Block 0738, lot 019
939 Ellis St
- City’s use
- Commercial Office
- Built
- 1961
- Stories
- 7
- Rooms
- 12 bathrooms
- Building
- 116,000 sq ft
- Lot
- 16,500 sq ft
- Zoning
- RC4
- Construction type
- S
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
55 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 2, 2025 | In progress issued Feb 2025 | 939 Ellis St | Convergint Technologies Llc | fire alarm t.i. voluntary upgrade. new celluar diater in main elec rm, new monitoring point for dialerDetails
fire alarm t.i. voluntary upgrade. new celluar diater in main elec rm, new monitoring point for dialer | $1,000 |
| Jan 14, 2022 | Completed final sign-off Oct 2022 | 939 Ellis St | Kaiser Foundation Health Plan Inc | project involves replacement of door hardware found not to be in compliance as part of sffd annual inspection work inclues: replacement of door hardware at conference room 7103 (noted as conference room #7 on report), stair 1 door, stiar 2 door and stair vestibule at level 7.Details
project involves replacement of door hardware found not to be in compliance as part of sffd annual inspection work inclues: replacement of door hardware at conference room 7103 (noted as conference room #7 on report), stair 1 door, stiar 2 door and stair vestibule at level 7. | $15,000 |
| May 27, 2021 | Completed final sign-off Mar 2022 | 939 Ellis St | errcs upgrade - revision to pa #2017-0605-8424 1. reprogram frequencies per ccsf dt 2. replace rooftop yagi antenna with a panel antenna 3. re-test errcs per ab #2.04 2019 4. coordinate inspections w/ccsf dt & sffdDetails
errcs upgrade - revision to pa #2017-0605-8424 1. reprogram frequencies per ccsf dt 2. replace rooftop yagi antenna with a panel antenna 3. re-test errcs per ab #2.04 2019 4. coordinate inspections w/ccsf dt & sffd | ||
| Jun 11, 2020 | Never finaled filed Jun 2020, never issued | 939 Ellis St | street spaceDetails
street space | ||
| Jan 9, 2020 | Completed final sign-off Aug 2020 | 939 Ellis St | Convergint Technologies Llc | add 3 control modules, 2 emr smoke relays, 1 general alarm relay for securty.Details
add 3 control modules, 2 emr smoke relays, 1 general alarm relay for securty. | $1,584 |
| Jun 28, 2019 | Never finaled issued Jun 2019, no final | 939 Ellis St | Convergint Technologies Llc | fira alarm ti buildout on 5th fl: 3 control relays, 5 smoke detectors, 3 duct detectors, 24 horn/strobes, 31 strobes. ref pa #201903195584Details
fira alarm ti buildout on 5th fl: 3 control relays, 5 smoke detectors, 3 duct detectors, 24 horn/strobes, 31 strobes. ref pa #201903195584 | $22,000 |
| Jun 28, 2019 | Never finaled issued Jun 2019, no final | 939 Ellis St | Convergint Technologies Llc | fira alarm ti buildout on 7th fl: 2 control relays, 2 smoke detectors, 7 duct detectors, 20 horn/strobes, 39 strobes. ref pa #201903195583Details
fira alarm ti buildout on 7th fl: 2 control relays, 2 smoke detectors, 7 duct detectors, 20 horn/strobes, 39 strobes. ref pa #201903195583 | $22,000 |
| Jun 28, 2019 | Never finaled issued Jun 2019, no final | 939 Ellis St | Convergint Technologies Llc | fira alarm ti buildout on 6th fl: 2 control relays, 2 smoke detectors, 7 duct detectors, 20 horn/strobes, 35 strobes. ref pa #201903114897Details
fira alarm ti buildout on 6th fl: 2 control relays, 2 smoke detectors, 7 duct detectors, 20 horn/strobes, 35 strobes. ref pa #201903114897 | $22,000 |
| Jun 25, 2019 | Never finaled issued Jul 2019, no final | 939 Ellis St | street spaceDetails
street space | ||
| Jun 25, 2019 | Never finaled filed Jun 2019, never issued | 939 Ellis St | street spaceDetails
street space | ||
| Jun 7, 2019 | Never finaled issued Jun 2019, no final | 939 Ellis St | Eco Fire Sprinklers Inc | floors 5/6/7: add 307 pendent sprinklers in area of ti. ref t.i. 201903195584/201903195583/201903114897. maher n/a.Details
floors 5/6/7: add 307 pendent sprinklers in area of ti. ref t.i. 201903195584/201903195583/201903114897. maher n/a. | $45,000 |
| May 20, 2019 | Never finaled filed May 2019, never issued | 939 Ellis St | street spaceDetails
street space | ||
