84 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 25, 2025 | Completed final sign-off Dec 2025 | 222 02nd St | Cobe Construction Inc | 14th fl/ installation of ner unistrut grid suspended from the existing floor structure above. this project does not propose any chnages to size, use or occupancy of existing spaces, therefore, the egress is not affected by the installation of new equipment.Details
14th fl/ installation of ner unistrut grid suspended from the existing floor structure above. this project does not propose any chnages to size, use or occupancy of existing spaces, therefore, the egress is not affected by the installation of new equipment. | $7,000 |
| Oct 20, 2025 | In progress issued Oct 2025 | 222 02nd St | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm ti adding 1 monitor module to existing notifer nfs2 3030 fire alarm system. ref 2022509266178Details
fire alarm ti adding 1 monitor module to existing notifer nfs2 3030 fire alarm system. ref 2022509266178 | $6,440 |
| May 21, 2025 | Completed final sign-off Nov 2025 | 222 02nd St | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm ti add 2 smoke detectors and 2 relay modules to e notifier nfs2-3030 fire alarm system. ref pa# 202504043741(15/f) and 202504083894(16/f)Details
fire alarm ti add 2 smoke detectors and 2 relay modules to e notifier nfs2-3030 fire alarm system. ref pa# 202504043741(15/f) and 202504083894(16/f) | $7,795 |
| Mar 27, 2025 | Completed final sign-off Jul 2025 | 222 02nd St | Peacock Construction | commercial tenant improvement, 2 meeting rooms into 1 executive office. demo one wall. light power, and signal. remove and reinstall linear diffusersDetails
commercial tenant improvement, 2 meeting rooms into 1 executive office. demo one wall. light power, and signal. remove and reinstall linear diffusers | $150,000 |
| Jan 9, 2025 | Completed final sign-off Feb 2025 | 222 02nd St | Ayoob & Peery Plumbing Co Inc | 13/f: demo existing armovers and return existing fire sprinkler system to core and shall conditions. 13th floor:changeout 88 fire sprinklers per t.i. demo job #24-730Details
13/f: demo existing armovers and return existing fire sprinkler system to core and shall conditions. 13th floor:changeout 88 fire sprinklers per t.i. demo job #24-730 | $21,135 |
| Jul 15, 2024 | In progress issued Aug 2024 | 222 02nd St | Rapid Fire Safety&Security Llc Dba Pafa | revision to pa# 202407085962. fire alarm t.i (resubmittal): adding 40 speaker strobe to existing nofifier nfs2-3030 fire alarm system.Details
revision to pa# 202407085962. fire alarm t.i (resubmittal): adding 40 speaker strobe to existing nofifier nfs2-3030 fire alarm system. | |
| Jul 8, 2024 | In progress issued Jul 2024 | 222 02nd St | Rapid Fire Safety&Security Llc Dba Pafa | ref pa# 2024-0524-2901 fire alarm ti: add 1 speaker & 44 sprinkler strobes to existing notifier nfs2-3030 fire alarm systemDetails
ref pa# 2024-0524-2901 fire alarm ti: add 1 speaker & 44 sprinkler strobes to existing notifier nfs2-3030 fire alarm system | $24,472 |
| Jun 28, 2024 | Completed final sign-off Aug 2024 | 222 02nd St | Novo Construction Inc | addition of supplemental water source heat pump, upsized vav box. work to include duct work, piping, controls, commissioning and air balance. electrical work includedDetails
addition of supplemental water source heat pump, upsized vav box. work to include duct work, piping, controls, commissioning and air balance. electrical work included | $75,000 |
| May 20, 2024 | Completed final sign-off Jun 2024 | 222 02nd St | Rapid Fire Safety&Security Llc Dba Pafa | 14th floor: fire alarm ti: adding 1 smoke detector and 1 relay module to extg notifier nfs2-3030 fire alarm system.Details
14th floor: fire alarm ti: adding 1 smoke detector and 1 relay module to extg notifier nfs2-3030 fire alarm system. | $5,784 |
