module are added. ref pa#: 202404220495 | $2,045 |
| Aug 8, 2024 | In progress issued Aug 2024 | 415 Mission St | Bcci Construction Company | 34th floor: modification to existing mechanical and electrical. relocate ducts and modify lightin. ref pa#202401023324.Details
34th floor: modification to existing mechanical and electrical. relocate ducts and modify lightin. ref pa#202401023324. | $45,000 |
| Jun 27, 2024 | Completed final sign-off Jul 2024 | 415 Mission St | Siemens Industry, Inc. | fire only: work for the "go center" mechanical system relocations on floor 5: additions are 1 smoke detector, 4 duct detectors, and 5 modules. ref permit bpa# 2023-0824-5117. 5/fDetails
fire only: work for the "go center" mechanical system relocations on floor 5: additions are 1 smoke detector, 4 duct detectors, and 5 modules. ref permit bpa# 2023-0824-5117. 5/f | $13,870 |
| Jun 25, 2024 | In progress issued Jun 2024 | 415 Mission St | Siemens Industry, Inc. | 34th fl - fire only for accenture remodel areas; additions are 2 duct detectors, 4 modules, 1 speaker/strobe and the relocation of 3 speaker/strobes. ref pa 202310118444Details
34th fl - fire only for accenture remodel areas; additions are 2 duct detectors, 4 modules, 1 speaker/strobe and the relocation of 3 speaker/strobes. ref pa 202310118444 | $10,740 |
| Jun 14, 2024 | In progress issued Jun 2024 | 415 Mission St | Golden Gate Fire Protection Inc | 5/f: fire sprinkler modification: relcoate 2 uprights and add 2 uprights in the av rack room. ref ti pa 202308245117Details
5/f: fire sprinkler modification: relcoate 2 uprights and add 2 uprights in the av rack room. ref ti pa 202308245117 | $1,000 |
| Apr 29, 2024 | Completed final sign-off Jun 2024 | 415 Mission St | Pribuss Engineering Inc | modify sprinkler head locations to accommodate new partition layout for safe room on 16/f. total 6 sprinklers. ref pa# 202402216253Details
modify sprinkler head locations to accommodate new partition layout for safe room on 16/f. total 6 sprinklers. ref pa# 202402216253 | $3,600 |
| Apr 22, 2024 | Completed final sign-off Jan 2025 | 415 Mission St | Hathaway Dinwiddie Co. | 4/f: conversion of an (e) it provisioning room into bt lab work room. relocation of selective furniture, selective relocation of lighting fixtures, upgrades of (e) partitions to the 1hr fire rating and door replacement, minor structural and hvac work included. no chang of occupant load or egressDetails
4/f: conversion of an (e) it provisioning room into bt lab work room. relocation of selective furniture, selective relocation of lighting fixtures, upgrades of (e) partitions to the 1hr fire rating and door replacement, minor structural and hvac work included. no chang of occupant load or egress | $1,350,000 |
| Apr 10, 2024 | Completed final sign-off Sep 2024 | 415 Mission St | Hathaway Dinwiddie Co. | in reference to architectural permit #2024-0221-6253; deferred mechaical and electrical scope that includes lighting low voltage and transfer duct workDetails
in reference to architectural permit #2024-0221-6253; deferred mechaical and electrical scope that includes lighting low voltage and transfer duct work | $100,000 |
| Mar 28, 2024 | Completed final sign-off Jun 2024 | 415 Mission St | Siemens Industry, Inc. | fire only work the secure room on floor 16, 2 strobes added and 1 speaker strobe relocated. ref 202402216253Details
fire only work the secure room on floor 16, 2 strobes added and 1 speaker strobe relocated. ref 202402216253 | $2,200 |
| Mar 4, 2024 | Completed final sign-off Aug 2024 | 415 Mission St | Ayoob & Peery Plumbing Co Inc | 34/f: add (10) relocate (15) fire sprinklers per ti job# 24-615 ref pa# 202401315007Details
34/f: add (10) relocate (15) fire sprinklers per ti job# 24-615 ref pa# 202401315007 | $15,528 |
| Feb 21, 2024 | Completed final sign-off Sep 2024 | 415 Mission St | Hathaway Dinwiddie Co. | 16/f: conversion of an (e) game room into a secure area including an entry, work room, and safe/storage room. demolition of interior partitions, ceiling, and lighting. new construction of interior non-bearing partitions, ceilings and finishes. no change of use or occupancy.Details
16/f: conversion of an (e) game room into a secure area including an entry, work room, and safe/storage room. demolition of interior partitions, ceiling, and lighting. new construction of interior non-bearing partitions, ceilings and finishes. no change of use or occupancy. | $425,434 |
| Jan 31, 2024 | In progress issued Feb 2024 | 415 Mission St | Bcci Construction Company | 34/f: revision to approved architectural and mep set pa# 202310118444 and 202401023324. new non-load bearing, electrical, ceiling, lighting, floor finishes and furnishings.Details
34/f: revision to approved architectural and mep set pa# 202310118444 and 202401023324. new non-load bearing, electrical, ceiling, lighting, floor finishes and furnishings. | |
| Jan 2, 2024 | In progress issued Jan 2024 | 415 Mission St | Bcci Construction Company | 34/f: mep submittal to support approved architectural permit # 202310118444Details
34/f: mep submittal to support approved architectural permit # 202310118444 | $100,000 |
| Nov 10, 2023 | In progress issued Nov 2023 | 415 Mission St | Siemens Industry, Inc. | 31st-35th fl, fire only work for the tenant stairwell in-fill on floor 33. revising the relocation sequence per sffd pre-app meeting; 6 smoke detectors have also been added on floor 33 for a draft stop, 2 modules added for sprinklers additions on floor 33; and 6 smoke detectors are relocated onDetails
31st-35th fl, fire only work for the tenant stairwell in-fill on floor 33. revising the relocation sequence per sffd pre-app meeting; 6 smoke detectors have also been added on floor 33 for a draft stop, 2 modules added for sprinklers additions on floor 33; and 6 smoke detectors are relocated on | $9,840 |
| Nov 8, 2023 | Never finaled issued Nov 2023, no final | 415 Mission St | Ayoob & Peery Plumbing Co Inc | 33/f, 34/f,35/f: tie in new prv control values to e) standpipes for job 23-639. stair fire sprinklers, upsize stairway sprinkler supply to 3" for hydrotic design. add hangers & bracing to conform w/ nfpa standard. ref bpa#202309156685.Details
33/f, 34/f,35/f: tie in new prv control values to e) standpipes for job 23-639. stair fire sprinklers, upsize stairway sprinkler supply to 3" for hydrotic design. add hangers & bracing to conform w/ nfpa standard. ref bpa#202309156685. | $3,727 |
| Oct 11, 2023 | Never finaled issued Oct 2023, no final | 415 Mission St | Bcci Construction Company | 34th fl: small alternation to include a broadcast studio video editing and presentation space, prject will include non load bearing partitions, mep defferred. structural drawings included.Details
34th fl: small alternation to include a broadcast studio video editing and presentation space, prject will include non load bearing partitions, mep defferred. structural drawings included. | $150,000 |
| Oct 11, 2023 | Expired or cancelled withdrawn Feb 2024 | 415 Mission St | Gci, Inc | 16th floor: partial floor commercial office tenant improvement on floor 16. conversion of an (e) game room to a secure area including an entry, work room and to safe/secture room. selective demo, new construction of partitions, ceiling finishes. minor structural for requipment bracing.Details
16th floor: partial floor commercial office tenant improvement on floor 16. conversion of an (e) game room to a secure area including an entry, work room and to safe/secture room. selective demo, new construction of partitions, ceiling finishes. minor structural for requipment bracing. | $350,000 |
| Sep 15, 2023 | Never finaled issued Sep 2023, no final | 415 Mission St | Bcci Construction Company | 31/f & 32/f: minor ti demo and patch work, noting changes to smoke control as a result of the removal of stairs on l32 and l33.Details
31/f & 32/f: minor ti demo and patch work, noting changes to smoke control as a result of the removal of stairs on l32 and l33. | $200,000 |
| Sep 15, 2023 | Never finaled issued Sep 2023, no final | 415 Mission St | Bcci Construction Company | 33/f, 34/f & 35/f: final conditions permit noting changes in smoke control as result of the (e) convenience stair being removed from l32-l33 and l33 slab infill uner pa# 202306230736.Details
33/f, 34/f & 35/f: final conditions permit noting changes in smoke control as result of the (e) convenience stair being removed from l32-l33 and l33 slab infill uner pa# 202306230736. | $200,000 |
| Aug 24, 2023 | Completed final sign-off Aug 2024 | 415 Mission St | Gci, Inc | re-fit of the mep systems on level 5 to provide 24/7 cooling and ventilation to a "go center" new rearranged electrical circuitsDetails
re-fit of the mep systems on level 5 to provide 24/7 cooling and ventilation to a "go center" new rearranged electrical circuits | $400,000 |
