Xl Construction, Corporation

Contractor license
647480
State license record
Based in
Milpitas
On San Francisco permits
Feb 2005 to May 2026
Last 24 months
5 permits filed

56 permits since 2000: 50 completed, 4 in progress, 2 never finaled.

Of the 2 never-finaled permits, 2 are 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Most recent permits

AllStairs 2
FiledOutcomeAddressWork described on the permitDeclared cost
May 28, 2026In progress
issued Jun 2026
1800 Owens Strevision to 202602266592. revised floor plan and associated mep
Details
Permit
202605282040
Status
issued
Filed
May 28, 2026
Permit issued
Jun 12, 2026
Declared cost
$65,000
Address
1800 Owens St

revision to 202602266592. revised floor plan and associated mep

Open the permit page

$65,000
Apr 15, 2026In progress
issued Apr 2026
1800 Owens St6/fl- deffered structural for equipment anchorage
Details
Permit
202604159446
Status
issued
Filed
Apr 15, 2026
Permit issued
Apr 23, 2026
Address
1800 Owens St

6/fl- deffered structural for equipment anchorage

Open the permit page

Feb 26, 2026In progress
issued Apr 2026
1800 Owens St6th fl, sector 2b ti for mri suite
Details
Permit
202602266592
Status
issued
Filed
Feb 26, 2026
Permit issued
Apr 2, 2026
Declared cost
$6,100,500
Address
1800 Owens St

6th fl, sector 2b ti for mri suite

Open the permit page

$6,100,500
Jan 12, 2026Completed
final sign-off Feb 2026
1800 Owens St6/f: interior non-structural demo only per ab-017.
Details
Permit
202601123690
Status
complete
Filed
Jan 12, 2026
Permit issued
Jan 20, 2026
Final sign-off
Feb 11, 2026
Declared cost
$50,000
Address
1800 Owens St

6/f: interior non-structural demo only per ab-017.

Open the permit page

$50,000
Jun 12, 2025In progress
issued Jul 2025
1800 Owens Stlevel 8 and level 9, 2 new privacy pods on level 8. 3 new privacy pods on level 9. the installation of these pods include associated structural, electrical & sprinkler installation defered.
Details
Permit
202506128629
Status
issued
Filed
Jun 12, 2025
Permit issued
Jul 22, 2025
Declared cost
$50,000
Address
1800 Owens St

level 8 and level 9, 2 new privacy pods on level 8. 3 new privacy pods on level 9. the installation of these pods include associated structural, electrical & sprinkler installation defered.

Open the permit page

$50,000
Aug 3, 2022Completed
final sign-off Oct 2022
1800 Owens Stevacuation map for floor 8-12 sector 1
Details
Permit
202208039804
Status
complete
Filed
Aug 3, 2022
Permit issued
Aug 11, 2022
Final sign-off
Oct 21, 2022
Declared cost
$3,000
Address
1800 Owens St

evacuation map for floor 8-12 sector 1

Open the permit page

$3,000
Aug 1, 2022Completed
final sign-off Aug 2024
1800 Owens Sttenant improvement on the 4th and 5th floors of an existing 12-story building. scope of work includes office and labratories (changing occupancy from b to l) with associated mechancial, plumbing, and electrical requirements.
Details
Permit
202208019663
Status
complete
Filed
Aug 1, 2022
Permit issued
Aug 29, 2023
Final sign-off
Aug 9, 2024
Declared cost
$6,000,000
Address
1800 Owens St

tenant improvement on the 4th and 5th floors of an existing 12-story building. scope of work includes office and labratories (changing occupancy from b to l) with associated mechancial, plumbing, and electrical requirements.

Open the permit page

$6,000,000
Jul 25, 2022Completed
final sign-off Mar 2024
1800 Owens Stselective demo in preparation for t.i of the 4-7th floor in sector 1 of an (e) 12-story bldg. no structural demo. to comply with ab-017.
Details
Permit
202207259239
Status
complete
Filed
Jul 25, 2022
Permit issued
Aug 11, 2022
Final sign-off
Mar 29, 2024
Declared cost
$125,000
Address
1800 Owens St

selective demo in preparation for t.i of the 4-7th floor in sector 1 of an (e) 12-story bldg. no structural demo. to comply with ab-017.

