Daniel G. Scovill
- Listed as
- architect, authorized agent-others
- Firm
- Arcsine Architecture
- Based in
- Oakland
- On San Francisco permits
- Oct 2004 to Oct 2021
11 permits since 2000 (architect on 10 permits, authorized agent-others on 1 permit): 9 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 28, 2021 | Completed final sign-off Sep 2022 | 495 Beach St | Excel Hotel Services | 1/f: addition of dining closure panels to existing dining room and existing lounge spaces.Details
1/f: addition of dining closure panels to existing dining room and existing lounge spaces. | $50,000 |
| Apr 6, 2021 | Completed final sign-off Nov 2021 | 495 Beach St | Excel Hotel Services | revision to pa 201909181934. new finishes per dph request, remodeled area into beverage station, new walk in cooler at existing location, identified accessible seating in dining area. accessible counter at fitness room. 1st flr guest room work.Details
revision to pa 201909181934. new finishes per dph request, remodeled area into beverage station, new walk in cooler at existing location, identified accessible seating in dining area. accessible counter at fitness room. 1st flr guest room work. | $465,000 |
| Sep 19, 2020 | Completed final sign-off Aug 2021 | 1725 Montgomery St | Marchetti Group | 3/f: t.i.:demo non-load bearing partitions & doors. new interior partition & doors. new millwork and new beverage equip in break area. new all finishes. no changes to mech. minor replace of light fixt. elec trade by gc. gc to provide supply lines for beverage equip,Details
3/f: t.i.:demo non-load bearing partitions & doors. new interior partition & doors. new millwork and new beverage equip in break area. new all finishes. no changes to mech. minor replace of light fixt. elec trade by gc. gc to provide supply lines for beverage equip, | $165,000 |
| Feb 21, 2020 | Completed final sign-off Aug 2021 | 495 Beach St | illustration of (e) corridor ceilings on the 5th fl. to demostrate compliance with section 1003.3.1, to memorialize tht all guestroom corridors are contiguous on each fl. and are therefore to be treated as one room with respect to compliance with 1003.3.1 n/a maherDetails
illustration of (e) corridor ceilings on the 5th fl. to demostrate compliance with section 1003.3.1, to memorialize tht all guestroom corridors are contiguous on each fl. and are therefore to be treated as one room with respect to compliance with 1003.3.1 n/a maher | $5,000 | |
| Sep 30, 2019 | Completed final sign-off Sep 2021 | 495 Beach St | partial int remodel to include non struct demo of int finishes and fixtures in rooms, new int finishes and fix in (e) corridors with new penetrations in (e) concrete beams, partial remodel in rooms to achieve accessible and non accessible suites. maher n/a.Details
partial int remodel to include non struct demo of int finishes and fixtures in rooms, new int finishes and fix in (e) corridors with new penetrations in (e) concrete beams, partial remodel in rooms to achieve accessible and non accessible suites. maher n/a. | $5,000,000 | |
| Sep 18, 2019 | Completed final sign-off Sep 2021 | 495 Beach St | Excel Hotel Services | partial interior remodel of (e) ground floor public area and kitchen spaces. memp and kitchen includedDetails
partial interior remodel of (e) ground floor public area and kitchen spaces. memp and kitchen included | $1,500,000 |
| Jan 17, 2019 | Expired or cancelled cancelled Sep 2020 | 101 01st St | Dome Construction Corp | project is new cafe and bar gr fl in existing vacant retail restaurant space. includes takeaway retail food service, comm kitchen and bakery, restrooms, mezzanine for storage and mech. scope e building lobby is a bar and lounge.Details
project is new cafe and bar gr fl in existing vacant retail restaurant space. includes takeaway retail food service, comm kitchen and bakery, restrooms, mezzanine for storage and mech. scope e building lobby is a bar and lounge. | $600,000 |
| Nov 17, 2014 | Expired or cancelled withdrawn Nov 2014 | 1355 Market St | review of mep only-attention: rey ortega. maher n/a.Details
review of mep only-attention: rey ortega. maher n/a. | $230,000 | |
| Jun 24, 2014 | Completed final sign-off Jun 2015 | 1355 Market St | Field Construction Inc. | t/i renovation of an (e) commercial space to include a new restaurant include a kitchen, bar, lounge areas, dining rm and exhibition kitchen, patrons will have access to share men's and women's restroom includes employee rest room - no compliance with maher ordinanceDetails
t/i renovation of an (e) commercial space to include a new restaurant include a kitchen, bar, lounge areas, dining rm and exhibition kitchen, patrons will have access to share men's and women's restroom includes employee rest room - no compliance with maher ordinance | $450,000 |
| Sep 21, 2012 | Completed final sign-off Sep 2013 | 2856 Scott St | Green City Construction Inc | to construct roof deck accessible by two units @ rear of the building @ rear level.Details
to construct roof deck accessible by two units @ rear of the building @ rear level. | $60,000 |
| Oct 18, 2004 | Completed final sign-off Dec 2004 | 2010 Chestnut St | Sure, Inc. | replace kitchen cabinet, bath vanity, bath medicine cabDetails
replace kitchen cabinet, bath vanity, bath medicine cab | $11,000 |