| Jun 23, 2023 | Never finaled issued Jul 2023, no final | 415 Mission St | Bcci Construction Company | 31/f & 32/f: demo only of (e) convenience stair. 31/f & 32/f to remain unoccupied. convenience stairs @ levels 33, 34 & 35 to remain. new structural infill of stair opening on 32nd and 33rd floor. mechanical page included.Details
31/f & 32/f: demo only of (e) convenience stair. 31/f & 32/f to remain unoccupied. convenience stairs @ levels 33, 34 & 35 to remain. new structural infill of stair opening on 32nd and 33rd floor. mechanical page included. | $200,000 |
| Jun 23, 2023 | Completed final sign-off Nov 2023 | 415 Mission St | Ayoob & Peery Plumbing Co Inc | 31/f: add (6) fire sprinker per ti; 32/f add (6) sprinklers per ti. remove exsiting sprinklers and piping beneath stairs to be demolished. job#: 23-639. pa#: 202306230736Details
31/f: add (6) fire sprinker per ti; 32/f add (6) sprinklers per ti. remove exsiting sprinklers and piping beneath stairs to be demolished. job#: 23-639. pa#: 202306230736 | $7,453 |
| Jun 12, 2023 | Completed final sign-off Jul 2025 | 415 Mission St | Hathaway Dinwiddie Co. | 44 flr and 45 flr: construct temporary 2hr rated partitions and access doors. demo a non-egress interconnecting staircase and infill structure slab. includes ceiling finish and mepDetails
44 flr and 45 flr: construct temporary 2hr rated partitions and access doors. demo a non-egress interconnecting staircase and infill structure slab. includes ceiling finish and mep | $122,000 |
| May 18, 2023 | Completed final sign-off Jul 2023 | 415 Mission St | Siemens Industry, Inc. | 51/f: remodel for "scotiabank", (4) speaker/strobes added, (2) speaker strobes relocated. ref bpa#202302232469Details
51/f: remodel for "scotiabank", (4) speaker/strobes added, (2) speaker strobes relocated. ref bpa#202302232469 | $3,844 |
| May 4, 2023 | Completed final sign-off Aug 2023 | 415 Mission St | Siemens Industry, Inc. | 18/f: remove fan coil unit module from 43/f to add new on 18/f for unit fcu 18-3. no ref bpa#Details
18/f: remove fan coil unit module from 43/f to add new on 18/f for unit fcu 18-3. no ref bpa# | $600 |
| Apr 12, 2023 | Never finaled issued Apr 2023, no final | 415 Mission St | Ayoob & Peery Plumbing Co Inc | 51/f: add 2 and relocate 20 fire sprinkler heads per t.i. 202302232469Details
51/f: add 2 and relocate 20 fire sprinkler heads per t.i. 202302232469 | $13,664 |
| Feb 23, 2023 | Completed final sign-off Aug 2023 | 415 Mission St | Gci, Inc | 51st fl: scope of work includes demo of partitions and new construction of interior buildout of approximately 2250 usf. no sructural work included in scope, no increase in area no change in occupancy or use 51st floorDetails
51st fl: scope of work includes demo of partitions and new construction of interior buildout of approximately 2250 usf. no sructural work included in scope, no increase in area no change in occupancy or use 51st floor | $600,000 |
| Dec 22, 2022 | Expired or cancelled cancelled Jan 2026 | 415 Mission St | project scope to convert (e) mens & womens restrooms on floor 49 to all-gender restrooms. restrooms will be in full compliance with accessibility requirements. plumbing fixture counts are un-changed, re-work of plumbing, (n) partitions, (n) signage.Details
project scope to convert (e) mens & womens restrooms on floor 49 to all-gender restrooms. restrooms will be in full compliance with accessibility requirements. plumbing fixture counts are un-changed, re-work of plumbing, (n) partitions, (n) signage. | $75,000 | |
| Sep 21, 2022 | Never finaled issued Sep 2022, no final | 101 01st St | Eco Fire Sprinklers Inc | as built for pa# 201905231550. add 2 sprinklers in area of work for t.i. at 1st fl. ref pa# 201811145879.Details
as built for pa# 201905231550. add 2 sprinklers in area of work for t.i. at 1st fl. ref pa# 201811145879. | $1,000 |
| Aug 22, 2022 | Never finaled issued Aug 2022, no final | 415 Mission St | Bcci Construction Company | 45th floor - new pre-fab phone booth structural calcs included.Details
45th floor - new pre-fab phone booth structural calcs included. | $25,000 |
| Aug 4, 2022 | Completed final sign-off Jun 2023 | 415 Mission St | Skyline Construction | 55/f: non-structural glass partition removal. mep's, ls, spr deferred if needed, submitted separately.Details
55/f: non-structural glass partition removal. mep's, ls, spr deferred if needed, submitted separately. | $80,000 |
| May 19, 2022 | Completed final sign-off Jun 2022 | 101 01st St | Hathaway Dinwiddie Co. | space p1: to obtain final inspection for work approved under pa201901291468. all work is complete.Details
space p1: to obtain final inspection for work approved under pa201901291468. all work is complete. | |
| May 19, 2022 | Completed final sign-off Nov 2022 | 101 01st St | Hathaway Dinwiddie Co. | space p1: to obtain final inspection for work approved under pa201811145879. all work is complete.Details
space p1: to obtain final inspection for work approved under pa201811145879. all work is complete. | |
| May 19, 2022 | Completed final sign-off Jun 2022 | 101 01st St | Hathaway Dinwiddie Co. | space p1: to obtain final inspection for work approved under pa202008222394. all work is complete.Details
space p1: to obtain final inspection for work approved under pa202008222394. all work is complete. | |
| May 19, 2022 | Expired or cancelled cancelled Jun 2022 | 415 Mission St | Hathaway Dinwiddie Co. | space p1: to obtain final inspection for work approved under pa202104158696. all work is complete.Details
space p1: to obtain final inspection for work approved under pa202104158696. all work is complete. | |
| Dec 30, 2021 | Completed final sign-off Jul 2022 | 415 Mission St | Novo Construction Inc | renew for final 201805300420, 201812107845Details
renew for final 201805300420, 201812107845 | |
| Dec 30, 2021 | Completed final sign-off Jul 2022 | 415 Mission St | renew for final 201805148963, 201805300425, 201806050987Details
renew for final 201805148963, 201805300425, 201806050987 | ||
| Dec 30, 2021 | Completed final sign-off Jul 2022 | 415 Mission St | Novo Construction Inc | renew for final 201812198693, 2018121986595. all work is complete.Details
renew for final 201812198693, 2018121986595. all work is complete. | |
| Oct 29, 2021 | Completed final sign-off Jan 2022 | 415 Mission St | Skyline Construction | 50/f to obtain a final inspection for work approved under pa 201806273080 & 2021808278382. all work is complete.Details
50/f to obtain a final inspection for work approved under pa 201806273080 & 2021808278382. all work is complete. | |
| Oct 29, 2021 | Completed final sign-off Jan 2022 | 415 Mission St | Skyline Construction | 55/f :to obtain a final inspection for work approved under pa 201811054977 & 201808278383. all work is complete.Details
55/f :to obtain a final inspection for work approved under pa 201811054977 & 201808278383. all work is complete. | |
| Aug 16, 2021 | Completed final sign-off Sep 2021 | 415 Mission St | Siemens Industry, Inc. | 37/f: fire only work for as built permit associated with the phase 3 remodel for "wework" on floor 37.Details
37/f: fire only work for as built permit associated with the phase 3 remodel for "wework" on floor 37. | |
| Aug 12, 2021 | Completed final sign-off Sep 2021 | 415 Mission St | Siemens Industry, Inc. | 38th fl - fire only work for an as-built permit associated with phase 3 remodel for "wework"Details
38th fl - fire only work for an as-built permit associated with phase 3 remodel for "wework" | |
| Jul 26, 2021 | Never finaled issued Aug 2021, no final | 415 Mission St | Skyline Construction | to obtain final inspection for work approved under pa# 201705176810, 201705176807, and 201705176809. all work is completed.Details
to obtain final inspection for work approved under pa# 201705176810, 201705176807, and 201705176809. all work is completed. | |
| Jul 26, 2021 | Never finaled issued Aug 2021, no final | 415 Mission St | Skyline Construction | to obtain final inspection for work approved under pa# 201804307753, 201805088456 and 201802272306. all work is completed.Details
to obtain final inspection for work approved under pa# 201804307753, 201805088456 and 201802272306. all work is completed. | |
| Jun 2, 2021 | Completed final sign-off Jul 2021 | 415 Mission St | Dome Construction Corp | floors 36/37/38: rev to pa201806121688 & 202002184644 - (n) door release at doors with card readers. new ada compliant sliding door levers. maher n/aDetails
floors 36/37/38: rev to pa201806121688 & 202002184644 - (n) door release at doors with card readers. new ada compliant sliding door levers. maher n/a | $1,000 |
| May 11, 2021 | Completed final sign-off Sep 2021 | 415 Mission St | Dome Construction Corp | adding initiating & notification appliances in the partial floor space to conform to the new floor plan layout. existing smoke control system will not be altered.Details
adding initiating & notification appliances in the partial floor space to conform to the new floor plan layout. existing smoke control system will not be altered. | $15,000 |
