Permit GraphShortlistSan Francisco building permits since 2000

Alan Johansen

License
C9672
Look the license up with the state
Listed as
architect, authorized agent-others, designer, engineer
Firm
Interior Architects
Based in
San Francisco
On San Francisco permits
Sep 2001 to Jan 2024

279 permits since 2000 (architect on 257 permits, designer on 10 permits, authorized agent-others on 8 permits, engineer on 5 permits): 232 completed, 25 never finaled, 22 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

Showing the 100 most recent of 279.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jan 30, 2024Completed
final sign-off May 2024
944 Stockton StG Swanson Constr. Inc.interior renovation of the back of house in an extg bank branch back of houose area in a high rise, multi-tenant mixed use bldg. scope of work includes: ceiling grid and tile replacement, lighting, finishes, flooring, millwork, furniture and equipment.
Details
Permit
202401304881
Status
complete
Filed
Jan 30, 2024
Permit issued
Mar 27, 2024
Final sign-off
May 6, 2024
Declared cost
$120,000
Address
944 Stockton St

interior renovation of the back of house in an extg bank branch back of houose area in a high rise, multi-tenant mixed use bldg. scope of work includes: ceiling grid and tile replacement, lighting, finishes, flooring, millwork, furniture and equipment.

Open the permit page

$120,000
Dec 13, 2017Completed
final sign-off Feb 2018
100 Montgomery StSwinerton Builders21st floor: one "l" shape low height partition. no ceiling, lighting, & other scope of work. electrical work to be under seperate trade permit. n/a for maher.
Details
Permit
201712136415
Status
complete
Filed
Dec 13, 2017
Permit issued
Dec 14, 2017
Final sign-off
Feb 23, 2018
Declared cost
$5,000
Address
100 Montgomery St

21st floor: one "l" shape low height partition. no ceiling, lighting, & other scope of work. electrical work to be under seperate trade permit. n/a for maher.

Open the permit page

$5,000
Jan 12, 2017Completed
final sign-off Oct 2017
50 Fremont StGci, Inc8,9,10th flr: refresh stairs, including demo at stairs of (e) architectural element with hand rails and associated lighting. adding additional support at (e) stairs; adding glass hand railing guardrail and handrails new lighting. maher ord 155-13 na
Details
Permit
201701127093
Status
complete
Filed
Jan 12, 2017
Permit issued
Jan 25, 2017
Final sign-off
Oct 26, 2017
Declared cost
$20,000
Address
50 Fremont St

8,9,10th flr: refresh stairs, including demo at stairs of (e) architectural element with hand rails and associated lighting. adding additional support at (e) stairs; adding glass hand railing guardrail and handrails new lighting. maher ord 155-13 na

Open the permit page

$20,000
Jan 12, 2017Completed
final sign-off Oct 2017
50 Fremont StGci, Inc5,6,7 flr: refresh stairs, including demo at stairs of (e) architectural element with hand rails and associated lighting. adding additional support at (e) stairs; adding glass hand railing guardrail and handrails new lighting. maher ord 155-13 na
Details
Permit
201701127092
Status
complete
Filed
Jan 12, 2017
Permit issued
Jan 25, 2017
Final sign-off
Oct 26, 2017
Declared cost
$20,000
Address
50 Fremont St

5,6,7 flr: refresh stairs, including demo at stairs of (e) architectural element with hand rails and associated lighting. adding additional support at (e) stairs; adding glass hand railing guardrail and handrails new lighting. maher ord 155-13 na

Open the permit page

$20,000
Dec 20, 2016Never finaled
issued Dec 2016, no final
1 Montgomery StBcci Construction Company25th flr: commercial tenant improvement which included demolition, new non-structural partitions, mep, lighting, millwork & finishes.
Details
Permit
201612205390
Status
issued
Filed
Dec 20, 2016
Permit issued
Dec 20, 2016
Declared cost
$2,200,000
Address
1 Montgomery St

25th flr: commercial tenant improvement which included demolition, new non-structural partitions, mep, lighting, millwork & finishes.

Open the permit page

$2,200,000
Dec 20, 2016Never finaled
issued Dec 2016, no final
1 Montgomery StBcci Construction Company24th floor: commercial t.i. which included selective demolition, new non-structural partitions, mep, lighting, millwork and finishes.
Details
Permit
201612205388
Status
issued
Filed
Dec 20, 2016
Permit issued
Dec 20, 2016
Declared cost
$975,000
Address
1 Montgomery St

24th floor: commercial t.i. which included selective demolition, new non-structural partitions, mep, lighting, millwork and finishes.

Open the permit page

$975,000
Dec 13, 2016Completed
final sign-off Nov 2017
50 Fremont StGci, Inc16/f- full floor tenant remodel existing office including ceiling partitions, ceilings and mep maher not req
Details
Permit
201612134827
Status
complete
Filed
Dec 13, 2016
Permit issued
Dec 20, 2016
Final sign-off
Nov 10, 2017
Declared cost
$2,750,000
Address
50 Fremont St

16/f- full floor tenant remodel existing office including ceiling partitions, ceilings and mep maher not req

Open the permit page

$2,750,000
Dec 6, 2016Completed
final sign-off Sep 2017
50 Fremont StGci, Incremove existing surface mounted light fixtures in all huddle and phone rooms. to be replaced with recessed downlights. ref pa# 201610119947
Details
Permit
201612064281
Status
complete
Filed
Dec 6, 2016
Permit issued
Dec 23, 2016
Final sign-off
Sep 25, 2017
Address
50 Fremont St

remove existing surface mounted light fixtures in all huddle and phone rooms. to be replaced with recessed downlights. ref pa# 201610119947

Open the permit page

Dec 6, 2016Completed
final sign-off Sep 2017
50 Fremont StGci, Incremove existing surface mounted light fixtures in all huddle and phone rooms. to be replaced with recessed downlights. ref. 2016-10-11-9943. maher not req
Details
Permit
201612064274
Status
complete
Filed
Dec 6, 2016
Permit issued
Dec 23, 2016
Final sign-off
Sep 19, 2017
Address
50 Fremont St

remove existing surface mounted light fixtures in all huddle and phone rooms. to be replaced with recessed downlights. ref. 2016-10-11-9943. maher not req

Open the permit page

Dec 6, 2016Completed
final sign-off Sep 2017
50 Fremont StGci, Incremove existing surface mounted light fixtures in all huddle and phone rooms. to be replaced with recessed downlights.
Details
Permit
201612064280
Status
complete
Filed
Dec 6, 2016
Permit issued
Dec 23, 2016
Final sign-off
Sep 19, 2017
Address
50 Fremont St

remove existing surface mounted light fixtures in all huddle and phone rooms. to be replaced with recessed downlights.

Open the permit page

Nov 2, 2016Completed
final sign-off Feb 2017
75 Hawthorne StTurner Construction Corevised occupancy type training room to 1:20 b occupancy ref pa 2015-1231-6239
Details
Permit
201611021790
Status
complete
Filed
Nov 2, 2016
Permit issued
Nov 9, 2016
Final sign-off
Feb 13, 2017
Declared cost
$996
Address
75 Hawthorne St

revised occupancy type training room to 1:20 b occupancy ref pa 2015-1231-6239

Open the permit page

$996
Nov 2, 2016Never finaled
issued Nov 2016, no final
75 Hawthorne StTurner Construction Corevision to 3rd floor interior ti of multi-tenant floor. improvements include electrical, mechanical, ceiling, lighting & finishes. no structural scope. no change of use. ref pa 2013-1211-3943
Details
Permit
201611021788
Status
issued
Filed
Nov 2, 2016
Permit issued
Nov 9, 2016
Declared cost
$30,000
Address
75 Hawthorne St

revision to 3rd floor interior ti of multi-tenant floor. improvements include electrical, mechanical, ceiling, lighting & finishes. no structural scope. no change of use. ref pa 2013-1211-3943

Open the permit page

$30,000
Oct 11, 2016Completed
final sign-off Oct 2017
50 Fremont StGci, Inc23rd floor: full floor commercial ti - including partitions. ceiling, furniture. finishes, light fixtures, mep. alarm/sprinkler deferred.
Details
Permit
201610119929
Status
complete
Filed
Oct 11, 2016
Permit issued
Nov 21, 2016
Final sign-off
Oct 26, 2017
Declared cost
$2,750,000
Address
50 Fremont St

23rd floor: full floor commercial ti - including partitions. ceiling, furniture. finishes, light fixtures, mep. alarm/sprinkler deferred.

