Block 3708, lot 056
525 Market St
- City’s use
- Commercial Office
- Built
- 1973
- Stories
- 38
- Building
- 1,086,700 sq ft
- Lot
- 44,267 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 16, 2026 | In progress issued Nov 2026 | 525 Market St | Richlen Construction | 15th flr: office t.i. of an existing space includes new partitions, mechanical, electrical upgrade. demo under separate permit. restroom upgrade. seperate deferred submission for health review in regards to pntry; beverage station in breakroom.Details
15th flr: office t.i. of an existing space includes new partitions, mechanical, electrical upgrade. demo under separate permit. restroom upgrade. seperate deferred submission for health review in regards to pntry; beverage station in breakroom. | $6,000,000 |
| Aug 20, 2026 | In progress issued Sep 2026 | 525 Market St | Richlen Construction | 15th fl - demo only permit (interior) accessibility per ab-017Details
15th fl - demo only permit (interior) accessibility per ab-017 | $30,000 |
| Aug 18, 2026 | In progress issued Aug 2026 | 525 Market St | Bilcor Inc | 3rd fl - install 2 call stations rath 2400-8058pm w/mushroom call button (flush mount); install 2 call stations rath signage 7049lss; 2 way ecs backbone infrastructure pa 202204051584 ref pa 202606253897Details
3rd fl - install 2 call stations rath 2400-8058pm w/mushroom call button (flush mount); install 2 call stations rath signage 7049lss; 2 way ecs backbone infrastructure pa 202204051584 ref pa 202606253897 | $2,000 |
| Aug 11, 2026 | In progress issued Sep 2026 | 525 Market St | Skyline Construction | 3/fl- revision 202606253897 to include work partitions and structrual work. 21/fl- revision 202606253896 to include work on structural, finishes and fixtures. 22/fl- revision 202606253894 to include structural work and finishes and finishes and mep. no exterior work.Details
3/fl- revision 202606253897 to include work partitions and structrual work. 21/fl- revision 202606253896 to include work on structural, finishes and fixtures. 22/fl- revision 202606253894 to include structural work and finishes and finishes and mep. no exterior work. | $10,000 |
| Aug 6, 2026 | In progress issued Aug 2026 | 525 Market St | Bcci Construction Company | installation of phone booth on the 19th, 20th, 21st, 33rd, 35th, 36th, 37th, and 38th floors. 18 booths x 11sf = 198 sqftDetails
installation of phone booth on the 19th, 20th, 21st, 33rd, 35th, 36th, 37th, and 38th floors. 18 booths x 11sf = 198 sqft | $35,000 |
| Aug 3, 2026 | In progress issued Sep 2026 | 525 Market St | Bcci Construction Company | anchoring (3) existing single phone booths. total work area = 3 x 11 sf = 33 sfDetails
anchoring (3) existing single phone booths. total work area = 3 x 11 sf = 33 sf | $8,500 |
| Jul 20, 2026 | In progress issued Oct 2026 | 525 Market St | Bcci Construction Company | l27- office t.i. demo existing and install new non structural partitions, millwork, and finishes.Details
l27- office t.i. demo existing and install new non structural partitions, millwork, and finishes. | $2,668,000 |
| Jun 25, 2026 | In progress issued Jul 2026 | 525 Market St | Skyline Construction | 3rd fl partial ti. non structural partitons, ceilings, fixtures and finishes, w mep.Details
3rd fl partial ti. non structural partitons, ceilings, fixtures and finishes, w mep. | $3,100,000 |
| Jun 25, 2026 | In progress issued Jul 2026 | 525 Market St | Skyline Construction | 21nd fl partial ti. non structural partitons, ceilings, fixtures and finishes, w mep.Details
21nd fl partial ti. non structural partitons, ceilings, fixtures and finishes, w mep. | $999,999 |
| Jun 25, 2026 | In progress issued Jul 2026 | 525 Market St | 22nd fl partial ti. non structural partitons, ceilings, fixtures and finishes, w mep.Details
22nd fl partial ti. non structural partitons, ceilings, fixtures and finishes, w mep. | $999,000 | |
| May 29, 2026 | Completed final sign-off Jul 2026 | 525 Market St | Ayoob & Peery Plumbing Co Inc | 30/f: as-built to 202602065417: add 8 f/s per t.i. update drawnings for adjusted piping plans.Details
30/f: as-built to 202602065417: add 8 f/s per t.i. update drawnings for adjusted piping plans. | $4,969 |
| May 28, 2026 | In progress issued Jun 2026 | 525 Market St | Skyline Construction | commercial tenant improvement on 20th fl to secure 1 office space. includes demo and construction of non structural partitons and furniture. minor update to ceilings and finishesDetails
commercial tenant improvement on 20th fl to secure 1 office space. includes demo and construction of non structural partitons and furniture. minor update to ceilings and finishes | $350,000 |
| Mar 23, 2026 | Completed final sign-off Apr 2026 | 525 Market St | Bilcor Inc | 30/f: as-built to permit# 202512081230. install (2) ceiling mount speaker strobes. install (1) control relay.Details
30/f: as-built to permit# 202512081230. install (2) ceiling mount speaker strobes. install (1) control relay. | $3,000 |
| Feb 20, 2026 | Completed final sign-off Jul 2026 | 525 Market St | Ayoob & Peery Plumbing Co Inc | 30/f: add (84) relocate (130) /fire sprinkler per t.i. job#25-658 reference#2025-0812-2833Details
30/f: add (84) relocate (130) /fire sprinkler per t.i. job#25-658 reference#2025-0812-2833 | $132,915 |
| Jan 29, 2026 | Completed final sign-off Jun 2026 | 525 Market St | C B F Inc | 34th floor: reference pa#202511179739. power, lighting, and signal title 24Details
34th floor: reference pa#202511179739. power, lighting, and signal title 24 | $15,000 |
| Jan 16, 2026 | Completed final sign-off Apr 2026 | 525 Market St | Bilcor Inc | 34/fl- ref 202511179739 and 202512121649- install 51 speaker strobes, 1 smoke detector, 3 control relays, and 1 call stationDetails
34/fl- ref 202511179739 and 202512121649- install 51 speaker strobes, 1 smoke detector, 3 control relays, and 1 call station | $35,000 |
| Dec 29, 2025 | Completed final sign-off Apr 2026 | 525 Market St | Bilcor Inc | 30th fl ref pa # 2025-0826-3889: install 1 wall mount speaker strobe, 75 ceilling mount speaker strobes, 1 smoke detector, 2 duct detectors & 2 control relays.Details
30th fl ref pa # 2025-0826-3889: install 1 wall mount speaker strobe, 75 ceilling mount speaker strobes, 1 smoke detector, 2 duct detectors & 2 control relays. | $53,946 |
| Dec 12, 2025 | Completed final sign-off Jun 2026 | 525 Market St | Acco Engineered Systems Inc. Dba Acco En | 34/fl- rework of vavs and low side duct layout to better serve (n) architectural layout upgrade (e) vavs to ddc controls, ref 202511179739Details
34/fl- rework of vavs and low side duct layout to better serve (n) architectural layout upgrade (e) vavs to ddc controls, ref 202511179739 | $548,000 |
| Dec 8, 2025 | Completed final sign-off Apr 2026 | 525 Market St | Bilcor Inc | 30th fl ref pa # 2025-0812-2833: install 11 ceiling mount speaker strobes, 6 duct detectors & 1 control relay.Details
30th fl ref pa # 2025-0812-2833: install 11 ceiling mount speaker strobes, 6 duct detectors & 1 control relay. | $11,988 |
| Dec 2, 2025 | Completed final sign-off May 2026 | 525 Market St | Pioneer Fire Inc. | 34th floor: convert 81 uprights to pendents, relocate 3 pendents to uprights, add 2 pendents, 2 uprights, remove 3 uprights. ref pa #202511179793Details
34th floor: convert 81 uprights to pendents, relocate 3 pendents to uprights, add 2 pendents, 2 uprights, remove 3 uprights. ref pa #202511179793 | $13,650 |
| Nov 25, 2025 | Completed final sign-off May 2026 | 525 Market St | M C S Construction Services | 14/f suite 1460: t.i includes demo of non-structural partitions and build new non-structural partitions. all mep work will be fully engineered and included in this permit. all life safety work will be design-built and submitted separately. fully sprinklered building.Details
14/f suite 1460: t.i includes demo of non-structural partitions and build new non-structural partitions. all mep work will be fully engineered and included in this permit. all life safety work will be design-built and submitted separately. fully sprinklered building. | $550,000 |
| Nov 17, 2025 | Completed final sign-off Jun 2026 | 525 Market St | Build Group Inc. | 34/f: new tenant improvement includes construction of non-structural partitions, ceilings, doors, glazing, light fixtures, casework, power/signal, and finishes. mep is deferred.Details
34/f: new tenant improvement includes construction of non-structural partitions, ceilings, doors, glazing, light fixtures, casework, power/signal, and finishes. mep is deferred. | $4,100,000 |
| Nov 5, 2025 | In progress issued Nov 2025 | 525 Market St | Ayoob & Peery Plumbing Co Inc | 30th fl - add 4, relocate 23 fire sprinkler per ti 202508122833Details
30th fl - add 4, relocate 23 fire sprinkler per ti 202508122833 | $16,770 |
| Oct 30, 2025 | Completed final sign-off May 2026 | 525 Market St | Build Group Inc. | 34/f. demolition of non-structural partitions, dors, glazing, ceilings, light fixtures and finishes per ab-17 space will remain unoccupied. permit for construction and related accessible features will be required prior to be occupancy.Details
34/f. demolition of non-structural partitions, dors, glazing, ceilings, light fixtures and finishes per ab-17 space will remain unoccupied. permit for construction and related accessible features will be required prior to be occupancy. | $296,311 |
| Oct 28, 2025 | In progress issued Oct 2025 | 525 Market St | Bilcor Inc | 17th fl - as built permit ref pa 202509246069 to document no smoke detectors oth the 17th floor bathroom exist.Details
17th fl - as built permit ref pa 202509246069 to document no smoke detectors oth the 17th floor bathroom exist. | |
| Oct 27, 2025 | In progress issued Oct 2025 | 525 Market St | Pioneer Fire Inc. | 34th fl: remove all pendant sprinklers and replace with new upright sprinklers in shell condition.Details