| May 10, 2021 | Completed final sign-off Sep 2021 | 415 Mission St | Dome Construction Corp | adding initiating & notification appliances in the partial floor space to conform to the new floor plan layout. existing smoke control system will not be altered.Details
adding initiating & notification appliances in the partial floor space to conform to the new floor plan layout. existing smoke control system will not be altered. | |
| Apr 20, 2021 | Completed final sign-off Jul 2021 | 415 Mission St | Edison Fire Extinguisher Company Inc | installation of ul 300 hood and duct fire system piranha systemDetails
installation of ul 300 hood and duct fire system piranha system | $12,000 |
| Apr 15, 2021 | Completed final sign-off Aug 2021 | 415 Mission St | Garnett Signs Llc | evacuation maps (4); 49th floorDetails
evacuation maps (4); 49th floor | $2,000 |
| Apr 15, 2021 | Completed final sign-off Jun 2021 | 415 Mission St | Siemens Industry, Inc. | fire only work for the "dumbwaiter" area on level 1 and parking level 1; additions are 1 duct detector, 2 modules, and 2 speaker/strobes.Details
fire only work for the "dumbwaiter" area on level 1 and parking level 1; additions are 1 duct detector, 2 modules, and 2 speaker/strobes. | $3,850 |
| Apr 14, 2021 | Completed final sign-off Jul 2021 | 415 Mission St | Dome Construction Corp | to obtain final inspection for work approved under permit application(s): 201805088541; 201811014759; 201811014753.Details
to obtain final inspection for work approved under permit application(s): 201805088541; 201811014759; 201811014753. | $15,600 |
| Apr 5, 2021 | Completed final sign-off Jul 2021 | 415 Mission St | Dome Construction Corp | to obtain final inspection for work approved under permit application# 201910215030: 201909272893.Details
to obtain final inspection for work approved under permit application# 201910215030: 201909272893. | |
| Apr 5, 2021 | Completed final sign-off Jul 2021 | 415 Mission St | Dome Construction Corp | to obtain final inspection for work approved under permit application# 201801199077.Details
to obtain final inspection for work approved under permit application# 201801199077. | $30,000 |
| Apr 5, 2021 | Completed final sign-off Jul 2021 | 415 Mission St | Dome Construction Corp | to obtain final inspection for work approved under permit application(s): 201808288555: 201801088085: 201712277415.Details
to obtain final inspection for work approved under permit application(s): 201808288555: 201801088085: 201712277415. | $1,000 |
| Apr 5, 2021 | Completed final sign-off Jul 2021 | 415 Mission St | Dome Construction Corp | to obtain final inspection for work approved under permit application(s): 201811014758: 201802090939: 201804247247.Details
to obtain final inspection for work approved under permit application(s): 201811014758: 201802090939: 201804247247. | |
| Apr 5, 2021 | Completed final sign-off Jul 2021 | 415 Mission St | Dome Construction Corp | to obtain final inspection for work approved under permit application # 201808288554: 201712277416.Details
to obtain final inspection for work approved under permit application # 201808288554: 201712277416. | $1,000 |
| Apr 2, 2021 | Completed final sign-off Jul 2021 | 415 Mission St | Dome Construction Corp | to obtain final inspection for work approved under permit no(s): 201808288551: 201805088538: 201802090935: all work is completed.Details
to obtain final inspection for work approved under permit no(s): 201808288551: 201805088538: 201802090935: all work is completed. | $1,000 |
| Mar 25, 2021 | Completed final sign-off Sep 2021 | 415 Mission St | Dome Construction Corp | 37/f & 38/f: rev to pa202012181350 - revise damper matix on sheet m-900. maher n/a.Details
37/f & 38/f: rev to pa202012181350 - revise damper matix on sheet m-900. maher n/a. | |
| Mar 11, 2021 | Completed final sign-off Jul 2021 | 415 Mission St | Siemens Industry, Inc. | revised life safety drawings to reflect smoke control sequence of operation to match the originally approved matrix by sffd plan check. these drawings are for the upper floors of the building to floor 61. no ref. building permit or any new devices.Details
revised life safety drawings to reflect smoke control sequence of operation to match the originally approved matrix by sffd plan check. these drawings are for the upper floors of the building to floor 61. no ref. building permit or any new devices. | |
| Dec 29, 2020 | Completed final sign-off Jul 2021 | 415 Mission St | provide fire sprinkler supply to piranha system per pre-approval letter signed by jon corbett.Details
provide fire sprinkler supply to piranha system per pre-approval letter signed by jon corbett. | $5,800 | |
| Dec 21, 2020 | Completed final sign-off Sep 2021 | 415 Mission St | replace yagi antenna & program bdaDetails
replace yagi antenna & program bda | ||
| Dec 18, 2020 | Completed final sign-off Sep 2021 | 415 Mission St | Dome Construction Corp | revision to pa #2018-0625-2845: update to the smoke control narrative per pre-application meeting confirmation.Details
revision to pa #2018-0625-2845: update to the smoke control narrative per pre-application meeting confirmation. | |
| Dec 15, 2020 | Never finaled issued Feb 2021, no final | 415 Mission St | Siemens Industry, Inc. | fire alarm addition of 1 speaker/strobe for the corridor expansion on floor 51; ref. permit # 2020 0905 3559Details
fire alarm addition of 1 speaker/strobe for the corridor expansion on floor 51; ref. permit # 2020 0905 3559 | $635 |
| Dec 8, 2020 | Never finaled issued Jan 2021, no final | 415 Mission St | Ayoob & Peery Plumbing Co Inc | 51st floor: add (4) and relocate five (5) sprinklers to conform with the wall/ceiling layout of the tenant improvement.Details
51st floor: add (4) and relocate five (5) sprinklers to conform with the wall/ceiling layout of the tenant improvement. | $3,225 |
| Nov 24, 2020 | Completed final sign-off Jul 2021 | 415 Mission St | Siemens Industry, Inc. | revised life safety drawings to reflect smoke control sequence of operation to match the originally approved matrix by sffd plan check. these drawings are for floors 7 through 43. no reference fuilding permit or any new devices.Details
revised life safety drawings to reflect smoke control sequence of operation to match the originally approved matrix by sffd plan check. these drawings are for floors 7 through 43. no reference fuilding permit or any new devices. | |
| Oct 22, 2020 | Completed final sign-off Jan 2022 | 415 Mission St | Hathaway Dinwiddie Co. | update plumbing documents per discussions with city plumbing department and on-site conditions. ref pa # 201802050382. permit revision # 3 submission.Details
update plumbing documents per discussions with city plumbing department and on-site conditions. ref pa # 201802050382. permit revision # 3 submission. | |
| Oct 20, 2020 | Never finaled issued Dec 2020, no final | 101 01st St | updates to tenant smoke control matrices (phase 2) for record on floors p1 thru 1, 3-6, 31-35, 44-61. see drawing reference list for applicable permits #'s. maher n/a.Details
updates to tenant smoke control matrices (phase 2) for record on floors p1 thru 1, 3-6, 31-35, 44-61. see drawing reference list for applicable permits #'s. maher n/a. | ||
| Oct 20, 2020 | Completed final sign-off Jun 2021 | 415 Mission St | Siemens Industry, Inc. | fire only additions of 1 strobe power supply, 3 speaker/strobes, and 6 modules for fan and fsd control/monitoring, at parking levels p2 and p3, for the "blackwater" remodel.Details
fire only additions of 1 strobe power supply, 3 speaker/strobes, and 6 modules for fan and fsd control/monitoring, at parking levels p2 and p3, for the "blackwater" remodel. | $6,480 |
| Oct 14, 2020 | Completed final sign-off Jul 2021 | 415 Mission St | Siemens Industry, Inc. | revise life safety drawings to reflect smoke control sequence of operations to match the originally approved matrix by sffd plan check; no reference building permit or new devices.Details
revise life safety drawings to reflect smoke control sequence of operations to match the originally approved matrix by sffd plan check; no reference building permit or new devices. | |
| Sep 30, 2020 | Expired or cancelled cancelled Nov 2024 | 415 Mission St | Dome Construction Corp | rev to pa# 201806121688 - partial demo of interior partitions, installation of new partitions new finishes throughout, paint and floor coverings installation of card readers at various locations, changes in egress path, mech rewiring deffusers and addition of transfer grills, mech e fixturesDetails
rev to pa# 201806121688 - partial demo of interior partitions, installation of new partitions new finishes throughout, paint and floor coverings installation of card readers at various locations, changes in egress path, mech rewiring deffusers and addition of transfer grills, mech e fixtures | |