Open the permit page

$2,750,000
Oct 11, 2016Completed
final sign-off Oct 2017
50 Fremont StGci, Inc15th floor: full floor commercial ti - including partitions. ceiling, furniture. finishes, light fixtures, mep
Details
Permit
201610119925
Status
complete
Filed
Oct 11, 2016
Permit issued
Nov 14, 2016
Final sign-off
Oct 26, 2017
Declared cost
$2,750,000
Address
50 Fremont St

15th floor: full floor commercial ti - including partitions. ceiling, furniture. finishes, light fixtures, mep

Open the permit page

$2,750,000
Oct 11, 2016Completed
final sign-off Sep 2017
50 Fremont StGci, Inc8th floor - full ti including partitions, ceilings, lights and mep. fire alarm & srpinkler on separate permit
Details
Permit
201610119995
Status
complete
Filed
Oct 11, 2016
Permit issued
Nov 14, 2016
Final sign-off
Sep 19, 2017
Declared cost
$700,000
Address
50 Fremont St

8th floor - full ti including partitions, ceilings, lights and mep. fire alarm & srpinkler on separate permit

Open the permit page

$700,000
Oct 11, 2016Completed
final sign-off Nov 2016
50 Fremont StGci, Inc6th floor - full ti including partitions, ceilings, lights and mep. fire alarm & sprinkler on separate permit
Details
Permit
201610119943
Status
complete
Filed
Oct 11, 2016
Permit issued
Nov 10, 2016
Final sign-off
Nov 15, 2016
Declared cost
$700,000
Address
50 Fremont St

6th floor - full ti including partitions, ceilings, lights and mep. fire alarm & sprinkler on separate permit

Open the permit page

$700,000
Oct 11, 2016Completed
final sign-off Sep 2017
50 Fremont StGci, Inc5th floor: full floor commercial ti - including partitions. ceiling, furniture. finishes, light fixtures, mep. life safety deferred.
Details
Permit
201610119928
Status
complete
Filed
Oct 11, 2016
Permit issued
Oct 31, 2016
Final sign-off
Sep 19, 2017
Declared cost
$700,000
Address
50 Fremont St

5th floor: full floor commercial ti - including partitions. ceiling, furniture. finishes, light fixtures, mep. life safety deferred.

Open the permit page

$700,000
Oct 11, 2016Completed
final sign-off Sep 2017
50 Fremont St7th floor - full ti including partitions, ceilings, lights and mep. fire alarm & srpinkler on separate permit
Details
Permit
201610119947
Status
complete
Filed
Oct 11, 2016
Permit issued
Nov 9, 2016
Final sign-off
Sep 19, 2017
Declared cost
$700,000
Address
50 Fremont St

7th floor - full ti including partitions, ceilings, lights and mep. fire alarm & srpinkler on separate permit

Open the permit page

$700,000
Sep 28, 2016Completed
final sign-off Oct 2017
50 Fremont StGci, Incflrs: 15 &16: (n)communicating stair; work includes selective demo @ floor opening,stair,glass guardrail and finishes; maher n/a
Details
Permit
201609289054
Status
complete
Filed
Sep 28, 2016
Permit issued
Oct 28, 2016
Final sign-off
Oct 26, 2017
Declared cost
$125,000
Address
50 Fremont St

flrs: 15 &16: (n)communicating stair; work includes selective demo @ floor opening,stair,glass guardrail and finishes; maher n/a

Open the permit page

$125,000
Sep 16, 2016Completed
final sign-off Oct 2016
50 Fremont StGci, Inc3rd floor: new partition, finishes, electrical devices
Details
Permit
201609167933
Status
complete
Filed
Sep 16, 2016
Permit issued
Sep 16, 2016
Final sign-off
Oct 25, 2016
Declared cost
$50,000
Address
50 Fremont St

3rd floor: new partition, finishes, electrical devices

Open the permit page

$50,000
Sep 2, 2016Completed
final sign-off Oct 2017
50 Fremont StGci, Inc15th flr: selective interior demo of partitions, ceiling & finishes maher na ab017. arch/mpe/life safety deferred. elevator lobby integrity to be maintained.
Details
Permit
201609026762
Status
complete
Filed
Sep 2, 2016
Permit issued
Sep 6, 2016
Final sign-off
Oct 26, 2017
Declared cost
$50,000
Address
50 Fremont St

15th flr: selective interior demo of partitions, ceiling & finishes maher na ab017. arch/mpe/life safety deferred. elevator lobby integrity to be maintained.

Open the permit page

$50,000
Aug 24, 2016Completed
final sign-off Oct 2016
75 Hawthorne StTurner Construction Corevision t0 (e) ti permit to add interior clerestory windows at internal offices on the 9th floor. scope of work limited to gyp board demo, modification of partition framing for (n) window locations patching/finishes (no scope of structural/mep/fire life safety) rev 2013-1218-4509
Details
Permit
201608245882
Status
complete
Filed
Aug 24, 2016
Permit issued
Aug 26, 2016
Final sign-off
Oct 20, 2016
Declared cost
$10,000
Address
75 Hawthorne St

revision t0 (e) ti permit to add interior clerestory windows at internal offices on the 9th floor. scope of work limited to gyp board demo, modification of partition framing for (n) window locations patching/finishes (no scope of structural/mep/fire life safety) rev 2013-1218-4509

Open the permit page

$10,000
Jul 19, 2016Completed
final sign-off Aug 2016
201 03rd StBcci Construction Company6/f- revision to pa 2015-0828-5519 to reclassify room 674a as an education classroom (training) room
Details
Permit
201607192749
Status
complete
Filed
Jul 19, 2016
Permit issued
Jul 21, 2016
Final sign-off
Aug 18, 2016
Address
201 03rd St

6/f- revision to pa 2015-0828-5519 to reclassify room 674a as an education classroom (training) room

Open the permit page

Jul 15, 2016Completed
final sign-off Nov 2017
50 Fremont StGci, Inc42nd flr: t.i. including (n)partitions,ceiling finishes, (n)mechanical & electrical devices including lighting. limited structural scope at roof. maher n/a
Details
Permit
201607152542
Status
complete
Filed
Jul 15, 2016
Permit issued
Aug 10, 2016
Final sign-off
Nov 10, 2017
Declared cost
$274,440
Address
50 Fremont St

42nd flr: t.i. including (n)partitions,ceiling finishes, (n)mechanical & electrical devices including lighting. limited structural scope at roof. maher n/a

Open the permit page

$274,440
Jul 1, 2016Completed
final sign-off Feb 2017
75 Hawthorne StTurner Construction Copartial 2nd floor interior ti on multi-tenant floor improvements include partitions, electrical, mechanical, plumbing, ceiling, lighting, finishes, and life safety. no structural scope
Details
Permit
201607011468
Status
complete
Filed
Jul 1, 2016
Permit issued
Aug 24, 2016
Final sign-off
Feb 1, 2017
Declared cost
$894,800
Address
75 Hawthorne St

partial 2nd floor interior ti on multi-tenant floor improvements include partitions, electrical, mechanical, plumbing, ceiling, lighting, finishes, and life safety. no structural scope

Open the permit page

$894,800
Jul 1, 2016Completed
final sign-off Dec 2016
100 Pine StPrincipal Builders Inc.partial 31st flr ti for partial floor and 32nd floor ti for full floor - minor demo, partitions, mechanical, electrical, ceiling and finishes. minor accessibility upgrades to the bldg core restrooms, include new accessible, minor toilet partition revisions and accessory adjustments
Details
Permit
201607011464
Status
complete
Filed
Jul 1, 2016
Permit issued
Aug 9, 2016
Final sign-off
Dec 15, 2016
Declared cost
$138,000
Address
100 Pine St

partial 31st flr ti for partial floor and 32nd floor ti for full floor - minor demo, partitions, mechanical, electrical, ceiling and finishes. minor accessibility upgrades to the bldg core restrooms, include new accessible, minor toilet partition revisions and accessory adjustments

Open the permit page

$138,000
Jun 27, 2016Completed
final sign-off Dec 2016
555 Mission StSkyline Construction19th floor, partial floor ti on multi-tenant floor including but not limited to selective demolition, partition, ceiling, mechanical, electrical, plumbing and finishes. path of travel is included as reference only, no structural work life safety under a separate permit.
Details
Permit
201606270945
Status
complete
Filed
Jun 27, 2016
Permit issued
Jul 14, 2016
Final sign-off
Dec 21, 2016
Declared cost
$720,000
Address
555 Mission St

19th floor, partial floor ti on multi-tenant floor including but not limited to selective demolition, partition, ceiling, mechanical, electrical, plumbing and finishes. path of travel is included as reference only, no structural work life safety under a separate permit.

