Block 0056, lot 002
1725 Montgomery St
- City’s use
- Commercial Office
- Built
- 1906
- Stories
- 3
- Units
- 3
- Rooms
- 5 bathrooms
- Building
- 61,533 sq ft
- Lot
- 37,812 sq ft
- Zoning
- C2
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
79 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 4, 2021 | Completed final sign-off Aug 2021 | 1725 Montgomery St | Sabah International Incorporated | 3rd floor: as built for app#202104078113 per fire marshal inspection comment, added 2 led strobes,1 led ceiling strobe, 2 led horn/strobesDetails
3rd floor: as built for app#202104078113 per fire marshal inspection comment, added 2 led strobes,1 led ceiling strobe, 2 led horn/strobes | |
| Jul 21, 2021 | Completed final sign-off Dec 2022 | 1725 Montgomery St | Marchetti Group | g/f: t.i.: demo of non-structural partitions and building new non-structural partitions. all new or revised mep, ls etc will be design build and sbumitted if needed.Details
g/f: t.i.: demo of non-structural partitions and building new non-structural partitions. all new or revised mep, ls etc will be design build and sbumitted if needed. | $150,000 |
| Jun 16, 2021 | Completed final sign-off Jul 2021 | 1725 Montgomery St | Sabah International Incorporated | as-built for permit # 2020-1228-1812 relocate new booster power supply, synchronization module, and smoke detector in room 128. revise fire alarm sequence of operations to change duct detectors to send supervisory signal.Details
as-built for permit # 2020-1228-1812 relocate new booster power supply, synchronization module, and smoke detector in room 128. revise fire alarm sequence of operations to change duct detectors to send supervisory signal. | |
| Apr 7, 2021 | Completed final sign-off Aug 2021 | 1725 Montgomery St | Sabah International Incorporated | ref #2020-0919-4515 r1 provide modification of the existing fire alarm system. add (1) booster pwr supply, (1) output module, (1) input module, (1) smoke detector, (24) ceiling strobes, (9) horn/strobes (ceiling), (1) strobe and (3) horn/strobesDetails
ref #2020-0919-4515 r1 provide modification of the existing fire alarm system. add (1) booster pwr supply, (1) output module, (1) input module, (1) smoke detector, (24) ceiling strobes, (9) horn/strobes (ceiling), (1) strobe and (3) horn/strobes | $37,213 |
| Jan 7, 2021 | Never finaled issued Feb 2021, no final | 1725 Montgomery St | Ad Art Inc. | install non-electric single faced wall sign: "bright mark"Details
install non-electric single faced wall sign: "bright mark" | $5,000 |
| Dec 28, 2020 | Completed final sign-off Jun 2021 | 1725 Montgomery St | Sabah International Incorporated | ti # 2020-0310-6580 / # 2020-0928-5228 modify existing fire alarm system. add (1) booster power supply, (1) syncmodule, (2) smoke detectors, (12) ceiling strobes, (13) ceiling horn/strobes, (6) duct smoke detectors, (6) high power control relays.Details
ti # 2020-0310-6580 / # 2020-0928-5228 modify existing fire alarm system. add (1) booster power supply, (1) syncmodule, (2) smoke detectors, (12) ceiling strobes, (13) ceiling horn/strobes, (6) duct smoke detectors, (6) high power control relays. | $17,708 |
| Oct 10, 2020 | Never finaled issued Oct 2020, no final | 1725 Montgomery St | fire sprinkler ti, relo 32, add 18, delete 25 sprinklers on 1st fl. ref 2020-0310-6580.Details
fire sprinkler ti, relo 32, add 18, delete 25 sprinklers on 1st fl. ref 2020-0310-6580. | $16,000 | |
| Sep 28, 2020 | Completed final sign-off Dec 2022 | 1725 Montgomery St | Marchetti Group | revison to pa #2020-0310-6580: mechanical for permit.Details
revison to pa #2020-0310-6580: mechanical for permit. | |
| Sep 19, 2020 | Completed final sign-off Aug 2021 | 1725 Montgomery St | Marchetti Group | 3/f: t.i.:demo non-load bearing partitions & doors. new interior partition & doors. new millwork and new beverage equip in break area. new all finishes. no changes to mech. minor replace of light fixt. elec trade by gc. gc to provide supply lines for beverage equip,Details