| Sep 23, 2020 | Completed final sign-off Nov 2021 | 101 01st St | Acco Engineered Systems Inc. Dba Acco En | install (n) auxillary chiller on (e) maintenance pad in chiller room.Details
install (n) auxillary chiller on (e) maintenance pad in chiller room. | $40,000 |
| Sep 5, 2020 | Never finaled filed Sep 2020, never issued | 415 Mission St | Gci, Inc | 51/f: t.i. new finishes, floors, walls & ceiling, mechanical & electricalDetails
51/f: t.i. new finishes, floors, walls & ceiling, mechanical & electrical | $150,000 |
| Aug 25, 2020 | Never finaled issued Sep 2020, no final | 101 01st St | updated smoke control matrices, phase 1. for record perposes on floors 7-30 and 39-43 ref list of applicable permits + application numbers.Details
updated smoke control matrices, phase 1. for record perposes on floors 7-30 and 39-43 ref list of applicable permits + application numbers. | ||
| Aug 22, 2020 | Completed final sign-off Jun 2022 | 101 01st St | Hathaway Dinwiddie Co. | revision to pa #201901291468. revision include deletion of antipipated trash chute enclosure and slab penetration at level 1. deletion of trash room & teannt storage room at level p1. scope of work reduction.Details
revision to pa #201901291468. revision include deletion of antipipated trash chute enclosure and slab penetration at level 1. deletion of trash room & teannt storage room at level p1. scope of work reduction. | |
| Aug 14, 2020 | Never finaled issued Aug 2020, no final | 415 Mission St | Golden Gate Fire Protection Inc | level p3 and p2: fire sprinklers: relocate 9 upright sprinklers on parking level p3 for new water tanks. relocate 4 upright sprinklers on parking level p2 for new water tanks. ref app#202001293057Details
level p3 and p2: fire sprinklers: relocate 9 upright sprinklers on parking level p3 for new water tanks. relocate 4 upright sprinklers on parking level p2 for new water tanks. ref app#202001293057 | $6,825 |
| Aug 7, 2020 | Expired or cancelled cancelled Jan 2026 | 101 01st St | True North Signs & Graphic Services | install (4) evacuation plaques interior to the building on 17/f (not visible from exterior).Details
install (4) evacuation plaques interior to the building on 17/f (not visible from exterior). | $1,400 |
| Jul 9, 2020 | Completed final sign-off Aug 2020 | 415 Mission St | revision to app#201904026857. scope of work reduced from 93 pendent and 3 dry pendent to 45 pendent semi recess 34 pendent on exposed pipe and 3 dry pendent 82 total. previous permit included for referance #202002184644Details
revision to app#201904026857. scope of work reduced from 93 pendent and 3 dry pendent to 45 pendent semi recess 34 pendent on exposed pipe and 3 dry pendent 82 total. previous permit included for referance #202002184644 | ||
| May 22, 2020 | Never finaled issued Jun 2020, no final | 415 Mission St | updates to the smoke controle matrices for record purposes reference original site permit pa201303132080. maher n/a.Details
updates to the smoke controle matrices for record purposes reference original site permit pa201303132080. maher n/a. | ||
| May 14, 2020 | Completed final sign-off Jul 2020 | 415 Mission St | Hathaway Dinwiddie Co. | comply with planning case 2019020896 enf. remove illegally installed "salesforce" graphic sign under gondolaDetails
comply with planning case 2019020896 enf. remove illegally installed "salesforce" graphic sign under gondola | |
| Mar 4, 2020 | Completed final sign-off Apr 2020 | 415 Mission St | Golden Gate Fire Protection Inc | 52nd, 53rd, & 54th floors: fire sprinklers revision to app#202001232588.add 2 pendent sprinklers. ref app#201909161757Details
52nd, 53rd, & 54th floors: fire sprinklers revision to app#202001232588.add 2 pendent sprinklers. ref app#201909161757 | $1,000 |
| Feb 27, 2020 | Expired or cancelled cancelled Jan 2026 | 415 Mission St | Dome Construction Corp | 36th- 38th floor: revision to app#201806252845. adding of single duct smoke detector. adjustment of t-24 test (checklist, mech forms) requirements.Details
36th- 38th floor: revision to app#201806252845. adding of single duct smoke detector. adjustment of t-24 test (checklist, mech forms) requirements. | $1,000 |
| Feb 18, 2020 | Completed final sign-off Sep 2021 | 415 Mission St | Dome Construction Corp | revision to pa #201806252845, 37th fl (n) card reader at scrubber; 38th fl wellness redesigned to office; partitions and ceilings, installation of card readers, duct rerouting and electrical/lighting reconfiguration. maher naDetails
revision to pa #201806252845, 37th fl (n) card reader at scrubber; 38th fl wellness redesigned to office; partitions and ceilings, installation of card readers, duct rerouting and electrical/lighting reconfiguration. maher na | $476,032 |
| Feb 13, 2020 | Completed final sign-off Jul 2021 | 415 Mission St | Firemaster | furnish and install 1 ansul r102 fire suppression system in the pollution control unitDetails
furnish and install 1 ansul r102 fire suppression system in the pollution control unit | $7,000 |
| Feb 13, 2020 | Never finaled issued Feb 2020, no final | 415 Mission St | Siemens Industry, Inc. | ref pa# 201908060835; fire alarm work for the "covington" remodel on floor 51; additions are 2 smoke detectors, 1 strobe power supply, 1 module, 12 speaker/strobes, and 1 strobe n/a maherDetails
ref pa# 201908060835; fire alarm work for the "covington" remodel on floor 51; additions are 2 smoke detectors, 1 strobe power supply, 1 module, 12 speaker/strobes, and 1 strobe n/a maher | $11,500 |
| Feb 10, 2020 | Completed final sign-off Feb 2021 | 415 Mission St | Siemens Industry, Inc. | 52nd - 54th fl - fire alarm work for the "covington" remodels. 4 speakers are added, 3 speakers are relocated & 5 speaker/strobes are relocated. ref pa 2019-0318-5447Details
52nd - 54th fl - fire alarm work for the "covington" remodels. 4 speakers are added, 3 speakers are relocated & 5 speaker/strobes are relocated. ref pa 2019-0318-5447 | $5,070 |
| Jan 29, 2020 | Completed final sign-off Jan 2022 | 101 01st St | Hathaway Dinwiddie Co. | revision to pa #2018-0205-0382 for black water treatment systems. updates include but not limited to equipment relocation coordination. minor tank height & revise tank water proofingDetails
revision to pa #2018-0205-0382 for black water treatment systems. updates include but not limited to equipment relocation coordination. minor tank height & revise tank water proofing | |
| Jan 23, 2020 | Completed final sign-off Apr 2020 | 415 Mission St | Golden Gate Fire Protection Inc | ref pa# 201909161757; fire sprinklers; relocate 6 pendent sprinklers on the 52nd fl. relocate 9 upright sprinklers and 5 pendents on the 53rd fl. relocate 9 upright sprinkler and 4 penent on 54th fl.Details
ref pa# 201909161757; fire sprinklers; relocate 6 pendent sprinklers on the 52nd fl. relocate 9 upright sprinklers and 5 pendents on the 53rd fl. relocate 9 upright sprinkler and 4 penent on 54th fl. | $15,500 |
| Jan 8, 2020 | Never finaled issued Jan 2020, no final | 415 Mission St | Siemens Industry, Inc. | 45th fl - fire alarm work for the "salesforce" remodel. additions are 2 smoke detectors, 6 duct detectors, 5 modules, 1 strobe power supply, and 17 speaker/strobes. ref pa 2019-0718-6243Details
45th fl - fire alarm work for the "salesforce" remodel. additions are 2 smoke detectors, 6 duct detectors, 5 modules, 1 strobe power supply, and 17 speaker/strobes. ref pa 2019-0718-6243 | $25,160 |
| Jan 2, 2020 | Never finaled issued Jan 2020, no final | 101 01st St | Pribuss Engineering Inc | ref pa# 201901170631; suite 01-51: fire sprinkler t.i. on 1 st fl. total add sprnkler (3), total rl changed out to pendent (21), total rl pendent (6), total add pendent (20),Details
ref pa# 201901170631; suite 01-51: fire sprinkler t.i. on 1 st fl. total add sprnkler (3), total rl changed out to pendent (21), total rl pendent (6), total add pendent (20), | $25,700 |
| Dec 23, 2019 | Never finaled issued Dec 2019, no final | 415 Mission St | Siemens Industry, Inc. | ref pa# 201806121688; fire alarm rev work for the "wework" remodels on floors 37 & 38; 3 beam detector emitters are relocated on floor 37.2 emitters are relocated and another is removed on floor 38, as well as a moduel additon on this floorDetails
ref pa# 201806121688; fire alarm rev work for the "wework" remodels on floors 37 & 38; 3 beam detector emitters are relocated on floor 37.2 emitters are relocated and another is removed on floor 38, as well as a moduel additon on this floor | $500 |
| Dec 12, 2019 | Completed final sign-off Feb 2020 | 415 Mission St | Golden Gate Fire Protection Inc | ref pa# 20111147306; 51st fl; fire sprinklers relocate 58 pendent sprinklers on the 51st fl.Details
ref pa# 20111147306; 51st fl; fire sprinklers relocate 58 pendent sprinklers on the 51st fl. | $30,500 |
| Dec 6, 2019 | Completed final sign-off Feb 2020 | 415 Mission St | Golden Gate Fire Protection Inc | 45th floor. fire sprinkler; as-built to permit # 2019-1025-5595Details