Open the permit page

$720,000
May 27, 2016Completed
final sign-off Sep 2016
101 California StNovo Construction Inctenant improvement on the 30th fl demo, new partitons, elec, mech, ceiling, finishes
Details
Permit
201605278620
Status
complete
Filed
May 27, 2016
Permit issued
Jun 7, 2016
Final sign-off
Sep 13, 2016
Declared cost
$1,000,000
Address
101 California St

tenant improvement on the 30th fl demo, new partitons, elec, mech, ceiling, finishes

Open the permit page

$1,000,000
May 26, 2016Never finaled
issued Jul 2016, no final
222 02nd StSwinerton Builders24/f- full floor t.i. new bldg. pa#200711309386. n/a ordinance #155-13
Details
Permit
201605268445
Status
issued
Filed
May 26, 2016
Permit issued
Jul 22, 2016
Declared cost
$900,000
Address
222 02nd St

24/f- full floor t.i. new bldg. pa#200711309386. n/a ordinance #155-13

Open the permit page

$900,000
May 26, 2016Never finaled
issued Jul 2016, no final
222 02nd StSwinerton Builders23/f- full floor t.i. new bldg. pa#200711309386. n/a ordinance #155-13
Details
Permit
201605268439
Status
issued
Filed
May 26, 2016
Permit issued
Jul 22, 2016
Declared cost
$900,000
Address
222 02nd St

23/f- full floor t.i. new bldg. pa#200711309386. n/a ordinance #155-13

Open the permit page

$900,000
May 2, 2016Never finaled
issued Aug 2016, no final
222 02nd StSwinerton Builders22nd floor - full floor t.i. including partitions, ceilings, finishes, millwork, furniture, lighting fixtures, plumbing, mechanical & electrical. ref #200711309386 for new construction. n/a maher ordinance
Details
Permit
201605026264
Status
issued
Filed
May 2, 2016
Permit issued
Aug 2, 2016
Declared cost
$1,200,000
Address
222 02nd St

22nd floor - full floor t.i. including partitions, ceilings, finishes, millwork, furniture, lighting fixtures, plumbing, mechanical & electrical. ref #200711309386 for new construction. n/a maher ordinance

Open the permit page

$1,200,000
May 2, 2016Never finaled
issued Aug 2016, no final
222 02nd StSwinerton Builders21st floor -full floor t.i. including partitions, ceilings, finishes, millwork, furniture, lighting, fixtures, plumbing, mechanical & electrical. ref #200711309386 for new construction. n/a maher ordinance
Details
Permit
201605026270
Status
issued
Filed
May 2, 2016
Permit issued
Aug 2, 2016
Declared cost
$1,200,000
Address
222 02nd St

21st floor -full floor t.i. including partitions, ceilings, finishes, millwork, furniture, lighting, fixtures, plumbing, mechanical & electrical. ref #200711309386 for new construction. n/a maher ordinance

Open the permit page

$1,200,000
Apr 6, 2016Completed
final sign-off Aug 2016
222 02nd StSwinerton Buildersbuild sound barrier on 5th floor roof around exhaust of p.c.u. and mechanical equipment
Details
Permit
201604064059
Status
complete
Filed
Apr 6, 2016
Permit issued
Apr 28, 2016
Final sign-off
Aug 12, 2016
Declared cost
$29,000
Address
222 02nd St

build sound barrier on 5th floor roof around exhaust of p.c.u. and mechanical equipment

Open the permit page

$29,000
Mar 28, 2016Completed
final sign-off Apr 2017
555 California StSwinerton Buildersrevision to pa#201602190037, split one office into two, lighting, finishes & power. n/a ordinance #155-13
Details
Permit
201603283252
Status
complete
Filed
Mar 28, 2016
Permit issued
Apr 13, 2016
Final sign-off
Apr 7, 2017
Declared cost
$50,000
Address
555 California St

revision to pa#201602190037, split one office into two, lighting, finishes & power. n/a ordinance #155-13

Open the permit page

$50,000
Mar 28, 2016Completed
final sign-off Apr 2017
555 California StSwinerton Buildersrevision to pa#201508063571 switch office & conference room, finishes, lighting & power. n/a ordinance #155-13
Details
Permit
201603283249
Status
complete
Filed
Mar 28, 2016
Permit issued
Apr 13, 2016
Final sign-off
Apr 7, 2017
Address
555 California St

revision to pa#201508063571 switch office & conference room, finishes, lighting & power. n/a ordinance #155-13

Open the permit page

Feb 19, 2016Completed
final sign-off Apr 2017
555 California StSwinerton Builders7th flr: partial floor tenant improvement for full tenant for additional card readers at common path egress door only, not an exit. card reader used only for local alarm and not tied to the building; maher n/a
Details
Permit
201602190035
Status
complete
Filed
Feb 19, 2016
Permit issued
Mar 8, 2016
Final sign-off
Apr 6, 2017
Declared cost
$158,000
Address
555 California St

7th flr: partial floor tenant improvement for full tenant for additional card readers at common path egress door only, not an exit. card reader used only for local alarm and not tied to the building; maher n/a

Open the permit page

$158,000
Feb 19, 2016Never finaled
issued Mar 2016, no final
555 California StSwinerton Builders11th flr: partial floor tenant improvement for full floor tenant including but not limited to: selective demolition, partition, millwork, electrical & finishes. no mechanical,plumbing or structural. life safety under a separate permit; maher n/a1
Details
Permit
201602190037
Status
issued
Filed
Feb 19, 2016
Permit issued
Mar 8, 2016
Declared cost
$166,000
Address
555 California St

11th flr: partial floor tenant improvement for full floor tenant including but not limited to: selective demolition, partition, millwork, electrical & finishes. no mechanical,plumbing or structural. life safety under a separate permit; maher n/a1

Open the permit page

$166,000
Feb 2, 2016Never finaled
issued Jul 2016, no final
75 Hawthorne StTurner Construction Coarch and mep plans with comm kitchen 4 new fsd's 1st and 2nd floors: partial floor t.i. conversion of office space to child care center. selective non-structural demolition, new partitons and finishes. close off and abandon 1 existing stair.
Details
Permit
201602028584
Status
issued
Filed
Feb 2, 2016
Permit issued
Jul 28, 2016
Declared cost
$880,000
Address
75 Hawthorne St

arch and mep plans with comm kitchen 4 new fsd's 1st and 2nd floors: partial floor t.i. conversion of office space to child care center. selective non-structural demolition, new partitons and finishes. close off and abandon 1 existing stair.

Open the permit page

$880,000
Feb 1, 2016Completed
final sign-off Feb 2017
75 Hawthorne StTurner Construction Co7th/8th floor: partial floor ti, ref pa 2015-1231-6241: mep work. sep permits for fire/life safety/restrooms/elevator lobby/arch.
Details
Permit
201602018528
Status
complete
Filed
Feb 1, 2016
Permit issued
Mar 4, 2016
Final sign-off
Feb 1, 2017
Declared cost
$800,000
Address
75 Hawthorne St

7th/8th floor: partial floor ti, ref pa 2015-1231-6241: mep work. sep permits for fire/life safety/restrooms/elevator lobby/arch.