Open the permit page

$125,000
Jul 18, 2022Completed
final sign-off Aug 2024
1800 Owens Stlevel 6-7: addition of shafts and duct riser only in sector 1 of building.
Details
Permit
202207188717
Status
complete
Filed
Jul 18, 2022
Permit issued
Jul 20, 2022
Final sign-off
Aug 9, 2024
Declared cost
$250,000
Address
1800 Owens St

level 6-7: addition of shafts and duct riser only in sector 1 of building.

Open the permit page

$250,000
Jul 18, 2022Completed
final sign-off Aug 2024
1800 Owens Stlevel 4-5: addition of shafts and duct riser only in sector 1 of building.
Details
Permit
202207188714
Status
complete
Filed
Jul 18, 2022
Permit issued
Jul 20, 2022
Final sign-off
Aug 9, 2024
Declared cost
$240,000
Address
1800 Owens St

level 4-5: addition of shafts and duct riser only in sector 1 of building.

Open the permit page

$240,000
Nov 29, 2021Completed
final sign-off May 2022
1800 Owens St7th floor: shaft enclusures at 7th floor.minor t.i. for future work.
Details
Permit
202111293210
Status
complete
Filed
Nov 29, 2021
Permit issued
Dec 14, 2021
Final sign-off
May 11, 2022
Declared cost
$5,000
Address
1800 Owens St

7th floor: shaft enclusures at 7th floor.minor t.i. for future work.

Open the permit page

$5,000
Oct 21, 2021Completed
final sign-off May 2022
1800 Owens Stlevels 8 + 9. work includes (n) huddles rooms break room, shaft connections (for future use) + associated finishes + mep
Details
Permit
202110210946
Status
complete
Filed
Oct 21, 2021
Permit issued
Nov 23, 2021
Final sign-off
May 11, 2022
Address
1800 Owens St

levels 8 + 9. work includes (n) huddles rooms break room, shaft connections (for future use) + associated finishes + mep

Open the permit page

Sep 1, 2021Completed
final sign-off Dec 2021
455 Mission Bay Blvd Southt.i. adding non bearing partitions, fixtures, mep. fire suppression under separate permit. ref partial t.i. work on 5th fl 2020 1222 1526.
Details
Permit
202109017583
Status
complete
Filed
Sep 1, 2021
Permit issued
Sep 13, 2021
Final sign-off
Dec 10, 2021
Declared cost
$755,762
Address
455 Mission Bay Blvd South

t.i. adding non bearing partitions, fixtures, mep. fire suppression under separate permit. ref partial t.i. work on 5th fl 2020 1222 1526.

Open the permit page

$755,762
Aug 16, 2021Completed
final sign-off Aug 2022
1800 Owens Staddition of shafts on floors 10, 11, &12 of the building
Details
Permit
202108166488
Status
complete
Filed
Aug 16, 2021
Permit issued
Oct 6, 2021
Final sign-off
Aug 25, 2022
Declared cost
$250,000
Address
1800 Owens St

addition of shafts on floors 10, 11, &12 of the building

Open the permit page

$250,000
Aug 2, 2021Completed
final sign-off Nov 2022
1800 Owens Stt.i.build out & change of use on the 10th,11th & 12th floors (all in sector)scope of work include office & laboratories (l occupancy)with associated mechanical, plumbing & electrical requirements.
Details
Permit
202108025538
Status
complete
Filed
Aug 2, 2021
Permit issued
Jan 6, 2022
Final sign-off
Nov 9, 2022
Declared cost
$10,000,000
Address
1800 Owens St

t.i.build out & change of use on the 10th,11th & 12th floors (all in sector)scope of work include office & laboratories (l occupancy)with associated mechanical, plumbing & electrical requirements.