| May 20, 2024 | Completed final sign-off Jun 2024 | 222 02nd St | Rapid Fire Safety&Security Llc Dba Pafa | 3rd floor: fire alarm ti: adding 1 smoke detector and 1 relay module to extg notifier nfs2-3030 fire alarm system. one 2 way communication call station to extg cornell 2 way comm. system.Details
3rd floor: fire alarm ti: adding 1 smoke detector and 1 relay module to extg notifier nfs2-3030 fire alarm system. one 2 way communication call station to extg cornell 2 way comm. system. | $6,000 |
| Apr 25, 2024 | Completed final sign-off May 2024 | 222 02nd St | Rapid Fire Safety&Security Llc Dba Pafa | 26th floor: fire alarm ti: adding 1 smoke detector and 1 relay. module to extg notification nfs2-3030 fire alarm system.Details
26th floor: fire alarm ti: adding 1 smoke detector and 1 relay. module to extg notification nfs2-3030 fire alarm system. | $5,784 |
| Mar 27, 2024 | Completed final sign-off Apr 2024 | 222 02nd St | Novo Construction Inc | 26/f: evacuation signage for tenant improvement. ref ti permit 202401164007Details
26/f: evacuation signage for tenant improvement. ref ti permit 202401164007 | $1,440 |
| Feb 9, 2024 | In progress issued Feb 2024 | 222 02nd St | Rapid Fire Safety&Security Llc Dba Pafa | ref 202312152618- fire alarm ti changing (1) speakers to speaker strobe on (e) notifier nfs2-3030 fa systemDetails
ref 202312152618- fire alarm ti changing (1) speakers to speaker strobe on (e) notifier nfs2-3030 fa system | |
| Jan 16, 2024 | Completed final sign-off May 2024 | 222 02nd St | Novo Construction Inc | 26/:f selective demolition of existing interior partitions, light fixtures and mep. new construction of non structural partitions mep and kitchen equipment for a employee only coffee barDetails
26/:f selective demolition of existing interior partitions, light fixtures and mep. new construction of non structural partitions mep and kitchen equipment for a employee only coffee bar | $1,250,000 |
| Dec 19, 2023 | Completed final sign-off Mar 2024 | 222 02nd St | Rapid Fire Safety&Security Llc Dba Pafa | 17th, 18th, 19th, 20th - fire alarm ti adding 7 smoke detectors , 8 relay modules and 1 transponder module to existing notifier nfs-3030 fire alarm system. ref pa 202311201089Details
17th, 18th, 19th, 20th - fire alarm ti adding 7 smoke detectors , 8 relay modules and 1 transponder module to existing notifier nfs-3030 fire alarm system. ref pa 202311201089 | $21,320 |
| Dec 15, 2023 | In progress issued Dec 2023 | 222 02nd St | Rapid Fire Safety&Security Llc Dba Pafa | 4th,5th, & 9th floor: fire alarm ti: adding 5 sprinklers extg notifier nfs2-3030 fire alarm system ref app#202311221285.Details
4th,5th, & 9th floor: fire alarm ti: adding 5 sprinklers extg notifier nfs2-3030 fire alarm system ref app#202311221285. | $9,322 |
| Nov 20, 2023 | Completed final sign-off Jun 2024 | 222 02nd St | Novo Construction Inc | 17th-20th fl - ti to include minor demo of (e) elevator vestibule doors and replacment in=kind with rated vestibule doors with security hardwareDetails
17th-20th fl - ti to include minor demo of (e) elevator vestibule doors and replacment in=kind with rated vestibule doors with security hardware | $57,588 |
| Nov 6, 2023 | In progress issued Nov 2023 | 222 02nd St | Rapid Fire Safety&Security Llc Dba Pafa | 1/f: f/a t.i., adding cellular communicator to (e) notifier nfs2-3030 f/a systemDetails
1/f: f/a t.i., adding cellular communicator to (e) notifier nfs2-3030 f/a system | |
| Sep 14, 2023 | Completed final sign-off Dec 2023 | 222 02nd St | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm ti. no new equipment being added to existing notifier nfs2 3030 fire alarm system. new drawings document additon of new card readers for stairwell door locks being added to e access control systemDetails
fire alarm ti. no new equipment being added to existing notifier nfs2 3030 fire alarm system. new drawings document additon of new card readers for stairwell door locks being added to e access control system | $4,744 |