45th floor. fire sprinkler; as-built to permit # 2019-1025-5595 | $1,000 |
| Nov 25, 2019 | Completed final sign-off Apr 2021 | 415 Mission St | Siemens Industry, Inc. | 37th fl - fire alarm work for "wework" phase 2 remodel. additions are 2 beam detectors, 10 duct detectors, 7 modules, and 16 speaker/strobes. ref pa 2018-0612-1688Details
37th fl - fire alarm work for "wework" phase 2 remodel. additions are 2 beam detectors, 10 duct detectors, 7 modules, and 16 speaker/strobes. ref pa 2018-0612-1688 | $30,200 |
| Nov 25, 2019 | Never finaled issued Nov 2019, no final | 415 Mission St | Siemens Industry, Inc. | 38th fl - fire alarm work for the "we work" phase 2 remodl. additions are 1 beam detector, 4 smoke detectors, 5 duct detectors, 18 modules, and 4 speaker/strobes. ref pa 2018-0612-1688Details
38th fl - fire alarm work for the "we work" phase 2 remodl. additions are 1 beam detector, 4 smoke detectors, 5 duct detectors, 18 modules, and 4 speaker/strobes. ref pa 2018-0612-1688 | $22,600 |
| Nov 22, 2019 | Completed final sign-off Apr 2021 | 415 Mission St | Siemens Industry, Inc. | fire alarm work for the "wework" remodel on floor 36; additions are 1 smoke detector, 8 duct detectors, 9 modules, and 8 speaker/strobes. ref pa #201806121688Details
fire alarm work for the "wework" remodel on floor 36; additions are 1 smoke detector, 8 duct detectors, 9 modules, and 8 speaker/strobes. ref pa #201806121688 | $22,390 |
| Nov 21, 2019 | Completed final sign-off Feb 2020 | 415 Mission St | Siemens Industry, Inc. | 51st fl - fire alarm for the "scotiabank" remodel; additions are 2 smoke detectors, 3 duct detecotrs, 10 modules and 18 speaker/strobes. ref pa 2019-0124-4198Details
51st fl - fire alarm for the "scotiabank" remodel; additions are 2 smoke detectors, 3 duct detecotrs, 10 modules and 18 speaker/strobes. ref pa 2019-0124-4198 | $22,455 |
| Nov 20, 2019 | Completed final sign-off Dec 2019 | 101 01st St | Hathaway Dinwiddie Co. | 62nd flr: revision to pa# 2018-0323-4520 - update energy code compliance formsDetails
62nd flr: revision to pa# 2018-0323-4520 - update energy code compliance forms | |
| Nov 14, 2019 | Completed final sign-off Mar 2020 | 415 Mission St | Gci, Inc | 51st floor: revision to pa #2019-0124-1198 & #2019-0806-8035 - addition of fsd's & clarification regarding dfh assembliesDetails
51st floor: revision to pa #2019-0124-1198 & #2019-0806-8035 - addition of fsd's & clarification regarding dfh assemblies | $1,000 |
| Nov 6, 2019 | Never finaled issued Nov 2019, no final | 415 Mission St | Gci, Inc | mechanical smoke control matrix. ref pa201901241198 & 201908068035Details
mechanical smoke control matrix. ref pa201901241198 & 201908068035 | |
| Nov 1, 2019 | Completed final sign-off Nov 2019 | 415 Mission St | Huey Const Mngmt Co Inc - Dba M H Const. | demo repair access door and ceiling. plumbing shutoff valve, elec leak sensor sep permitDetails
demo repair access door and ceiling. plumbing shutoff valve, elec leak sensor sep permit | $3,000 |
| Oct 30, 2019 | Completed final sign-off Jul 2021 | 101 01st St | Clark/Hathaway Dinwiddie A Joint Venture | to obtain final inspection for work approved under pa#201303132080. all work is completeDetails
to obtain final inspection for work approved under pa#201303132080. all work is complete | |
| Oct 30, 2019 | Never finaled issued Oct 2019, no final | 415 Mission St | Hathaway Dinwiddie Co. | revision to 201907186243, revised millwork detail for led tile walls. revised mech controls maher not reqDetails
revision to 201907186243, revised millwork detail for led tile walls. revised mech controls maher not req | $10,000 |
| Oct 25, 2019 | Completed final sign-off Mar 2020 | 415 Mission St | Golden Gate Fire Protection Inc | 45/f: install fire sprinkler system, relocate 60 pendent sprinklers; add 2 uprights. ref t.i. pa#201907186243. maher n/a.Details
45/f: install fire sprinkler system, relocate 60 pendent sprinklers; add 2 uprights. ref t.i. pa#201907186243. maher n/a. | $8,400 |
| Oct 21, 2019 | Completed final sign-off Mar 2020 | 415 Mission St | Siemens Industry, Inc. | fire alrm work for the opening of the elevator lobbies on floor 3,4,6 additions are 2 smoke detectors on floor 6, 3 2 way comm call stations, reprogramming of smoke detectors floor 3 and 4Details
fire alrm work for the opening of the elevator lobbies on floor 3,4,6 additions are 2 smoke detectors on floor 6, 3 2 way comm call stations, reprogramming of smoke detectors floor 3 and 4 | $4,200 |
| Oct 21, 2019 | Expired or cancelled expired Jul 2021 | 415 Mission St | Dome Construction Corp | 36th through 38th floors: revision to app#201806121688. addition of shell/core system smoke detectors. misc rfi's(non code items)Details
36th through 38th floors: revision to app#201806121688. addition of shell/core system smoke detectors. misc rfi's(non code items) | |
| Sep 27, 2019 | Expired or cancelled expired Jul 2021 | 415 Mission St | Dome Construction Corp | revision to pa 201806121688. 36th-38th flrs. modifications to ti smoke control matrixDetails
revision to pa 201806121688. 36th-38th flrs. modifications to ti smoke control matrix | |
| Sep 19, 2019 | Never finaled issued Sep 2019, no final | 415 Mission St | streetspace | ||
| Sep 16, 2019 | Completed final sign-off Apr 2021 | 415 Mission St | Gci, Inc | revision to 201809119776: minor changes to existing office space. finishes, lighting, elevator lobby includes mechanical/electrical plans.Details
revision to 201809119776: minor changes to existing office space. finishes, lighting, elevator lobby includes mechanical/electrical plans. | $10,000 |
| Sep 16, 2019 | Completed final sign-off Apr 2021 | 415 Mission St | Gci, Inc | revision to 201901231054, 201903044294 minor changes to e office space 52-54. includes mechanical/electrical plans.Details
revision to 201901231054, 201903044294 minor changes to e office space 52-54. includes mechanical/electrical plans. | $15,000 |
| Sep 4, 2019 | Never finaled issued Oct 2019, no final | 101 01st St | Dome Construction Corp | revision to app#201901170631. includes new exterior entry ramp. new ceiling and wall installations added to cafe and bar area. n/a for maherDetails
revision to app#201901170631. includes new exterior entry ramp. new ceiling and wall installations added to cafe and bar area. n/a for maher | |
| Sep 3, 2019 | Completed final sign-off Jun 2025 | 415 Mission St | Bcci Construction Company | 34th fl - revision to remove maker lab and all product conveying exhaust equipment. new room shall be used as display space. ref pa 2017-0913-7868, 2017-1011-0893, 2018-0508-8484 and 2018-0118-8890Details
34th fl - revision to remove maker lab and all product conveying exhaust equipment. new room shall be used as display space. ref pa 2017-0913-7868, 2017-1011-0893, 2018-0508-8484 and 2018-0118-8890 | $40,000 |
| Aug 23, 2019 | Completed final sign-off Oct 2019 | 415 Mission St | Golden Gate Fire Protection Inc | fire sprinklers relocate 48 pendent sprinklers and 6 uprights on the 51st flDetails
fire sprinklers relocate 48 pendent sprinklers and 6 uprights on the 51st fl | $28,350 |
| Aug 9, 2019 | Expired or cancelled expired Jun 2025 | 415 Mission St | Bcci Construction Company | to obtain final inspection for work approved under pa 201709229378. all work is complete.Details
to obtain final inspection for work approved under pa 201709229378. all work is complete. | |
| Aug 9, 2019 | Expired or cancelled expired Jun 2025 | 415 Mission St | Bcci Construction Company | to obtain final inspection for work approved under pa 2017-1129-5067. all work is complete.Details
to obtain final inspection for work approved under pa 2017-1129-5067. all work is complete. | |
| Aug 9, 2019 | Expired or cancelled expired Jun 2025 | 415 Mission St | Bcci Construction Company | to obtain final inspection for work approved under pa 2017-1011-0893. all work is complete.Details
to obtain final inspection for work approved under pa 2017-1011-0893. all work is complete. | |
| Aug 6, 2019 | Completed final sign-off Mar 2020 | 415 Mission St | Gci, Inc | interior buildout of approx 7991 sf deferred mep. to reduce scope of work from previously approved and issued permit. ref 201901241198. construction cost reduced fro 3,600,000 to $1,000,000 (john finnegan 08/07/2019)Details
interior buildout of approx 7991 sf deferred mep. to reduce scope of work from previously approved and issued permit. ref 201901241198. construction cost reduced fro 3,600,000 to $1,000,000 (john finnegan 08/07/2019) | |
| Aug 6, 2019 | Completed final sign-off Apr 2021 | 415 Mission St | Gci, Inc | 51st - 54th floor - egress stair upgrade to stair #1 & stair #2 only buff existing concrete floor, refresh paint; replace light fixtures, new drop ceiling, relocate sprinkler head in new drop ceilingDetails