Open the permit page

$800,000
Jan 15, 2016Completed
final sign-off Feb 2017
75 Hawthorne StTurner Construction Co6th floor: partial floor t.i. for mep scope of work. seperate permit: fire sprinkler, fire, life safty, resterooms, elvator lobby, architectural t.i. ab 060 compliant, adding fsd's through rated walls.
Details
Permit
201601157250
Status
complete
Filed
Jan 15, 2016
Permit issued
Mar 4, 2016
Final sign-off
Feb 13, 2017
Declared cost
$800,000
Address
75 Hawthorne St

6th floor: partial floor t.i. for mep scope of work. seperate permit: fire sprinkler, fire, life safty, resterooms, elvator lobby, architectural t.i. ab 060 compliant, adding fsd's through rated walls.

Open the permit page

$800,000
Dec 31, 2015Completed
final sign-off Feb 2017
75 Hawthorne StTurner Construction Cofull floor ti: selective non-structural demolition; new partitions, finishes, minor structural bracing, ceiling, secondary restrooms. under separate permits: mep, fire sprinkler, fire life safety, core restrooms, elevator lobby.
Details
Permit
201512316239
Status
complete
Filed
Dec 31, 2015
Permit issued
Mar 29, 2016
Final sign-off
Feb 7, 2017
Declared cost
$996,000
Address
75 Hawthorne St

full floor ti: selective non-structural demolition; new partitions, finishes, minor structural bracing, ceiling, secondary restrooms. under separate permits: mep, fire sprinkler, fire life safety, core restrooms, elevator lobby.

Open the permit page

$996,000
Dec 7, 2015Completed
final sign-off Apr 2016
101 California StSource Planning And Construction Increnovate e shower rooms, selective demo and construction of non load bearing partitions, modifications to ceiling grid and tile, new light fixtures, salvaged door/fra,e/hardware, new millwork, showers, toilets, sinks, finishes. mep, l/s under separate permit. n/a ordinance #155-13
Details
Permit
201512074309
Status
complete
Filed
Dec 7, 2015
Permit issued
Jan 8, 2016
Final sign-off
Apr 22, 2016
Declared cost
$107,021
Address
101 California St

renovate e shower rooms, selective demo and construction of non load bearing partitions, modifications to ceiling grid and tile, new light fixtures, salvaged door/fra,e/hardware, new millwork, showers, toilets, sinks, finishes. mep, l/s under separate permit. n/a ordinance #155-13

Open the permit page

$107,021
Dec 3, 2015Completed
final sign-off Jul 2016
201 03rd StBcci Construction Company5/6 floors: revision to issued pa 201502178521 to revise structural details.
Details
Permit
201512034077
Status
complete
Filed
Dec 3, 2015
Permit issued
Dec 3, 2015
Final sign-off
Jul 6, 2016
Address
201 03rd St

5/6 floors: revision to issued pa 201502178521 to revise structural details.

Open the permit page

Dec 3, 2015Completed
final sign-off Jul 2016
201 03rd StBcci Construction Company6 & 7 floors: revision to issued pa 201508103765 to revise structural detail.
Details
Permit
201512034079
Status
complete
Filed
Dec 3, 2015
Permit issued
Dec 3, 2015
Final sign-off
Jul 6, 2016
Address
201 03rd St

6 & 7 floors: revision to issued pa 201508103765 to revise structural detail.

Open the permit page

Dec 1, 2015Completed
final sign-off May 2016
100 01st StCommercial Interior Builders Inc12th floor; partial floor tenant improvement, demolition of non structural partitions. new partitons, ceilings, finishes, electrical and mechanical
Details
Permit
201512013803
Status
complete
Filed
Dec 1, 2015
Permit issued
Dec 7, 2015
Final sign-off
May 5, 2016
Declared cost
$100,000
Address
100 01st St

12th floor; partial floor tenant improvement, demolition of non structural partitions. new partitons, ceilings, finishes, electrical and mechanical

Open the permit page

$100,000
Oct 15, 2015Completed
final sign-off Jul 2016
550 Terry A. Francois BlSwinerton Builderspartial t.i. of full floor tenant space, scope of work to include construction on new walls, ceilings, floor finishes, mechanical and electrical. n/a ordinance #155-13
Details
Permit
201510159800
Status
complete
Filed
Oct 15, 2015
Permit issued
Oct 26, 2015
Final sign-off
Jul 1, 2016
Declared cost
$300,000
Address
550 Terry A. Francois Bl

partial t.i. of full floor tenant space, scope of work to include construction on new walls, ceilings, floor finishes, mechanical and electrical. n/a ordinance #155-13

Open the permit page

$300,000
Oct 9, 2015Completed
final sign-off Jul 2016
222 02nd StSwinerton Builderspcu exhaust riser shaft terminates of floor 5 roof. 250 sq ft project area. n/a maher
Details
Permit
201510099314
Status
complete
Filed
Oct 9, 2015
Permit issued
Jan 25, 2016
Final sign-off
Jul 29, 2016
Declared cost
$40,000
Address
222 02nd St

pcu exhaust riser shaft terminates of floor 5 roof. 250 sq ft project area. n/a maher

Open the permit page

$40,000
Oct 6, 2015Expired or cancelled
cancelled Mar 2017
85 02nd StGci, Incground floor, suite #100: enlarging server room. duct distribution being modified. 1 new 2.0 tons split ac system for telcom room 114. maher na
Details
Permit
201510068899
Status
cancelled
Filed
Oct 6, 2015
Permit issued
Oct 27, 2015
Declared cost
$50,000
Address
85 02nd St

ground floor, suite #100: enlarging server room. duct distribution being modified. 1 new 2.0 tons split ac system for telcom room 114. maher na

Open the permit page

$50,000
Sep 30, 2015Completed
final sign-off Dec 2016
121 Spear StBcci Construction Company3rd flr: partial floor t.i. in office portion of the building incl demo,drywall ceilings,doors,finishes,mechanical & electric, fire alarm life safety and sprinklers on seperate permits. maher n/a
Details
Permit
201509308432
Status
complete
Filed
Sep 30, 2015
Permit issued
Oct 6, 2015
Final sign-off
Dec 22, 2016
Declared cost
$511,560
Address
121 Spear St

3rd flr: partial floor t.i. in office portion of the building incl demo,drywall ceilings,doors,finishes,mechanical & electric, fire alarm life safety and sprinklers on seperate permits. maher n/a

Open the permit page

$511,560
Sep 29, 2015Completed
final sign-off Jul 2016
550 Terry A. Francois BlSwinerton Buildersdemolition of portion of 1st floor space, including partitions, electrical, mechanical, ceiling, lighting and finishes. area of work shall remain vacant per ab-017. n/a ordinance #155-13
Details
Permit
201509298282
Status
complete
Filed
Sep 29, 2015
Permit issued
Sep 29, 2015
Final sign-off
Jul 12, 2016
Declared cost
$15,000
Address
550 Terry A. Francois Bl

demolition of portion of 1st floor space, including partitions, electrical, mechanical, ceiling, lighting and finishes. area of work shall remain vacant per ab-017. n/a ordinance #155-13

Open the permit page

$15,000
Sep 17, 2015Completed
final sign-off Jan 2016
1 Embarcadero CenterDome Construction Corp15th floor suite 1550 partial floor t.i. for single tenant including selective demo, new partition, finishes, rcp. mep design build under separate permit. n/a maher ordinance
Details
Permit
201509177247
Status
complete
Filed
Sep 17, 2015
Permit issued
Oct 13, 2015
Final sign-off
Jan 13, 2016
Declared cost
$500,000
Address
1 Embarcadero Center

15th floor suite 1550 partial floor t.i. for single tenant including selective demo, new partition, finishes, rcp. mep design build under separate permit. n/a maher ordinance

Open the permit page

$500,000
Sep 16, 2015Never finaled
issued Nov 2015, no final
685 Market StTruebeck Construction5th flr: partial floor administrative office, t.i. selective demo,partitions,ceilings,finishes,meps,no structural work, sprinkler & life safety permits under separate submittal; maher n/a
Details
Permit
201509167176
Status
issued
Filed
Sep 16, 2015
Permit issued
Nov 2, 2015
Declared cost
$250,000
Address
685 Market St

5th flr: partial floor administrative office, t.i. selective demo,partitions,ceilings,finishes,meps,no structural work, sprinkler & life safety permits under separate submittal; maher n/a

Open the permit page

$250,000
Sep 15, 2015Completed
final sign-off Jun 2016
303 02nd StSkyline Construction4/f: multi tenant partial floor ti selective demo of finishes partitions, new partitions, ceilings and finishes. new restrooms. mep & fire life safety under separate permit. compliance with maher ordinance no 155-13 not required.
Details
Permit
201509156943
Status
complete
Filed
Sep 15, 2015
Permit issued
Sep 29, 2015
Final sign-off
Jun 6, 2016
Declared cost
$200,000
Address
303 02nd St

4/f: multi tenant partial floor ti selective demo of finishes partitions, new partitions, ceilings and finishes. new restrooms. mep & fire life safety under separate permit. compliance with maher ordinance no 155-13 not required.