Open the permit page

$10,000,000
Jul 16, 2021Never finaled
issued Jul 2021, no final
455 Mission Bay Blvd Southaddition of 0,2 depletion sensors @ 1/f & 5/f gas storage areas associated w/(e) compressed gas distribution system under bpa#202106031593 & t.i. permit 202012221526
Details
Permit
202107164578
Status
issued
Filed
Jul 16, 2021
Permit issued
Jul 20, 2021
Declared cost
$2,000
Address
455 Mission Bay Blvd South

addition of 0,2 depletion sensors @ 1/f & 5/f gas storage areas associated w/(e) compressed gas distribution system under bpa#202106031593 & t.i. permit 202012221526

Open the permit page

$2,000
Jun 3, 2021Completed
final sign-off Jun 2021
455 Mission Bay Blvd Southmodification to e compressed gas distribution system serving ti under 202012221526. modification includes (n) piping runs from (e) storage room at level 1 to renovated areas at level 5
Details
Permit
202106031593
Status
complete
Filed
Jun 3, 2021
Permit issued
Jun 7, 2021
Final sign-off
Jun 23, 2021
Declared cost
$1,000
Address
455 Mission Bay Blvd South

modification to e compressed gas distribution system serving ti under 202012221526. modification includes (n) piping runs from (e) storage room at level 1 to renovated areas at level 5

Open the permit page

$1,000
May 11, 2021Never finaled
issued May 2021, no final
1800 Owens Strevisions to pa# 201909121454 & 201909121458. minor revisions to 8th & 9th fl consisting of new huddle rooms, breakrooms, finishes, millwork, cieling & associated electrical, mechanical & plumbing work. maher na.
Details
Permit
202105110190
Status
issued
Filed
May 11, 2021
Permit issued
May 24, 2021
Address
1800 Owens St

revisions to pa# 201909121454 & 201909121458. minor revisions to 8th & 9th fl consisting of new huddle rooms, breakrooms, finishes, millwork, cieling & associated electrical, mechanical & plumbing work. maher na.

Open the permit page

Apr 14, 2021Completed
final sign-off Jan 2022
1800 Owens St10/f,11/f,12/f - selective demo in preparation for tenant improcements. soft demo does not include structural demo or demo of rated construction needed to maintain core x shell conditions for life safety per ab-017.
Details
Permit
202104148565
Status
complete
Filed
Apr 14, 2021
Permit issued
Apr 29, 2021
Final sign-off
Jan 12, 2022
Declared cost
$60,000
Address
1800 Owens St

10/f,11/f,12/f - selective demo in preparation for tenant improcements. soft demo does not include structural demo or demo of rated construction needed to maintain core x shell conditions for life safety per ab-017.

Open the permit page

$60,000
Dec 22, 2020Completed
final sign-off Jun 2021
455 Mission Bay Blvd South5th fl: tenant improvement. fire suppression system under sep permit. deffered fire sprinklers & life safety system to remain operational during construction and alterations to be system will be design build.
Details
Permit
202012221526
Status
complete
Filed
Dec 22, 2020
Permit issued
Apr 22, 2021
Final sign-off
Jun 23, 2021
Declared cost
$850,000
Address
455 Mission Bay Blvd South

5th fl: tenant improvement. fire suppression system under sep permit. deffered fire sprinklers & life safety system to remain operational during construction and alterations to be system will be design build.

Open the permit page

$850,000
Aug 15, 2019Completed
final sign-off Apr 2021
455 Mission Bay Blvd South5th flr lab/freezer storage only - interior demo. non structural demo only of non rated construction per ab017, space to remain vacant until accessible features are restored.
Details
Permit
201908158903
Status
complete
Filed
Aug 15, 2019
Permit issued
Aug 19, 2019
Final sign-off
Apr 27, 2021
Declared cost
$12,000
Address
455 Mission Bay Blvd South

5th flr lab/freezer storage only - interior demo. non structural demo only of non rated construction per ab017, space to remain vacant until accessible features are restored.

Open the permit page

$12,000
Apr 29, 2019Completed
final sign-off Aug 2019
360 03rd Strevision to 201901281353 to provide structural drawings and calculations for equip weighing over 450 lbs. inclucing manifold system. ups support system and fishtank support as shown on ti permit,maher not req
Details
Permit
201904299173
Status
complete
Filed
Apr 29, 2019
Permit issued
May 6, 2019
Final sign-off
Aug 2, 2019
Address
360 03rd St

revision to 201901281353 to provide structural drawings and calculations for equip weighing over 450 lbs. inclucing manifold system. ups support system and fishtank support as shown on ti permit,maher not req

Open the permit page

Apr 4, 2019Completed
final sign-off Jan 2020
939 Ellis St5th fl - mep for tenant improvement ref pa 2019-0319-5584
Details
Permit
201904047075
Status
complete
Filed
Apr 4, 2019
Permit issued
May 23, 2019
Final sign-off
Jan 31, 2020
Declared cost
$500,000
Address
939 Ellis St