3/f: t.i.:demo non-load bearing partitions & doors. new interior partition & doors. new millwork and new beverage equip in break area. new all finishes. no changes to mech. minor replace of light fixt. elec trade by gc. gc to provide supply lines for beverage equip, | $165,000 |
| Sep 15, 2020 | Completed final sign-off Feb 2022 | 1725 Montgomery St | Mcclure Electric Inc | title 24 lighting only. ref pa# 202003106580Details
title 24 lighting only. ref pa# 202003106580 | |
| Mar 10, 2020 | Completed final sign-off Dec 2022 | 1725 Montgomery St | Marchetti Group | 1st fl ti includes demo of non structural partitions and building new non structural partitions. meps life safetyDetails
1st fl ti includes demo of non structural partitions and building new non structural partitions. meps life safety | $828,000 |
| Dec 10, 2019 | Completed final sign-off Jun 2020 | 1725 Montgomery St | Marchetti Group | ti include only demo work per ab-017. the existing building ceiling is currently an open/exposed ceiling with all of the fire spriknkler heads already turned up facing open ceiling. a new ti permit will be sumitted under separate permit for the new construction. the building is fully sprinkleredDetails
ti include only demo work per ab-017. the existing building ceiling is currently an open/exposed ceiling with all of the fire spriknkler heads already turned up facing open ceiling. a new ti permit will be sumitted under separate permit for the new construction. the building is fully sprinklered | $75,000 |
| Jan 2, 2019 | Completed final sign-off Feb 2019 | 1725 Montgomery St | Rittenbach Roofing & Waterproofing Inc | reroofing.Details
reroofing. | $26,000 |
| Oct 7, 2016 | Completed final sign-off Nov 2016 | 140 Chestnut St | Sabah International Incorporated | as built submittal to reflect accurate location and number of devices for 201603242930 per fire marshal request to address inspection commentsDetails
as built submittal to reflect accurate location and number of devices for 201603242930 per fire marshal request to address inspection comments | |
| Aug 24, 2016 | Never finaled issued Aug 2016, no final | 150 Chestnut St | Geo M Robinson & Co | add 39 pendents & 9 upright fire sprinklers and plug 4 existing uprights per new wall & ceiling configuration. as built. maher naDetails
add 39 pendents & 9 upright fire sprinklers and plug 4 existing uprights per new wall & ceiling configuration. as built. maher na | $9,100 |
| Aug 24, 2016 | Never finaled issued Aug 2016, no final | 150 Chestnut St | Geo M Robinson & Co | add 44 pendent & 15 upright fire sprinklers and plug 6 existing uprights on the 1st level due to new hall and ceiling configurations. ref 2016-0817-5267. as built - n/a maher ord. 155-13Details
add 44 pendent & 15 upright fire sprinklers and plug 6 existing uprights on the 1st level due to new hall and ceiling configurations. ref 2016-0817-5267. as built - n/a maher ord. 155-13 | $6,325 |
| Aug 17, 2016 | Never finaled issued Aug 2016, no final | 150 Chestnut St | Geo M Robinson & Co | 2nd floor: add 39 pendent & 9 upright fire sprinklers and plug 4 (e) upright due to new wall and ceiling configurations. maher naDetails
2nd floor: add 39 pendent & 9 upright fire sprinklers and plug 4 (e) upright due to new wall and ceiling configurations. maher na | $9,100 |
| Aug 17, 2016 | Never finaled issued Aug 2016, no final | 150 Chestnut St | Geo M Robinson & Co | 1st floor: add 46 pendent & 10 upright fire sprinklers and plug 6 (e) upright due to new wall and ceiling configurations. maher naDetails
1st floor: add 46 pendent & 10 upright fire sprinklers and plug 6 (e) upright due to new wall and ceiling configurations. maher na | $6,325 |
| Jul 27, 2016 | Completed final sign-off Mar 2017 | 150 Chestnut St | Turner Construction Co | install roof mounted chiller maher naDetails
install roof mounted chiller maher na | $35,000 |
| Jul 18, 2016 | Completed final sign-off Aug 2016 | 150 Chestnut St | Sabah International Incorporated | modify existing f.a. system to accommodate new arch floor plans. all notification appliances & remote power supply to be replaced. also provide (1) monitor module for cross trip of adjacent bldg 140 chestnut f.a. system. ref t.i. #2016-0202-8606.Details