51st - 54th floor - egress stair upgrade to stair #1 & stair #2 only buff existing concrete floor, refresh paint; replace light fixtures, new drop ceiling, relocate sprinkler head in new drop ceiling | $10,000 |
| Jul 31, 2019 | Completed final sign-off Sep 2020 | 415 Mission St | Hathaway Dinwiddie Co. | revised smk control report for floors 60 & 61 with fan damper matrix, programming notes and insp. ltr ref 201808288594Details
revised smk control report for floors 60 & 61 with fan damper matrix, programming notes and insp. ltr ref 201808288594 | |
| Jul 18, 2019 | Completed final sign-off Mar 2021 | 415 Mission St | Hathaway Dinwiddie Co. | 45th flr - interior ti for single tenant. non load nearing partitions, suspended systems, floor and wall finishes, casework, hvac, ele and plm.Details
45th flr - interior ti for single tenant. non load nearing partitions, suspended systems, floor and wall finishes, casework, hvac, ele and plm. | $900,000 |
| Jul 17, 2019 | Never finaled issued Jul 2019, no final | 415 Mission St | Aaa Restaurant Fire Control/Dba Aaa Fire | as built drawings for ref pa# 201901099875; to change note #6 to exhaust fan is to stay on and make up air must stay on per the bld. smoke control plan, upon fire system alterationsDetails
as built drawings for ref pa# 201901099875; to change note #6 to exhaust fan is to stay on and make up air must stay on per the bld. smoke control plan, upon fire system alterations | |
| Jul 5, 2019 | Completed final sign-off Sep 2019 | 415 Mission St | Siemens Industry, Inc. | fire alarm work for the "salesforce" remodel on floor 44; additions are 2 smoke detectors, 9 duct detectors, 1 strobe power supply, 2 modules, 11 speakers, and 47 speaker/strobes. ref pa #201901150410.Details
fire alarm work for the "salesforce" remodel on floor 44; additions are 2 smoke detectors, 9 duct detectors, 1 strobe power supply, 2 modules, 11 speakers, and 47 speaker/strobes. ref pa #201901150410. | $54,850 |
| Jul 5, 2019 | Completed final sign-off Sep 2019 | 415 Mission St | Siemens Industry, Inc. | fire alarm work for the "salesforce" remodel on floor 43; additions are 2 smoke detectors, 9 duct detectors, 1 strobe power supply, 5 modules, 11 speakers, and 47 speaker/strobes. ref pa #201901150409.Details
fire alarm work for the "salesforce" remodel on floor 43; additions are 2 smoke detectors, 9 duct detectors, 1 strobe power supply, 5 modules, 11 speakers, and 47 speaker/strobes. ref pa #201901150409. | $56,350 |
| Jul 5, 2019 | Completed final sign-off Sep 2019 | 415 Mission St | Siemens Industry, Inc. | fire alarm work for the "salesforce" remodel on floor 42; additions are 2 smoke detectors, 9 duct detectors, 1 strobe power supply, 3 modules, 11 speakers, and 47 speaker/strobes. ref pa #201901150407.Details
fire alarm work for the "salesforce" remodel on floor 42; additions are 2 smoke detectors, 9 duct detectors, 1 strobe power supply, 3 modules, 11 speakers, and 47 speaker/strobes. ref pa #201901150407. | $55,350 |
| Jun 17, 2019 | Completed final sign-off Jul 2019 | 415 Mission St | Siemens Industry, Inc. | 40th fl - fire alarm work for the "salesforce". additions are 2 smoke detectors, 9 duct detectors, 5 modules, 1 strobe power supply, 11 speakers and 49 speaker/strobes. ref pa 2018-1030-4546Details
40th fl - fire alarm work for the "salesforce". additions are 2 smoke detectors, 9 duct detectors, 5 modules, 1 strobe power supply, 11 speakers and 49 speaker/strobes. ref pa 2018-1030-4546 | $57,600 |
| Jun 17, 2019 | Completed final sign-off Jul 2019 | 415 Mission St | Siemens Industry, Inc. | 41st fl - fire alarm for the "salesforce" remodel. additions are 2 smoke detectors, 2 modules, 9 duct detectors, 1 strobe power supply, 11 speakers and 47 speaker/strobes. ref pa 2018-1030-4544Details
41st fl - fire alarm for the "salesforce" remodel. additions are 2 smoke detectors, 2 modules, 9 duct detectors, 1 strobe power supply, 11 speakers and 47 speaker/strobes. ref pa 2018-1030-4544 | $54,800 |
| Jun 13, 2019 | Completed final sign-off Jul 2019 | 415 Mission St | Siemens Industry, Inc. | fire alarm work for the "salesforce" remodel on floor 39; additions are 2 smoke detectors, 9 duct detectors, 1 strobe power supply, 2 modules, 11 speakers, and 47 speaker/strobes. ref pa #201810304547. maher naDetails
fire alarm work for the "salesforce" remodel on floor 39; additions are 2 smoke detectors, 9 duct detectors, 1 strobe power supply, 2 modules, 11 speakers, and 47 speaker/strobes. ref pa #201810304547. maher na | $54,800 |
| Jun 6, 2019 | Completed final sign-off Sep 2019 | 415 Mission St | Hathaway Dinwiddie Co. | revision to lighting controls on 60th & 61st floors. ref 2017121968551, 201712196849, 201804166394, 201804166392Details
revision to lighting controls on 60th & 61st floors. ref 2017121968551, 201712196849, 201804166394, 201804166392 | |
| Jun 5, 2019 | Completed final sign-off Aug 2019 | 415 Mission St | Siemens Industry, Inc. | fire alarm work for the management office remodel on floor 2, additions are 6 smoke detectors, 3 modules, 5 speaker strobes ref 201901089852. n/a for maher.Details
fire alarm work for the management office remodel on floor 2, additions are 6 smoke detectors, 3 modules, 5 speaker strobes ref 201901089852. n/a for maher. | $8,470 |
| May 31, 2019 | Expired or cancelled cancelled Jan 2026 | 415 Mission St | Bcci Construction Company | 34th - revision to pa 2018-0710-4088 new equipment for clean space, create space and shape space. revised smoke control report to reflect changes to equipmentDetails
34th - revision to pa 2018-0710-4088 new equipment for clean space, create space and shape space. revised smoke control report to reflect changes to equipment | $100,000 |
| May 24, 2019 | Completed final sign-off Sep 2020 | 415 Mission St | Golden Gate Fire Protection Inc | floors 42/43/44: fire sprinklers relocate 151 pendent sprinkers, 4 uprights 42nd fl. relocate 142 pendent sprinklers and 4 uprights 43rd fl relocate 149 pendent sprinkelrs and 3 upright on 44th fl. ti 2019011504107 43rd 201901150409, 44th 201901150410 maher not req.Details
floors 42/43/44: fire sprinklers relocate 151 pendent sprinkers, 4 uprights 42nd fl. relocate 142 pendent sprinklers and 4 uprights 43rd fl relocate 149 pendent sprinkelrs and 3 upright on 44th fl. ti 2019011504107 43rd 201901150409, 44th 201901150410 maher not req. | $237,825 |
| May 23, 2019 | Expired or cancelled cancelled Aug 2023 | 415 Mission St | Eco Fire Sprinklers Inc | as built for 201904238647 add 4 sprinkler in area of work for ti.Details
as built for 201904238647 add 4 sprinkler in area of work for ti. | |
| May 15, 2019 | Never finaled issued May 2019, no final | 415 Mission St | Gci, Inc | 2nd fl - transbay tower mechanical & electrical. install 3 new 4 pipe fan coil units. install low pr3essure duct work & hydronic piping. new lighting, power & signal. ref pa 2019-0108-9852Details
2nd fl - transbay tower mechanical & electrical. install 3 new 4 pipe fan coil units. install low pr3essure duct work & hydronic piping. new lighting, power & signal. ref pa 2019-0108-9852 | $200,000 |
| May 3, 2019 | Completed final sign-off Jun 2019 | 415 Mission St | fire srpinkler permit. relcoate 13, add 2 and delete 12 sprinkler on the 2nd floor. ref pa 2019-0108-9852Details
fire srpinkler permit. relcoate 13, add 2 and delete 12 sprinkler on the 2nd floor. ref pa 2019-0108-9852 | $4,000 | |
| Apr 23, 2019 | Never finaled issued Apr 2019, no final | 101 01st St | Eco Fire Sprinklers Inc | p1 & l1: add 4 sprinklers in area of work for tiDetails
p1 & l1: add 4 sprinklers in area of work for ti | $2,000 |
| Apr 8, 2019 | Expired or cancelled cancelled Jul 2021 | 415 Mission St | Dome Construction Corp | revision to 201806252845 spa only revision to finishes and spa construction material. n/a for maher.Details
revision to 201806252845 spa only revision to finishes and spa construction material. n/a for maher. | $1,000 |
| Apr 4, 2019 | Expired or cancelled cancelled Jul 2021 | 415 Mission St | Dome Construction Corp | deferred permit for installation of a floating floor/isolated slab on te 38th fl for a gym. ref original pa #201806252845.Details
deferred permit for installation of a floating floor/isolated slab on te 38th fl for a gym. ref original pa #201806252845. | $50,000 |
| Apr 3, 2019 | Completed final sign-off Sep 2020 | 415 Mission St | Hathaway Dinwiddie Co. | 43rd floor: rev to pa# 201901150409; for revisd communicating stair (seperate permit) by removing flight between floors 43 & 44 revisions include ceiling, mep & smoke controlletterDetails
43rd floor: rev to pa# 201901150409; for revisd communicating stair (seperate permit) by removing flight between floors 43 & 44 revisions include ceiling, mep & smoke controlletter | |
| Apr 3, 2019 | Completed final sign-off Mar 2021 | 415 Mission St | Hathaway Dinwiddie Co. | rev to pa# 201902041975; remove scope for stair from 43 to 44, remove scope for fl. opening on fl. 44 add guard rail around fl. opening on floor 43Details