5th fl - mep for tenant improvement ref pa 2019-0319-5584

Open the permit page

$500,000
Apr 4, 2019Completed
final sign-off Jan 2020
939 Ellis St7th fl - mep for tenant improvement ref pa 2019-0319-5583
Details
Permit
201904047074
Status
complete
Filed
Apr 4, 2019
Permit issued
May 23, 2019
Final sign-off
Jan 31, 2020
Declared cost
$500,000
Address
939 Ellis St

7th fl - mep for tenant improvement ref pa 2019-0319-5583

Open the permit page

$500,000
Mar 22, 2019Completed
final sign-off May 2021
1700 California St(n) generator at level g5. sffd requested this permit be submitted separately from pa# 2018-1205-7469. which it orignally was part. payment for this permit is under first permit. generator for kaiser office space.** maher n/a**
Details
Permit
201903225977
Status
complete
Filed
Mar 22, 2019
Permit issued
Nov 19, 2019
Final sign-off
May 19, 2021
Address
1700 California St

(n) generator at level g5. sffd requested this permit be submitted separately from pa# 2018-1205-7469. which it orignally was part. payment for this permit is under first permit. generator for kaiser office space.** maher n/a**

Open the permit page

Mar 19, 2019Completed
final sign-off Jan 2020
939 Ellis St5th fl project consist of buildout of 1 floor of leased warm shell space. program includes counselor offices, group therapy rooms, reception and staff support spaces mep deferred maher not req
Details
Permit
201903195584
Status
complete
Filed
Mar 19, 2019
Permit issued
Apr 24, 2019
Final sign-off
Jan 31, 2020
Declared cost
$883,000
Address
939 Ellis St

5th fl project consist of buildout of 1 floor of leased warm shell space. program includes counselor offices, group therapy rooms, reception and staff support spaces mep deferred maher not req

Open the permit page

$883,000
Mar 19, 2019Completed
final sign-off Jan 2020
939 Ellis St7th fl build out of 1 floor leased warm shell space. program includes counselor offices, group therapy rooms, reception and staff support spaces. mep defered non osh facility
Details
Permit
201903195583
Status
complete
Filed
Mar 19, 2019
Permit issued
May 9, 2019
Final sign-off
Jan 31, 2020
Declared cost
$883,000
Address
939 Ellis St

7th fl build out of 1 floor leased warm shell space. program includes counselor offices, group therapy rooms, reception and staff support spaces. mep defered non osh facility

Open the permit page

$883,000
Mar 13, 2019Completed
final sign-off Jan 2020
939 Ellis St6th floor: mechanical, electrical and plumbing for 201903114897
Details
Permit
201903135077
Status
complete
Filed
Mar 13, 2019
Permit issued
May 23, 2019
Final sign-off
Jan 31, 2020
Declared cost
$567,000
Address
939 Ellis St

6th floor: mechanical, electrical and plumbing for 201903114897

Open the permit page

$567,000
Mar 11, 2019Completed
final sign-off Jan 2020
939 Ellis St6th flr - this project consist of buildout of one floor of leased warm shell space. program includes councilor offices; therapy room, reception area and staff support spaces. mep
Details
Permit
201903114897
Status
complete
Filed
Mar 11, 2019
Permit issued
May 9, 2019
Final sign-off
Jan 31, 2020
Declared cost
$883,000
Address
939 Ellis St

6th flr - this project consist of buildout of one floor of leased warm shell space. program includes councilor offices; therapy room, reception area and staff support spaces. mep

Open the permit page

$883,000
Jan 28, 2019Completed
final sign-off Aug 2019
360 03rd St7th fl - ti of office to include non structural improvement of office area, break room (no food service), mep improvement. sprinkler, & fire safety under separate permit. no exterior work
Details
Permit
201901281353
Status
complete
Filed
Jan 28, 2019
Permit issued
Jan 29, 2019
Final sign-off
Aug 2, 2019
Declared cost
$7,273,098
Address
360 03rd St

7th fl - ti of office to include non structural improvement of office area, break room (no food service), mep improvement. sprinkler, & fire safety under separate permit. no exterior work