modify existing f.a. system to accommodate new arch floor plans. all notification appliances & remote power supply to be replaced. also provide (1) monitor module for cross trip of adjacent bldg 140 chestnut f.a. system. ref t.i. #2016-0202-8606. | $21,625 |
| Jun 22, 2016 | Never finaled issued Jun 2016, no final | 150 Chestnut St | Geo M Robinson & Co | 2nd floor: add 13 pendent and 11 upright fire sprinklers and plug 4 (e) uprights per new wall & ceiling configurations. maher naDetails
2nd floor: add 13 pendent and 11 upright fire sprinklers and plug 4 (e) uprights per new wall & ceiling configurations. maher na | $9,100 |
| Jun 22, 2016 | Never finaled issued Jun 2016, no final | 150 Chestnut St | Geo M Robinson & Co | 1st floor: add 20 pendent and 1 upright fire sprinklers due to new wall & ceiling configurations. maher naDetails
1st floor: add 20 pendent and 1 upright fire sprinklers due to new wall & ceiling configurations. maher na | $6,825 |
| Apr 26, 2016 | Completed final sign-off Apr 2017 | 150 Chestnut St | Turner Construction Co | revision to ref pa's 201602028606/201602028608: mep permit - install new dx air-cooled split system and associated refrigerant piping and control. replace supplu air duct work and air devices. maher naDetails
revision to ref pa's 201602028606/201602028608: mep permit - install new dx air-cooled split system and associated refrigerant piping and control. replace supplu air duct work and air devices. maher na | $150,000 |
| Apr 7, 2016 | Completed final sign-off Jul 2016 | 1725 Montgomery St | Marchetti Group | #200: modification and expansion of extg t.i. to include selective demolition and reinforcement non-load bearing partitions to create opening between 2 suite. minor electrical work to be removed back to source, relocation of light switches and relocation of exit sign new paint, carpet.Details
#200: modification and expansion of extg t.i. to include selective demolition and reinforcement non-load bearing partitions to create opening between 2 suite. minor electrical work to be removed back to source, relocation of light switches and relocation of exit sign new paint, carpet. | $25,000 |
| Apr 6, 2016 | Completed final sign-off Mar 2017 | 150 Chestnut St | Turner Construction Co | 2nd fl: revisions to pa 201602028608; remove work and storage rooms, add work areas; maher n/aDetails
2nd fl: revisions to pa 201602028608; remove work and storage rooms, add work areas; maher n/a | |
| Apr 6, 2016 | Completed final sign-off Mar 2017 | 150 Chestnut St | Turner Construction Co | 1st fl: revision to pa 201602028606, remove work rooms; maher n/aDetails
1st fl: revision to pa 201602028606, remove work rooms; maher n/a | |
| Mar 24, 2016 | Completed final sign-off Nov 2016 | 140 Chestnut St | Sabah International Incorporated | install new manual fire alarm system (voluntary)to monitor bldg sprinkler system.install water flow & switch to (e)sprinkler system.add (1)new duct detector,(1)control relay,(5)pull stations(1)monitor module for tamper & flow switches,25 ceiling mount horn/strobes & 6 ceiling mount strobesDetails
install new manual fire alarm system (voluntary)to monitor bldg sprinkler system.install water flow & switch to (e)sprinkler system.add (1)new duct detector,(1)control relay,(5)pull stations(1)monitor module for tamper & flow switches,25 ceiling mount horn/strobes & 6 ceiling mount strobes | $61,933 |
| Feb 2, 2016 | Never finaled issued Feb 2016, no final | 150 Chestnut St | Turner Construction Co | 1st floor demo of non-structural partition walls, ceiling. installation of new on-structural office partitions. partial infill of 2nd floor openings - structural included, sprinkler, fire alarm & mep on separate permit. maher naDetails
1st floor demo of non-structural partition walls, ceiling. installation of new on-structural office partitions. partial infill of 2nd floor openings - structural included, sprinkler, fire alarm & mep on separate permit. maher na | $727,720 |