rev to pa# 201902041975; remove scope for stair from 43 to 44, remove scope for fl. opening on fl. 44 add guard rail around fl. opening on floor 43 | |
| Apr 3, 2019 | Completed final sign-off Sep 2020 | 415 Mission St | Hathaway Dinwiddie Co. | 42nd floor:rev to pa# 201901150407; for revisd communicating stair (seperate permit) by removing flight between floors 43 & 44 revisions include ceiling, mep & smoke controlDetails
42nd floor:rev to pa# 201901150407; for revisd communicating stair (seperate permit) by removing flight between floors 43 & 44 revisions include ceiling, mep & smoke control | |
| Apr 3, 2019 | Completed final sign-off Sep 2020 | 415 Mission St | Hathaway Dinwiddie Co. | rev to pa# 201901150410; for revisd communicating stair (seperate permit) by removing flight between floors 43 & 44 revisions include ceilings, mep & smoke controlDetails
rev to pa# 201901150410; for revisd communicating stair (seperate permit) by removing flight between floors 43 & 44 revisions include ceilings, mep & smoke control | |
| Apr 3, 2019 | Completed final sign-off Aug 2019 | 415 Mission St | Siemens Industry, Inc. | life saftey system corrections to both the sequence of operations and the evac chart, per the sffd testing inspectors for the "covington" remodels flr 51-54 ref 201903185446, 201903185447, 201903185449, 201903185450 maher naDetails
life saftey system corrections to both the sequence of operations and the evac chart, per the sffd testing inspectors for the "covington" remodels flr 51-54 ref 201903185446, 201903185447, 201903185449, 201903185450 maher na | |
| Apr 2, 2019 | Completed final sign-off Aug 2020 | 415 Mission St | fire sprinkler ti 37 and 38 floor 93 pendent heads and 3 dry heads 96 heads total ref 201806252845Details
fire sprinkler ti 37 and 38 floor 93 pendent heads and 3 dry heads 96 heads total ref 201806252845 | $28,250 | |
| Mar 26, 2019 | Completed final sign-off Jun 2025 | 415 Mission St | Bcci Construction Company | 31, 32, 33, 34, 35th - mech as built dwgs to support arch dwg.Details
31, 32, 33, 34, 35th - mech as built dwgs to support arch dwg. | |
| Mar 20, 2019 | Completed final sign-off Apr 2019 | 415 Mission St | Siemens Industry, Inc. | 28/f:fire alarm work for the "salesforce" remodel.; additions are 2 smke detectors, 9 duct detectors, 3 modules, 11 speakers, 45 speaker/strobes, and 1 strobe power supply. ref pa #20180278400. maher naDetails
28/f:fire alarm work for the "salesforce" remodel.; additions are 2 smke detectors, 9 duct detectors, 3 modules, 11 speakers, 45 speaker/strobes, and 1 strobe power supply. ref pa #20180278400. maher na | $54,100 |
| Mar 20, 2019 | Completed final sign-off Apr 2019 | 415 Mission St | Siemens Industry, Inc. | fire alarm work for the "salesforce" remodel fl 30; additions are 2 smoke detectors, 9 duct detectors, 3 modules, 11 speakers, 45 speakers/strobes, and 1 strobe power supply. ref pa #201808278404. maher naDetails
fire alarm work for the "salesforce" remodel fl 30; additions are 2 smoke detectors, 9 duct detectors, 3 modules, 11 speakers, 45 speakers/strobes, and 1 strobe power supply. ref pa #201808278404. maher na | $54,100 |
| Mar 20, 2019 | Completed final sign-off Apr 2019 | 415 Mission St | Siemens Industry, Inc. | 29/f: fire alarm work for the "salesforce" remodel; additions are 2 smoke detectors, 9 duct detectors, 5 modules, 11 speakers, 46 speaker/strobes, and 1 strobe power supply. ref pa #201808278406. maher naDetails
29/f: fire alarm work for the "salesforce" remodel; additions are 2 smoke detectors, 9 duct detectors, 5 modules, 11 speakers, 46 speaker/strobes, and 1 strobe power supply. ref pa #201808278406. maher na | $55,720 |
| Mar 18, 2019 | Completed final sign-off Aug 2019 | 415 Mission St | Siemens Industry, Inc. | 51st fl - fire alarm work for the "covington" remodel; additions are 2 smoke detectors, 6 duct detectors, 2 modules, 29 speakers and 13 speaker/strobes. ref pa 2018-0911-9776Details
51st fl - fire alarm work for the "covington" remodel; additions are 2 smoke detectors, 6 duct detectors, 2 modules, 29 speakers and 13 speaker/strobes. ref pa 2018-0911-9776 | $40,960 |
| Mar 18, 2019 | Completed final sign-off Aug 2019 | 415 Mission St | Siemens Industry, Inc. | 54th fl - fire alarm work for the "covington" remodel; additions are 5 smoke detectors, 13 duct detectors, 8 modules, 35 speakers and 45 speaker/strobes and 6 strobes. ref pa 2018-0911-9778Details
54th fl - fire alarm work for the "covington" remodel; additions are 5 smoke detectors, 13 duct detectors, 8 modules, 35 speakers and 45 speaker/strobes and 6 strobes. ref pa 2018-0911-9778 | $80,500 |
| Mar 18, 2019 | Completed final sign-off Aug 2019 | 415 Mission St | Siemens Industry, Inc. | 53rd fl - fire alarm work for the "covington" remodel; additions are 16 smoke detectors, 13 duct detectors, 36 modules, 34 speakers and 43 speaker/strobes and 6 strobes. ref pa 2018-0911-9774Details
53rd fl - fire alarm work for the "covington" remodel; additions are 16 smoke detectors, 13 duct detectors, 36 modules, 34 speakers and 43 speaker/strobes and 6 strobes. ref pa 2018-0911-9774 | $100,800 |
| Mar 18, 2019 | Completed final sign-off Aug 2019 | 415 Mission St | Siemens Industry, Inc. | 52nd fl - fire alarm work for the "covington" remodel; additions are 3 smoke detectors, 9 duct detectors, 10 modules, 51 speakers and 41 speaker/strobes and 6 strobes. ref pa 2018-0911-9775Details
52nd fl - fire alarm work for the "covington" remodel; additions are 3 smoke detectors, 9 duct detectors, 10 modules, 51 speakers and 41 speaker/strobes and 6 strobes. ref pa 2018-0911-9775 | $79,300 |
| Mar 12, 2019 | Completed final sign-off Apr 2019 | 415 Mission St | Golden Gate Fire Protection Inc | 39th, 40th & 41st flrs. relocate 174 pendents at 39th flr. relocate 4 uprights & 2 sidewall. relocate 173 pendent sprinklers at 40th flr. relocate 4 uprights & add 2 sidewalls. relocate 173 pendents at 41st flr. relocate 4 uprights & add 2 sidewalls. ref pa's 201810304547, 201810304546, 201810304544Details
39th, 40th & 41st flrs. relocate 174 pendents at 39th flr. relocate 4 uprights & 2 sidewall. relocate 173 pendent sprinklers at 40th flr. relocate 4 uprights & add 2 sidewalls. relocate 173 pendents at 41st flr. relocate 4 uprights & add 2 sidewalls. ref pa's 201810304547, 201810304546, 201810304544 | $269,000 |
| Mar 11, 2019 | Never finaled issued Mar 2019, no final | 415 Mission St | Edison Fire Extinguisher Company Inc | 1st fl: ul 300 fire system installation. n/a for maherDetails
1st fl: ul 300 fire system installation. n/a for maher | $4,800 |
| Mar 4, 2019 | Completed final sign-off Sep 2019 | 415 Mission St | Gci, Inc | 53rd fl, rvision to pa 2018-0911-9774 for addition of 1 hr rated corridor and associated design changesDetails
53rd fl, rvision to pa 2018-0911-9774 for addition of 1 hr rated corridor and associated design changes | $10,000 |
| Feb 19, 2019 | Completed final sign-off Sep 2019 | 101 01st St | Eric F Anderson Incorporated | 5/f: revision to smoke control for adding a 3rd acd. revision to app#201901251278. n/a for maherDetails
5/f: revision to smoke control for adding a 3rd acd. revision to app#201901251278. n/a for maher | $10,000 |
| Feb 19, 2019 | Completed final sign-off Apr 2021 | 415 Mission St | Gci, Inc | defferred plumbing drawing for 51st, 52nd, 53rd, 54th. pa#201809119775 (52nd), 201809119776 (51st). 201809119788 (54th), 201809119774 (53rd) maher n/a.Details
defferred plumbing drawing for 51st, 52nd, 53rd, 54th. pa#201809119775 (52nd), 201809119776 (51st). 201809119788 (54th), 201809119774 (53rd) maher n/a. | |
| Feb 11, 2019 | Completed final sign-off Feb 2019 | 415 Mission St | Siemens Industry, Inc. | fire alarm as built for "mcdermott, will, emery" remodel to reflect a duct detector relocation per sffd testing inspector. ref#201807275795 n/a for maher.Details
fire alarm as built for "mcdermott, will, emery" remodel to reflect a duct detector relocation per sffd testing inspector. ref#201807275795 n/a for maher. | |
| Feb 11, 2019 | Completed final sign-off Aug 2019 | 415 Mission St | Siemens Industry, Inc. | fire alarm work for "starbucks" remodel on floor 5, additions are 5 duct detectors, 4 modules, 10 speaker strobes. ref#201804136284. n/a for maher.Details
fire alarm work for "starbucks" remodel on floor 5, additions are 5 duct detectors, 4 modules, 10 speaker strobes. ref#201804136284. n/a for maher. | $16,270 |
| Feb 4, 2019 | Completed final sign-off Mar 2021 | 415 Mission St | Hathaway Dinwiddie Co. | interconnecting stairs on levels 42,43,44,&45. including handrails, guardrails, bench foffits, sprinkler draft stops. n/a for maherDetails
interconnecting stairs on levels 42,43,44,&45. including handrails, guardrails, bench foffits, sprinkler draft stops. n/a for maher | $120,000 |
