10 permits since 2000 (engineer on 10 permits): 10 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 18, 2017 | Completed final sign-off Apr 2018 | 1603 Pine St | Cahill Contractors Llc. | 1st fl: installation of a new light gauge framing to support (n) interior storefront w/o altering (e) fire rated plenum.Details
1st fl: installation of a new light gauge framing to support (n) interior storefront w/o altering (e) fire rated plenum. | $2,000 |
| Jun 1, 2016 | Completed final sign-off Nov 2018 | 2701 Mission St | G Swanson Constr. Inc. | tenant improvement to (e)bank: scope includes demolition of non-bearing partitions,atms,teller line,acoustic ceiling & removal of furniture & finishes.(e)restrooms,stairs,night drop & vault to remain,new scope includes offices,breakroom,tellerline,doors,millwork,floor finish & associated hvac,a/v &Details
tenant improvement to (e)bank: scope includes demolition of non-bearing partitions,atms,teller line,acoustic ceiling & removal of furniture & finishes.(e)restrooms,stairs,night drop & vault to remain,new scope includes offices,breakroom,tellerline,doors,millwork,floor finish & associated hvac,a/v & | $900,000 |
| Feb 25, 2016 | Completed final sign-off Oct 2017 | 1335 26th Av | Segale Construction | remodel kitchen, living rooms, dinning rooms, roof, structure over living, dinning and kitchen will be new framing.Details
remodel kitchen, living rooms, dinning rooms, roof, structure over living, dinning and kitchen will be new framing. | $143,000 |
| Jun 26, 2014 | Completed final sign-off Apr 2017 | 1830 Sutter St | Wickman Development And Construction | 2 story preschool building addition with rooftop play yard.Details
2 story preschool building addition with rooftop play yard. | $2,098,700 |
| Jun 11, 2014 | Completed final sign-off Dec 2014 | 345 Spear St | Bcci Construction Company | cafe 3rd floor: minor demolition, new wall, kitchen equipment and mechanical & electrical. installing new hortzontial exit. ls & sprinklers under seperate permit. n/a ordinance #155-13-per pre-application mtg 7-3-14- phase i- temp exiting corridor- sealing convience stair. occupant load.Details
cafe 3rd floor: minor demolition, new wall, kitchen equipment and mechanical & electrical. installing new hortzontial exit. ls & sprinklers under seperate permit. n/a ordinance #155-13-per pre-application mtg 7-3-14- phase i- temp exiting corridor- sealing convience stair. occupant load. | $1,400,000 |
| Sep 12, 2013 | Completed final sign-off Nov 2013 | 901 Market St | Fisher Development Inc | revision to appl #2013.03.26.3069 - delete composite beam from project.Details
revision to appl #2013.03.26.3069 - delete composite beam from project. | |
| Mar 26, 2013 | Completed final sign-off Mar 2014 | 901 Market St | Fisher Development Inc | struc,arch,mech upgrades on the grd thru 3rd flr. demo of mezzanine, install elevator & a pair of escalators between flrs 1 & 2. infill areas at grd flr where (e) level changes occur & (e) retail entry to basement. add 3rd exit stair from 2nd flr.change use base of atrium from 2nd to 3rd flr.Details
struc,arch,mech upgrades on the grd thru 3rd flr. demo of mezzanine, install elevator & a pair of escalators between flrs 1 & 2. infill areas at grd flr where (e) level changes occur & (e) retail entry to basement. add 3rd exit stair from 2nd flr.change use base of atrium from 2nd to 3rd flr. | $1,500,000 |
| Dec 6, 2012 | Completed final sign-off Jul 2013 | 140 Chestnut St | Howard S. Wright Constructors Lp | change of occupancy to b and f-1. interior ceiling height walls/new 1 hour rated walls as noted. nw elect. for open area work space, shared office, conf. rooms, strorage room, & elect room. new light fixtures as indicated throughout. the space. nw plmg fixtures & new ada shower & restroom. chDetails
change of occupancy to b and f-1. interior ceiling height walls/new 1 hour rated walls as noted. nw elect. for open area work space, shared office, conf. rooms, strorage room, & elect room. new light fixtures as indicated throughout. the space. nw plmg fixtures & new ada shower & restroom. ch | $1,500,000 |
| Apr 27, 2009 | Completed final sign-off Oct 2009 | 595 Market St | Dpr Construction Inc | t.i at 28th, 29th 30th floor: mechanical, electrical, plumbing, structural & life safety, upgrade existing toilet rooms and add additional toilet rooms on 30th fl.Details
t.i at 28th, 29th 30th floor: mechanical, electrical, plumbing, structural & life safety, upgrade existing toilet rooms and add additional toilet rooms on 30th fl. | $5,000,000 |
| May 19, 2008 | Completed final sign-off Sep 2008 | 1596 Howard St | Swinerton Builders | minor demolition of walls & tenant improvement @ 3rd floor. new partitions to create office & storage space. existing toilets & egress to remain. minor demolitions of walls.Details
minor demolition of walls & tenant improvement @ 3rd floor. new partitions to create office & storage space. existing toilets & egress to remain. minor demolitions of walls. | $1,300,000 |