Open the permit page

$7,273,098
Dec 6, 2018Completed
final sign-off Jun 2019
360 03rd Stinterior soft demo on 7th floor office space. approx 26,500 sf. no exterior work, no cou, sprinkler permit under sep permit
Details
Permit
201812067656
Status
complete
Filed
Dec 6, 2018
Permit issued
Dec 7, 2018
Final sign-off
Jun 4, 2019
Declared cost
$100,000
Address
360 03rd St

interior soft demo on 7th floor office space. approx 26,500 sf. no exterior work, no cou, sprinkler permit under sep permit

Open the permit page

$100,000
Dec 5, 2018Completed
final sign-off Nov 2020
1700 California St(4th & 2nd flrs, g5 & g2) ti of (e) office space. (n) outpatient ivf and reproductive med office clinic. (n) fuel port installation & (n) mechanical unit. (non-oshpd3 review) (fire alarm & sprinklers under separate permit) structural included. ((n) generator under separate permit)
Details
Permit
201812057469
Status
complete
Filed
Dec 5, 2018
Permit issued
Aug 13, 2019
Final sign-off
Nov 23, 2020
Declared cost
$2,400,000
Address
1700 California St

(4th & 2nd flrs, g5 & g2) ti of (e) office space. (n) outpatient ivf and reproductive med office clinic. (n) fuel port installation & (n) mechanical unit. (non-oshpd3 review) (fire alarm & sprinklers under separate permit) structural included. ((n) generator under separate permit)

Open the permit page

$2,400,000
Nov 6, 2018Completed
final sign-off May 2019
360 03rd Stdemo per ab-017 of 29,500 sf of (e) offices in ste 700 partitions, electrical, data cabling, ceilings, and flooring to be removed, temp const. barrier to be provided between ste 700 & 750, mep is design-build, fire sprinklers & life safety to remain operational, defered sprinkler to be
Details
Permit
201811065181
Status
complete
Filed
Nov 6, 2018
Permit issued
Nov 8, 2018
Final sign-off
May 8, 2019
Declared cost
$5,000
Address
360 03rd St

demo per ab-017 of 29,500 sf of (e) offices in ste 700 partitions, electrical, data cabling, ceilings, and flooring to be removed, temp const. barrier to be provided between ste 700 & 750, mep is design-build, fire sprinklers & life safety to remain operational, defered sprinkler to be

Open the permit page

$5,000
Oct 28, 2015Completed
final sign-off Apr 2016
343 Sansome St5th floor, suite 505: interior ti of (e) office maher na replace finishes, demo partition walls, replace suite entry door, add eating counter and casework.
Details
Permit
201510281068
Status
complete
Filed
Oct 28, 2015
Permit issued
Nov 16, 2015
Final sign-off
Apr 19, 2016
Declared cost
$42,000
Address
343 Sansome St

5th floor, suite 505: interior ti of (e) office maher na replace finishes, demo partition walls, replace suite entry door, add eating counter and casework.

Open the permit page

$42,000
Oct 9, 2015Completed
final sign-off Aug 2016
1 Daniel Burnham Ctexploratory demo: to verify low voltage wiring & plumbing line location; no structural work under this permit.
Details
Permit
201510099361
Status
complete
Filed
Oct 9, 2015
Permit issued
Oct 9, 2015
Final sign-off
Aug 31, 2016
Declared cost
$8,000
Address
1 Daniel Burnham Ct

exploratory demo: to verify low voltage wiring & plumbing line location; no structural work under this permit.

Open the permit page

$8,000
Mar 2, 2015Completed
final sign-off Jun 2015
555 California St2nd and 3rd floor: show location of card reader locations on egress drawings per fire dept. ref. appl. 201406279698 & 201406279703. maher n/a. card readers were shown/approved under bpa#201406279698
Details
Permit
201503029747
Status
complete
Filed
Mar 2, 2015
Permit issued
Mar 3, 2015
Final sign-off
Jun 2, 2015
Address
555 California St

2nd and 3rd floor: show location of card reader locations on egress drawings per fire dept. ref. appl. 201406279698 & 201406279703. maher n/a. card readers were shown/approved under bpa#201406279698