| Feb 2, 2016 | Completed final sign-off Mar 2017 | 150 Chestnut St | Turner Construction Co | 2nd floor demo of interior non structural partitions, ceilings tiles. construction of non structural office partitions. sprinkler, fire alarm & mep on separate permit. maher naDetails
2nd floor demo of interior non structural partitions, ceilings tiles. construction of non structural office partitions. sprinkler, fire alarm & mep on separate permit. maher na | $311,880 |
| Nov 19, 2015 | Never finaled issued Dec 2015, no final | 150 Chestnut St | Rudolph And Sletten Inc | replace existing skylights with new skylights, restripe parking lot and provide ada van parking stall. maher not reqDetails
replace existing skylights with new skylights, restripe parking lot and provide ada van parking stall. maher not req | $31,600 |
| Jul 22, 2015 | Completed final sign-off Aug 2015 | 150 Chestnut St | fire sprinkler ti 19 new sprinklers in new ceilingDetails
fire sprinkler ti 19 new sprinklers in new ceiling | $10,270 | |
| May 11, 2015 | Completed final sign-off Jan 2016 | 150 Chestnut St | Rudolph And Sletten Inc | partial interior renovation, demo non-load bearing partitions, ceiling & lighting elements & associated finishes. new construction consists of new non load bearing partitions, wheelchair lift, guardrails, bike racks, pantry, ceiling and lighting element and associated finishes. n/a ordinance #155-13Details
partial interior renovation, demo non-load bearing partitions, ceiling & lighting elements & associated finishes. new construction consists of new non load bearing partitions, wheelchair lift, guardrails, bike racks, pantry, ceiling and lighting element and associated finishes. n/a ordinance #155-13 | $75,000 |
| Apr 8, 2015 | Completed final sign-off Jul 2015 | 140 Chestnut St | Comfort Dynamics Inc. | install 1 exhaust fan on roof ro reject heat from washing machine; install one new hood to accomodate exhaust fan on roof.Details
install 1 exhaust fan on roof ro reject heat from washing machine; install one new hood to accomodate exhaust fan on roof. | $26,000 |
| Feb 10, 2015 | Completed final sign-off Mar 2015 | 150 Chestnut St | San Francisco Commercial Builders Inc | demolition of non load bearing partitons, carpet and wainscotting. ab-17 vacant spaceDetails
demolition of non load bearing partitons, carpet and wainscotting. ab-17 vacant space | $15,000 |
| Sep 23, 2014 | Never finaled issued Sep 2014, no final | 1725 Montgomery St | Sabah International Incorporated | t.i. 201406037390, 2nd flr: provide a modification of the (e) fire alarm system. add 1 (n) notification power supply with batteries, 1 (n) synchronization output module, 1 (n) smoke detector, 26 (n) wall mounted horn/strobes, 16 (n) wall mounted strobes, 1 (n)in-duct smoke detector for fsd, 1 (n) cDetails
t.i. 201406037390, 2nd flr: provide a modification of the (e) fire alarm system. add 1 (n) notification power supply with batteries, 1 (n) synchronization output module, 1 (n) smoke detector, 26 (n) wall mounted horn/strobes, 16 (n) wall mounted strobes, 1 (n)in-duct smoke detector for fsd, 1 (n) c | $12,650 |
| Jul 2, 2014 | Never finaled issued Jul 2014, no final | 1725 Montgomery St | street space | ||
| Jun 3, 2014 | Completed final sign-off Dec 2014 | 1725 Montgomery St | Cameron Builders Inc. | 2nd floor. (e) office constructed for primary care clinic, imaging suite. upgrade mep sprinklers on a separate permit. fire alarm on separate permit. window wall glazing under separate permit. demo application under pa# 2014/06/03/7372. ** maher: complaince with ordinance no# 155-13 not required **Details
2nd floor. (e) office constructed for primary care clinic, imaging suite. upgrade mep sprinklers on a separate permit. fire alarm on separate permit. window wall glazing under separate permit. demo application under pa# 2014/06/03/7372. ** maher: complaince with ordinance no# 155-13 not required ** | $1,500,000 |