34th fl: remove all pendant sprinklers and replace with new upright sprinklers in shell condition. | $5,500 |
| Oct 24, 2025 | Completed final sign-off Nov 2025 | 525 Market St | Ayoob & Peery Plumbing Co Inc | 14/f: add (2) fire sprinkler per t.i. 18/f: add (1) fire sprinkler per t.i. ref permit 202508122875Details
14/f: add (2) fire sprinkler per t.i. 18/f: add (1) fire sprinkler per t.i. ref permit 202508122875 | $1,863 |
| Sep 26, 2025 | In progress filed Sep 2025, not yet issued | 525 Market St | revision to pa# 202509122875: revising anchorage detail - anchorage embedment changed from 3" to 2" due to site constraints.Details
revision to pa# 202509122875: revising anchorage detail - anchorage embedment changed from 3" to 2" due to site constraints. | ||
| Sep 26, 2025 | Completed final sign-off Nov 2025 | 525 Market St | Pioneer Fire Inc. | 17/fl- convert 32 pendents, relocate 1 pendent, add 4 pendents, remove 2 pendents. ti 202506209088Details
17/fl- convert 32 pendents, relocate 1 pendent, add 4 pendents, remove 2 pendents. ti 202506209088 | $9,250 |
| Sep 25, 2025 | Completed final sign-off Nov 2025 | 525 Market St | Bilcor Inc | install 17 ceiling mount speaker strobe. ref to t.i. 202507030137Details
install 17 ceiling mount speaker strobe. ref to t.i. 202507030137 | $11,322 |
| Sep 24, 2025 | Completed final sign-off Jan 2026 | 525 Market St | Bilcor Inc | 17th floor: install 23 ceiling mount speaker strobes. ref arch pa 202506209088 and mechanical ref pa #202509084782Details
17th floor: install 23 ceiling mount speaker strobes. ref arch pa 202506209088 and mechanical ref pa #202509084782 | $15,318 |
| Sep 24, 2025 | In progress issued Oct 2025 | 525 Market St | Bilcor Inc | 17th floor: install 7 ceiling mount speaker strobes. ref arch pa #202505277281Details
17th floor: install 7 ceiling mount speaker strobes. ref arch pa #202505277281 | $4,662 |
| Sep 12, 2025 | In progress issued Sep 2025 | 525 Market St | Anderson, Rowe & Buckley, Inc. | 21st & 27th floor:fire sprinkler ti, building permit 202507030137, modify sprinkler head locations to accomodate new phone booths on 21st & 27th floor. total added pendent sprinklers-2; total added sprinklers-2.Details
21st & 27th floor:fire sprinkler ti, building permit 202507030137, modify sprinkler head locations to accomodate new phone booths on 21st & 27th floor. total added pendent sprinklers-2; total added sprinklers-2. | $785 |
| Sep 8, 2025 | Completed final sign-off Mar 2026 | 525 Market St | Gci, Inc | 17/fl- ti 202506209088- to include mechanical add (1) ddvav box and 2 new inline exhaust. electrical power and lighting.plumbing: applicancesDetails
17/fl- ti 202506209088- to include mechanical add (1) ddvav box and 2 new inline exhaust. electrical power and lighting.plumbing: applicances | $521,296 |
| Aug 27, 2025 | Completed final sign-off Oct 2025 | 525 Market St | Ayoob & Peery Plumbing Co Inc | 17th floor: add 5 relocate 22 fire sprinkler per t.i.; job #25-651; ref pa #202505277281Details
17th floor: add 5 relocate 22 fire sprinkler per t.i.; job #25-651; ref pa #202505277281 | $16,770 |
| Aug 26, 2025 | Completed final sign-off Sep 2026 | 525 Market St | Bcci Construction Company | suite 3000- office ti to include new partitions, offices, conference rooms, mechanical ducting for heating & cooling, lighting & plumbing. structural submittal deferredDetails
suite 3000- office ti to include new partitions, offices, conference rooms, mechanical ducting for heating & cooling, lighting & plumbing. structural submittal deferred | $3,889,000 |
| Aug 12, 2025 | Completed final sign-off Sep 2026 | 525 Market St | Bcci Construction Company | 30th fl- ti includes demo of non strucutral partitions & new structural partitions to create a common corridor. new plumbing fixtures millwork and finishes will be provided throughout the corridor and core restrooms. all new or revised life safety work will be design build and submitted seperately.Details
30th fl- ti includes demo of non strucutral partitions & new structural partitions to create a common corridor. new plumbing fixtures millwork and finishes will be provided throughout the corridor and core restrooms. all new or revised life safety work will be design build and submitted seperately. | $750,000 |
| Aug 12, 2025 | Completed final sign-off Jan 2026 | 525 Market St | Bcci Construction Company | 18 & 14/fl-install phone booth (7) on the 18th floor and (4) on the 14th floor. total work area 121sfDetails
18 & 14/fl-install phone booth (7) on the 18th floor and (4) on the 14th floor. total work area 121sf | $35,000 |
| Jul 3, 2025 | Completed final sign-off Nov 2025 | 525 Market St | Skyline Construction | installation and anchoring of phone booths on floors 19, 20, 21, 27Details
installation and anchoring of phone booths on floors 19, 20, 21, 27 | $148,000 |
| Jun 20, 2025 | Completed final sign-off Mar 2026 | 525 Market St | Gci, Inc | 17th fl- 10,433 sq ft tenant improvement consists of new partitions, doors, frames, hardware, flooring, ceilings & casework. all mechanical, electrical, plumbing & fire life safety is design build & under separate permitDetails
17th fl- 10,433 sq ft tenant improvement consists of new partitions, doors, frames, hardware, flooring, ceilings & casework. all mechanical, electrical, plumbing & fire life safety is design build & under separate permit | $2,000,000 |
| May 27, 2025 | Completed final sign-off Nov 2025 | 525 Market St | Bcci Construction Company | 17f: ti includes (n) non-str partitionsto create a common corridor & demise 2 suites. new plumbing fixtures millwork and finishes throughout corridor & core restrooms. all new or revised life safety work will be design build & submitted separately. (blding is fully sprinklered) mep included.Details
17f: ti includes (n) non-str partitionsto create a common corridor & demise 2 suites. new plumbing fixtures millwork and finishes throughout corridor & core restrooms. all new or revised life safety work will be design build & submitted separately. (blding is fully sprinklered) mep included. | $289,000 |
| Dec 30, 2024 | Completed final sign-off Jan 2025 | 525 Market St | Bilcor Inc | fl/20th,21st,33rd, 35th , 36th, 37th, 38th: install (17) ceiling strobe lights. ref ti # 2023-1219-2736Details
fl/20th,21st,33rd, 35th , 36th, 37th, 38th: install (17) ceiling strobe lights. ref ti # 2023-1219-2736 | $11,322 |
| Dec 18, 2024 | Completed final sign-off Jan 2025 | 525 Market St | Golden Gate Fire Protection Inc | fire sprinklers - relocate 1 pendent on the 207th fl; 1 pendent on the 21st fl;1 pendent on the 33rd fl; 2 pendent on the 35th fl; 2 pendent on the 37th fl; delete 1 sprinkler on the 21st fl ref pa 202312192736Details
fire sprinklers - relocate 1 pendent on the 207th fl; 1 pendent on the 21st fl;1 pendent on the 33rd fl; 2 pendent on the 35th fl; 2 pendent on the 37th fl; delete 1 sprinkler on the 21st fl ref pa 202312192736 | $1,750 |
| Nov 6, 2024 | Completed final sign-off Nov 2024 | 525 Market St | Bilcor Inc | rev to pa# 2024-0719-6936; revising sequence of operationsDetails
rev to pa# 2024-0719-6936; revising sequence of operations | |
| Nov 5, 2024 | In progress issued Nov 2024 | 525 Market St | Principal Builders Inc. | 29th fl - ti including minor demo (e) wall, new glass door & glass partitionDetails
29th fl - ti including minor demo (e) wall, new glass door & glass partition | $51,000 |
| Aug 16, 2024 | Completed final sign-off Oct 2024 | 525 Market St | Martinelli Environmental Graph | 7th fl evacuation mapsDetails
7th fl evacuation maps | $1,000 |
| Aug 14, 2024 | Completed final sign-off Nov 2024 | 525 Market St | Bilcor Inc | modification of (e) fire alarm system to accomodate the construction of a new interior interconnected stairway between the 31/f & 32/f. rev to building relocation sequence, smoke controle sequence. ref ti. 202405091763. smoke control under sep permit.Details
modification of (e) fire alarm system to accomodate the construction of a new interior interconnected stairway between the 31/f & 32/f. rev to building relocation sequence, smoke controle sequence. ref ti. 202405091763. smoke control under sep permit. | $666 |
| Aug 9, 2024 | Completed final sign-off Dec 2024 | 525 Market St | Bilcor Inc | install (1) cellular communicator & (1) monitor moduleDetails
install (1) cellular communicator & (1) monitor module | $332 |
| Jul 31, 2024 | Completed final sign-off Nov 2024 | 525 Market St | Bilcor Inc | 31st flr-install 94 ceiling sp-strobes. install(5)wall sp-strobes. install(5)smoke detectors. install(6)duct detectors. install(6)control ralays. install(1)dual monitor module. install(2)call stations rath 2400-805spm w / mushroom button(flush mount). ref202405091766, #202406053811,#202204051584Details
31st flr-install 94 ceiling sp-strobes. install(5)wall sp-strobes. install(5)smoke detectors. install(6)duct detectors. install(6)control ralays. install(1)dual monitor module. install(2)call stations rath 2400-805spm w / mushroom button(flush mount). ref202405091766, #202406053811,#202204051584 | $79,254 |
| Jul 30, 2024 | Completed final sign-off Jan 2025 | 525 Market St | Bcci Construction Company | 7/f: health department review only for approved t.i permit 202401113849 and revision to approved deferred mep permit 202402236430.Details
7/f: health department review only for approved t.i permit 202401113849 and revision to approved deferred mep permit 202402236430. | |
| Jul 30, 2024 | Completed final sign-off Nov 2024 | 525 Market St | Bilcor Inc | 32nd fl: install 85 ceiling speaker strobes, 7 wall speaker strobes, 4 smoke detectors, 4 duct detectors, 6 control relays, 2 call station. arch ref pa# 202405091774. mech ref pa# 202406053819. 2-way ecs ref pa# 202204051584.Details
32nd fl: install 85 ceiling speaker strobes, 7 wall speaker strobes, 4 smoke detectors, 4 duct detectors, 6 control relays, 2 call station. arch ref pa# 202405091774. mech ref pa# 202406053819. 2-way ecs ref pa# 202204051584. | $60,606 |