| Jun 21, 2022 | Completed final sign-off Aug 2022 | 222 02nd St | Plant Construction Co, Lp | 18th flr: administrative permit only for existing catering support room for department of public health review only no construction or demolition in scope (review w/christina lee @ dph) ref pa 202201115789.Details
18th flr: administrative permit only for existing catering support room for department of public health review only no construction or demolition in scope (review w/christina lee @ dph) ref pa 202201115789. | |
| Apr 7, 2022 | Never finaled issued Apr 2022, no final | 222 02nd St | Anderson, Rowe & Buckley, Inc. | fire sprinkler only - relocate 39 pendents & add 3 relocate 27 uprights delete 4 for linked in on the 18th fl. 69 heads total ref pa 2022-0111-5789Details
fire sprinkler only - relocate 39 pendents & add 3 relocate 27 uprights delete 4 for linked in on the 18th fl. 69 heads total ref pa 2022-0111-5789 | $34,500 |
| Aug 17, 2021 | Completed final sign-off Oct 2021 | 222 02nd St | Ayoob & Peery Plumbing Co Inc | 5th floor: add (3), relocate (6), per ti, 9th floor add (3) relocate (6), per ti, 13th floor add 3 relocate (6) changeout 1 per ti, ref pa 202106182800 job# 21-650Details
5th floor: add (3), relocate (6), per ti, 9th floor add (3) relocate (6), per ti, 13th floor add 3 relocate (6) changeout 1 per ti, ref pa 202106182800 job# 21-650 | $9,000 |
| Dec 17, 2020 | Completed final sign-off Dec 2021 | 222 02nd St | replace yagi antenna and reprogram bdaDetails
replace yagi antenna and reprogram bda | ||
| Jun 25, 2020 | Completed final sign-off Aug 2020 | 222 02nd St | Ayoob & Peery Plumbing Co Inc | 24th flr fire sprinklers -Details
24th flr fire sprinklers - | $8,100 |
| Jun 4, 2020 | Never finaled filed Jun 2020, never issued | 222 02nd St | 18/f:partial tenant improvement including new partitions, ceilings, finishes, millwork, furniture, lighting, mechanical, electrical, plumbing including new catering support room with limited food prep. no structural scope of workDetails
18/f:partial tenant improvement including new partitions, ceilings, finishes, millwork, furniture, lighting, mechanical, electrical, plumbing including new catering support room with limited food prep. no structural scope of work | $1,500,000 | |
| Feb 19, 2020 | Completed final sign-off Dec 2020 | 222 02nd St | Pacific Auxiliary Fire Alarm | fire alarm ti add 1 duct detector 1 relay module and 5 speaker strobes to e notifier nfs2 3030 fire alarm system ref 201911076724 maher not reqDetails
fire alarm ti add 1 duct detector 1 relay module and 5 speaker strobes to e notifier nfs2 3030 fire alarm system ref 201911076724 maher not req | $7,322 |
| Dec 13, 2019 | Completed final sign-off Feb 2020 | 222 02nd St | Pacific Auxiliary Fire Alarm | fire alarm tenant improvement to e notifier nfs2-3030 to document the changes the building elevator bank e-h. the high rise elevators g and h have been made accessible to 3rd fl lvl. elevator e and f were made accessible on ti needed.Details
fire alarm tenant improvement to e notifier nfs2-3030 to document the changes the building elevator bank e-h. the high rise elevators g and h have been made accessible to 3rd fl lvl. elevator e and f were made accessible on ti needed. | $6,000 |
| Dec 4, 2019 | Completed final sign-off Feb 2020 | 222 02nd St | Pacific Auxiliary Fire Alarm | 26th floor: fire alarm t.i. resubmitting fa permit #201910164648, adding 5 speaker strobes, 1 duct detector with relay and deleting 2 smoke detectors from extg notifier nfs2-3030 fire alarm system. ref. arch app#201909030453Details
26th floor: fire alarm t.i. resubmitting fa permit #201910164648, adding 5 speaker strobes, 1 duct detector with relay and deleting 2 smoke detectors from extg notifier nfs2-3030 fire alarm system. ref. arch app#201909030453 | $2,500 |