| Apr 26, 2019 | Completed final sign-off Feb 2020 | 939 Ellis St | Gidel & Kocal Construction Co Inc | all levels; barrier removal.Details
all levels; barrier removal. | $105,000 |
| Apr 26, 2019 | Completed final sign-off Nov 2019 | 939 Ellis St | Aqualine Piping Inc. | interior waste line upgrades, 3 floor penetrations at entry level to the roof. total of 7 levels.Details
interior waste line upgrades, 3 floor penetrations at entry level to the roof. total of 7 levels. | $85,000 |
| Apr 15, 2019 | Completed final sign-off Jul 2021 | 939 Ellis St | Webcor Construction Lp, Granite Excavation & Demolition Inc | install temporary shoring & underpinning along property lines to allow excavation for new development at 830 eddy. tie backs from northern row of soldier beams will enchroach onto 939 ellis st.**maher n/a**Details
install temporary shoring & underpinning along property lines to allow excavation for new development at 830 eddy. tie backs from northern row of soldier beams will enchroach onto 939 ellis st.**maher n/a** | $100,000 |
| Apr 4, 2019 | Completed final sign-off Jan 2020 | 939 Ellis St | Xl Construction, Corporation | 5th fl - mep for tenant improvement ref pa 2019-0319-5584Details
5th fl - mep for tenant improvement ref pa 2019-0319-5584 | $500,000 |
| Apr 4, 2019 | Completed final sign-off Jan 2020 | 939 Ellis St | Xl Construction, Corporation | 7th fl - mep for tenant improvement ref pa 2019-0319-5583Details
7th fl - mep for tenant improvement ref pa 2019-0319-5583 | $500,000 |
| Mar 19, 2019 | Completed final sign-off Jan 2020 | 939 Ellis St | Xl Construction, Corporation | 5th fl project consist of buildout of 1 floor of leased warm shell space. program includes counselor offices, group therapy rooms, reception and staff support spaces mep deferred maher not reqDetails
5th fl project consist of buildout of 1 floor of leased warm shell space. program includes counselor offices, group therapy rooms, reception and staff support spaces mep deferred maher not req | $883,000 |
| Mar 19, 2019 | Completed final sign-off Jan 2020 | 939 Ellis St | Xl Construction, Corporation | 7th fl build out of 1 floor leased warm shell space. program includes counselor offices, group therapy rooms, reception and staff support spaces. mep defered non osh facilityDetails
7th fl build out of 1 floor leased warm shell space. program includes counselor offices, group therapy rooms, reception and staff support spaces. mep defered non osh facility | $883,000 |
| Mar 13, 2019 | Completed final sign-off Jan 2020 | 939 Ellis St | Xl Construction, Corporation | 6th floor: mechanical, electrical and plumbing for 201903114897Details
6th floor: mechanical, electrical and plumbing for 201903114897 | $567,000 |
| Mar 11, 2019 | Completed final sign-off Jan 2020 | 939 Ellis St | Xl Construction, Corporation | 6th flr - this project consist of buildout of one floor of leased warm shell space. program includes councilor offices; therapy room, reception area and staff support spaces. mepDetails
6th flr - this project consist of buildout of one floor of leased warm shell space. program includes councilor offices; therapy room, reception area and staff support spaces. mep | $883,000 |
| Dec 3, 2018 | Completed final sign-off Nov 2019 | 939 Ellis St | Acco Engineered Systems Inc. Dba Acco En | remove and replace extg boiler like for like and provide new piping connections. n/a for maherDetails
remove and replace extg boiler like for like and provide new piping connections. n/a for maher | $247,000 |
| Jul 24, 2017 | Completed final sign-off Jul 2017 | 939 Ellis St | Plant Construction Co, Lp | administrative correction to existing pa 2015-0518-6561 to correct special inspectionsDetails
administrative correction to existing pa 2015-0518-6561 to correct special inspections | |
| Jul 5, 2017 | Completed final sign-off Dec 2020 | 939 Ellis St | Convergint Technologies Llc | fire alarm as built drawing for relocated emergency generator. ref pa 2016-1121-3180. maher naDetails
fire alarm as built drawing for relocated emergency generator. ref pa 2016-1121-3180. maher na | |