| Jun 3, 2014 | Completed final sign-off Aug 2014 | 1725 Montgomery St | Cameron Builders Inc. | 2nd floor demo existing office plumbing walls non-bearing & electrical. per ab-017. n/a maher ordinance 155-13Details
2nd floor demo existing office plumbing walls non-bearing & electrical. per ab-017. n/a maher ordinance 155-13 | $68,000 |
| Oct 21, 2013 | Completed final sign-off Nov 2013 | 1725 Montgomery St | Bay Cities Pyrotector Inc | installation of stat-x aersol fire suppression system to protect server room, per 2010 nfpa 2010.Details
installation of stat-x aersol fire suppression system to protect server room, per 2010 nfpa 2010. | $15,429 |
| May 6, 2013 | Completed final sign-off Aug 2013 | 1725 Montgomery St | Specialized Graphics Inc | evacuation maps of 3rd floorDetails
evacuation maps of 3rd floor | $950 |
| Apr 26, 2013 | Expired or cancelled cancelled Nov 2024 | 1725 Montgomery St | grading parking lot to improve drainage & prevent water to go into building windowsDetails
grading parking lot to improve drainage & prevent water to go into building windows | $150,000 | |
| Apr 18, 2013 | Completed final sign-off Nov 2013 | 140 Chestnut St | Howard S. Wright Constructors Lp | modification of (e) electrical, plumbing & mechanical for installation of ph monitoring station. architectural work submitted under pa# 2013-0411-4353 (not issued)Details
modification of (e) electrical, plumbing & mechanical for installation of ph monitoring station. architectural work submitted under pa# 2013-0411-4353 (not issued) | $100,000 |
| Apr 11, 2013 | Completed final sign-off Jul 2013 | 140 Chestnut St | Howard S. Wright Constructors Lp | construction of new non structural interior partition & new 4'x7' doorDetails
construction of new non structural interior partition & new 4'x7' door | $5,000 |
| Mar 14, 2013 | Completed final sign-off Mar 2013 | 140 Chestnut St | Westates Mechanical Corporation Inc | add 16 fire sprinkler heads to extg system for new mezzanine and ceiling. ref app#201211285062 and 201212065649Details
add 16 fire sprinkler heads to extg system for new mezzanine and ceiling. ref app#201211285062 and 201212065649 | $3,500 |
| Mar 11, 2013 | Never finaled issued Mar 2013, no final | 1725 Montgomery St | Eagle Bay Enterprises, Inc (Dba Garnett | install one exterior, non illuminated wall sign.Details
install one exterior, non illuminated wall sign. | $1,500 |
| Mar 11, 2013 | Completed final sign-off May 2013 | 140 Chestnut St | Howard S. Wright Constructors Lp | barrier removal-renovate (e) accessible ramp to comply with current codeDetails
barrier removal-renovate (e) accessible ramp to comply with current code | $8,000 |
| Feb 28, 2013 | Completed final sign-off Jun 2013 | 1725 Montgomery St | Sabah International Incorporated | 1st/2nd/3rd floors-upd (e) sprinkler sys to expanded capacity in order to accomodate future ti. replace (e) elevator control with smoke detectors & relays for recall functions. monitor point for tenant server rm for fire suppression sys. see atached sht for qty'sDetails
1st/2nd/3rd floors-upd (e) sprinkler sys to expanded capacity in order to accomodate future ti. replace (e) elevator control with smoke detectors & relays for recall functions. monitor point for tenant server rm for fire suppression sys. see atached sht for qty's | $22,000 |
| Feb 8, 2013 | Completed final sign-off Apr 2013 | 140 Chestnut St | Westates Mechanical Corporation Inc | add 205 fire sprinklers to extg system due to change of bldg occupancy. ref app#201212065649Details
add 205 fire sprinklers to extg system due to change of bldg occupancy. ref app#201212065649 | $40,000 |
| Jan 25, 2013 | Completed final sign-off Mar 2013 | 1725 Montgomery St | Golden Gate Fire Protection Inc | fire sprinkler system upgrade; relocate 24 pendant sprinkler heads on the 3rd floor. relocate 1 upright, add 1 upright.Details
fire sprinkler system upgrade; relocate 24 pendant sprinkler heads on the 3rd floor. relocate 1 upright, add 1 upright. | $13,390 |
| Jan 18, 2013 | Completed final sign-off Jan 2013 | 1725 Montgomery St | Ayoob & Peery Plumbing Co Inc | relocate and add fire sprinkler heads per tenant improvement at 2nd floor. (1 add) & (1 relocate)Details