| Nov 26, 2019 | Completed final sign-off Feb 2020 | 222 02nd St | Pacific Auxiliary Fire Alarm | fire alarm ti add 1 duct detector, 1 dual paint monitor module and delay module to e notifier nfs2-3030 fire alarm systemDetails
fire alarm ti add 1 duct detector, 1 dual paint monitor module and delay module to e notifier nfs2-3030 fire alarm system | $2,500 |
| Nov 25, 2019 | Completed final sign-off Feb 2020 | 222 02nd St | Pacific Auxiliary Fire Alarm | fire alarm ti: adding 1 duct detector, 1 duct point monitor module and 1 relay module to existing notifer nfs2-3030 fire alarm system.Details
fire alarm ti: adding 1 duct detector, 1 duct point monitor module and 1 relay module to existing notifer nfs2-3030 fire alarm system. | |
| Nov 5, 2019 | Never finaled issued Nov 2019, no final | 222 02nd St | Ace Fire Equipment&Serv. | 3rd floor: add nozzle protection to ansul system. ref app#201906193820Details
3rd floor: add nozzle protection to ansul system. ref app#201906193820 | |
| Nov 5, 2019 | Completed final sign-off Nov 2019 | 222 02nd St | Pacific Auxiliary Fire Alarm | fire alarm ti 24th fl: adding 27 speaker strobes, 1 smoke detector, 1 duct detector,2 relay modules, and 1 dual point monitor module to existing notifier nfs2-3030 fa system. ref arch #201906264413.and 1 duct detector.Details
fire alarm ti 24th fl: adding 27 speaker strobes, 1 smoke detector, 1 duct detector,2 relay modules, and 1 dual point monitor module to existing notifier nfs2-3030 fa system. ref arch #201906264413.and 1 duct detector. | $11,724 |
| Oct 16, 2019 | Completed final sign-off Mar 2020 | 222 02nd St | Pacific Auxiliary Fire Alarm | fire alarm ti: adding (26) sprinkler strobes, (4) smoke detectors and (2) relay modules to (e) notifiers nfs2-3030 fa system; relocate 1 strobeDetails
fire alarm ti: adding (26) sprinkler strobes, (4) smoke detectors and (2) relay modules to (e) notifiers nfs2-3030 fa system; relocate 1 strobe | $12,192 |
| Oct 8, 2019 | Completed final sign-off Oct 2019 | 222 02nd St | Pacific Auxiliary Fire Alarm | fire alarm ti add 27 speakers strobes, 1 speaker strobe, 1 smoke detector to e notifier nfs2-3030 fire alarm systemDetails
fire alarm ti add 27 speakers strobes, 1 speaker strobe, 1 smoke detector to e notifier nfs2-3030 fire alarm system | $11,474 |
| Sep 18, 2019 | Completed final sign-off Oct 2019 | 222 02nd St | Pacific Auxiliary Fire Alarm | 23rd flr - fa ti - add 28 speaker strobes, 1 speaker and 1 smk det to (e) notifier nfs2-3030 fa system, ref 201904178180Details
23rd flr - fa ti - add 28 speaker strobes, 1 speaker and 1 smk det to (e) notifier nfs2-3030 fa system, ref 201904178180 | $11,466 |
| Mar 27, 2019 | Never finaled issued Jun 2019, no final | 222 02nd St | Novo Construction Inc | 3rd fl - partial demo of (e) plumbing, case and rated soffit of (e) single tenant bldg to provide new elevator stop (deferreed submittal). new furring partitions and soffit to finish new opening. (e) plumbing lines and other infrastructure located inside (e) chase to be reworkedDetails
3rd fl - partial demo of (e) plumbing, case and rated soffit of (e) single tenant bldg to provide new elevator stop (deferreed submittal). new furring partitions and soffit to finish new opening. (e) plumbing lines and other infrastructure located inside (e) chase to be reworked | $50,000 |
| Jan 15, 2019 | Completed final sign-off Jul 2019 | 222 02nd St | C B F Inc | 1st flr, t.i. 1,760 sq mercantile space. all gender restroom and pantry, new lighting new power. ref p.a. #2018 1010 2865. title 24 compliance. maher n/a.Details
1st flr, t.i. 1,760 sq mercantile space. all gender restroom and pantry, new lighting new power. ref p.a. #2018 1010 2865. title 24 compliance. maher n/a. | $167,350 |
| Jan 10, 2019 | Never finaled issued Jan 2019, no final | 222 02nd St | Pacific Auxiliary Fire Alarm | 1st fl. fire alarm (4) speaker/strobes; (3) duct detectors; (1) addressable control relay for audio system shunt.Details