| Jul 16, 2024 | Completed final sign-off Dec 2024 | 525 Market St | 32/f: ti improvement to (e) fire sprinkler system.relocate 120 f/s; add 104 f/s,delete 2 f/s. plan locations: relocate pendents#1-8, relocate uprights#04, added pendents #70, added uprights #34 deleted sprinklers # 02 ti 202405091774. added hydro calcs to permit.Details
32/f: ti improvement to (e) fire sprinkler system.relocate 120 f/s; add 104 f/s,delete 2 f/s. plan locations: relocate pendents#1-8, relocate uprights#04, added pendents #70, added uprights #34 deleted sprinklers # 02 ti 202405091774. added hydro calcs to permit. | $50,000 | |
| Jul 15, 2024 | Completed final sign-off Dec 2024 | 525 Market St | 31st floor: ti improvement to (e) fire sprinkler system. relocate 187 fire sprinklers. add 94 fire sprinklers. delete 10 fire sprinklers. building ti pa# 2024050917663 added hydraulic calculations to permit.Details
31st floor: ti improvement to (e) fire sprinkler system. relocate 187 fire sprinklers. add 94 fire sprinklers. delete 10 fire sprinklers. building ti pa# 2024050917663 added hydraulic calculations to permit. | $50,000 | |
| Jun 5, 2024 | Completed final sign-off Dec 2024 | 525 Market St | Principal Builders Inc. | floor 31: deferred mep fpr pa# 2024-0509-1774.Details
floor 31: deferred mep fpr pa# 2024-0509-1774. | $1,795,824 |
| Jun 5, 2024 | Completed final sign-off Dec 2024 | 525 Market St | Principal Builders Inc. | floor 32: deferred mep for pa# 2024-0509-1774.Details
floor 32: deferred mep for pa# 2024-0509-1774. | $1,795,824 |
| May 14, 2024 | Completed final sign-off Sep 2024 | 525 Market St | Bilcor Inc | 7/f: fa installation of 1-booster panel, 54-ceiling speaker-strobes, 25-wall mount speaker-strobes, 7- weather proof wall mount speaker-strobes, 9-smoke detectors, 25 duct detectors, 7-control replays, 2-pull stations, and 2-phone jacks, ref ti pa# 202401113849 & mech pa# 202402236430.Details
7/f: fa installation of 1-booster panel, 54-ceiling speaker-strobes, 25-wall mount speaker-strobes, 7- weather proof wall mount speaker-strobes, 9-smoke detectors, 25 duct detectors, 7-control replays, 2-pull stations, and 2-phone jacks, ref ti pa# 202401113849 & mech pa# 202402236430. | $87,912 |
| May 9, 2024 | Completed final sign-off Dec 2024 | 525 Market St | Principal Builders Inc. | 31st fl ti - partitions, floors, existingm, fixtures & finishes. mep deferredDetails
31st fl ti - partitions, floors, existingm, fixtures & finishes. mep deferred | $3,500,000 |
| May 9, 2024 | Completed final sign-off Dec 2024 | 525 Market St | Principal Builders Inc. | 32/f: tenant improvement - partitions, ceiling, fixtures, and finishes. movable partition. mep deferred.Details
32/f: tenant improvement - partitions, ceiling, fixtures, and finishes. movable partition. mep deferred. | $3,500,000 |
| May 9, 2024 | Completed final sign-off Dec 2024 | 525 Market St | Principal Builders Inc. | floors 31-32 interconnecting stair onlyDetails
floors 31-32 interconnecting stair only | $100,000 |
| May 8, 2024 | In progress issued May 2024 | 525 Market St | Source Planning And Construction Inc | lighting for 3rd and 4th floor office ti. electrical work includes new lighting and branch circuiting to existing panel; energy code compliance forms. reference permit 202401184171.Details
lighting for 3rd and 4th floor office ti. electrical work includes new lighting and branch circuiting to existing panel; energy code compliance forms. reference permit 202401184171. | $505,000 |
| Apr 26, 2024 | In progress issued Apr 2024 | 525 Market St | Bilcor Inc | smoke control update. ref app#202403057128Details
smoke control update. ref app#202403057128 | $666 |
| Apr 17, 2024 | Completed final sign-off Oct 2024 | 525 Market St | Ayoob & Peery Plumbing Co Inc | ref 202401113849- 7/f relocated (246) fire spirnkers and add (51) new sprinklers per ti job # 23-700Details
ref 202401113849- 7/f relocated (246) fire spirnkers and add (51) new sprinklers per ti job # 23-700 | $184,467 |
| Apr 16, 2024 | In progress issued May 2024 | 525 Market St | Bilcor Inc | 29/f- install (97) ceiling mount speaker strobes. install (1) smoke detector. install (2) control relays. install (2) call stations w/ mushroom button. arch ref# 202311090576, arch rev# 202402226374, mech ref# 202312202872, backbone ref ti# 202204051584Details
29/f- install (97) ceiling mount speaker strobes. install (1) smoke detector. install (2) control relays. install (2) call stations w/ mushroom button. arch ref# 202311090576, arch rev# 202402226374, mech ref# 202312202872, backbone ref ti# 202204051584 | $67,932 |
| Apr 16, 2024 | In progress issued Apr 2024 | 525 Market St | Golden Gate Fire Protection Inc | fire sprinklers relocate 3 pendents on the 28th fl. ref t.i permit 202404129854Details
fire sprinklers relocate 3 pendents on the 28th fl. ref t.i permit 202404129854 | $1,800 |
| Apr 12, 2024 | In progress issued Apr 2024 | 525 Market St | Acco Engineered Systems Inc. Dba Acco En | 28th fl new ductwork and grilles as required to serve private office. relocate existing thermostat to private office. ref to t.i. 202404129854Details
28th fl new ductwork and grilles as required to serve private office. relocate existing thermostat to private office. ref to t.i. 202404129854 | $27,114 |
| Apr 12, 2024 | Completed final sign-off May 2024 | 525 Market St | Fuse Builds Llc/ Dba Liberty Builds | t.i. (no change of use) on 28th floors as to add one private office. work includes removal and replacement of ceiling and carpeting and new electrical receptacle in office.Details
t.i. (no change of use) on 28th floors as to add one private office. work includes removal and replacement of ceiling and carpeting and new electrical receptacle in office. | $128,306 |
| Mar 29, 2024 | Completed final sign-off May 2024 | 525 Market St | Bilcor Inc | 3rd and 4th floors: install 16 ceiling speaker strobes, arch ref ti 202401184171 & arch rev ref tiDetails
3rd and 4th floors: install 16 ceiling speaker strobes, arch ref ti 202401184171 & arch rev ref ti | $10,656 |
| Mar 5, 2024 | Completed final sign-off Aug 2024 | 525 Market St | Principal Builders Inc. | 30/f-31/f: demo & infill (e) stair between floors 30-31. maher n/a.Details
30/f-31/f: demo & infill (e) stair between floors 30-31. maher n/a. | $50,000 |
| Mar 1, 2024 | Completed final sign-off May 2024 | 525 Market St | Principal Builders Inc. | 29/f: revision to 202311090576 for sffd assembly stamp for larger conference room when operable partition is open.Details
29/f: revision to 202311090576 for sffd assembly stamp for larger conference room when operable partition is open. | |
| Feb 29, 2024 | Completed final sign-off Dec 2024 | 525 Market St | Principal Builders Inc. | 31/f: interior non-structural demo, per ab-017 the area of demo is to remain vacant until accessory facilities are returned under the future tenant improvements.Details
31/f: interior non-structural demo, per ab-017 the area of demo is to remain vacant until accessory facilities are returned under the future tenant improvements. | $30,000 |
| Feb 29, 2024 | In progress filed Feb 2024, not yet issued | 525 Market St | interiori non structural sdemo of 31st fl per ab017. the area of demo is to remain vacant until acccessory facilities are returned under the future tenantDetails
interiori non structural sdemo of 31st fl per ab017. the area of demo is to remain vacant until acccessory facilities are returned under the future tenant | $30,000 | |
| Feb 27, 2024 | Completed final sign-off Jun 2024 | 525 Market St | Principal Builders Inc. | deferred structural permit to 202311090576 for retractable wall. revised arch on separate permit for assembly space >49 when wall is retracted.Details
deferred structural permit to 202311090576 for retractable wall. revised arch on separate permit for assembly space >49 when wall is retracted. | |
| Feb 23, 2024 | Completed final sign-off Jan 2025 | 525 Market St | Bcci Construction Company | 7/f: deferred mep for bpa# 202401113849 to include exhaust fans and ducts.Details
7/f: deferred mep for bpa# 202401113849 to include exhaust fans and ducts. | |
| Feb 22, 2024 | Completed final sign-off Jun 2024 | 525 Market St | Principal Builders Inc. | 29/f: revision pa# 202311090576 & 202312202872 for minor elevator lobby door/ wall revision and mech revisions.Details
29/f: revision pa# 202311090576 & 202312202872 for minor elevator lobby door/ wall revision and mech revisions. | |
| Feb 15, 2024 | In progress issued Feb 2024 | 525 Market St | Bilcor Inc | basement/subbasement: install 1 dual monitor module, ref pa# 202108116256.Details
basement/subbasement: install 1 dual monitor module, ref pa# 202108116256. | $666 |
| Feb 9, 2024 | Completed final sign-off Jun 2024 | 525 Market St | Source Planning And Construction Inc | rev to pa# 202401184171; add in restroom demo with the previous demo ab-017. sprinkler permit 202401164030Details
rev to pa# 202401184171; add in restroom demo with the previous demo ab-017. sprinkler permit 202401164030 | |
| Jan 22, 2024 | Completed final sign-off Apr 2024 | 525 Market St | Anderson, Rowe & Buckley, Inc. | 29/f: ref ti pa# 202311090576. (e) fire sprinkler system. ti 201 relocated & 45 removed fire sprinklers.Details
29/f: ref ti pa# 202311090576. (e) fire sprinkler system. ti 201 relocated & 45 removed fire sprinklers. | $146,000 |
| Jan 18, 2024 | Completed final sign-off Jun 2024 | 525 Market St | Source Planning And Construction Inc | 3rd and 4th fl: full demolition including non structural partitions, suspended ceilings, lighting, plumbing and finishes etc. sprinkler heads will be turned up per 202401164030. mep, sprinklers and fire life safety scope deferred submittal ab-017Details
3rd and 4th fl: full demolition including non structural partitions, suspended ceilings, lighting, plumbing and finishes etc. sprinkler heads will be turned up per 202401164030. mep, sprinklers and fire life safety scope deferred submittal ab-017 | $504,000 |