Open the permit page

$200,000
Sep 1, 2015Completed
final sign-off Dec 2015
1 Post StSc Builders, Increvision to app#201507101233 and 201506048075 addressing douglas fir with wood panelling as request by general james fire inspector.
Details
Permit
201509015793
Status
complete
Filed
Sep 1, 2015
Permit issued
Sep 1, 2015
Final sign-off
Dec 1, 2015
Address
1 Post St

revision to app#201507101233 and 201506048075 addressing douglas fir with wood panelling as request by general james fire inspector.

Open the permit page

Aug 11, 2015Completed
final sign-off Jul 2016
425 Market StSkyline Construction28th floor - full floor t.i. includes partitions & demountable partitions. mechanical electrical work etc. sprinkler & life safety work if needed, under separate permit. demo under sep permit #201507070783. n/a maher ordinance
Details
Permit
201508113884
Status
complete
Filed
Aug 11, 2015
Permit issued
Sep 3, 2015
Final sign-off
Jul 1, 2016
Declared cost
$2,000,000
Address
425 Market St

28th floor - full floor t.i. includes partitions & demountable partitions. mechanical electrical work etc. sprinkler & life safety work if needed, under separate permit. demo under sep permit #201507070783. n/a maher ordinance

Open the permit page

$2,000,000
Aug 11, 2015Never finaled
issued Oct 2015, no final
1455 Market StDeb Construction Llc1st floor: partial floor t.i. including but not limited to: selective demo, partition, ceiling & finishes. life saftey under sep permit. maher na
Details
Permit
201508113903
Status
issued
Filed
Aug 11, 2015
Permit issued
Oct 27, 2015
Declared cost
$467,544
Address
1455 Market St

1st floor: partial floor t.i. including but not limited to: selective demo, partition, ceiling & finishes. life saftey under sep permit. maher na

Open the permit page

$467,544
Aug 11, 2015Completed
final sign-off Oct 2016
425 Market StSkyline Construction27th floor - full floor t.i. includes partitions & demountable partitions. mechanical electrical & plumbing. sprinkler & life safety work if needed, under separate permit. demo under sep permit. n/a maher ordinance
Details
Permit
201508113880
Status
complete
Filed
Aug 11, 2015
Permit issued
Sep 3, 2015
Final sign-off
Oct 28, 2016
Declared cost
$2,000,000
Address
425 Market St

27th floor - full floor t.i. includes partitions & demountable partitions. mechanical electrical & plumbing. sprinkler & life safety work if needed, under separate permit. demo under sep permit. n/a maher ordinance

Open the permit page

$2,000,000
Aug 10, 2015Completed
final sign-off Jul 2016
201 03rd StBcci Construction Companynew steel stair between 6th and 7th flr including structural work and associated mechanical.
Details
Permit
201508103765
Status
complete
Filed
Aug 10, 2015
Permit issued
Aug 10, 2015
Final sign-off
Jul 6, 2016
Declared cost
$519,000
Address
201 03rd St

new steel stair between 6th and 7th flr including structural work and associated mechanical.

Open the permit page

$519,000
Jul 27, 2015Expired or cancelled
cancelled Apr 2016
1 Montgomery StSkyline Constructiont.i. for full floor tenant, selective demolition, new partitions, mechanical & electrical.
Details
Permit
201507272518
Status
cancelled
Filed
Jul 27, 2015
Permit issued
Aug 11, 2015
Declared cost
$50,000
Address
1 Montgomery St

t.i. for full floor tenant, selective demolition, new partitions, mechanical & electrical.

Open the permit page

$50,000
Jul 27, 2015Expired or cancelled
cancelled Apr 2016
1 Montgomery StSkyline Constructiont.i. for the 11/f to include selective demolition, new partitions, mechanical & electrical.
Details
Permit
201507272517
Status
cancelled
Filed
Jul 27, 2015
Permit issued
Aug 11, 2015
Declared cost
$50,000
Address
1 Montgomery St

t.i. for the 11/f to include selective demolition, new partitions, mechanical & electrical.

Open the permit page

$50,000
Jul 22, 2015Completed
final sign-off May 2016
303 02nd StSkyline Constructionnorth tower- partial floor t.i. to include selective demo, construction of new partitions. mep & fire life safety under seperate permit. n/a ordinance #155-13
Details
Permit
201507222145
Status
complete
Filed
Jul 22, 2015
Permit issued
Aug 4, 2015
Final sign-off
May 25, 2016
Declared cost
$180,000
Address
303 02nd St

north tower- partial floor t.i. to include selective demo, construction of new partitions. mep & fire life safety under seperate permit. n/a ordinance #155-13

Open the permit page

$180,000
Jul 21, 2015Completed
final sign-off Jan 2017
222 02nd StSwinerton Builderspartial commercial t.i. including stairs, handrail, guardrails, selective structural reinforcement. n/a ordinance #155-13
Details
Permit
201507212015
Status
complete
Filed
Jul 21, 2015
Permit issued
Oct 2, 2015
Final sign-off
Jan 4, 2017
Declared cost
$200,000
Address
222 02nd St

partial commercial t.i. including stairs, handrail, guardrails, selective structural reinforcement. n/a ordinance #155-13

Open the permit page

$200,000
Jul 7, 2015Completed
final sign-off Oct 2016
425 Market StSkyline Constructionpartial demolition of 28th fl tenant suite including partitions, elec, mech plumbing, ceiling, lighting, and finish. arch, mep, sprinkler and fire alarm revisions under separate application.
Details
Permit
201507070783
Status
complete
Filed
Jul 7, 2015
Permit issued
Jul 13, 2015
Final sign-off
Oct 28, 2016
Declared cost
$60,000
Address
425 Market St

partial demolition of 28th fl tenant suite including partitions, elec, mech plumbing, ceiling, lighting, and finish. arch, mep, sprinkler and fire alarm revisions under separate application.

Open the permit page

$60,000
Jun 17, 2015Completed
final sign-off Sep 2016
222 02nd StSwinerton Builderst.i. including ceiling, partitions, furniture, finishes, lighting fixtures, mechanical, plumbing, electrical, fire alarms, selective structural reinforcements. fire sprinklers deferred. n/a ordinance #155-13
Details
Permit
201506179153
Status
complete
Filed
Jun 17, 2015
Permit issued
Sep 2, 2015
Final sign-off
Sep 2, 2016
Declared cost
$900,000
Address
222 02nd St

t.i. including ceiling, partitions, furniture, finishes, lighting fixtures, mechanical, plumbing, electrical, fire alarms, selective structural reinforcements. fire sprinklers deferred. n/a ordinance #155-13

Open the permit page

$900,000
Jun 17, 2015Completed
final sign-off Sep 2016
222 02nd StSwinerton Builders7th flor t.i.: consisting of ceilings, partitions, furniture, finishes, lighting, fixtures, mech, plumbing, elec, selective structural reinforcements. fire alarm, spklrs, sep permits
Details
Permit
201506179207
Status
complete
Filed
Jun 17, 2015
Permit issued
Aug 31, 2015
Final sign-off
Sep 2, 2016
Declared cost
$900,000
Address
222 02nd St

7th flor t.i.: consisting of ceilings, partitions, furniture, finishes, lighting, fixtures, mech, plumbing, elec, selective structural reinforcements. fire alarm, spklrs, sep permits

Open the permit page

$900,000
Jun 4, 2015Completed
final sign-off Dec 2015
600 Market StSc Builders, Inc21st floor, suite 2130: t.i. on multi- tenant floor. (partitions, ceiling, millwork, finishes.)demo under previous permit. under separate permit mep & life safety (fire alarm sprinkler). no structural work.
Details
Permit
201506048075
Status
complete
Filed
Jun 4, 2015
Permit issued
Jun 25, 2015
Final sign-off
Dec 1, 2015
Declared cost
$394,000
Address
600 Market St

21st floor, suite 2130: t.i. on multi- tenant floor. (partitions, ceiling, millwork, finishes.)demo under previous permit. under separate permit mep & life safety (fire alarm sprinkler). no structural work.