| Jun 13, 2017 | Completed final sign-off Jul 2017 | 939 Ellis St | Plant Construction Co, Lp | revision to pa 2017-0309-1114 relocation of fuel port to exterior wall per district inspector's request addition of code required shut offDetails
revision to pa 2017-0309-1114 relocation of fuel port to exterior wall per district inspector's request addition of code required shut off | |
| Jun 5, 2017 | Completed final sign-off Jul 2017 | 939 Ellis St | E. J. Weber Elect.Co Inc | g/f- emergency responder radio coverage system. n/a ordinance #155-13Details
g/f- emergency responder radio coverage system. n/a ordinance #155-13 | $35,000 |
| May 31, 2017 | Completed final sign-off Jul 2017 | 939 Ellis St | Allied Fire Protection | modify sprinker system to accomodate relocation of an (e) non conforming generator to a new bldg. code compliant room enclosure, ref pa 201703091114, design density to 0.4Details
modify sprinker system to accomodate relocation of an (e) non conforming generator to a new bldg. code compliant room enclosure, ref pa 201703091114, design density to 0.4 | $3,500 |
| Mar 9, 2017 | Completed final sign-off Jul 2017 | 939 Ellis St | Plant Construction Co, Lp | relocation of an (e) non conforming generator to a new building code complaint room/enclosure with a 2 hr fire separation from (e) structure. maher naDetails
relocation of an (e) non conforming generator to a new building code complaint room/enclosure with a 2 hr fire separation from (e) structure. maher na | $35,000 |
| Jan 23, 2017 | Completed final sign-off Jul 2017 | 939 Ellis St | Priority Architectural Graphics Dba Prio | 19 evaucation maps to be reviewed by sffd only (all floors) floors b, 1, 2, 3, 4, 5, 6, 7, roof. n/a maher ordinanceDetails
19 evaucation maps to be reviewed by sffd only (all floors) floors b, 1, 2, 3, 4, 5, 6, 7, roof. n/a maher ordinance | $4,700 |
| Dec 21, 2016 | Completed final sign-off Jan 2017 | 939 Ellis St | Plant Construction Co, Lp | basement: scope is to add elevator equipment room in basement elevator #3 only. revision to 201511193144 maher naDetails
basement: scope is to add elevator equipment room in basement elevator #3 only. revision to 201511193144 maher na | $35,000 |
| Nov 21, 2016 | Completed final sign-off Jul 2017 | 939 Ellis St | Convergint Technologies Llc | fire alarm ti for appl #2015-1119-3144 r1, #2016-0613-9802. including 1 pullstation, 14 input modules, 2 booster power supplies, 8 sync modules, 14 smoke detectors, 93 hornstrobes, 16 relays and 13 duct detectors.Details
fire alarm ti for appl #2015-1119-3144 r1, #2016-0613-9802. including 1 pullstation, 14 input modules, 2 booster power supplies, 8 sync modules, 14 smoke detectors, 93 hornstrobes, 16 relays and 13 duct detectors. | $35,000 |
| Oct 4, 2016 | Completed final sign-off Jul 2017 | 939 Ellis St | E. J. Weber Elect.Co Inc | maintain circuitry to(e)garage,stor rm&closets.safe off&demo bldg core&tenant litg/recp.minor abandon data sys-clean(e) dnbros&feeders-torque terminator.install led litg&pwr in elev lobbies&rr, t-24 ctrls,pwr to new hvac&plumbing eqp-prov pwr to 1 renovated elevr. bldg permit 2015-11-19-3144.Details
maintain circuitry to(e)garage,stor rm&closets.safe off&demo bldg core&tenant litg/recp.minor abandon data sys-clean(e) dnbros&feeders-torque terminator.install led litg&pwr in elev lobbies&rr, t-24 ctrls,pwr to new hvac&plumbing eqp-prov pwr to 1 renovated elevr. bldg permit 2015-11-19-3144. | $559,000 |
| Jun 14, 2016 | Never finaled issued Jun 2016, no final | 939 Ellis St | street spaceDetails
street space | ||
| Jun 13, 2016 | Completed final sign-off Jul 2017 | 939 Ellis St | Bay City Mechanical Inc | demolition of extg hvac equipment. refurbish extg air handling unit and boiler. provide co monitoring of garage. install 6 package uints and new vrv system with 12 fan coils, 5 condensing units with controls.provide 6 new exhaust fans. n/a for maher.Details
demolition of extg hvac equipment. refurbish extg air handling unit and boiler. provide co monitoring of garage. install 6 package uints and new vrv system with 12 fan coils, 5 condensing units with controls.provide 6 new exhaust fans. n/a for maher. | $850,000 |