1st fl. fire alarm (4) speaker/strobes; (3) duct detectors; (1) addressable control relay for audio system shunt. | $8,000 |
| Dec 19, 2018 | Completed final sign-off Jul 2019 | 222 02nd St | Acco Engineered Systems Inc. Dba Acco En | 1st floor: installation of (n) wshp to serve small retail space. will tie into (e) cw lines will run (n) duct to serve space, will install (n) ef to serve (n) bathroom (2) fsd's will be added to maintain raiting of (e) spaces, booster pump will be added to help with pump head baseDetails
1st floor: installation of (n) wshp to serve small retail space. will tie into (e) cw lines will run (n) duct to serve space, will install (n) ef to serve (n) bathroom (2) fsd's will be added to maintain raiting of (e) spaces, booster pump will be added to help with pump head base | $20,000 |
| Nov 20, 2018 | Completed final sign-off Dec 2018 | 222 02nd St | Pribuss Engineering Inc | fire sprinkler t.i. on ground flr. relocated sprinkler (12), total (12)Details
fire sprinkler t.i. on ground flr. relocated sprinkler (12), total (12) | $6,168 |
| Oct 10, 2018 | Completed final sign-off Jul 2019 | 222 02nd St | Dome Construction Corp | 1st fl - ti of 1st floor mercantile space; includes (n) concrete topper slab, all gender restroom and pantry as well as acoustic mitigation at the ceiling.Details
1st fl - ti of 1st floor mercantile space; includes (n) concrete topper slab, all gender restroom and pantry as well as acoustic mitigation at the ceiling. | $400,000 |
| Sep 17, 2018 | Completed final sign-off Dec 2018 | 222 02nd St | Pacific Auxiliary Fire Alarm | 20/f:fire alarm ti existin notifier nfs2-3030. add 30 speaker strobes, 4 speakers, 1 duct smoke detectorwith internal relay, 1 dual monitoring module for fsd position sations and 1 remote led for duct detector. pa201804237079.Details
20/f:fire alarm ti existin notifier nfs2-3030. add 30 speaker strobes, 4 speakers, 1 duct smoke detectorwith internal relay, 1 dual monitoring module for fsd position sations and 1 remote led for duct detector. pa201804237079. | $14,912 |
| Sep 17, 2018 | Completed final sign-off Dec 2018 | 222 02nd St | Pacific Auxiliary Fire Alarm | 21/f: fire alarm ti to e notifier nfs2-3030. add 35 speaker strobes, 1 duct smoke detecord with internal relay, 1 dual monitor module for fsd position status and 1 remote led for duct detector. ref pa201804237078.Details
21/f: fire alarm ti to e notifier nfs2-3030. add 35 speaker strobes, 1 duct smoke detecord with internal relay, 1 dual monitor module for fsd position status and 1 remote led for duct detector. ref pa201804237078. | $150,092 |
| Sep 17, 2018 | Completed final sign-off Dec 2018 | 222 02nd St | Pacific Auxiliary Fire Alarm | 22/f:fire alarm tenant improvement to existing notifier nfs2-3030. add 34 speaker strobes, 1 strobe, 1 duct smoke detector with internal relay. dual module for fsd position stations, 1 remodte led for duct detector. pa #201804237080.Details
22/f:fire alarm tenant improvement to existing notifier nfs2-3030. add 34 speaker strobes, 1 strobe, 1 duct smoke detector with internal relay. dual module for fsd position stations, 1 remodte led for duct detector. pa #201804237080. | $15,032 |
| Sep 14, 2018 | Completed final sign-off Dec 2018 | 222 02nd St | Pacific Auxiliary Fire Alarm | ref pa# 201804237077; fire alarm t.i. to an (e) notifier nfs2-3030, adding (33) speaker strobes, (3) strobes, (1) duct smoke detector with internal relay, (1) dual monitorning module for fsd positin stations and 1 remote led for duct detectorDetails
ref pa# 201804237077; fire alarm t.i. to an (e) notifier nfs2-3030, adding (33) speaker strobes, (3) strobes, (1) duct smoke detector with internal relay, (1) dual monitorning module for fsd positin stations and 1 remote led for duct detector | $14,812 |