Open the permit page

Jan 9, 2015Completed
final sign-off Jun 2015
555 California St2nd floor -revision to pa #2014.1029.0262 & 2014.0808.3436: changes include incorporation of (n) shear walls & video monitors. mep under separate permit. n/a maher ordinance
Details
Permit
201501095359
Status
complete
Filed
Jan 9, 2015
Permit issued
Jan 16, 2015
Final sign-off
Jun 2, 2015
Address
555 California St

2nd floor -revision to pa #2014.1029.0262 & 2014.0808.3436: changes include incorporation of (n) shear walls & video monitors. mep under separate permit. n/a maher ordinance

Open the permit page

Oct 30, 2014Completed
final sign-off Dec 2014
555 California St1st floor - temperary removal and replacement in kind of (e) ceilings to inspect new plumbing infrastructural needed as point of the work associated with bldg. appl. 2014.0627.9698. haher n/a.
Details
Permit
201410300335
Status
complete
Filed
Oct 30, 2014
Permit issued
Oct 30, 2014
Final sign-off
Dec 2, 2014
Declared cost
$10,000
Address
555 California St

1st floor - temperary removal and replacement in kind of (e) ceilings to inspect new plumbing infrastructural needed as point of the work associated with bldg. appl. 2014.0627.9698. haher n/a.

Open the permit page

$10,000
Oct 29, 2014Completed
final sign-off Jun 2015
555 California Strevision to app#201408083436. changes include change from glass guardrail to cable rail and incorporation of a smoke curtain. n/a for the maher.
Details
Permit
201410290262
Status
complete
Filed
Oct 29, 2014
Permit issued
Oct 31, 2014
Final sign-off
Jun 2, 2015
Address
555 California St

revision to app#201408083436. changes include change from glass guardrail to cable rail and incorporation of a smoke curtain. n/a for the maher.

Open the permit page

Oct 29, 2014Completed
final sign-off Apr 2015
555 California Strevision to app#201406279703. revision to conference room change from non rated to rated partition at corridor b and minor plant ceiling revisions in response to field conditions and client request. n/a for the maher.
Details
Permit
201410290263
Status
complete
Filed
Oct 29, 2014
Permit issued
Oct 31, 2014
Final sign-off
Apr 14, 2015
Address
555 California St

revision to app#201406279703. revision to conference room change from non rated to rated partition at corridor b and minor plant ceiling revisions in response to field conditions and client request. n/a for the maher.

Open the permit page

Oct 29, 2014Completed
final sign-off Apr 2015
555 California St2/f: revision to app#201406279698. revisions include minor plan and ceiling revisions in response to field conditions and client requests and incorporation of cold formed framing details. n/a for the maher.
Details
Permit
201410290264
Status
complete
Filed
Oct 29, 2014
Permit issued
Oct 31, 2014
Final sign-off
Apr 14, 2015
Address
555 California St

2/f: revision to app#201406279698. revisions include minor plan and ceiling revisions in response to field conditions and client requests and incorporation of cold formed framing details. n/a for the maher.

Open the permit page

Aug 8, 2014Completed
final sign-off Jun 2015
555 California St(n) connecting stair between 2nd & 3rd floors for tenant. revision to t.i. permits 2014-0627-9698 & 2014-0627-9703. draft curtains and sprinklers under sep. permit maher n/a
Details
Permit
201408083436
Status
complete
Filed
Aug 8, 2014
Permit issued
Sep 8, 2014
Final sign-off
Jun 2, 2015
Declared cost
$140,000
Address
555 California St

(n) connecting stair between 2nd & 3rd floors for tenant. revision to t.i. permits 2014-0627-9698 & 2014-0627-9703. draft curtains and sprinklers under sep. permit maher n/a

Open the permit page

$140,000
Jun 27, 2014Completed
final sign-off Apr 2015
555 California St2nd flr: approx 19000 sq.ft. tenant improvement of a class "a"office space on the 2nd flr including private offices, meeting rooms & powered workstations, construction of (n) pantries, restrooms, & conference rms, no structural work,no exterior work; maher n/a /a
Details
Permit
201406279698
Status
complete
Filed
Jun 27, 2014
Permit issued
Jul 22, 2014
Final sign-off
Apr 14, 2015
Declared cost
$2,500,000
Address
555 California St

2nd flr: approx 19000 sq.ft. tenant improvement of a class "a"office space on the 2nd flr including private offices, meeting rooms & powered workstations, construction of (n) pantries, restrooms, & conference rms, no structural work,no exterior work; maher n/a /a