| Jun 9, 2016 | Completed final sign-off Jan 2017 | 939 Ellis St | Plant Construction Co, Lp | administrative permit to correct official story-count from 7 to 8. previous parking stories were labeled basement. no construction.n/a for maher.Details
administrative permit to correct official story-count from 7 to 8. previous parking stories were labeled basement. no construction.n/a for maher. | |
| May 25, 2016 | Completed final sign-off Jan 2017 | 939 Ellis St | Allied Fire Protection | fully sprinkler existing building to nfpa 13 per ab-005 exit constraints. seismic upgrade existing partial wet pipe systems. after completion of installation & final insp well remove class 2 standpipe fire hose rack assembily. hose value optional to remain. ** maher: n/a **Details
fully sprinkler existing building to nfpa 13 per ab-005 exit constraints. seismic upgrade existing partial wet pipe systems. after completion of installation & final insp well remove class 2 standpipe fire hose rack assembily. hose value optional to remain. ** maher: n/a ** | $374,310 |
| Nov 19, 2015 | Completed final sign-off Jul 2017 | 939 Ellis St | Plant Construction Co, Lp | interior core for full building including (n) ada bathrooms, (n) elevators, updated rooftop. mep, sprinklers and fire alarm separate permit. office ti separate permit. ** maher: n/a **Details
interior core for full building including (n) ada bathrooms, (n) elevators, updated rooftop. mep, sprinklers and fire alarm separate permit. office ti separate permit. ** maher: n/a ** | $3,000,000 |
| May 18, 2015 | Completed final sign-off Jan 2017 | 939 Ellis St | Balfour Beatty Construction Llc, Plant Construction Co, Lp | facde renovate w/ new cladding on building, and the rooftop will be updated to provide private roof-top space for tenants. maher ordinance ext is not required.Details
facde renovate w/ new cladding on building, and the rooftop will be updated to provide private roof-top space for tenants. maher ordinance ext is not required. | $5,670,128 |
| Aug 30, 2011 | Completed final sign-off Feb 2012 | 939 Ellis St | Acco Engineered Systems Inc. Dba Acco En | 3rd floor - reconfigure existing zone to serve office, add new (1) vav & serve single office, not going through any walls, no new ductwork.Details
3rd floor - reconfigure existing zone to serve office, add new (1) vav & serve single office, not going through any walls, no new ductwork. | $9,500 |
| May 17, 2011 | Completed final sign-off Jul 2011 | 939 Ellis St | Bcci Construction Company | to obtain final inspection for work approved under pa 200906231114; all work is completeDetails
to obtain final inspection for work approved under pa 200906231114; all work is complete | |
| Feb 22, 2011 | Completed final sign-off Jul 2011 | 939 Ellis St | Accel Air Systems Inc. | replace small unit ( split system unit) ac and outdoor unit. install dehumidification unitDetails
replace small unit ( split system unit) ac and outdoor unit. install dehumidification unit | $50,000 |
| Jul 22, 2010 | Never finaled issued Jul 2010, no final | 939 Ellis St | Bcci Construction Company | revision to pa# 2009-0623-1114-strengthening of (e) concrete joists, fire alarm, sprinkler, mechanical under seperate permitsDetails
revision to pa# 2009-0623-1114-strengthening of (e) concrete joists, fire alarm, sprinkler, mechanical under seperate permits | $12,000 |
| May 18, 2010 | Completed final sign-off Jul 2011 | 939 Ellis St | Diversified Fire Products | fire alarm ti for 6th fl. add 1 monitor module, 1 smoke detector, 2 control relays, 1 duct detectorDetails
fire alarm ti for 6th fl. add 1 monitor module, 1 smoke detector, 2 control relays, 1 duct detector | $12,980 |
| Mar 26, 2010 | Expired or cancelled expired May 2013 | 939 Ellis St | Bcci Construction Company | 6th floor-mechanical, electrical work associated with approved pa# 2010-0316-8311 including new ac untis, 2 new fsd & lightingDetails
6th floor-mechanical, electrical work associated with approved pa# 2010-0316-8311 including new ac untis, 2 new fsd & lighting | $58,500 |
| Mar 16, 2010 | Completed final sign-off Jul 2011 | 939 Ellis St | Bcci Construction Company | 6th floor-minor tenant improvement & server rm. mech. & electrical under separate permit.Details
