Block 0022, lot 010
2700 Jones St
- City’s use
- Commercial Hotel
- Built
- 1983
- Stories
- 4
- Units
- 243
- Building
- 73,000 sq ft
- Lot
- 37,812 sq ft
- Zoning
- C2
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
34 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 22, 2021 | Never finaled issued Nov 2021, no final | 2700 Jones St | per pa #201910306001s, relocated tourist hotel main entrance from 495 beach st to 2700 jones st. 495 beach st has to retire.Details
per pa #201910306001s, relocated tourist hotel main entrance from 495 beach st to 2700 jones st. 495 beach st has to retire. | ||
| Oct 28, 2021 | Completed final sign-off Sep 2022 | 495 Beach St | Excel Hotel Services | 1/f: addition of dining closure panels to existing dining room and existing lounge spaces.Details
1/f: addition of dining closure panels to existing dining room and existing lounge spaces. | $50,000 |
| May 27, 2021 | Completed final sign-off Aug 2021 | 495 Beach St | Aaa Restaurant Fire Control/Dba Aaa Fire | revisions to permit #2021-0407-8089 add 1 applianceDetails
revisions to permit #2021-0407-8089 add 1 appliance | |
| Apr 7, 2021 | Completed final sign-off Aug 2021 | 495 Beach St | Aaa Restaurant Fire Control/Dba Aaa Fire | as-built drawings for permit # 2020-1123-9540Details
as-built drawings for permit # 2020-1123-9540 | |
| Apr 6, 2021 | Completed final sign-off Nov 2021 | 495 Beach St | Excel Hotel Services | revision to pa 201909181934. new finishes per dph request, remodeled area into beverage station, new walk in cooler at existing location, identified accessible seating in dining area. accessible counter at fitness room. 1st flr guest room work.Details
revision to pa 201909181934. new finishes per dph request, remodeled area into beverage station, new walk in cooler at existing location, identified accessible seating in dining area. accessible counter at fitness room. 1st flr guest room work. | $465,000 |
| Jan 26, 2021 | Completed final sign-off Sep 2021 | 495 Beach St | Sabah International Incorporated | voluntary fire alarm system upgrade. add (6) booster power supplies, (113) smoke/heat detectors, (33) modules, (33) strobes, (66) horn/strobes, (249) low frequency sounders.Details
voluntary fire alarm system upgrade. add (6) booster power supplies, (113) smoke/heat detectors, (33) modules, (33) strobes, (66) horn/strobes, (249) low frequency sounders. | $305,116 |
| Nov 23, 2020 | Completed final sign-off Aug 2021 | 475 Beach St | Aaa Restaurant Fire Control/Dba Aaa Fire | rework & repipe one (1) existing ansul r-102 fire suppression system in the main kitchen area. ref. permit # 2019-0918-1934.Details
rework & repipe one (1) existing ansul r-102 fire suppression system in the main kitchen area. ref. permit # 2019-0918-1934. | $8,500 |
| Sep 23, 2020 | Completed final sign-off Oct 2021 | 495 Beach St | Acco Engineered Systems Inc. Dba Acco En | new toilet exhaust fans & ductwork in rooms. ref t.i. pa201909303101. maher n/a.Details
new toilet exhaust fans & ductwork in rooms. ref t.i. pa201909303101. maher n/a. | $12,000 |
| Sep 22, 2020 | Completed final sign-off Sep 2021 | 495 Beach St | Sabah International Incorporated | t.i #201909181934. modify existing fire alarm system. add (10) duct detectors, (10) control relays, (3) pull stations, (5) ceiling strobes, (9) ceiling horn/strobes, (6) wall horn/strobes, (1) weather proof wall horn/strobes.Details
t.i #201909181934. modify existing fire alarm system. add (10) duct detectors, (10) control relays, (3) pull stations, (5) ceiling strobes, (9) ceiling horn/strobes, (6) wall horn/strobes, (1) weather proof wall horn/strobes. | $42,934 |
| Aug 31, 2020 | Completed final sign-off Sep 2021 | 495 Beach St | E S & A Sign Co | fco letters with indirect lighting: altonDetails
fco letters with indirect lighting: alton | $7,251 |
| Aug 31, 2020 | Completed final sign-off Sep 2021 | 495 Beach St | E S & A Sign Co | projecting electric sign: altonDetails
projecting electric sign: alton | $29,052 |
| Aug 31, 2020 | Completed final sign-off Sep 2021 | 495 Beach St | E S & A Sign Co | neon blade sign: the fairlight cafeDetails
neon blade sign: the fairlight cafe | $12,723 |