Open the permit page

$394,000
May 13, 2015Completed
final sign-off Jan 2016
201 03rd StBcci Construction Companyrevision to pa#201504022678 . this is a revision to a previous exiting design.
Details
Permit
201505136215
Status
complete
Filed
May 13, 2015
Permit issued
May 13, 2015
Final sign-off
Jan 12, 2016
Declared cost
$25,000
Address
201 03rd St

revision to pa#201504022678 . this is a revision to a previous exiting design.

Open the permit page

$25,000
May 12, 2015Completed
final sign-off Dec 2015
801 Montgomery StGci, Inc3rd floor:full floor t.i. new restroom. no structural, nw partitions, ceiling, finishes, mock data room, mock control rm, bar loundge area, nw training rm, nw mock pantry. oven for heating only. fire place (electric), nw card readers. mep under seperate prmt. n/a for the maher.
Details
Permit
201505126069
Status
complete
Filed
May 12, 2015
Permit issued
May 14, 2015
Final sign-off
Dec 30, 2015
Declared cost
$650,000
Address
801 Montgomery St

3rd floor:full floor t.i. new restroom. no structural, nw partitions, ceiling, finishes, mock data room, mock control rm, bar loundge area, nw training rm, nw mock pantry. oven for heating only. fire place (electric), nw card readers. mep under seperate prmt. n/a for the maher.

Open the permit page

$650,000
May 11, 2015Completed
final sign-off Jul 2015
188 Spear StHathaway Dinwiddie Co.2nd floor - revision to pa #201406239080: storage room changed to green screen room, control, & recording rooms (new architectrual, mechanical & electrical sheets). n/a maher ordinance
Details
Permit
201505115886
Status
complete
Filed
May 11, 2015
Permit issued
May 12, 2015
Final sign-off
Jul 14, 2015
Declared cost
$54,770
Address
188 Spear St

2nd floor - revision to pa #201406239080: storage room changed to green screen room, control, & recording rooms (new architectrual, mechanical & electrical sheets). n/a maher ordinance

Open the permit page

$54,770
Apr 30, 2015Never finaled
issued May 2015, no final
801 Montgomery StGci, Incselective demo (interior only, no structural) inclduing partitions, ceiling, light fixtures, finishes, millwork & interior glazing. n/a ordinance #155-13.
Details
Permit
201504304974
Status
issued
Filed
Apr 30, 2015
Permit issued
May 6, 2015
Declared cost
$15,000
Address
801 Montgomery St

selective demo (interior only, no structural) inclduing partitions, ceiling, light fixtures, finishes, millwork & interior glazing. n/a ordinance #155-13.

Open the permit page

$15,000
Mar 31, 2015Completed
final sign-off Aug 2015
1 Post StSc Builders, Inc20th partial tenant improvement consisting of adding one partition, a door in (e) wall, millwork, ceiling patch/repair, relocation of lighting, finishes & adjusting accessible entry door into bld to meet 5lb max. for da 20% rule. maher - not req'd
Details
Permit
201503312450
Status
complete
Filed
Mar 31, 2015
Permit issued
Apr 3, 2015
Final sign-off
Aug 21, 2015
Declared cost
$10,000
Address
1 Post St

20th partial tenant improvement consisting of adding one partition, a door in (e) wall, millwork, ceiling patch/repair, relocation of lighting, finishes & adjusting accessible entry door into bld to meet 5lb max. for da 20% rule. maher - not req'd

Open the permit page

$10,000
Mar 26, 2015Completed
final sign-off Jul 2015
1 Post StSc Builders, Inc21st fl, suite 2130 - demolition of portion including partitions, elect, mech ,plumbing, ceiling, lighting & finishes. life safety to be deferred submittal. no structural work.
Details
Permit
201503262003
Status
complete
Filed
Mar 26, 2015
Permit issued
Apr 3, 2015
Final sign-off
Jul 9, 2015
Declared cost
$20,000
Address
1 Post St

21st fl, suite 2130 - demolition of portion including partitions, elect, mech ,plumbing, ceiling, lighting & finishes. life safety to be deferred submittal. no structural work.

Open the permit page

$20,000
Mar 23, 2015Completed
final sign-off Mar 2017
1 Post StSc Builders, Inc19th partial tenant improvement consisting of adding one partition, a door in (e) wall, millwork, ceiling patch/repair, relocation of lighting, finishes & adjusting accessible entry door into bld to meet 5lb max. for da 20% rule. maher - not req'd-sprinkler separate permit
Details
Permit
201503231590
Status
complete
Filed
Mar 23, 2015
Permit issued
Apr 3, 2015
Final sign-off
Mar 16, 2017
Declared cost
$10,000
Address
1 Post St

19th partial tenant improvement consisting of adding one partition, a door in (e) wall, millwork, ceiling patch/repair, relocation of lighting, finishes & adjusting accessible entry door into bld to meet 5lb max. for da 20% rule. maher - not req'd-sprinkler separate permit

Open the permit page

$10,000
Feb 27, 2015Completed
final sign-off Nov 2015
525 Market StSkyline Construction37th floor:single tenant floor t.i. consisting of non-structural demolition of extg office. new construction to include partition and interior window wall, doors millwork. mep under seperate permit.
Details
Permit
201502279553
Status
complete
Filed
Feb 27, 2015
Permit issued
Mar 16, 2015
Final sign-off
Nov 13, 2015
Declared cost
$2,500,000
Address
525 Market St

37th floor:single tenant floor t.i. consisting of non-structural demolition of extg office. new construction to include partition and interior window wall, doors millwork. mep under seperate permit.

Open the permit page

$2,500,000
Feb 5, 2015Completed
final sign-off Aug 2015
1355 Market StNovo Construction Inc2nd floor:partial 2nd floor t.i. to include selective demolition, new non load bearing partitions. mep and fire/life safety under seperate permit. n/a for the maher.
Details
Permit
201502057565
Status
complete
Filed
Feb 5, 2015
Permit issued
Feb 5, 2015
Final sign-off
Aug 3, 2015
Declared cost
$5,000
Address
1355 Market St

2nd floor:partial 2nd floor t.i. to include selective demolition, new non load bearing partitions. mep and fire/life safety under seperate permit. n/a for the maher.

Open the permit page

$5,000
Dec 23, 2014Completed
final sign-off Apr 2015
455 Market StSwinerton Builders20th floor - build a new print/supply room enclosure. ref t.i. #2014.0618.8720. n/a maher ordinance
Details
Permit
201412234383
Status
complete
Filed
Dec 23, 2014
Permit issued
Jan 16, 2015
Final sign-off
Apr 14, 2015
Declared cost
$25,000
Address
455 Market St

20th floor - build a new print/supply room enclosure. ref t.i. #2014.0618.8720. n/a maher ordinance

Open the permit page

$25,000
Nov 20, 2014Completed
final sign-off Jun 2016
201 03rd StBcci Construction Company5th floor interior demolition only - including selective demo of partitions, electrical, finishes & mechanical. no exterior or structural elements shall be modified or altered. per ab-017, there is no requirement to provide disabled access ot vacant space.
Details
Permit
201411202135
Status
complete
Filed
Nov 20, 2014
Permit issued
Nov 20, 2014
Final sign-off
Jun 3, 2016
Declared cost
$128,000
Address
201 03rd St

5th floor interior demolition only - including selective demo of partitions, electrical, finishes & mechanical. no exterior or structural elements shall be modified or altered. per ab-017, there is no requirement to provide disabled access ot vacant space.