| Feb 4, 2019 | Expired or cancelled withdrawn Feb 2019 | 101 01st St | cafe & bar on ground floor. work includes take away retail food service (cafe), kitchen & bakers & restrooms. work on new mezzanine, 1st floor for storage and mechanical. work on basement p1 level for new refrigerated storage and nw finishes.n/a for maherDetails
cafe & bar on ground floor. work includes take away retail food service (cafe), kitchen & bakers & restrooms. work on new mezzanine, 1st floor for storage and mechanical. work on basement p1 level for new refrigerated storage and nw finishes.n/a for maher | $1,000,000 | |
| Jan 29, 2019 | Completed final sign-off Jul 2019 | 415 Mission St | Pioneer Fire Inc. | 53rd floor: install 2 new hose valves. ref app#201810112967Details
53rd floor: install 2 new hose valves. ref app#201810112967 | $20,000 |
| Jan 29, 2019 | Completed final sign-off Jun 2022 | 101 01st St | Hathaway Dinwiddie Co. | revision to pa #201811145879 for location of dumbwaiter slab penetrations & related fire rated hoistway. revised slab penetration location of trash chute, trash chute room door & tenant storage room roof structure at level p1.Details
revision to pa #201811145879 for location of dumbwaiter slab penetrations & related fire rated hoistway. revised slab penetration location of trash chute, trash chute room door & tenant storage room roof structure at level p1. | |
| Jan 28, 2019 | Completed final sign-off Jun 2019 | 415 Mission St | 36th,37th, & 38th floor. fire sprinkler permit. 89 pendent and 34 upright 123 total heads. ref app#201806121688. n/a for maherDetails
36th,37th, & 38th floor. fire sprinkler permit. 89 pendent and 34 upright 123 total heads. ref app#201806121688. n/a for maher | $36,162 | |
| Jan 25, 2019 | Completed final sign-off Sep 2019 | 101 01st St | Eric F Anderson Incorporated | mep revision to 2010805148996Details
mep revision to 2010805148996 | $10,000 |
| Jan 24, 2019 | Completed final sign-off Jul 2021 | 415 Mission St | Dome Construction Corp | 38/f: deffered permit for fire shutters 7 structural supports. ref pa201806121688. maher n/a.Details
38/f: deffered permit for fire shutters 7 structural supports. ref pa201806121688. maher n/a. | $300,000 |
| Jan 24, 2019 | Completed final sign-off Mar 2020 | 415 Mission St | Gci, Inc | 51st flr, t.i. interior build-out of approx 7,991 sq ft. no structural work. no increase in area, no change in occ or use. life safety and sprinklers to be pulled separately. mep deferred.Details
51st flr, t.i. interior build-out of approx 7,991 sq ft. no structural work. no increase in area, no change in occ or use. life safety and sprinklers to be pulled separately. mep deferred. | $3,600,000 |
| Jan 23, 2019 | Completed final sign-off Apr 2021 | 415 Mission St | Gci, Inc | 52nd floor: revision to app#201809119775. 2 hour partitions. added at mdf room, revised ceiling height & finishes at restroom. clarify card readers scope, addition of elevation tags a & b/ sheet a2.30. n/a for maherDetails
52nd floor: revision to app#201809119775. 2 hour partitions. added at mdf room, revised ceiling height & finishes at restroom. clarify card readers scope, addition of elevation tags a & b/ sheet a2.30. n/a for maher | |
| Jan 23, 2019 | Completed final sign-off Sep 2019 | 415 Mission St | Gci, Inc | rev to pa# 201810112967; remove draft stops from scope-not required per cbc 7.12.1.9 - connects floors 53-54 only.Details
rev to pa# 201810112967; remove draft stops from scope-not required per cbc 7.12.1.9 - connects floors 53-54 only. | |
| Jan 23, 2019 | Completed final sign-off Apr 2021 | 415 Mission St | Gci, Inc | 51st fl: revision to app#201809119776. removal of conference room 5158, revised ceiling at conf room to a.c.t. clarification of card reader scope. n/a for maherDetails
51st fl: revision to app#201809119776. removal of conference room 5158, revised ceiling at conf room to a.c.t. clarification of card reader scope. n/a for maher | |
| Jan 23, 2019 | Completed final sign-off Sep 2019 | 415 Mission St | Gci, Inc | rev to pa# 201809119774 addition of elevations tags, sheet a2-30m revision of ceiling height & finish at rest room, clarification of card reader scopeDetails
rev to pa# 201809119774 addition of elevations tags, sheet a2-30m revision of ceiling height & finish at rest room, clarification of card reader scope | $1,000 |
| Jan 23, 2019 | Completed final sign-off Apr 2021 | 415 Mission St | Gci, Inc | rev to pa# 201809119778; addition of elevation tags, revision of ceiling height & finish at core restrooms, clarification of card reader scopeDetails
rev to pa# 201809119778; addition of elevation tags, revision of ceiling height & finish at core restrooms, clarification of card reader scope | $1,000 |
| Jan 17, 2019 | Expired or cancelled cancelled Sep 2020 | 101 01st St | Dome Construction Corp | project is new cafe and bar gr fl in existing vacant retail restaurant space. includes takeaway retail food service, comm kitchen and bakery, restrooms, mezzanine for storage and mech. scope e building lobby is a bar and lounge.Details
project is new cafe and bar gr fl in existing vacant retail restaurant space. includes takeaway retail food service, comm kitchen and bakery, restrooms, mezzanine for storage and mech. scope e building lobby is a bar and lounge. | $600,000 |
| Jan 15, 2019 | Completed final sign-off Dec 2019 | 415 Mission St | Hathaway Dinwiddie Co. | 43rd fl - ti for entire floor includes (n) access flooring, partitions, mep, ceilings, lighting & employee limited cafeDetails
43rd fl - ti for entire floor includes (n) access flooring, partitions, mep, ceilings, lighting & employee limited cafe | $2,500,000 |
| Jan 15, 2019 | Completed final sign-off Dec 2019 | 415 Mission St | Hathaway Dinwiddie Co. | 44th fl - ti for entire floor includes (n) access flooring, partitions, mep, ceilings, lighting & employee limited cafeDetails
44th fl - ti for entire floor includes (n) access flooring, partitions, mep, ceilings, lighting & employee limited cafe | $2,500,000 |
| Jan 15, 2019 | Completed final sign-off Dec 2019 | 415 Mission St | Hathaway Dinwiddie Co. | 42nd fl - ti for entire floor includes (n) access flooring, partitions, mep, ceilings, lighting & employee limited cafeDetails
42nd fl - ti for entire floor includes (n) access flooring, partitions, mep, ceilings, lighting & employee limited cafe | $2,500,000 |
| Jan 14, 2019 | Never finaled issued Jan 2019, no final | 415 Mission St | Bcci Construction Company | ref pa# 201711022971; 33rd fl. fire only assembly permit no new work shall be conducted. n/a for maher.Details
ref pa# 201711022971; 33rd fl. fire only assembly permit no new work shall be conducted. n/a for maher. | |
| Jan 9, 2019 | Never finaled issued Jan 2019, no final | 415 Mission St | Aaa Restaurant Fire Control/Dba Aaa Fire | furnish and install 1 ansul r102 fire system in main kitchen area 61st fl. 1 ansul r102 system in the pollution control unit on the 64th fl roof. ref pa 2018-0416-6394Details
furnish and install 1 ansul r102 fire system in main kitchen area 61st fl. 1 ansul r102 system in the pollution control unit on the 64th fl roof. ref pa 2018-0416-6394 | $10,000 |
| Jan 8, 2019 | Never finaled issued Apr 2019, no final | 415 Mission St | Gci, Inc | 2nd fl: non-structural demo, non structural partitions, doors, blazing, ceiling, lights, millwork, fihishes. no change in area, occupancy, use. mep, life safety, sprinklers under sep permit.Details
2nd fl: non-structural demo, non structural partitions, doors, blazing, ceiling, lights, millwork, fihishes. no change in area, occupancy, use. mep, life safety, sprinklers under sep permit. | $204,930 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Siemens Industry, Inc. (44), Hathaway Dinwiddie Co. (37), Dome Construction Corp (22), Gci, Inc (21), Bcci Construction Company (18), Golden Gate Fire Protection Inc (10), Ayoob & Peery Plumbing Co Inc (5), Skyline Construction (5), Eco Fire Sprinklers Inc (4), Novo Construction Inc (3), Aaa Restaurant Fire Control/Dba Aaa Fire (2), Edison Fire Extinguisher Company Inc (2), Eric F Anderson Incorporated (2), Pribuss Engineering Inc (2), Acco Engineered Systems Inc. Dba Acco En, Clark/Hathaway Dinwiddie A Joint Venture, Firemaster, Garnett Signs Llc, Huey Const Mngmt Co Inc - Dba M H Const., Pioneer Fire Inc., True North Signs & Graphic Services
- Architects
- Victoria Salgado (11), James Mcleish (6), Nathan Dison (5), Rollie Childers (4), Ian Lawlor (3), Douglas Zucker (2), Shawnm Anderson (2), Adam Murphy, Daniel G. Scovill, George Soskin, Jason Sayner, Luda Hoe, Mark Cavagnero, Sashikala Murthy, Steven David Stept
- Engineers
- Lindsay M Marion (5), Raj Daswani (4), Todd See (4), Jillian Mcleod (3), Joseph Collins (3), Ron Kekmencic (3), Srdjan Rebraca (3), Darby Scott Rowland (2), Alexander Joseph Pacheco, Anthony Pusatera, Evan Dinelli, Gladys Yang, Gregory Gershkovich, Jeffrey Sacks, Jillian Mclead, Michael Gemmill, Rudolfo P Bustos Iii, Sherry Chaumpluke, Todd Kemen, Tomislav Gajic
- Designers
- Ronald Demartini (3), Eco Fire Sprinklers Inc