| Sep 14, 2018 | Never finaled issued Sep 2018, no final | 222 02nd St | Pacific Auxiliary Fire Alarm | ref pa# 201805159109; fire alarm t.i. to (e) notifier nfs2-3030. adding (2) strobesDetails
ref pa# 201805159109; fire alarm t.i. to (e) notifier nfs2-3030. adding (2) strobes | $4,875 |
| Aug 15, 2018 | Completed final sign-off Dec 2018 | 222 02nd St | Pribuss Engineering Inc | rev to pa#201609147743; fire sprinkler t.i. on flrs 19-22 only. (no work on flrs. 23-25)Details
rev to pa#201609147743; fire sprinkler t.i. on flrs 19-22 only. (no work on flrs. 23-25) | |
| Aug 3, 2018 | Never finaled issued Aug 2018, no final | 222 02nd St | Pacific Auxiliary Fire Alarm | fire alarm ti to existing notifier nfs2,3030 add 3 speaker strobes ref 201806010758Details
fire alarm ti to existing notifier nfs2,3030 add 3 speaker strobes ref 201806010758 | $7,250 |
| Aug 3, 2018 | Completed final sign-off Oct 2018 | 222 02nd St | Pacific Auxiliary Fire Alarm | fire alarm ti to e notifier nfs2-3030 adding 2 speaker strobesDetails
fire alarm ti to e notifier nfs2-3030 adding 2 speaker strobes | $7,364 |
| Aug 3, 2018 | Never finaled issued Aug 2018, no final | 222 02nd St | Pacific Auxiliary Fire Alarm | fire alarm ti to e notifier nfs2-3030 adding 2 speaker strobes ref 201805159111Details
fire alarm ti to e notifier nfs2-3030 adding 2 speaker strobes ref 201805159111 | $7,250 |
| Jul 5, 2018 | Completed final sign-off Dec 2018 | 222 02nd St | Pribuss Engineering Inc | 6th flr fire sprinkler ti ref 201804176540 relocate 1 hd add 1Details
6th flr fire sprinkler ti ref 201804176540 relocate 1 hd add 1 | $1,028 |
| Jul 5, 2018 | Completed final sign-off Oct 2018 | 222 02nd St | Pribuss Engineering Inc | 13th flr fire sprinkler ti ref 201804176543. relocate 7 hdDetails
13th flr fire sprinkler ti ref 201804176543. relocate 7 hd | $3,598 |
| Jul 5, 2018 | Expired or cancelled cancelled Dec 2018 | 222 02nd St | Pribuss Engineering Inc | 18th flr fire sprinkler ti ref 201805159111. relocate 1 hdDetails
18th flr fire sprinkler ti ref 201805159111. relocate 1 hd | $514 |
| Apr 23, 2018 | Never finaled issued Jun 2018, no final | 222 02nd St | Novo Construction Inc | 21st flr - revision to 201605026270 to revise originally approved layout. mechanical and electrical included.Details
21st flr - revision to 201605026270 to revise originally approved layout. mechanical and electrical included. | |
| Apr 23, 2018 | Never finaled issued May 2018, no final | 222 02nd St | Novo Construction Inc | 22nd flr - revision to 201605026264 to revise originally approved layout. mech & elec includedDetails
22nd flr - revision to 201605026264 to revise originally approved layout. mech & elec included | |
| Apr 23, 2018 | Never finaled issued May 2018, no final | 222 02nd St | Novo Construction Inc | 20th flr - revision to 201605026264 to revise originally approved layout mech & elec included.Details
20th flr - revision to 201605026264 to revise originally approved layout mech & elec included. | |
| Apr 23, 2018 | Never finaled issued May 2018, no final | 222 02nd St | Novo Construction Inc | 19th flr - revision to 201605026244 to revise originally approved layout. mech & elec included. ref pa 2016-0502-6244Details
19th flr - revision to 201605026244 to revise originally approved layout. mech & elec included. ref pa 2016-0502-6244 | |
| Apr 17, 2018 | Never finaled issued Jul 2018, no final | 222 02nd St | Novo Construction Inc | 13 flr - partial floor ti - new conference room, new partitions, ceilings, doors & hardware, finishes, mech & ele. fire alarm, sprinklers under separate permitDetails
13 flr - partial floor ti - new conference room, new partitions, ceilings, doors & hardware, finishes, mech & ele. fire alarm, sprinklers under separate permit | $50,000 |
| Apr 17, 2018 | Never finaled issued Jul 2018, no final | 222 02nd St | Novo Construction Inc | 6 floors - partial floor ti - selective demo, new partitions, electrical, ceilings, doors, finishes. sprinklers and fire alarm, mech sep permitDetails