| Aug 31, 2020 | Completed final sign-off Oct 2021 | 495 Beach St | E S & A Sign Co | fco letters w external down lighting: altonDetails
fco letters w external down lighting: alton | $7,666 |
| Jun 22, 2020 | Never finaled issued Jun 2020, no final | 495 Beach St | street spaceDetails
street space | ||
| May 7, 2020 | Completed final sign-off Sep 2021 | 495 Beach St | Battalion One Fire Protection | add and relocate fire sprinkler heads and piping in lobby, registration, corridors, offices, and dining area of the partially sprinklered 1st floor. add new fire sprinkler heads and piping to thecurrently unsprinklered parking area (this is 2nd phase. please route to j estrella)ref 2019-1227-0795Details
add and relocate fire sprinkler heads and piping in lobby, registration, corridors, offices, and dining area of the partially sprinklered 1st floor. add new fire sprinkler heads and piping to thecurrently unsprinklered parking area (this is 2nd phase. please route to j estrella)ref 2019-1227-0795 | $127,500 |
| Feb 21, 2020 | Completed final sign-off Aug 2021 | 495 Beach St | illustration of (e) corridor ceilings on the 5th fl. to demostrate compliance with section 1003.3.1, to memorialize tht all guestroom corridors are contiguous on each fl. and are therefore to be treated as one room with respect to compliance with 1003.3.1 n/a maherDetails
illustration of (e) corridor ceilings on the 5th fl. to demostrate compliance with section 1003.3.1, to memorialize tht all guestroom corridors are contiguous on each fl. and are therefore to be treated as one room with respect to compliance with 1003.3.1 n/a maher | $5,000 | |
| Feb 20, 2020 | Never finaled issued Feb 2020, no final | 495 Beach St | street space/mta metersDetails
street space/mta meters | ||
| Jan 23, 2020 | Never finaled filed Jan 2020, never issued | 495 Beach St | street spaceDetails
street space | ||
| Dec 27, 2019 | Completed final sign-off Aug 2021 | 495 Beach St | Battalion One Fire Protection | fire sprinkler tenant improvement from levels 2 thru 5 of (e) hotel. convert (e) dry standpipe to wet & install new floor control assembly at each level. install new a.s. system throughout corridors and guestrooms.Details
fire sprinkler tenant improvement from levels 2 thru 5 of (e) hotel. convert (e) dry standpipe to wet & install new floor control assembly at each level. install new a.s. system throughout corridors and guestrooms. | $629,000 |
| Dec 19, 2019 | Never finaled issued Dec 2019, no final | 495 Beach St | street spaceDetails
street space | ||
| Oct 30, 2019 | Completed final sign-off Sep 2021 | 495 Beach St | Excel Hotel Services | exterior alterations to include relocation of main entry from beach to jones st. removal of (e) canopy, accessible ramp, new retaining wall & planter, alterations to (e) entrance & storefront glazing, enlargement of (e) dining terrace, alterations to (e) service area.**maher n/a**Details
exterior alterations to include relocation of main entry from beach to jones st. removal of (e) canopy, accessible ramp, new retaining wall & planter, alterations to (e) entrance & storefront glazing, enlargement of (e) dining terrace, alterations to (e) service area.**maher n/a** | $250,000 |
| Oct 16, 2019 | Never finaled issued Nov 2019, no final | 495 Beach St | street spaceDetails
street space | ||
| Sep 30, 2019 | Completed final sign-off Sep 2021 | 495 Beach St | partial int remodel to include non struct demo of int finishes and fixtures in rooms, new int finishes and fix in (e) corridors with new penetrations in (e) concrete beams, partial remodel in rooms to achieve accessible and non accessible suites. maher n/a.Details
partial int remodel to include non struct demo of int finishes and fixtures in rooms, new int finishes and fix in (e) corridors with new penetrations in (e) concrete beams, partial remodel in rooms to achieve accessible and non accessible suites. maher n/a. | $5,000,000 | |
| Sep 18, 2019 | Completed final sign-off Sep 2021 | 495 Beach St | Excel Hotel Services | partial interior remodel of (e) ground floor public area and kitchen spaces. memp and kitchen includedDetails
partial interior remodel of (e) ground floor public area and kitchen spaces. memp and kitchen included | $1,500,000 |