Open the permit page

$2,500,000
Jun 27, 2014Completed
final sign-off Jun 2015
555 California St3rd flr: t.i. of approx 24,650 sq.ft. for office space incl private offices, meeting rms & powered work stations,work includes (n) pantries, restrooms, closets, and (2) large conference rms, (accessory a2 occupancies, no structural or exterior work;maher n/a
Details
Permit
201406279703
Status
complete
Filed
Jun 27, 2014
Permit issued
Jul 22, 2014
Final sign-off
Jun 2, 2015
Declared cost
$2,500,000
Address
555 California St

3rd flr: t.i. of approx 24,650 sq.ft. for office space incl private offices, meeting rms & powered work stations,work includes (n) pantries, restrooms, closets, and (2) large conference rms, (accessory a2 occupancies, no structural or exterior work;maher n/a

Open the permit page

$2,500,000
Apr 22, 2014Completed
final sign-off Dec 2014
120 Kearny Strevised layout of restroom partitions per pa# 201403120525
Details
Permit
201404223896
Status
complete
Filed
Apr 22, 2014
Permit issued
Apr 23, 2014
Final sign-off
Dec 30, 2014
Address
120 Kearny St

revised layout of restroom partitions per pa# 201403120525

Open the permit page

Apr 22, 2014Completed
final sign-off Dec 2014
120 Kearny Strevised layout of restroom partitons per pa # 201403110475
Details
Permit
201404223897
Status
complete
Filed
Apr 22, 2014
Permit issued
Apr 23, 2014
Final sign-off
Dec 30, 2014
Address
120 Kearny St

revised layout of restroom partitons per pa # 201403110475

Open the permit page

Apr 15, 2014Completed
final sign-off Jul 2015
120 Kearny St19th floor: revision to app#201403120525. construction of structural partitions and finishes. n/a for the maher ordinance #155-13 mep, fire alarm and sprinklers separate permit.
Details
Permit
201404153280
Status
complete
Filed
Apr 15, 2014
Permit issued
Apr 16, 2014
Final sign-off
Jul 1, 2015
Address
120 Kearny St

19th floor: revision to app#201403120525. construction of structural partitions and finishes. n/a for the maher ordinance #155-13 mep, fire alarm and sprinklers separate permit.

Open the permit page

Mar 12, 2014Completed
final sign-off Sep 2014
120 Kearny St19th floor:demolition of extg non-structural interior partitions, doors, frames, hardware, millwork, ceilings, finishes, mep, construction of non-structural partitions, doors, frames, hardware, millwork, acoustical ceiling, finishes. mep deferred submittal for life-safty.
Details
Permit
201403120525
Status
complete
Filed
Mar 12, 2014
Permit issued
Mar 13, 2014
Final sign-off
Sep 4, 2014
Declared cost
$1,375,000
Address
120 Kearny St

19th floor:demolition of extg non-structural interior partitions, doors, frames, hardware, millwork, ceilings, finishes, mep, construction of non-structural partitions, doors, frames, hardware, millwork, acoustical ceiling, finishes. mep deferred submittal for life-safty.

Open the permit page

$1,375,000
Mar 11, 2014Completed
final sign-off Sep 2014
120 Kearny St20/f-demol (e) non-structural int partitoins in restroom,doors,frames, hardware,millwork,ceiling, finishes, mep. construction of non-structural partitions, doors, frames, hardware, millwrok & acoustical ceiling, finishes, mep deferred submittal for life - safety. n/a compliance w/ordinance #155-13
Details
Permit
201403110475
Status
complete
Filed
Mar 11, 2014
Permit issued
Mar 12, 2014
Final sign-off
Sep 4, 2014
Declared cost
$1,375,000
Address
120 Kearny St

20/f-demol (e) non-structural int partitoins in restroom,doors,frames, hardware,millwork,ceiling, finishes, mep. construction of non-structural partitions, doors, frames, hardware, millwrok & acoustical ceiling, finishes, mep deferred submittal for life - safety. n/a compliance w/ordinance #155-13

Open the permit page

$1,375,000
Mar 4, 2014Completed
final sign-off Sep 2014
1 Montgomery Stselective demolition of acoustical ceilings, existing mechanical ductwork, light fixtures and drywall partitions. scope of work on 19th and 20th floors. demo per ab-017.
Details
Permit
201403049836
Status
complete
Filed
Mar 4, 2014
Permit issued
Mar 4, 2014
Final sign-off
Sep 4, 2014
Declared cost
$150,000
Address
1 Montgomery St

selective demolition of acoustical ceilings, existing mechanical ductwork, light fixtures and drywall partitions. scope of work on 19th and 20th floors. demo per ab-017.