6 floors - partial floor ti - selective demo, new partitions, electrical, ceilings, doors, finishes. sprinklers and fire alarm, mech sep permit | $50,000 |
| Sep 14, 2016 | Never finaled issued Dec 2016, no final | 222 02nd St | Pribuss Engineering Inc | floors 19-25 - fire sprinkler t.i. under permit #2015-0818-4605 relocate: 347 add: 394 total 741x(517.32)=383,334Details
floors 19-25 - fire sprinkler t.i. under permit #2015-0818-4605 relocate: 347 add: 394 total 741x(517.32)=383,334 | $383,334 |
| Jun 15, 2016 | Completed final sign-off Jun 2016 | 222 02nd St | Pribuss Engineering Inc | 1st flr: fire sprinkler t.i. under permit 201508184605; adds 4 total 4x514.62= 2,058.Details
1st flr: fire sprinkler t.i. under permit 201508184605; adds 4 total 4x514.62= 2,058. | $2,058 |
| Mar 8, 2016 | Completed final sign-off Aug 2016 | 222 02nd St | Pribuss Engineering Inc | fire sprinkler t.i. under pa# 2016-0113-6951 (15th floor); pa# 2016-0114-7158 (16th floor); pa# 2016-0113-6958 (18th floor). relocate 201, add 233, total 434.Details
fire sprinkler t.i. under pa# 2016-0113-6951 (15th floor); pa# 2016-0114-7158 (16th floor); pa# 2016-0113-6958 (18th floor). relocate 201, add 233, total 434. | $218,199 |
| Mar 3, 2016 | Completed final sign-off Aug 2016 | 222 02nd St | Swinerton Builders | 2nd flr: revision to 2015 0818 4604 - mechanical ducts per inspectorDetails
2nd flr: revision to 2015 0818 4604 - mechanical ducts per inspector | |
| Jan 14, 2016 | Completed final sign-off Jan 2017 | 222 02nd St | Swinerton Builders | 16th floor, complete interior ti including mep'sDetails
16th floor, complete interior ti including mep's | $1,700,000 |
| Jan 13, 2016 | Completed final sign-off Jan 2017 | 222 02nd St | Swinerton Builders | 15th flr:: full interior tenant improvement including mep's; maher n/aDetails
15th flr:: full interior tenant improvement including mep's; maher n/a | $1,300,000 |
| Jan 13, 2016 | Completed final sign-off Jan 2017 | 222 02nd St | Swinerton Builders | 18th flr: full floor tenant improvement to include mep's.Details
18th flr: full floor tenant improvement to include mep's. | $599,000 |
| Dec 30, 2015 | Expired or cancelled withdrawn Jan 2016 | 222 02nd St | Pribuss Engineering Inc | 13th floor: fire sprinkler t.i. under gc permit #201508265351. relocates 88 and adds 92 total is 180Details
13th floor: fire sprinkler t.i. under gc permit #201508265351. relocates 88 and adds 92 total is 180 | $92,631 |
| Dec 30, 2015 | Expired or cancelled withdrawn Jan 2016 | 222 02nd St | Pribuss Engineering Inc | 14th floor: fire sprinkler t.i. under gc permit #201508265350. relocates 77 and adds 84 total is 161Details
14th floor: fire sprinkler t.i. under gc permit #201508265350. relocates 77 and adds 84 total is 161 | $82,854 |
| Dec 18, 2015 | Expired or cancelled withdrawn Jan 2016 | 222 02nd St | Pribuss Engineering Inc | fire sprinkler ti under gc 201505267078Details
fire sprinkler ti under gc 201505267078 | $151,298 |
| Dec 18, 2015 | Expired or cancelled withdrawn Jan 2016 | 222 02nd St | Pribuss Engineering Inc | fire sprinkler ti under 201505267078 relocate 232, add 250, total 482Details
fire sprinkler ti under 201505267078 relocate 232, add 250, total 482 | $248,046 |
| Sep 15, 2015 | Completed final sign-off Mar 2016 | 222 02nd St | Pacific Auxiliary Fire Alarm | fire only. add 46 speaker/strobes, 1 speaker, 1 duct detector, 1 monitoring module due to tenant improvement on the 11th fl maher not reqDetails
fire only. add 46 speaker/strobes, 1 speaker, 1 duct detector, 1 monitoring module due to tenant improvement on the 11th fl maher not req | $30,000 |
| Sep 15, 2015 | Completed final sign-off Apr 2016 | 222 02nd St | Pacific Auxiliary Fire Alarm | fire only. add 46 speaker/strobes, 1 speaker, 1 duct detector, 1 monitoring module due to tenant improvement on the 12th fl maher not reqDetails