| Aug 9, 2019 | Completed final sign-off Sep 2021 | 495 Beach St | add (7) (n) guest rooms within (e) building envelope. construct (1) exercise room. fully sprinklered building under separate permit.Details
add (7) (n) guest rooms within (e) building envelope. construct (1) exercise room. fully sprinklered building under separate permit. | $280,000 | |
| Jul 3, 2019 | Completed final sign-off Aug 2019 | 495 Beach St | Sabah International Incorporated | 1/f: fire alarm modification of (e) system. add 1 wall horn strobe inside fitness center. ref t.i. pa#201809281704. maher n/a.Details
1/f: fire alarm modification of (e) system. add 1 wall horn strobe inside fitness center. ref t.i. pa#201809281704. maher n/a. | $6,495 |
| Mar 20, 2019 | Never finaled issued May 2019, no final | 495 Beach St | remodel of 2 existing hotel rooms and adjacent corridor at 4th fl. non-structural demolition of interior finishes and fixtures.Details
remodel of 2 existing hotel rooms and adjacent corridor at 4th fl. non-structural demolition of interior finishes and fixtures. | $6,000 | |
| Sep 28, 2018 | Completed final sign-off Aug 2019 | 495 Beach St | Satori Inc | demolition of existing elevator lobby finishes and existing restroom finishes. upgrade of new elevator lobby and restroom finishes at 20th fl. mep ls/sprinkler under sep permit. no change to e egress and exit occupancyDetails
demolition of existing elevator lobby finishes and existing restroom finishes. upgrade of new elevator lobby and restroom finishes at 20th fl. mep ls/sprinkler under sep permit. no change to e egress and exit occupancy | $29,720 |
| Sep 26, 2018 | Never finaled issued Sep 2018, no final | 495 Beach St | street spaceDetails
street space | ||
| May 13, 2014 | Never finaled issued May 2014, no final | 495 Beach St | Sabah International Incorporated | revision to appl#2014-0304-9806. add (1) control relay for elevator hat light for the elevator upgrade. n/a maher ordinance #155-13Details
revision to appl#2014-0304-9806. add (1) control relay for elevator hat light for the elevator upgrade. n/a maher ordinance #155-13 | $9,070 |
| Mar 4, 2014 | Never finaled issued Mar 2014, no final | 495 Beach St | Sabah International Incorporated | upgrade existing f.a. system for holiday inn include replacing (2) existing smoke detectors with new smoke/co detectors and (1) heat detector with new heat/co detector in electrical, mechanical room and maintenance shop. na compliance #155-13.Details
upgrade existing f.a. system for holiday inn include replacing (2) existing smoke detectors with new smoke/co detectors and (1) heat detector with new heat/co detector in electrical, mechanical room and maintenance shop. na compliance #155-13. | $9,070 |
| Oct 30, 2009 | Completed final sign-off Dec 2009 | 495 Beach St | H K Fire Protection Inc.* Check I.D. *** | upgrade automatic fire supression system for exhaust hoodDetails
upgrade automatic fire supression system for exhaust hood | $4,000 |
| Nov 18, 2005 | Never finaled issued Dec 2005, no final | 495 Beach St | this is a follow up to app #200405063202 emergency facp replacement this scope of work is to bring the bldg up to current fire life safety codeDetails
this is a follow up to app #200405063202 emergency facp replacement this scope of work is to bring the bldg up to current fire life safety code | $120,000 | |
| May 6, 2004 | Expired or cancelled expired Jan 2007 | 495 Beach St | Edwards Systems Technology Inc/Est Servi | per nov replace existing facp iwth new facp. site upgrade ot facp to current code will be on sprinklDetails
per nov replace existing facp iwth new facp. site upgrade ot facp to current code will be on sprinkl | $35,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Sabah International Incorporated (5), E S & A Sign Co (4), Excel Hotel Services (4), Aaa Restaurant Fire Control/Dba Aaa Fire (3), Battalion One Fire Protection (2), Acco Engineered Systems Inc. Dba Acco En, Edwards Systems Technology Inc/Est Servi, H K Fire Protection Inc.* Check I.D. ***, Satori Inc
- Architects
- Daniel G. Scovill (5)
- Engineers
- Srdjan Rebraca (3), Tomislav Gajic (3)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.