| Jan 16, 2024 | In progress issued Jan 2024 | 525 Market St | Pioneer Fire Inc. | 3-4/f: convert 96 pendents to ssu, remove 4 pendents. ref # 2024 0118 4171Details
3-4/f: convert 96 pendents to ssu, remove 4 pendents. ref # 2024 0118 4171 | $4,800 |
| Jan 11, 2024 | Completed final sign-off Jan 2025 | 525 Market St | Bcci Construction Company | 7th fl.t.i. inc (n) non structural partitions (n) suspended ceilings and drywall ceilings, (n) havac & mech systems (n) plumbing fixtures (n) light fixtures, elec outlets (n) finishesDetails
7th fl.t.i. inc (n) non structural partitions (n) suspended ceilings and drywall ceilings, (n) havac & mech systems (n) plumbing fixtures (n) light fixtures, elec outlets (n) finishes | $4,500,000 |
| Dec 20, 2023 | Completed final sign-off Jul 2024 | 525 Market St | Principal Builders Inc. | 29th floor - t.i. deferred mep. ref pa# 202311090576Details
29th floor - t.i. deferred mep. ref pa# 202311090576 | $1,692,216 |
| Dec 19, 2023 | Completed final sign-off Feb 2025 | 525 Market St | Skyline Construction | installing and anchoring furniture phone booths on office floors 20, 21, 33, 35, 36, 37 and 38th floor. no change of use interior onlyDetails
installing and anchoring furniture phone booths on office floors 20, 21, 33, 35, 36, 37 and 38th floor. no change of use interior only | $142,800 |
| Dec 18, 2023 | In progress issued Mar 2024 | 525 Market St | Skyline Construction | revision to pa# 202108116256, sub basement/ basement: to remove partition at storage, new partition at storage, new doors at vestibule, electrical revisions.Details
revision to pa# 202108116256, sub basement/ basement: to remove partition at storage, new partition at storage, new doors at vestibule, electrical revisions. | |
| Nov 9, 2023 | Completed final sign-off Jul 2024 | 525 Market St | Principal Builders Inc. | 29th fl - interior ti including non-load bearing partitions, ceiling, & floor finishes. mep deferredDetails
29th fl - interior ti including non-load bearing partitions, ceiling, & floor finishes. mep deferred | $3,900,000 |
| Oct 20, 2023 | Completed final sign-off Jan 2025 | 525 Market St | Bcci Construction Company | 7th fl: interior demo only: demo of non-structural partitions, ceiling tiles & grid, drywall ceilings, floor/wall finishes, toilet fixtures, lighting (non-e-gress), ductwork, piping, and/or equipment, elec outlets and/or devices. egress lighting, sprinklers & fire alarm to remain. per ab-017.Details
7th fl: interior demo only: demo of non-structural partitions, ceiling tiles & grid, drywall ceilings, floor/wall finishes, toilet fixtures, lighting (non-e-gress), ductwork, piping, and/or equipment, elec outlets and/or devices. egress lighting, sprinklers & fire alarm to remain. per ab-017. | $300,000 |
| Oct 6, 2023 | Completed final sign-off Oct 2023 | 525 Market St | Bilcor Inc | ground floor: install (7) ceiling mount speaker strobes. architectural and mechanical ref bpa# 202303143634Details
ground floor: install (7) ceiling mount speaker strobes. architectural and mechanical ref bpa# 202303143634 | $4,620 |
| Sep 22, 2023 | Completed final sign-off Sep 2023 | 525 Market St | Bilcor Inc | permit revision to bpa# 202308184708: revise equipment list and candela ratings to match on field conditions- installing (7) sprinkler strobes.Details
permit revision to bpa# 202308184708: revise equipment list and candela ratings to match on field conditions- installing (7) sprinkler strobes. | $4,620 |
| Sep 20, 2023 | Completed final sign-off Sep 2023 | 525 Market St | Anderson, Rowe & Buckley, Inc. | 1/f: tenant improvement - existing fire sprinkler system. 1 sprinkled. ref pa# 202308144359.Details
1/f: tenant improvement - existing fire sprinkler system. 1 sprinkled. ref pa# 202308144359. | $700 |
| Aug 18, 2023 | Completed final sign-off Sep 2023 | 525 Market St | Bilcor Inc | install (7) ceiling mount strobes. ref 202306029098.Details
install (7) ceiling mount strobes. ref 202306029098. | $4,620 |
| Aug 14, 2023 | Completed final sign-off Sep 2023 | 525 Market St | Anderson, Rowe & Buckley, Inc. | ground fl - (e) fire sprinkler system - tenant improvements. relocate 28 uprights, add 1 upright, relocate 1 pendent & plug off 7 outlets. demo to shell.Details
ground fl - (e) fire sprinkler system - tenant improvements. relocate 28 uprights, add 1 upright, relocate 1 pendent & plug off 7 outlets. demo to shell. | $19,000 |
| Jul 31, 2023 | Never finaled issued Jul 2023, no final | 525 Market St | Pioneer Fire Inc. | convert 96 pendents to uprights ref pa 2023-0602-9098Details
convert 96 pendents to uprights ref pa 2023-0602-9098 | $14,400 |
| Jun 29, 2023 | Never finaled issued Jul 2023, no final | 525 Market St | Skyline Construction | sub basement/basement - generator permit 202108116256 1 remote monitoring panel; piping between existing fuel oil supply & return; new life safety generator sub base tank. install pressure relief valve. low voltage wiring for fule oil alarms. install leak sensors and level probesDetails
sub basement/basement - generator permit 202108116256 1 remote monitoring panel; piping between existing fuel oil supply & return; new life safety generator sub base tank. install pressure relief valve. low voltage wiring for fule oil alarms. install leak sensors and level probes | $50,000 |
| Jun 2, 2023 | Completed final sign-off Oct 2023 | 525 Market St | Novo Construction Inc | 29th fl - full demo including non structural partitions, suspended ceilings, lighting, plumbing, finishes etc. new and modifications to existing elevator lobby doors to be provided. sprinkler heads will be turned up once acoustical ceiling has been removedDetails
29th fl - full demo including non structural partitions, suspended ceilings, lighting, plumbing, finishes etc. new and modifications to existing elevator lobby doors to be provided. sprinkler heads will be turned up once acoustical ceiling has been removed | $350,000 |
| May 10, 2023 | Completed final sign-off Jun 2023 | 525 Market St | Bilcor Inc | install 26 new call stations and 26 signs. 2-way comm backbon under ref pa202204051584.Details
install 26 new call stations and 26 signs. 2-way comm backbon under ref pa202204051584. | $34,320 |
| Apr 14, 2023 | Never finaled issued May 2023, no final | 525 Market St | Skyline Construction | 20/f: structural work for led display support & suspended lighting @ video production room. ref bpa#202301311040Details
20/f: structural work for led display support & suspended lighting @ video production room. ref bpa#202301311040 | $10,000 |
| Mar 14, 2023 | Completed final sign-off Jul 2025 | 525 Market St | Skyline Construction | suite 120 on 1/f: t.i, demo of non structural partitions and storefront, and building new non-structural partitions and storefront at building facade. (scope includes 294sf of g/f area back to original wall dimensions per 1973 construction)Details
suite 120 on 1/f: t.i, demo of non structural partitions and storefront, and building new non-structural partitions and storefront at building facade. (scope includes 294sf of g/f area back to original wall dimensions per 1973 construction) | $410,000 |
| Feb 13, 2023 | Completed final sign-off Mar 2023 | 525 Market St | Anderson, Rowe & Buckley, Inc. | 20/f: fire sprinkler only. change out 8 pendents to upright sprinklers. ref permit 202301311040Details
20/f: fire sprinkler only. change out 8 pendents to upright sprinklers. ref permit 202301311040 | $5,000 |
| Jan 31, 2023 | Never finaled issued Feb 2023, no final | 525 Market St | Skyline Construction | 20/flr: change from conference room to video production room, limited demolition & new construction only to the single room.Details
20/flr: change from conference room to video production room, limited demolition & new construction only to the single room. | $90,000 |
| Jan 4, 2023 | Completed final sign-off Jan 2023 | 525 Market St | Pribuss Engineering Inc | fire sprinkler t.i. for 5th + 32nd floor restorooms. total sprinklers = 11. gc pa# 202207067816 (5f) + 202207067812 (32f)Details
fire sprinkler t.i. for 5th + 32nd floor restorooms. total sprinklers = 11. gc pa# 202207067816 (5f) + 202207067812 (32f) | $5,500 |
| Oct 12, 2022 | Never finaled issued Oct 2022, no final | 525 Market St | Bilcor Inc | install (7) ceiling mount speaker-strobes, arch ref pa# 202207067816Details
install (7) ceiling mount speaker-strobes, arch ref pa# 202207067816 | $4,620 |
| Oct 11, 2022 | Never finaled issued Oct 2022, no final | 525 Market St | Bilcor Inc | 17/f: install (7) ceiling mount speaker strobes. ref arch. permit 202208291465Details
17/f: install (7) ceiling mount speaker strobes. ref arch. permit 202208291465 | $4,620 |
| Oct 11, 2022 | Never finaled issued Oct 2022, no final | 525 Market St | Bilcor Inc | 32/f: install (7) ceiling mount speaker-strobes. ref arch. permit 202111102163Details
32/f: install (7) ceiling mount speaker-strobes. ref arch. permit 202111102163 | $4,620 |
| Aug 29, 2022 | Completed final sign-off Apr 2023 | 525 Market St | Novo Construction Inc | 17/f: interior demo including non-structural partitions, suspdned ceiling, lihghitng, plumbing and finishes. f/s under pa 202208231121. maher n/a ab-017 appliesDetails
17/f: interior demo including non-structural partitions, suspdned ceiling, lihghitng, plumbing and finishes. f/s under pa 202208231121. maher n/a ab-017 applies | $25,000 |
| Aug 23, 2022 | Completed final sign-off Apr 2023 | 525 Market St | Novo Construction Inc | 5/f: title 24 electrical work for t.i. ref pa 202207067816. maher n/aDetails
5/f: title 24 electrical work for t.i. ref pa 202207067816. maher n/a | $60,000 |
| Aug 23, 2022 | Completed final sign-off Nov 2022 | 525 Market St | Ayoob & Peery Plumbing Co Inc | 17th fl: revert (e) fire system to core and shell conditions. remove all unnecessary arm overs in accordance with core and shell conditions. add new wire restraints as necessary.Details