fire only. add 46 speaker/strobes, 1 speaker, 1 duct detector, 1 monitoring module due to tenant improvement on the 12th fl maher not req | $30,000 |
| Sep 3, 2015 | Completed final sign-off Mar 2016 | 222 02nd St | Pribuss Engineering Inc | 6th & 7th flr: fire sprinkler ti - modify 114 heads (6th flr) modify 99 heads (7th flr) ref pa 2015 0617 9204 & 9207 used flex heads.Details
6th & 7th flr: fire sprinkler ti - modify 114 heads (6th flr) modify 99 heads (7th flr) ref pa 2015 0617 9204 & 9207 used flex heads. | $109,614 |
| Aug 18, 2015 | Completed final sign-off Sep 2016 | 222 02nd St | Swinerton Builders | 3rd flr: t.i. for kitchen, dining and restroom facilities consisting of: partitions, ceilings, lighting fixtures, mechanical, electrical & plumbing, maher n/aDetails
3rd flr: t.i. for kitchen, dining and restroom facilities consisting of: partitions, ceilings, lighting fixtures, mechanical, electrical & plumbing, maher n/a | $1,500,000 |
| Aug 18, 2015 | Completed final sign-off Jan 2017 | 222 02nd St | Swinerton Builders | 1st flr: partial t.i. consists of addition of 2 exit stairs, one door opening, one server room & 2 small offices; maher n/aDetails
1st flr: partial t.i. consists of addition of 2 exit stairs, one door opening, one server room & 2 small offices; maher n/a | $1,200,000 |
| Aug 18, 2015 | Completed final sign-off Jul 2016 | 222 02nd St | Swinerton Builders | 2nd flr: commercial t.i. including partitions, ceilings, finishes, plumbing, mechanical, electrical & structural; maher n/aDetails
2nd flr: commercial t.i. including partitions, ceilings, finishes, plumbing, mechanical, electrical & structural; maher n/a | $1,500,000 |
| Jul 22, 2015 | Completed final sign-off Sep 2016 | 222 02nd St | Swinerton Builders | 12th floor t.i.: partitions, lighting, mep, structural reinforcing life safety sep permitsDetails
12th floor t.i.: partitions, lighting, mep, structural reinforcing life safety sep permits | $1,200,000 |
| Jul 10, 2015 | Completed final sign-off Sep 2016 | 222 02nd St | Swinerton Builders | ti partitions, lighting, mep and minor structuralDetails
ti partitions, lighting, mep and minor structural | $1,445,000 |
| Jun 17, 2015 | Completed final sign-off Jul 2016 | 222 02nd St | Swinerton Builders | 6th floor ti consisting of ceilings, partitions, furniture, finishes, lighting fixtures, mechaniical, plumbing, electrical, selective structural reinforcement. life safety deferred.Details
6th floor ti consisting of ceilings, partitions, furniture, finishes, lighting fixtures, mechaniical, plumbing, electrical, selective structural reinforcement. life safety deferred. | $900,000 |
| Jun 17, 2015 | Completed final sign-off Sep 2016 | 222 02nd St | Swinerton Builders | 7th flor t.i.: consisting of ceilings, partitions, furniture, finishes, lighting, fixtures, mech, plumbing, elec, selective structural reinforcements. fire alarm, spklrs, sep permitsDetails
7th flor t.i.: consisting of ceilings, partitions, furniture, finishes, lighting, fixtures, mech, plumbing, elec, selective structural reinforcements. fire alarm, spklrs, sep permits | $900,000 |
| Jun 10, 2015 | Completed final sign-off Aug 2016 | 222 02nd St | Pribuss Engineering Inc | 5th floor: fire sprinkler t.i. under gc permit #201505267078. relocate 17 heads and add 81 heads. total 98 heads.Details
5th floor: fire sprinkler t.i. under gc permit #201505267078. relocate 17 heads and add 81 heads. total 98 heads. | $50,430 |
| May 11, 2015 | Never finaled issued Jul 2015, no final | 222 02nd St | street spaceDetails
street space | ||
| Oct 8, 2014 | Never finaled issued Oct 2014, no final | 222 02nd St | street spaceDetails
street space | ||
| Sep 19, 2007 | Never finaled issued Sep 2007, no final | 222 02nd St | street space & sidewalk permit only.Details
street space & sidewalk permit only. |