Timothy W. Mcpartland
- Listed as
- architect, engineer
- Firm
- Atm Engineering
- On San Francisco permits
- Oct 2013 to Aug 2025
20 permits since 2000 (engineer on 19 permits, architect on 1 permit): 11 completed, 1 in progress, 7 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 6, 2025 | Completed final sign-off Mar 2026 | 88 Kearny St | Skyline Construction | deferred structural plans for operable partition at training 521 a and training 521 b ref 202505055774Details
deferred structural plans for operable partition at training 521 a and training 521 b ref 202505055774 | $2,000 |
| Jul 15, 2025 | In progress issued Jul 2025 | 475 Sansome St | Skyline Construction | 16/f: deferred anchorage submittal for approved permit# 202502190638. show connection details for operable wall.Details
16/f: deferred anchorage submittal for approved permit# 202502190638. show connection details for operable wall. | $10,000 |
| Feb 27, 2024 | Completed final sign-off Jun 2024 | 525 Market St | Principal Builders Inc. | deferred structural permit to 202311090576 for retractable wall. revised arch on separate permit for assembly space >49 when wall is retracted.Details
deferred structural permit to 202311090576 for retractable wall. revised arch on separate permit for assembly space >49 when wall is retracted. | |
| Jun 16, 2022 | Expired or cancelled cancelled Jan 2026 | 235 Montgomery St | R.M.R. Construction Company | 4th fl ste 450: structural details for work proposed under pa# 202203039148.Details
4th fl ste 450: structural details for work proposed under pa# 202203039148. | $5,000 |
| Jul 1, 2021 | Never finaled issued Jul 2021, no final | 699 08th St | Clune Construction Company L P | deferred structural to approved permit 2020-1207-0374Details
deferred structural to approved permit 2020-1207-0374 | $50,000 |
| Aug 18, 2020 | Never finaled issued Oct 2020, no final | 699 08th St | Clune Construction Company L P | deferred structural submittal to 2019.1030.5929 structural support system for modernfold door systemDetails
deferred structural submittal to 2019.1030.5929 structural support system for modernfold door system | $10,000 |
| Oct 2, 2019 | Completed final sign-off Jan 2020 | 333 Market St | G L C Construction Company Inc | install movable gas partition. (electrical door)Details
install movable gas partition. (electrical door) | $50,000 |
| Apr 29, 2019 | Completed final sign-off Aug 2019 | 360 03rd St | Xl Construction, Corporation | revision to 201901281353 to provide structural drawings and calculations for equip weighing over 450 lbs. inclucing manifold system. ups support system and fishtank support as shown on ti permit,maher not reqDetails
revision to 201901281353 to provide structural drawings and calculations for equip weighing over 450 lbs. inclucing manifold system. ups support system and fishtank support as shown on ti permit,maher not req | |
| Apr 29, 2019 | Completed final sign-off May 2021 | 50 Fremont St | Gci, Inc | 4/f: structural work for operable partition. ref. 2019-0130-1557.Details
4/f: structural work for operable partition. ref. 2019-0130-1557. | $2,500 |
| Jan 11, 2019 | Completed final sign-off May 2019 | 120 Kearny St | Principal Builders Inc. | 24th floor: revision to app#201812279211 to document change to bolt size and type only. n/a for maherDetails
24th floor: revision to app#201812279211 to document change to bolt size and type only. n/a for maher | |
| Dec 27, 2018 | Completed final sign-off May 2019 | 120 Kearny St | Principal Builders Inc. | ref pa# 201810304497; structural details for operable partition in training rooms on 24th fl. for t.i. work phaseDetails
ref pa# 201810304497; structural details for operable partition in training rooms on 24th fl. for t.i. work phase | $90,000 |
| Aug 27, 2018 | Never finaled issued Feb 2019, no final | 250 Sutter St | Skyline Construction | 5th fl - revision to pa 2018-0724-5305 to revise structural details and calculationsDetails
5th fl - revision to pa 2018-0724-5305 to revise structural details and calculations | |
| Jul 24, 2018 | Never finaled issued Jul 2018, no final | 250 Sutter St | Skyline Construction | structural work for operable partition on 6th floor. ref #201805148978.Details
structural work for operable partition on 6th floor. ref #201805148978. | $15,000 |
| Jul 24, 2018 | Completed final sign-off Apr 2019 | 250 Sutter St | Skyline Construction | mep for tenant improvement on the 6th fl. ref pa #201805148978.Details
mep for tenant improvement on the 6th fl. ref pa #201805148978. | $150,000 |
| Dec 6, 2017 | Never finaled issued Dec 2017, no final | 415 Mission St | Skyline Construction | structural work for operable partitionDetails
structural work for operable partition | $10,000 |
| Sep 9, 2016 | Never finaled issued Sep 2016, no final | 345 California St | Gci, Inc | 31st floor - revision to pa #201607081853 - operable partition wall ( structural sheets).Details
31st floor - revision to pa #201607081853 - operable partition wall ( structural sheets). | $10,000 |
| Mar 10, 2016 | Completed final sign-off Mar 2017 | 555 California St | Gci, Inc | floor 12 & 13 structural operable partition, ref pa 2015-1120-3197 & 2016-0229-0729. maher naDetails
floor 12 & 13 structural operable partition, ref pa 2015-1120-3197 & 2016-0229-0729. maher na | $35,000 |
| Mar 20, 2015 | Completed final sign-off Sep 2016 | 71 Stevenson St | Source Planning And Construction Inc | 20th floor: movable partition. revision to app#201502057621Details
20th floor: movable partition. revision to app#201502057621 | |
| Apr 14, 2014 | Never finaled issued Apr 2014, no final | 111 Sutter St | Gci, Inc | 10th floor:installation of railing for movable partition. partition not in scope of work, separate permit required. ref app#201312023137 for t.i. work. n/a for the maher ordinance #155-13Details
10th floor:installation of railing for movable partition. partition not in scope of work, separate permit required. ref app#201312023137 for t.i. work. n/a for the maher ordinance #155-13 | $12,330 |
| Oct 25, 2013 | Completed final sign-off Feb 2014 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | operable partition between training rooms c & d.Details
operable partition between training rooms c & d. | $10,000 |