17th fl: revert (e) fire system to core and shell conditions. remove all unnecessary arm overs in accordance with core and shell conditions. add new wire restraints as necessary. | $28,300 |
| Aug 23, 2022 | Completed final sign-off Apr 2023 | 525 Market St | Novo Construction Inc | 32/f: title 24 electrical work for t.i. ref pa 202207067812. maher n/aDetails
32/f: title 24 electrical work for t.i. ref pa 202207067812. maher n/a | $50,000 |
| Aug 16, 2022 | Completed final sign-off Apr 2023 | 525 Market St | Novo Construction Inc | mechanical work for tenant improvement on the 32nd fl ref arch 202207067812Details
mechanical work for tenant improvement on the 32nd fl ref arch 202207067812 | $10,000 |
| Aug 16, 2022 | Completed final sign-off Apr 2023 | 525 Market St | Novo Construction Inc | mechanical work for tenant improvement on the 5th fl ref 202207067816Details
mechanical work for tenant improvement on the 5th fl ref 202207067816 | $10,000 |
| Aug 5, 2022 | Completed final sign-off Apr 2023 | 525 Market St | Hathaway Dinwiddie Co. | 18th flr - interior t.i. including minor alterations to 1 partition, finishes, and power/signal. addition of 1 new heat pump.Details
18th flr - interior t.i. including minor alterations to 1 partition, finishes, and power/signal. addition of 1 new heat pump. | $122,000 |
| Jul 6, 2022 | Completed final sign-off Apr 2023 | 525 Market St | Novo Construction Inc | 32/f: creating a full floor "white box' and core restroom. all new or revised meps and life safety work will be design-build and submitted separately. demo permit under 202111102163. bldg fully sprinklered.Details
32/f: creating a full floor "white box' and core restroom. all new or revised meps and life safety work will be design-build and submitted separately. demo permit under 202111102163. bldg fully sprinklered. | $201,200 |
| Jul 6, 2022 | Completed final sign-off Apr 2023 | 525 Market St | Novo Construction Inc | 5/f: creating a full floor "white box' and core restroom. renovation includes new non-structural partitions - all new or revised. meps and life safety work will be design-build and submitted separately. demo permit under 202109228958. bldg fully sprinklered.Details
5/f: creating a full floor "white box' and core restroom. renovation includes new non-structural partitions - all new or revised. meps and life safety work will be design-build and submitted separately. demo permit under 202109228958. bldg fully sprinklered. | $201,200 |
| Jun 10, 2022 | Completed final sign-off Jun 2023 | 525 Market St | Western Roofing Service | replacement of roofing membrane on the main roof and 39th floor roofDetails
replacement of roofing membrane on the main roof and 39th floor roof | $950,000 |
| May 25, 2022 | Completed final sign-off Jul 2022 | 525 Market St | Golden Gate Fire Protection Inc | 25th-26th fl: fire sprinklers. relocate 9 pendent sprinklers and add 10 pendents on 25th fl. relocate 9 pendent sprinklers and add 10 pendents on 26th fl. ref pa# 202109108179 & 202109108159.Details
25th-26th fl: fire sprinklers. relocate 9 pendent sprinklers and add 10 pendents on 25th fl. relocate 9 pendent sprinklers and add 10 pendents on 26th fl. ref pa# 202109108179 & 202109108159. | $19,000 |
| Apr 29, 2022 | Never finaled issued May 2022, no final | 525 Market St | Clune Construction Company L P | 33/f: install fire proofing to underside of level 33 metal decking, approximately 185 sq. ft.Details
33/f: install fire proofing to underside of level 33 metal decking, approximately 185 sq. ft. | $15,000 |
| Apr 18, 2022 | Expired or cancelled cancelled Jan 2026 | 525 Market St | Skyline Construction | 25th fl: mechanical work for tenant improvement. ref pa# 202109108159.Details
25th fl: mechanical work for tenant improvement. ref pa# 202109108159. | $125,000 |
| Apr 18, 2022 | Never finaled issued Apr 2022, no final | 525 Market St | Skyline Construction | 25th & 26th flr: electrical work for tenant improvement. ref pa# 202109108159 & 202109108179Details
25th & 26th flr: electrical work for tenant improvement. ref pa# 202109108159 & 202109108179 | $45,000 |
| Apr 12, 2022 | Expired or cancelled cancelled Jan 2026 | 525 Market St | revision to 202109108179. ervised location of phone rooms. no mep or change of me interior only.Details
revision to 202109108179. ervised location of phone rooms. no mep or change of me interior only. | ||
| Apr 12, 2022 | Expired or cancelled cancelled Jan 2026 | 525 Market St | revision to permit # 202109108159. revised location of phone rooms. no mep or change of use. interior onlyDetails
revision to permit # 202109108159. revised location of phone rooms. no mep or change of use. interior only | ||
| Apr 5, 2022 | Completed final sign-off Jun 2022 | 525 Market St | Bilcor Inc | fire safety: 2-way communication. 1 rath command center. 1 desk mount subbase station. 1 command center system supervisory (2500-76sprvsr), 1 command center system supervisory (2500-92spvsr), 1 power supply backup, 3 ups backup battery modules, 1 relay control card. 1 push button. 1 monitor moduleDetails
fire safety: 2-way communication. 1 rath command center. 1 desk mount subbase station. 1 command center system supervisory (2500-76sprvsr), 1 command center system supervisory (2500-92spvsr), 1 power supply backup, 3 ups backup battery modules, 1 relay control card. 1 push button. 1 monitor module | $9,240 |
| Apr 1, 2022 | Completed final sign-off Jul 2022 | 525 Market St | Bilcor Inc | 25/f: fire life safety; install 10 ceiling mount speaker strobes, 10 led ceiling mount speaker strobes. relocate 2 ceiling mount speaker strobes. ref arch permit 202109108179.Details
25/f: fire life safety; install 10 ceiling mount speaker strobes, 10 led ceiling mount speaker strobes. relocate 2 ceiling mount speaker strobes. ref arch permit 202109108179. | $13,200 |
| Apr 1, 2022 | Completed final sign-off Jul 2022 | 525 Market St | Bilcor Inc | 26/f: fire life safety; install 11 ceiling mount speaker strobes, 10 led ceiling mount speaker strobes. relocate 2 ceiling mount speaker strobes. ref arch permit 202109108159.Details
26/f: fire life safety; install 11 ceiling mount speaker strobes, 10 led ceiling mount speaker strobes. relocate 2 ceiling mount speaker strobes. ref arch permit 202109108159. | $13,860 |
| Feb 1, 2022 | Completed final sign-off Feb 2022 | 525 Market St | Bilcor Inc | 32/f: fire life safety: install (4) ceiling mount speaker strobes, arch ref pa# 202111102163Details
32/f: fire life safety: install (4) ceiling mount speaker strobes, arch ref pa# 202111102163 | $2,640 |
| Nov 10, 2021 | Completed final sign-off Sep 2022 | 525 Market St | Clune Construction Company L P | demo only permit: removal of non-loading bearing partitions, selective demo of existing ceiling grid & tile light fixtures, millwork, electrical,plumbing,finishes & office doors.Details
demo only permit: removal of non-loading bearing partitions, selective demo of existing ceiling grid & tile light fixtures, millwork, electrical,plumbing,finishes & office doors. | $140,000 |
| Nov 9, 2021 | Completed final sign-off Jan 2022 | 525 Market St | Golden Gate Fire Protection Inc | 32/f: fire sprinkler, relocate 137 upright, sprinklers on 32/fl. maher n/a.Details
32/f: fire sprinkler, relocate 137 upright, sprinklers on 32/fl. maher n/a. | $30,825 |
| Sep 29, 2021 | Never finaled filed Sep 2021, never issued | 525 Market St | Bilcor Inc | flrs 9 & 16: fire life safety : install (2) controlled relays, (2) modules, (2) call stations and (2) line fault monitors.Details
flrs 9 & 16: fire life safety : install (2) controlled relays, (2) modules, (2) call stations and (2) line fault monitors. | $5,280 |
| Sep 22, 2021 | Completed final sign-off Mar 2022 | 525 Market St | Skyline Construction | 5th floor: interior demolition of partitions, finishes mechanical, electrical and plumbing. sprinkler permit 202006128622 ab-017Details
5th floor: interior demolition of partitions, finishes mechanical, electrical and plumbing. sprinkler permit 202006128622 ab-017 | $50,000 |
| Sep 10, 2021 | Never finaled issued Mar 2022, no final | 525 Market St | Skyline Construction | 26th fl - minor ti to (e) space. revised furniture layouts, modified and new furniture demountable partitions. minor electrical and mechanical work as required. will be submitted on separate permit.Details
26th fl - minor ti to (e) space. revised furniture layouts, modified and new furniture demountable partitions. minor electrical and mechanical work as required. will be submitted on separate permit. | $1,126,600 |
| Sep 10, 2021 | Never finaled issued Mar 2022, no final | 525 Market St | Skyline Construction | 25th fl - minor ti to (e) space. revised furniture layouts, modified and new furniture demountable partitions. minor electrical and mechanical work as required. will be submitted on separate permit.Details
25th fl - minor ti to (e) space. revised furniture layouts, modified and new furniture demountable partitions. minor electrical and mechanical work as required. will be submitted on separate permit. | $1,126,600 |
| Aug 11, 2021 | Completed final sign-off Oct 2024 | 525 Market St | Skyline Construction | subbasement: replace (e) life safety diesel generator.Details
subbasement: replace (e) life safety diesel generator. | $1,600,000 |
| Aug 3, 2021 | Completed final sign-off May 2022 | 525 Market St | Skyline Construction | 27/f: mechanical and electrical work for ti. ref. pa 202102104395Details
27/f: mechanical and electrical work for ti. ref. pa 202102104395 | $22,000 |
| Aug 3, 2021 | Completed final sign-off May 2022 | 525 Market St | Skyline Construction | mech & electrical work for t.i. on 28th fl. ref pa #202012151053Details
mech & electrical work for t.i. on 28th fl. ref pa #202012151053 | $22,000 |