Open the permit page

$128,000
Nov 20, 2014Completed
final sign-off Jun 2015
201 03rd StBcci Construction Companysuite 620, 6th floor tenant improvement - replace cabinet door pulls, add power & data at (5) locations & apply new fiishes. m,e as needed, under separate permit.
Details
Permit
201411202137
Status
complete
Filed
Nov 20, 2014
Permit issued
Nov 21, 2014
Final sign-off
Jun 26, 2015
Declared cost
$128,500
Address
201 03rd St

suite 620, 6th floor tenant improvement - replace cabinet door pulls, add power & data at (5) locations & apply new fiishes. m,e as needed, under separate permit.

Open the permit page

$128,500
Nov 4, 2014Never finaled
issued Aug 2015, no final
75 Hawthorne StTurner Construction Coadministratie permit for the purpose of documentation of swing up grab bar installed on the 12th fl mens room. reasonable accomodation request
Details
Permit
201411040695
Status
issued
Filed
Nov 4, 2014
Permit issued
Aug 25, 2015
Address
75 Hawthorne St

administratie permit for the purpose of documentation of swing up grab bar installed on the 12th fl mens room. reasonable accomodation request

Open the permit page

Oct 29, 2014Completed
final sign-off Apr 2017
555 California StSwinerton Builders6th floor revision to pa #2014.0619.8862: card readers & emergency release buttons added to elev lobbies, revised door hardware groups, renumbering door schedule. compliance with maher ordinance 155-13 not required.
Details
Permit
201410290182
Status
complete
Filed
Oct 29, 2014
Permit issued
Oct 31, 2014
Final sign-off
Apr 6, 2017
Declared cost
$10,000
Address
555 California St

6th floor revision to pa #2014.0619.8862: card readers & emergency release buttons added to elev lobbies, revised door hardware groups, renumbering door schedule. compliance with maher ordinance 155-13 not required.

Open the permit page

$10,000
Oct 29, 2014Completed
final sign-off Apr 2017
555 California StSwinerton Buildersrevision to #2014.0619.8843: added aiphones & card readers to suite a entry doors, occupant load calc's, layout revised ste b added doors, changed hardwr groups,revised demo, added wellness rm, revised furniture, finishes,revised t-24 cal's, altered fixtures, outlets update havc layouts,add ht pump
Details
Permit
201410290186
Status
complete
Filed
Oct 29, 2014
Permit issued
Oct 31, 2014
Final sign-off
Apr 7, 2017
Declared cost
$788,000
Address
555 California St

revision to #2014.0619.8843: added aiphones & card readers to suite a entry doors, occupant load calc's, layout revised ste b added doors, changed hardwr groups,revised demo, added wellness rm, revised furniture, finishes,revised t-24 cal's, altered fixtures, outlets update havc layouts,add ht pump

Open the permit page

$788,000
Oct 23, 2014Completed
final sign-off Jan 2015
201 03rd StBcci Construction Companytenant improvement on the 5th fl to replace existing chain link fence and lockable gate doors with new full height partition and door with card reader. existing ceiling grid and tile to remain and associated m and e. ls and fire alarm under separate permit
Details
Permit
201410239706
Status
complete
Filed
Oct 23, 2014
Permit issued
Oct 23, 2014
Final sign-off
Jan 26, 2015
Declared cost
$50,000
Address
201 03rd St

tenant improvement on the 5th fl to replace existing chain link fence and lockable gate doors with new full height partition and door with card reader. existing ceiling grid and tile to remain and associated m and e. ls and fire alarm under separate permit

Open the permit page

$50,000
Sep 24, 2014Completed
final sign-off Jul 2015
1 Post StC B 2 Builders Incorporated22nd flr, ste 2250: partial tenant improvement to the 22nd flr, no structural. includes: ceiling height partitions, millwork & finishes, some electrical & data wiring.
Details
Permit
201409247166
Status
complete
Filed
Sep 24, 2014
Permit issued
Sep 25, 2014
Final sign-off
Jul 1, 2015
Declared cost
$75,000
Address
1 Post St

22nd flr, ste 2250: partial tenant improvement to the 22nd flr, no structural. includes: ceiling height partitions, millwork & finishes, some electrical & data wiring.

Open the permit page

$75,000
Sep 12, 2014Completed
final sign-off Feb 2015
1390 Market StHathaway Dinwiddie Co.1st floor-space 110- demolition of a 5,500 sq.ft. office, all ceiling grid/tiles, lighting fixtures, carpet and partial drywalls per ab-17. t.i. will be under seperate. n/a ordinance #155-13. ref arch ti application # 2014/08/06/3107.
Details
Permit
201409126177
Status
complete
Filed
Sep 12, 2014
Permit issued
Sep 12, 2014
Final sign-off
Feb 27, 2015
Declared cost
$20,000
Address
1390 Market St

1st floor-space 110- demolition of a 5,500 sq.ft. office, all ceiling grid/tiles, lighting fixtures, carpet and partial drywalls per ab-17. t.i. will be under seperate. n/a ordinance #155-13. ref arch ti application # 2014/08/06/3107.

Open the permit page

$20,000
Sep 9, 2014Completed
final sign-off Jul 2015
1 Post StC B 2 Builders Incorporated22nd flr, #2250: partial demolition of partitions and light fixtures, at ste 2250, within demised partitions, no new constructions.
Details
Permit
201409095835
Status
complete
Filed
Sep 9, 2014
Permit issued
Sep 10, 2014
Final sign-off
Jul 2, 2015
Address
1 Post St

22nd flr, #2250: partial demolition of partitions and light fixtures, at ste 2250, within demised partitions, no new constructions.

Open the permit page

Sep 8, 2014Completed
final sign-off Oct 2014
201 03rd StCommercial Interior Builders Incstair enclosure on the 5th fl. full floor single tenant. existing communicating stair between 4th and 5th fl to remain. work includes selective demo of light fistures and ceiling panels, new 2 hr rated partitions, ceiling & associated finishes.
Details
Permit
201409085733
Status
complete
Filed
Sep 8, 2014
Permit issued
Sep 30, 2014
Final sign-off
Oct 28, 2014
Declared cost
$40,000
Address
201 03rd St

stair enclosure on the 5th fl. full floor single tenant. existing communicating stair between 4th and 5th fl to remain. work includes selective demo of light fistures and ceiling panels, new 2 hr rated partitions, ceiling & associated finishes.

Open the permit page

$40,000
Aug 26, 2014Never finaled
issued Aug 2015, no final
75 Hawthorne StTurner Construction Codocument smoke control sequence for building. no work to be done for this application.
Details
Permit
201408264786
Status
issued
Filed
Aug 26, 2014
Permit issued
Aug 25, 2015
Address
75 Hawthorne St

document smoke control sequence for building. no work to be done for this application.