relocate and add fire sprinkler heads per tenant improvement at 2nd floor. (1 add) & (1 relocate) | $1,028 |
| Jan 9, 2013 | Completed final sign-off Jul 2013 | 140 Chestnut St | Howard S. Wright Constructors Lp | new electrical work to support commercial bldg renovation, tenant improvement under separate permit. new mech and plumbing under separate pa# 201212065649 (arch)Details
new electrical work to support commercial bldg renovation, tenant improvement under separate permit. new mech and plumbing under separate pa# 201212065649 (arch) | |
| Dec 20, 2012 | Completed final sign-off Jul 2013 | 140 Chestnut St | Howard S. Wright Constructors Lp | demolition of (e) mech, pumbing, new hvac & plumbing, new rch construction under pa #2012.12.06.5649. electrical and lighting under seperate permit.Details
demolition of (e) mech, pumbing, new hvac & plumbing, new rch construction under pa #2012.12.06.5649. electrical and lighting under seperate permit. | |
| Dec 11, 2012 | Completed final sign-off Feb 2013 | 1725 Montgomery St | Richlen Construction | minor construction at internal stair to enclose landing and separate it from adj sute 201 including walls, door, frame and relocation of lighting.Details
minor construction at internal stair to enclose landing and separate it from adj sute 201 including walls, door, frame and relocation of lighting. | $13,000 |
| Dec 7, 2012 | Completed final sign-off Jul 2013 | 1725 Montgomery St | Source Planning And Construction Inc | tenant improvement - demolition of existing space 3rd floor, new office and support facilities. sprinkler work under separate permit. mech & electrical work also included.Details
tenant improvement - demolition of existing space 3rd floor, new office and support facilities. sprinkler work under separate permit. mech & electrical work also included. | $695,000 |
| Dec 6, 2012 | Completed final sign-off Jul 2013 | 140 Chestnut St | Howard S. Wright Constructors Lp | change of occupancy to b and f-1. interior ceiling height walls/new 1 hour rated walls as noted. nw elect. for open area work space, shared office, conf. rooms, strorage room, & elect room. new light fixtures as indicated throughout. the space. nw plmg fixtures & new ada shower & restroom. chDetails
change of occupancy to b and f-1. interior ceiling height walls/new 1 hour rated walls as noted. nw elect. for open area work space, shared office, conf. rooms, strorage room, & elect room. new light fixtures as indicated throughout. the space. nw plmg fixtures & new ada shower & restroom. ch | $1,500,000 |
| Nov 28, 2012 | Completed final sign-off Jul 2013 | 140 Chestnut St | Howard S. Wright Constructors Lp | work on the 1st & 2nd floor: demolition of (e) non-structural interior ceiling height walls, remaining partitions, (e) ceiling height walls, remaining partitions, (e) associated elect, (e) light fixts & finishes as indicated.Details
work on the 1st & 2nd floor: demolition of (e) non-structural interior ceiling height walls, remaining partitions, (e) ceiling height walls, remaining partitions, (e) associated elect, (e) light fixts & finishes as indicated. | $45,000 |
| Nov 7, 2012 | Never finaled issued Nov 2012, no final | 1725 Montgomery St | San Francisco Commercial Builders Inc | revision to appl #2012.0828.8411 - increase clearances around pg &e transformer, change cmu enclosure from partial height to full height, structural calculations included.Details
revision to appl #2012.0828.8411 - increase clearances around pg &e transformer, change cmu enclosure from partial height to full height, structural calculations included. | |
| Aug 28, 2012 | Never finaled issued Sep 2012, no final | 1725 Montgomery St | San Francisco Commercial Builders Inc | the work includes selected demo of exterior site elements in open garage, including (7) bollards, (5) light bollards, and the construction of (n) cmu wall enclosure, light bollards, lighting, exterior finishes & curb ramp.Details