| Jun 15, 2021 | Completed final sign-off Nov 2021 | 525 Market St | Bilcor Inc | fire life safety (27th & 28th fl): install (16) ceiling mount speaker strobes, install (4) duct detectors architectural reference ti #: 2021-0210-4395, 2020-1215-1053Details
fire life safety (27th & 28th fl): install (16) ceiling mount speaker strobes, install (4) duct detectors architectural reference ti #: 2021-0210-4395, 2020-1215-1053 | $13,200 |
| Jun 8, 2021 | Completed final sign-off Aug 2021 | 525 Market St | Golden Gate Fire Protection Inc | fire sprinklers; relocate 8 pendent sprinklers and 2 uprights on the 27th floor. relocate 8 pendent sprinklers and 2 uprights on the 28th floor. t.i. ref # 2021-0210-4395 (27th floor) and #2021-1215-1053 (28th floor)Details
fire sprinklers; relocate 8 pendent sprinklers and 2 uprights on the 27th floor. relocate 8 pendent sprinklers and 2 uprights on the 28th floor. t.i. ref # 2021-0210-4395 (27th floor) and #2021-1215-1053 (28th floor) | $10,500 |
| Feb 10, 2021 | Completed final sign-off May 2022 | 525 Market St | Skyline Construction | 27/f: restroom accessibility upgrades, new finishes throughout. restrooms, multi tenant corridor, and passenger elevator lobby.Details
27/f: restroom accessibility upgrades, new finishes throughout. restrooms, multi tenant corridor, and passenger elevator lobby. | $162,000 |
| Jan 7, 2021 | Completed final sign-off Apr 2021 | 525 Market St | Skyline Construction | 22nd floor evacuation plan (x4) and 23rd floor evacuation plan (x4)Details
22nd floor evacuation plan (x4) and 23rd floor evacuation plan (x4) | $6,600 |
| Dec 15, 2020 | Completed final sign-off May 2022 | 525 Market St | Skyline Construction | floor 28. restroom accessibility upgrades. new finishes throughout restrooms/ multi-tenant corridor/ passenger elevator lobby.Details
floor 28. restroom accessibility upgrades. new finishes throughout restrooms/ multi-tenant corridor/ passenger elevator lobby. | $162,000 |
| Dec 15, 2020 | Completed final sign-off Jan 2021 | 525 Market St | Bilcor Inc | fire life safety: install (144) ceiling mount speaker strobes, (2) call station, (2) dual monitor module, (2) control relays, (2) smoke detector w/base. reference #: 2019-1227-0746, 2019-1227-0750Details
fire life safety: install (144) ceiling mount speaker strobes, (2) call station, (2) dual monitor module, (2) control relays, (2) smoke detector w/base. reference #: 2019-1227-0746, 2019-1227-0750 | $100,320 |
| Nov 20, 2020 | Completed final sign-off Feb 2021 | 525 Market St | Skyline Construction | revision to pa# 201912270746. to add structural detail for handrail.Details
revision to pa# 201912270746. to add structural detail for handrail. | |
| Nov 20, 2020 | Expired or cancelled cancelled Jul 2023 | 525 Market St | Skyline Construction | fire only permit to obtain required fire stamps for assembly permit. ref arch 2020-0102-1138.Details
fire only permit to obtain required fire stamps for assembly permit. ref arch 2020-0102-1138. | |
| Nov 6, 2020 | Completed final sign-off Jan 2021 | 525 Market St | Bilcor Inc | fire life safety: install (2) smoke detectors w/base, (1) duct detector, (1) pull station, (1) call station. reference ti #2019-1227-0747. mep #2020-0923-4858.Details
fire life safety: install (2) smoke detectors w/base, (1) duct detector, (1) pull station, (1) call station. reference ti #2019-1227-0747. mep #2020-0923-4858. | $3,300 |
| Oct 29, 2020 | Completed final sign-off Jan 2021 | 525 Market St | Bilcor Inc | fire life saftey: install - (61) ceiling mount speaker strobes, (1) call station, (1) dual monitor module, (1) control relay, (1) smoke detector with base. reference ti# 2019-1227-0749.Details
fire life saftey: install - (61) ceiling mount speaker strobes, (1) call station, (1) dual monitor module, (1) control relay, (1) smoke detector with base. reference ti# 2019-1227-0749. | $42,900 |
| Oct 2, 2020 | Completed final sign-off Feb 2021 | 525 Market St | Skyline Construction | floors 35/36/37: rev to pa201908158959/201908158962/201908239717 at column in breakroom at grdlines b|f to add intumescent paint for 2-hour rating. maher n/aDetails
floors 35/36/37: rev to pa201908158959/201908158962/201908239717 at column in breakroom at grdlines b|f to add intumescent paint for 2-hour rating. maher n/a | |
| Sep 23, 2020 | Completed final sign-off Feb 2021 | 525 Market St | Skyline Construction | 19/f: mechanical & electrical for t.i. ref pa201912270747. maher n/aDetails
19/f: mechanical & electrical for t.i. ref pa201912270747. maher n/a | $35,000 |
| Sep 20, 2020 | Expired or cancelled withdrawn Apr 2022 | 525 Market St | Bilcor Inc | 22/f: install 61 celing mount speaker/strobes, 1 call station, 1 dual monitor modules, 1 control relay, 1 smoke detctor with base. ref t.i. 201912270746. maher n/a.Details
22/f: install 61 celing mount speaker/strobes, 1 call station, 1 dual monitor modules, 1 control relay, 1 smoke detctor with base. ref t.i. 201912270746. maher n/a. | $42,900 |
| Sep 10, 2020 | Completed final sign-off Apr 2021 | 525 Market St | 6th fl: (4) evacuation signs per sffd bulletin 2.11Details
6th fl: (4) evacuation signs per sffd bulletin 2.11 | $2,600 | |
| Sep 8, 2020 | Completed final sign-off Dec 2020 | 525 Market St | Golden Gate Fire Protection Inc | relocate 153 pendent sprinklers & 85 uprights on 22nd fl. relocate 158 pendent sprinklers & 86 uprights on 23rd fl. relocate 136 pendent sprinklers & 79 uprights on 24th fl. upgrade end of line & earthquake bracing. ti# 201912270746, 201912270750, 201912270749Details
relocate 153 pendent sprinklers & 85 uprights on 22nd fl. relocate 158 pendent sprinklers & 86 uprights on 23rd fl. relocate 136 pendent sprinklers & 79 uprights on 24th fl. upgrade end of line & earthquake bracing. ti# 201912270746, 201912270750, 201912270749 | $361,500 |
| Sep 5, 2020 | Completed final sign-off Nov 2020 | 525 Market St | Bilcor Inc | 28th fl: fire lift safety: install 1 ceiling count strobe. ref ti pa# 201904269043Details
28th fl: fire lift safety: install 1 ceiling count strobe. ref ti pa# 201904269043 | $660 |
| Aug 31, 2020 | Never finaled issued Sep 2020, no final | 525 Market St | Golden Gate Fire Protection Inc | 19/f: relocate 3 pendent sprinklers in restrooms, relocate 5 pendent in the elevator lobby. t.i. ref bpa#201912270747Details
19/f: relocate 3 pendent sprinklers in restrooms, relocate 5 pendent in the elevator lobby. t.i. ref bpa#201912270747 | $4,200 |
| Jul 19, 2020 | Completed final sign-off Apr 2021 | 525 Market St | Skyline Construction | mech and elec for t.i on the 6/f. architectural ref pa# 202001021138Details
mech and elec for t.i on the 6/f. architectural ref pa# 202001021138 | $250,000 |
| Jul 7, 2020 | Completed final sign-off Oct 2020 | 525 Market St | Hathaway Dinwiddie Co. | convert (e) room into mother lactation room, work involves demo of fixtures and wall/door, and new wall and door, new millwork and fixture and new finishes, modifications to electrical, mechanical system and relocation of 1 sink is to be design/build and submitted separately by the g.c. contractorsDetails
convert (e) room into mother lactation room, work involves demo of fixtures and wall/door, and new wall and door, new millwork and fixture and new finishes, modifications to electrical, mechanical system and relocation of 1 sink is to be design/build and submitted separately by the g.c. contractors | $255,000 |
| Jun 12, 2020 | Completed final sign-off Nov 2021 | 525 Market St | 5/f: remove all pendent spirnlkers and arm over piping. install 233 upright spirnklers. maher n/a.Details
5/f: remove all pendent spirnlkers and arm over piping. install 233 upright spirnklers. maher n/a. | $50,000 | |
| Jun 12, 2020 | Never finaled issued Sep 2020, no final | 525 Market St | Bilcor Inc | 6/f: fire life safety:-install (25) ceiling mount speaker strobes-install (3) duct detectors-install (6) control relays-install (1) dual module-install (2) call stations-install (1) line fault monitor-install (1) remote controller. ref 202001021138.Details
6/f: fire life safety:-install (25) ceiling mount speaker strobes-install (3) duct detectors-install (6) control relays-install (1) dual module-install (2) call stations-install (1) line fault monitor-install (1) remote controller. ref 202001021138. | $25,740 |
| Mar 11, 2020 | Completed final sign-off Nov 2020 | 525 Market St | 6th fl fire sprinkler permit: relocate 39 and add 31 sprinklers. ref ti #202001021138Details
6th fl fire sprinkler permit: relocate 39 and add 31 sprinklers. ref ti #202001021138 | $24,000 | |
| Mar 4, 2020 | Never finaled issued Mar 2020, no final | 525 Market St | 35th-38th fl evacuation plan (4 per each floor)Details
35th-38th fl evacuation plan (4 per each floor) | $9,600 | |
| Feb 13, 2020 | Expired or cancelled cancelled Jan 2026 | 525 Market St | 8th fl - remodel of existing entry to include (n) medium conference room and 2 focus rooms. partial demo of (e) lighting, mechanical millwork. new lighting and hvac in areas of affected workDetails
8th fl - remodel of existing entry to include (n) medium conference room and 2 focus rooms. partial demo of (e) lighting, mechanical millwork. new lighting and hvac in areas of affected work | $170,168 | |
| Feb 12, 2020 | Completed final sign-off Oct 2020 | 525 Market St | Skyline Construction | this project includes the demolition of internal communicating stair and infill and associated structural adjacent partitions and construction of new infill slab and framing (28th & 29th floors)Details
this project includes the demolition of internal communicating stair and infill and associated structural adjacent partitions and construction of new infill slab and framing (28th & 29th floors) | $50,000 |
| Feb 5, 2020 | Completed final sign-off Aug 2020 | 525 Market St | Bilcor Inc | 37th fl - ref pa# 201912139496; fire alarm install 1 booster panel power supply, install 1 dual monitor module, instll 61 ceiling monitor and spaeker strobes, install 1 call station, install 1 smoke detector, install 1 call station line fault monitor, install 1 conrol relay module,Details