Open the permit page

Aug 6, 2014Completed
final sign-off Apr 2015
1390 Market StHathaway Dinwiddie Co.1st flr: a tenant improvement project of 5,560 sf space with new floor & ceiling finishes, (e) restrooms, new lighting fixtures & hvac ducts, exhaust fan & ac unit; life safety under separate permit. ** maher: compliance with ordinance no# 155-13 not required **
Details
Permit
201408063107
Status
complete
Filed
Aug 6, 2014
Permit issued
Oct 8, 2014
Final sign-off
Apr 14, 2015
Declared cost
$472,600
Address
1390 Market St

1st flr: a tenant improvement project of 5,560 sf space with new floor & ceiling finishes, (e) restrooms, new lighting fixtures & hvac ducts, exhaust fan & ac unit; life safety under separate permit. ** maher: compliance with ordinance no# 155-13 not required **

Open the permit page

$472,600
Jul 24, 2014Completed
final sign-off Dec 2014
455 Market StSwinerton Builders20th flr: this permit application is a revision to 201406188720, scope is limited to changing the rating of door 2022 (elevator lobby door) and removing the ab 2.10 requirement. elec, mech, fire/life safety under separate permits. maher n/a
Details
Permit
201407242030
Status
complete
Filed
Jul 24, 2014
Permit issued
Aug 11, 2014
Final sign-off
Dec 3, 2014
Address
455 Market St

20th flr: this permit application is a revision to 201406188720, scope is limited to changing the rating of door 2022 (elevator lobby door) and removing the ab 2.10 requirement. elec, mech, fire/life safety under separate permits. maher n/a

Open the permit page

Jun 27, 2014Never finaled
issued Jul 2014, no final
555 Mission StSkyline Construction23rd floor: t.i. to include selective demolition, new non-load bearing partitions. mep and life safety under seperate permit. n/a for the maher ordinance #155-13
Details
Permit
201406279674
Status
issued
Filed
Jun 27, 2014
Permit issued
Jul 2, 2014
Declared cost
$650,000
Address
555 Mission St

23rd floor: t.i. to include selective demolition, new non-load bearing partitions. mep and life safety under seperate permit. n/a for the maher ordinance #155-13

Open the permit page

$650,000
Jun 24, 2014Completed
final sign-off Dec 2015
101 California StSwinerton Builders13th flr: revision to existing permit 201405125469, offices changed to conference rooms and conference room changed to office; maher not required
Details
Permit
201406249288
Status
complete
Filed
Jun 24, 2014
Permit issued
Jun 27, 2014
Final sign-off
Dec 8, 2015
Address
101 California St

13th flr: revision to existing permit 201405125469, offices changed to conference rooms and conference room changed to office; maher not required

Open the permit page

Jun 23, 2014Completed
final sign-off Jul 2015
188 Spear StHathaway Dinwiddie Co.commercial tenant improvement including selective demolition, interior partitions, ceilings, lighting, finishes, furniture, mechanical, plumbing & electrical. f/a and sprinklers under separate permit. n/a ordinance #155-13.
Details
Permit
201406239080
Status
complete
Filed
Jun 23, 2014
Permit issued
Jun 25, 2014
Final sign-off
Jul 14, 2015
Declared cost
$1,040,000
Address
188 Spear St

commercial tenant improvement including selective demolition, interior partitions, ceilings, lighting, finishes, furniture, mechanical, plumbing & electrical. f/a and sprinklers under separate permit. n/a ordinance #155-13.

Open the permit page

$1,040,000
Jun 19, 2014Completed
final sign-off Apr 2017
555 California StSwinerton Builders7th floor: partial floor tenant improvement for full floor tenant to create 4 offices including selective demolition, partition, ceiling, finishes, mechanical. life safety under a seperate permit. n/a ordinance #155-13.
Details
Permit
201406198840
Status
complete
Filed
Jun 19, 2014
Permit issued
Aug 19, 2014
Final sign-off
Apr 6, 2017
Declared cost
$289,000
Address
555 California St

7th floor: partial floor tenant improvement for full floor tenant to create 4 offices including selective demolition, partition, ceiling, finishes, mechanical. life safety under a seperate permit. n/a ordinance #155-13.

Open the permit page

$289,000
Jun 19, 2014Completed
final sign-off Apr 2017
555 California StSwinerton Builders11th floor: partial floor tenant improvement for full floor tenant including selective demolition, partition, ceiling, finishes, electrical, mechanical & plumbing. life safety under a seperate permit. n/a ordinance #155-13.
Details
Permit
201406198843
Status
complete
Filed
Jun 19, 2014
Permit issued
Aug 19, 2014
Final sign-off
Apr 7, 2017
Declared cost
$788,000
Address
555 California St

11th floor: partial floor tenant improvement for full floor tenant including selective demolition, partition, ceiling, finishes, electrical, mechanical & plumbing. life safety under a seperate permit. n/a ordinance #155-13.

Open the permit page

$788,000
Jun 18, 2014Completed
final sign-off Dec 2014
455 Market StSwinerton Builders20th flr: partial floor tenant improvement on multi tenant floor includes demo, new partitions, ceiling revisions, electrical, mechanical, fire/life safety under separate permit. construction is on the 20th flr; compliance with ord 155-13 not required includes elevator lobby locks
Details
Permit
201406188720
Status
complete
Filed
Jun 18, 2014
Permit issued
Jun 24, 2014
Final sign-off
Dec 3, 2014
Declared cost
$300,000
Address
455 Market St

20th flr: partial floor tenant improvement on multi tenant floor includes demo, new partitions, ceiling revisions, electrical, mechanical, fire/life safety under separate permit. construction is on the 20th flr; compliance with ord 155-13 not required includes elevator lobby locks

Open the permit page

$300,000
May 15, 2014Completed
final sign-off Nov 2014
1455 Market StSkyline Constructiont.i. improvement to include new partitions, cieiling & finishes, structural support at operable partition system.n/a maher
Details
Permit
201405155863
Status
complete
Filed
May 15, 2014
Permit issued
May 21, 2014
Final sign-off
Nov 17, 2014
Declared cost
$750,000
Address
1455 Market St

t.i. improvement to include new partitions, cieiling & finishes, structural support at operable partition system.n/a maher

Open the permit page

$750,000
May 12, 2014Completed
final sign-off Dec 2015
101 California StSwinerton Builderspartial floor tenant improvement including selective demo, partitons, electrical, ceiling and finishes. life safety, fire alarm and sprinkler under separate permit. access controlled egress doors are part of this submittal. n/a maher ordinance 155-13
Details
Permit
201405125469
Status
complete
Filed
May 12, 2014
Permit issued
May 29, 2014
Final sign-off
Dec 8, 2015
Declared cost
$408,000
Address
101 California St

partial floor tenant improvement including selective demo, partitons, electrical, ceiling and finishes. life safety, fire alarm and sprinkler under separate permit. access controlled egress doors are part of this submittal. n/a maher ordinance 155-13

Open the permit page

$408,000
Apr 28, 2014Completed
final sign-off Nov 2014
685 Market St5/f- partial floor office t.i. on multi tenant floor including selective demo, partitions, ceilings, finishes, mechanical, plumbing and electrical, fire sprinklers and life safety under seperate permit. n/a ordinance #155-13.
Details
Permit
201404284303
Status
complete
Filed
Apr 28, 2014
Permit issued
May 15, 2014
Final sign-off
Nov 20, 2014
Declared cost
$250,000
Address
685 Market St

5/f- partial floor office t.i. on multi tenant floor including selective demo, partitions, ceilings, finishes, mechanical, plumbing and electrical, fire sprinklers and life safety under seperate permit. n/a ordinance #155-13.

Open the permit page

$250,000
Apr 10, 2014Completed
final sign-off Sep 2014
450 Bryant StD.P. Stearnsrevision to pa#201312234861, relocate existing permitted metal stairs, add office at original stair location. enclose existing meeting room into storage closet @ 2nd floor. n/a ordinance #155-13.
Details
Permit
201404102912
Status
complete
Filed
Apr 10, 2014
Permit issued
Apr 16, 2014
Final sign-off
Sep 9, 2014
Declared cost
$22,500
Address
450 Bryant St

revision to pa#201312234861, relocate existing permitted metal stairs, add office at original stair location. enclose existing meeting room into storage closet @ 2nd floor. n/a ordinance #155-13.

Open the permit page

$22,500
Mar 18, 2014Completed
final sign-off Oct 2014
360 03rd StSkyline Constructioninterior tenant improvement. demising paritions for multi tenant floor. mep. life safety, fire sprinkler under separate permit. compliance with ordinance #155-13 not required
Details
Permit
201403180997
Status
complete
Filed
Mar 18, 2014
Permit issued
Mar 19, 2014
Final sign-off
Oct 21, 2014
Declared cost
$150,000
Address
360 03rd St

interior tenant improvement. demising paritions for multi tenant floor. mep. life safety, fire sprinkler under separate permit. compliance with ordinance #155-13 not required

Open the permit page

$150,000