Open the permit page

$150,000
Jan 22, 2014Completed
final sign-off Jun 2014
1580 Valencia Stsuite #802- remodel of 2 suites into one large suite, provide accessible exams and corridors. life safety permits separate compliance with ordinance #155-13 not required.
Details
Permit
201401226787
Status
complete
Filed
Jan 22, 2014
Permit issued
Feb 19, 2014
Final sign-off
Jun 6, 2014
Declared cost
$493,000
Address
1580 Valencia St

suite #802- remodel of 2 suites into one large suite, provide accessible exams and corridors. life safety permits separate compliance with ordinance #155-13 not required.

Open the permit page

$493,000
Apr 7, 2009Completed
final sign-off Jul 2010
755 Ashbury Stremove/replace existing fire exit stair w/ a code compliant exit stair, removal of (e) windows on 3rd & 4th floor, to be replaced w/ egress doors, removal/replace of (e) egress doors on 2nd floor, relocat of ladder to roof, removel a reconfiguration of interior partitions & classrm doors,
Details
Permit
200904075715
Status
complete
Filed
Apr 7, 2009
Permit issued
Jul 21, 2009
Final sign-off
Jul 27, 2010
Declared cost
$150,000
Address
755 Ashbury St

remove/replace existing fire exit stair w/ a code compliant exit stair, removal of (e) windows on 3rd & 4th floor, to be replaced w/ egress doors, removal/replace of (e) egress doors on 2nd floor, relocat of ladder to roof, removel a reconfiguration of interior partitions & classrm doors,

Open the permit page

$150,000
Apr 11, 2006Completed
final sign-off Jul 2006
270 Masonic Avrevision to approved pa# 2006/03/23/7367. new 3'-0" high x 12" wide buttress @ 7'-2 1/2" o.c. attached to (e) concrete retaining wall.
Details
Permit
200604118688
Status
complete
Filed
Apr 11, 2006
Permit issued
Apr 11, 2006
Final sign-off
Jul 19, 2006
Declared cost
$2,000
Address
270 Masonic Av

revision to approved pa# 2006/03/23/7367. new 3'-0" high x 12" wide buttress @ 7'-2 1/2" o.c. attached to (e) concrete retaining wall.

Open the permit page

$2,000
Mar 23, 2006Completed
final sign-off Jul 2006
270 Masonic Avadd to (e) permit: new structurals foundation for owners equipment (condensers for freezer s) owners requipment condenser units to be under separate permit.
Details
Permit
200603237367
Status
complete
Filed
Mar 23, 2006
Permit issued
Mar 23, 2006
Final sign-off
Jul 19, 2006
Declared cost
$8,000
Address
270 Masonic Av

add to (e) permit: new structurals foundation for owners equipment (condensers for freezer s) owners requipment condenser units to be under separate permit.

Open the permit page

$8,000
Mar 16, 2006Completed
final sign-off Jun 2006
270 Masonic Avrevise 200511228850, 200601313445. install walk in freezer and piping (new). sprinkler under separte permit
Details
Permit
200603166787
Status
complete
Filed
Mar 16, 2006
Permit issued
Apr 21, 2006
Final sign-off
Jun 26, 2006
Declared cost
$95,000
Address
270 Masonic Av

revise 200511228850, 200601313445. install walk in freezer and piping (new). sprinkler under separte permit

Open the permit page

$95,000
Feb 3, 2005Completed
final sign-off May 2005
270 Masonic Avminor modifications to appl#200405113517 increase in interior ramp length due to scope(from 18'to19'
Details
Permit
200502034765
Status
complete
Filed
Feb 3, 2005
Permit issued
Feb 3, 2005
Final sign-off
May 11, 2005
Declared cost
$11,000
Address
270 Masonic Av

minor modifications to appl#200405113517 increase in interior ramp length due to scope(from 18'to19'

Open the permit page

$11,000