37th fl - ref pa# 201912139496; fire alarm install 1 booster panel power supply, install 1 dual monitor module, instll 61 ceiling monitor and spaeker strobes, install 1 call station, install 1 smoke detector, install 1 call station line fault monitor, install 1 conrol relay module, | $44,880 |
| Feb 5, 2020 | Completed final sign-off Aug 2020 | 525 Market St | Bilcor Inc | 38th fl - ref pa# 201912139497; install 1 booster panel power supply, install 1 control relay modules, install 58 ceiling mount speaker strobes, install 1 panel monitor module, install 3 proof ceilng mount speaker strobes, install 1 call station, install 1 smoke detector,Details
38th fl - ref pa# 201912139497; install 1 booster panel power supply, install 1 control relay modules, install 58 ceiling mount speaker strobes, install 1 panel monitor module, install 3 proof ceilng mount speaker strobes, install 1 call station, install 1 smoke detector, | $44,880 |
| Feb 5, 2020 | Completed final sign-off Nov 2020 | 525 Market St | Bilcor Inc | 14th fl - ref pa# 202001313219; install (1) control relay, install (1) duct detector with sampling tubeDetails
14th fl - ref pa# 202001313219; install (1) control relay, install (1) duct detector with sampling tube | $1,320 |
| Jan 31, 2020 | Completed final sign-off Nov 2020 | 525 Market St | Hathaway Dinwiddie Co. | add (1) heat pump on the 14th fl. and replace (1) heat pump of 18th fl.Details
add (1) heat pump on the 14th fl. and replace (1) heat pump of 18th fl. | $45,000 |
| Jan 24, 2020 | Completed final sign-off Aug 2020 | 525 Market St | Bilcor Inc | ref pa# 201908158959; fire alarm install 1 booster panel power supply, 1 smoke detector, 1 control relay module, 1 dual monitor module, 1 call station, 1 line fault mointor, 1 call station remote control, 61 ceiling mount speaker strobesDetails
ref pa# 201908158959; fire alarm install 1 booster panel power supply, 1 smoke detector, 1 control relay module, 1 dual monitor module, 1 call station, 1 line fault mointor, 1 call station remote control, 61 ceiling mount speaker strobes | $44,880 |
| Jan 24, 2020 | Completed final sign-off Aug 2020 | 525 Market St | Bilcor Inc | fire alarm install 1 booster panel power supply, 60 ceiling mount speaker strobes, 1 smoke detector, 1 control, relay module 1 dual monitor module, 1 call station, 1 call station fault monitor, 1 call station remote controllerDetails
fire alarm install 1 booster panel power supply, 60 ceiling mount speaker strobes, 1 smoke detector, 1 control, relay module 1 dual monitor module, 1 call station, 1 call station fault monitor, 1 call station remote controller | $44,880 |
| Jan 21, 2020 | Expired or cancelled cancelled Jan 2026 | 525 Market St | Bilcor Inc | fire alarm 2 dual module, 2 booster panel power supply, 2 call stations, 121 ceiling mount speaker strobes, 2 call station line faul monitor, 2 smoke detectors, 2 call station remote controller, 2 control relay modules,ref 35th 201908158959, 36th f201912189493Details
fire alarm 2 dual module, 2 booster panel power supply, 2 call stations, 121 ceiling mount speaker strobes, 2 call station line faul monitor, 2 smoke detectors, 2 call station remote controller, 2 control relay modules,ref 35th 201908158959, 36th f201912189493 | $89,100 |
| Jan 10, 2020 | Completed final sign-off Feb 2021 | 525 Market St | Skyline Construction | rev to pa# 201909171850; revise structural details for 35th & 36th fl. landing/rail connection and stair post connection detailDetails
rev to pa# 201909171850; revise structural details for 35th & 36th fl. landing/rail connection and stair post connection detail | |
| Jan 2, 2020 | Completed final sign-off Apr 2021 | 525 Market St | Skyline Construction | 6th fl interior demo of non structural elements. new construction includes installation of interior doors, partitions, finishes, lighting, and mech and elec components. scope of work also include some ada updates at the existing restroom. no changes to fixture quantity. mep plan to be separateDetails
6th fl interior demo of non structural elements. new construction includes installation of interior doors, partitions, finishes, lighting, and mech and elec components. scope of work also include some ada updates at the existing restroom. no changes to fixture quantity. mep plan to be separate | $2,600,000 |
| Dec 27, 2019 | Completed final sign-off Feb 2021 | 525 Market St | Skyline Construction | 22nd floor: t.i on 22nd floor to include demolition, new non-load bearing partition. mechanical, electrical and plumbing ceiling lighting and finihes.Details
22nd floor: t.i on 22nd floor to include demolition, new non-load bearing partition. mechanical, electrical and plumbing ceiling lighting and finihes. | $1,500,000 |
| Dec 27, 2019 | Completed final sign-off Feb 2021 | 525 Market St | Skyline Construction | tenant improvement on the 24th fl to include demo, new non load bearing partitions, mech, elec, plumbing, ceiling, lighting, 7Details
tenant improvement on the 24th fl to include demo, new non load bearing partitions, mech, elec, plumbing, ceiling, lighting, 7 | $1,500,000 |
| Dec 27, 2019 | Completed final sign-off Feb 2021 | 525 Market St | Skyline Construction | 19th fl: base bldg elevator shaft modification, restroom and minor ti, to include demolition, structural modification to core shaft wall, new-load bearing partitions. maher naDetails
19th fl: base bldg elevator shaft modification, restroom and minor ti, to include demolition, structural modification to core shaft wall, new-load bearing partitions. maher na | $250,000 |
| Dec 27, 2019 | Completed final sign-off Feb 2021 | 525 Market St | Skyline Construction | 23nd floor: t.i on 23nd floor to include demolition, new non-load bearing partition. mechanical, electrical and plumbing ceiling lighting and finishes.Details
23nd floor: t.i on 23nd floor to include demolition, new non-load bearing partition. mechanical, electrical and plumbing ceiling lighting and finishes. | $1,500,000 |
| Dec 13, 2019 | Completed final sign-off Feb 2021 | 525 Market St | Skyline Construction | revision to permit 201908239711: modifications to 3 gender neutral restrooms, and add shower to 2 gender neutral restrooms.Details
revision to permit 201908239711: modifications to 3 gender neutral restrooms, and add shower to 2 gender neutral restrooms. | |
| Dec 13, 2019 | Completed final sign-off Feb 2021 | 525 Market St | Skyline Construction | revision to permit 201908239717: modifications to one gender neutral restroom.Details
revision to permit 201908239717: modifications to one gender neutral restroom. | |
| Dec 13, 2019 | Completed final sign-off Feb 2021 | 525 Market St | Skyline Construction | revision to permit 201908158962; modifications to change shower to mother's room, and change a mother's room to storage.Details
revision to permit 201908158962; modifications to change shower to mother's room, and change a mother's room to storage. | |
| Dec 6, 2019 | Completed final sign-off Jul 2020 | 525 Market St | Golden Gate Fire Protection Inc | 35th-38th floor. fire sprinkler; as-built to permit # 2019-1105-6446Details
35th-38th floor. fire sprinkler; as-built to permit # 2019-1105-6446 | $1,000 |
| Nov 27, 2019 | Completed final sign-off Feb 2020 | 525 Market St | Golden Gate Fire Protection Inc | fire sprinkler only relocate 137 uprights for the 22nd fl and 137 uprights for 23rd fl, and 137 uprt for 24 th flDetails
fire sprinkler only relocate 137 uprights for the 22nd fl and 137 uprights for 23rd fl, and 137 uprt for 24 th fl | $205,500 |
| Nov 5, 2019 | Completed final sign-off Jul 2020 | 525 Market St | Golden Gate Fire Protection Inc | fire sprinklers. relocate 188 pendant sprinklers and 23 upright on the 35th floor. relocate 187 pendant and 25 uprights on the 36th floor. relocate 193 pendants and 23 uprights on the 37th floor. relocate 190 pendants and 20 uprights on the 38th flr. ti ref. #201908158959, 201908158962, 201908239717Details
fire sprinklers. relocate 188 pendant sprinklers and 23 upright on the 35th floor. relocate 187 pendant and 25 uprights on the 36th floor. relocate 193 pendants and 23 uprights on the 37th floor. relocate 190 pendants and 20 uprights on the 38th flr. ti ref. #201908158959, 201908158962, 201908239717 | $424,500 |
| Oct 17, 2019 | Completed final sign-off Nov 2019 | 525 Market St | Bilcor Inc | 2nd floor:fire alarm: install 9 ceiling mount speaker srobes. install 11 smoke detectors w/sampling tube. install 8 duct detectors w/sampling tube. install 1 control relay. install 1 dual monitor modules. install 2 call station. install 1 2way comm line fault monitor.Details
2nd floor:fire alarm: install 9 ceiling mount speaker srobes. install 11 smoke detectors w/sampling tube. install 8 duct detectors w/sampling tube. install 1 control relay. install 1 dual monitor modules. install 2 call station. install 1 2way comm line fault monitor. | $20,460 |
| Oct 9, 2019 | Never finaled issued Oct 2019, no final | 525 Market St | evacuation plan 2nd floor (6 evac maps)Details
evacuation plan 2nd floor (6 evac maps) | $4,500 | |
| Oct 8, 2019 | Never finaled issued Oct 2019, no final | 525 Market St | Service West Inc | level 20: interior t.i to install a new door and demountable partition to an existing team room on the 20 floor.Details
level 20: interior t.i to install a new door and demountable partition to an existing team room on the 20 floor. | $11,210 |
| Sep 30, 2019 | Expired or cancelled cancelled Jan 2026 | 525 Market St | Skyline Construction | 22nd, 23rd, 24th fl: selective demo of non-load bearing partitions, ceilinbg, ceilings, light fixtures, millwork, plumbing, & finishes. maher naDetails
22nd, 23rd, 24th fl: selective demo of non-load bearing partitions, ceilinbg, ceilings, light fixtures, millwork, plumbing, & finishes. maher na | |