the work includes selected demo of exterior site elements in open garage, including (7) bollards, (5) light bollards, and the construction of (n) cmu wall enclosure, light bollards, lighting, exterior finishes & curb ramp. | $15,000 |
| Sep 7, 2011 | Completed final sign-off Sep 2011 | 1725 Montgomery St | Golden Gate Fire Protection Inc | fire sprinkler system upgrade. relocate 72 pendent sprinkers and 23 upright sprinklers. upgrade branchline restraintsDetails
fire sprinkler system upgrade. relocate 72 pendent sprinkers and 23 upright sprinklers. upgrade branchline restraints | $49,000 |
| Aug 26, 2011 | Completed final sign-off Nov 2011 | 1725 Montgomery St | enlargement of existing elevator machine room on first floor. mep under separate permit.Details
enlargement of existing elevator machine room on first floor. mep under separate permit. | $10,000 | |
| Jul 18, 2011 | Completed final sign-off Aug 2011 | 150 Chestnut St | Rocha Electrical Systems | as builts for fire alarm system, revision to pa#2010-03-03-7490. revise sequence of operation matrix for general hvac system shut down.Details
as builts for fire alarm system, revision to pa#2010-03-03-7490. revise sequence of operation matrix for general hvac system shut down. | $45,000 |
| Jul 13, 2011 | Completed final sign-off Dec 2011 | 1725 Montgomery St | Marchetti Construction Inc. | demo extg interior partitions build new demising wall, new partition walls, new suspended ceiling, new finishes. mep under seperate permit.Details
demo extg interior partitions build new demising wall, new partition walls, new suspended ceiling, new finishes. mep under seperate permit. | $750,000 |
| Mar 3, 2010 | Never finaled issued Apr 2010, no final | 150 Chestnut St | Rocha Electrical Systems | new fire alarm installation and remove existing systemDetails
new fire alarm installation and remove existing system | $120,000 |
| Jul 29, 2009 | Never finaled issued Jul 2009, no final | 1725 Montgomery St | Aquamatic Fire Protection | as built revised as installed. showing piping as done in field under pa3200905087980.Details
as built revised as installed. showing piping as done in field under pa3200905087980. | $200 |
| May 8, 2009 | Never finaled issued May 2009, no final | 1725 Montgomery St | Aquamatic Fire Protection | relocate 44 sprinklers on 1st flor, remove/replace or add new piping due to interior remodel.Details
relocate 44 sprinklers on 1st flor, remove/replace or add new piping due to interior remodel. | $4,600 |
| Apr 6, 2009 | Completed final sign-off Aug 2009 | 1725 Montgomery St | ground floor tenant improvement project: two first floor space are merged to create one full floor tenant space. work to i nclude enw walls, doors, interior glazing, millwork & finsihes. upgrade restrooms to full ada compliance. plbg, elec & fire sprinkler work to be permitted separately.Details
ground floor tenant improvement project: two first floor space are merged to create one full floor tenant space. work to i nclude enw walls, doors, interior glazing, millwork & finsihes. upgrade restrooms to full ada compliance. plbg, elec & fire sprinkler work to be permitted separately. | $180,000 | |
| Jun 25, 2007 | Completed final sign-off Aug 2007 | 1725 Montgomery St | Miller Construction | demolition of interior partitions( metal stud) . construction of new interior partitions, relocation of electrical data outlets and light fixtures, patching and repair of surfaces damaged from workDetails
demolition of interior partitions( metal stud) . construction of new interior partitions, relocation of electrical data outlets and light fixtures, patching and repair of surfaces damaged from work | $7,000 |
| Apr 18, 2007 | Completed final sign-off Aug 2007 | 140 Chestnut St | Miller Construction | tenant improvement: partitions, lightiong, electrical. new stair and ada upgrades.Details
tenant improvement: partitions, lightiong, electrical. new stair and ada upgrades. | $92,000 |