| Sep 17, 2019 | Never finaled issued Oct 2019, no final | 525 Market St | Skyline Construction | 35th and 36th floors - modifications to existing ti convenience steel stair between 35th and 36th floor. work include demo, (n) glass railings and gypsum board headers). maher n/aDetails
35th and 36th floors - modifications to existing ti convenience steel stair between 35th and 36th floor. work include demo, (n) glass railings and gypsum board headers). maher n/a | $200,000 |
| Aug 23, 2019 | Completed final sign-off Feb 2021 | 525 Market St | Skyline Construction | 38th fl - full ti demo, new partitions (n0n-load bearing), mechanical, plumbing, electrical, ceiling and lighting, floor finishes and furnishingsDetails
38th fl - full ti demo, new partitions (n0n-load bearing), mechanical, plumbing, electrical, ceiling and lighting, floor finishes and furnishings | $1,500,000 |
| Aug 23, 2019 | Completed final sign-off Feb 2021 | 525 Market St | Skyline Construction | 37th fl - full ti demo, new partitions (n0n-load bearing), mechanical, plumbing, electrical, ceiling and lighting, floor finishes and furnishingsDetails
37th fl - full ti demo, new partitions (n0n-load bearing), mechanical, plumbing, electrical, ceiling and lighting, floor finishes and furnishings | $1,500,000 |
| Aug 22, 2019 | Never finaled issued Aug 2019, no final | 525 Market St | Golden Gate Fire Protection Inc | 2nd fl - fire sprinkler only as built for field fire inspection (kitchenette) layout change. ref pa 2019-0806-7994Details
2nd fl - fire sprinkler only as built for field fire inspection (kitchenette) layout change. ref pa 2019-0806-7994 | |
| Aug 15, 2019 | Completed final sign-off Feb 2021 | 525 Market St | Skyline Construction | 36th flr - ti demo, new non load bearing partitions, mech, plm, ele, ceiling and lighting , floors, finishes and furnishingsDetails
36th flr - ti demo, new non load bearing partitions, mech, plm, ele, ceiling and lighting , floors, finishes and furnishings | $1,500,000 |
| Aug 15, 2019 | Completed final sign-off Feb 2021 | 525 Market St | Skyline Construction | 35th flr - ti demo, new non load bearing partitions, mech, plm, ele, ceiling and lighting , floors, finishes and furnishingsDetails
35th flr - ti demo, new non load bearing partitions, mech, plm, ele, ceiling and lighting , floors, finishes and furnishings | $1,500,000 |
| Aug 13, 2019 | Completed final sign-off Aug 2019 | 525 Market St | Bilcor Inc | 28th flr -fls ti - install 28 ceiling mount speaker strobes 2 ceiling mount strobes, 1 smk det w/base 3 duct det, 4 control relaysDetails
28th flr -fls ti - install 28 ceiling mount speaker strobes 2 ceiling mount strobes, 1 smk det w/base 3 duct det, 4 control relays | $23,120 |
| Aug 6, 2019 | Completed final sign-off Oct 2019 | 525 Market St | Golden Gate Fire Protection Inc | 2nd fl - relocate 29 pendents; relocate 39 uprights for amazon. ref pa 2019-0515-0662Details
2nd fl - relocate 29 pendents; relocate 39 uprights for amazon. ref pa 2019-0515-0662 | $34,000 |
| Jul 26, 2019 | Completed final sign-off Aug 2019 | 525 Market St | Golden Gate Fire Protection Inc | fire sprinklers: relocate 43 pendent sprinklers and 2 uprights on the 28th fl. ref pa #201905241650Details
fire sprinklers: relocate 43 pendent sprinklers and 2 uprights on the 28th fl. ref pa #201905241650 | $23,625 |
| Jul 19, 2019 | Completed final sign-off Dec 2020 | 525 Market St | Skyline Construction | add structural steel overhead to support modern fold system. ref pa 201905150662Details
add structural steel overhead to support modern fold system. ref pa 201905150662 | |
| Jun 6, 2019 | Expired or cancelled cancelled Aug 2023 | 525 Market St | 35th fl - upgrade existing sprinklers 217 (n) sprinklers; 36th fl - 217 (n) sprinklers; 37th fl - 194 (n) sprinklers; 38th fl - 232 (n) sprinklersDetails
35th fl - upgrade existing sprinklers 217 (n) sprinklers; 36th fl - 217 (n) sprinklers; 37th fl - 194 (n) sprinklers; 38th fl - 232 (n) sprinklers | $1,500 | |
| Jun 4, 2019 | Never finaled issued Jun 2019, no final | 525 Market St | Skyline Construction | 1st,2nd, & mezz.: demolition of internal elevator shaft (serving floors 1,2,and mezzanine) and associated equipment. adjacent partitions and electrical components for elevator mezzanine level, elevator hoist room and projecting floor plate.Details
1st,2nd, & mezz.: demolition of internal elevator shaft (serving floors 1,2,and mezzanine) and associated equipment. adjacent partitions and electrical components for elevator mezzanine level, elevator hoist room and projecting floor plate. | $91,500 |
| May 24, 2019 | Never finaled issued May 2019, no final | 525 Market St | Peacock Construction | 28th floor: t.i. work to include non structural partitions, doors, finishes, ceiling and fixtures.Details
28th floor: t.i. work to include non structural partitions, doors, finishes, ceiling and fixtures. | $500,000 |
| May 24, 2019 | Completed final sign-off Jun 2019 | 525 Market St | Bilcor Inc | install 23 ceilng mount speakers strobes, 1 ceiling mount strobe, 2 smoke detectors, 10 control relays, 4 dual monitor modules, 10 duct detectorsDetails
install 23 ceilng mount speakers strobes, 1 ceiling mount strobe, 2 smoke detectors, 10 control relays, 4 dual monitor modules, 10 duct detectors | $33,000 |
| May 16, 2019 | Completed final sign-off Sep 2019 | 525 Market St | Hathaway Dinwiddie Co. | 14th floor: revision to app#201811196218: structural revision: 1 transformer is being installed & seismically anchored, rather than being suspended as shown previously. additional transformer is being supported on a unistrut frame lines. mep revision:nw heat pump hp14-s is being added.Details
14th floor: revision to app#201811196218: structural revision: 1 transformer is being installed & seismically anchored, rather than being suspended as shown previously. additional transformer is being supported on a unistrut frame lines. mep revision:nw heat pump hp14-s is being added. | $50,000 |
| May 15, 2019 | Completed final sign-off Dec 2020 | 525 Market St | Skyline Construction | 2nd fl - interior ti to existing corridor event space. alt work space, new ceilings, finishes, lighting. no exterior or structuralDetails
2nd fl - interior ti to existing corridor event space. alt work space, new ceilings, finishes, lighting. no exterior or structural | $288,000 |
| Apr 26, 2019 | Completed final sign-off Oct 2020 | 525 Market St | Peacock Construction | 28th floor: t.i- interior demolition of non-structural elements, including but not limited to , interior partitions, doors, and finishes. no ceiling work in this permit. mech and elec plans will be submitted as a separate permit. scope of work does not affect fixture quantitiesDetails
28th floor: t.i- interior demolition of non-structural elements, including but not limited to , interior partitions, doors, and finishes. no ceiling work in this permit. mech and elec plans will be submitted as a separate permit. scope of work does not affect fixture quantities | $10,000 |
| Apr 24, 2019 | Never finaled issued Jun 2019, no final | 525 Market St | Skyline Construction | demolition for 4 floors (35-38). no structural work. ref sprinkler pa#201906062664Details
demolition for 4 floors (35-38). no structural work. ref sprinkler pa#201906062664 | $500,000 |
| Apr 1, 2019 | Completed final sign-off Jun 2019 | 525 Market St | Intelligent Technologies & Services Inc | as built submittal for 2019-0315-5396Details
as built submittal for 2019-0315-5396 | $6,357 |
| Mar 27, 2019 | Never finaled issued Mar 2019, no final | 525 Market St | Golden Gate Fire Protection Inc | fire sprinkers, relocate 8 sprinkler uprights gr fl suite 100Details
fire sprinkers, relocate 8 sprinkler uprights gr fl suite 100 | $11,415 |
| Mar 15, 2019 | Completed final sign-off Jun 2019 | 525 Market St | Intelligent Technologies & Services Inc | provide detection & notification for preaction system on 16th & 18th floor.Details
provide detection & notification for preaction system on 16th & 18th floor. | $6,357 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bilcor Inc (48), Skyline Construction (47), Golden Gate Fire Protection Inc (14), Principal Builders Inc. (13), Bcci Construction Company (11), Novo Construction Inc (8), Ayoob & Peery Plumbing Co Inc (7), Anderson, Rowe & Buckley, Inc. (5), Pioneer Fire Inc. (5), Hathaway Dinwiddie Co. (4), Source Planning And Construction Inc (3), Acco Engineered Systems Inc. Dba Acco En (2), Build Group Inc. (2), Clune Construction Company L P (2), Gci, Inc (2), Intelligent Technologies & Services Inc (2), Peacock Construction (2), Richlen Construction (2), C B F Inc, Fuse Builds Llc/ Dba Liberty Builds, M C S Construction Services, Martinelli Environmental Graph, Pribuss Engineering Inc, Service West Inc, Western Roofing Service
- Architects
- Daniel Pamperin (15), Ariane Lebrilla (9), Victoria Salgado (7), Guillermo Monter (5), Luda Hoe (4), Charles Blank (3), Marco Fung (3), Eric Ibsen (2), Liam Larkin (2), Ashley G Miller, Bert Deviterbo, Brereton Architects, Claudette Bleijenberg, David De Valeria, Douglass Street, Hunstman Ag, Janie Angeleri, Lars P. Mortensen, Lawrence Smith, Matthew Bens, Michael Castro, Michael Zelazek, Seth Hanley, Suwanty Mulia
- Engineers
- Douglas Forslund (8), Brian Alan Haugk (7), Amit Wadhwa (6), David Byrne (6), Levi G. Abarte (4), Rodolfo Bustos (4), Ariane Lebrilla (2), Austin L Hilton (2), Dean Macy (2), Matthew K Gordon (2), Nishkian Menninger (2), Sherry Chaumpluke (2), Stephen Shaffer (2), Acco Engineered Systems, Anderson,Rowe,Buckley, Arthur Metzler, Lars P. Mortensen, Ramzi Hodali, Rey T. Solidum, Rogelio S Parra, Timothy W. Mcpartland
- Authorized agents
- Christina Nguyen (2), Lori Thompson, Michael Zelazek, Turhin Ammons
- Designers
- Bilcor Inc (6), Ayoob & Peery Plumbing (2), Anderson, Rowe & Buckley, Inc.
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.