| Mar 16, 2007 | Expired or cancelled expired Mar 2009 | 140 Chestnut St | Miller Construction | demo select non bearing partitions light fixtures, carpet, t-bar ceiling on interior of space. no structural or exterior work is included. remove caninets, cap off plmgDetails
demo select non bearing partitions light fixtures, carpet, t-bar ceiling on interior of space. no structural or exterior work is included. remove caninets, cap off plmg | $12,000 |
| Dec 28, 2006 | Expired or cancelled expired Mar 2009 | 140 Chestnut St | Miller Construction | remove existing exterior ramp & steel lean-to roof. currently vacant space.Details
remove existing exterior ramp & steel lean-to roof. currently vacant space. | $18,000 |
| Dec 19, 2006 | Expired or cancelled expired Mar 2009 | 140 Chestnut St | Miller Construction | demolition of current single level office/canopy. addition of (n) entry facade, access ramp & stair.Details
demolition of current single level office/canopy. addition of (n) entry facade, access ramp & stair. | $200,000 |
| Aug 29, 2005 | Expired or cancelled expired Mar 2009 | 1725 Montgomery St | Aquamatic Fire Protection | 2/fl-relocate 9 fire sprinklers for new walls in office tenant remodel.Details
2/fl-relocate 9 fire sprinklers for new walls in office tenant remodel. | $2,750 |
| Jun 27, 2005 | Completed final sign-off Sep 2005 | 1725 Montgomery St | interior remodel of (e) interior space; 20 percent ada work; interior ceiling height walls & one houDetails
interior remodel of (e) interior space; 20 percent ada work; interior ceiling height walls & one hou | $5,500 | |
| Jun 14, 2005 | Completed final sign-off Jan 2006 | 1725 Montgomery St | 13-D Fire Systems | relocate (e) sprinklers to accomodate new wall locations. (two total)Details
relocate (e) sprinklers to accomodate new wall locations. (two total) | $1,200 |
| Mar 30, 2005 | Expired or cancelled expired Mar 2009 | 1725 Montgomery St | Hazel Construction Inc. | response to notice of violation/nw low walls & ceiling height walls for new work station &Details
response to notice of violation/nw low walls & ceiling height walls for new work station & | $50,000 |
| Jul 28, 2003 | Completed final sign-off Sep 2003 | 1725 Montgomery St | Sign Solutions Inc Dba Artsigns | signDetails
sign | |
| Apr 25, 2003 | Completed final sign-off Aug 2003 | 1725 Montgomery St | tenant improvement & renovation, accessible, new lighting, electrical outlets, mechanical.Details
tenant improvement & renovation, accessible, new lighting, electrical outlets, mechanical. | $49,000 | |
| Mar 12, 2003 | Completed final sign-off Jul 2004 | 150 Chestnut St | Plant Construction Co, Lp | add additional structural bracing to existing roof trussesDetails
add additional structural bracing to existing roof trusses | $75,000 |
| Oct 12, 2000 | Expired or cancelled expired Feb 2001 | 1725 Montgomery St | street space |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Sabah International Incorporated (9), Howard S. Wright Constructors Lp (7), Geo M Robinson & Co (6), Marchetti Group (6), Turner Construction Co (6), Miller Construction (5), Aquamatic Fire Protection (3), San Francisco Commercial Builders Inc (3), Cameron Builders Inc. (2), Golden Gate Fire Protection Inc (2), Rocha Electrical Systems (2), Rudolph And Sletten Inc (2), Westates Mechanical Corporation Inc (2), 13-D Fire Systems, Ad Art Inc., Ayoob & Peery Plumbing Co Inc, Bay Cities Pyrotector Inc, Comfort Dynamics Inc., Eagle Bay Enterprises, Inc (Dba Garnett, Hazel Construction Inc., Marchetti Construction Inc., Mcclure Electric Inc, Plant Construction Co, Lp, Richlen Construction, Rittenbach Roofing & Waterproofing Inc, Sign Solutions Inc Dba Artsigns, Source Planning And Construction Inc, Specialized Graphics Inc
- Architects
- Jennifer Clifford (4), Doug Zucker (3), Clement Soga, Daniel G. Scovill, Jennifer M Harding, John Flath, Joseph Remling, Ken Eng, Michael Castro
- Engineers
- Kevin Fogarty, Kirk Johnston, Michael Andrew Hynding, Parabhjeet Grewal, Srdjan Rebraca, Tim Heiman, Tomislav Gajic
- Authorized agents
- Alan Pullman, Michael Zucher
- Designers
- Michael Castro
Find contractors for work like this