6th floor-minor tenant improvement & server rm. mech. & electrical under separate permit. | $45,000 |
| Nov 17, 2009 | Completed final sign-off Jan 2010 | 939 Ellis St | Diversified Fire Products | fire alarm t.i. for 5th. flr.; relocation (e) strobes & horn/strobes.Details
fire alarm t.i. for 5th. flr.; relocation (e) strobes & horn/strobes. | $4,700 |
| Nov 5, 2009 | Completed final sign-off Jan 2010 | 939 Ellis St | Commercial Interior Builders Inc | 5th floor -demolition of non-load bearing partitions, install new light fixtures & switches, new gyp bd., ceiling, new drinking fountain & new finishes. minor mechanical modification, elec work under separate permit.Details
5th floor -demolition of non-load bearing partitions, install new light fixtures & switches, new gyp bd., ceiling, new drinking fountain & new finishes. minor mechanical modification, elec work under separate permit. | $24,300 |
| Sep 10, 2009 | Completed final sign-off Jun 2010 | 939 Ellis St | Commercial Interior Builders Inc | title 24 calculations for lighting. reference application 200908195190Details
title 24 calculations for lighting. reference application 200908195190 | $3,500 |
| Sep 10, 2009 | Completed final sign-off Nov 2009 | 939 Ellis St | Diversified Fire Products | 7th floor-fire alarm t.i for "conference room"-add 1 horn/strobeDetails
7th floor-fire alarm t.i for "conference room"-add 1 horn/strobe | $3,780 |
| Aug 19, 2009 | Completed final sign-off Jun 2010 | 939 Ellis St | Commercial Interior Builders Inc | removal and construction of non-load bearing partitions. new acoustical ceilings and new light fixtures. new office doors and finishes. new striping for accessible parking in garage. mechanical and electrical work to be done under separate permit.Details
removal and construction of non-load bearing partitions. new acoustical ceilings and new light fixtures. new office doors and finishes. new striping for accessible parking in garage. mechanical and electrical work to be done under separate permit. | $25,000 |
| Jul 23, 2009 | Expired or cancelled cancelled Jan 2026 | 939 Ellis St | demolition and construction of non-load bearing partitions, relocate light fixtures and repair gyp. bd. ceiling at affected area; new office doors and new finishes.Details
demolition and construction of non-load bearing partitions, relocate light fixtures and repair gyp. bd. ceiling at affected area; new office doors and new finishes. | $25,000 | |
| Jun 23, 2009 | Expired or cancelled expired Jan 2011 | 939 Ellis St | 6th floor-modification to (e) 6th floor. work includes demolition & construction of non-bearing partitions, new ceiling grid & tiles to align with (e). relocate light fixtures, new office doors, new millwork & new finishes. m.e.p under seperate permitDetails
6th floor-modification to (e) 6th floor. work includes demolition & construction of non-bearing partitions, new ceiling grid & tiles to align with (e). relocate light fixtures, new office doors, new millwork & new finishes. m.e.p under seperate permit | $33,000 | |
| Jun 17, 2008 | Expired or cancelled expired Jan 2012 | 939 Ellis St | Accel Air Systems Inc. | add 2 - 2 ton split system air conditiones, for computer server room on 6th floor.Details
add 2 - 2 ton split system air conditiones, for computer server room on 6th floor. | $25,070 |
| Apr 14, 2004 | Expired or cancelled withdrawn Jun 2004 | 939 Ellis St | Benjamin Gilmore Bolles | upgrade life safety system; newfire alarm systemDetails
upgrade life safety system; newfire alarm system | $250,000 |
| Oct 31, 2003 | Completed final sign-off Jun 2004 | 939 Ellis St | The Lawson Roofing Co Inc. | reroofingDetails
reroofing | $353,387 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Convergint Technologies Llc (7), Plant Construction Co, Lp (7), Xl Construction, Corporation (6), Bcci Construction Company (4), Commercial Interior Builders Inc (3), Diversified Fire Products (3), Accel Air Systems Inc. (2), Acco Engineered Systems Inc. Dba Acco En (2), Allied Fire Protection (2), E. J. Weber Elect.Co Inc (2), Aqualine Piping Inc., Balfour Beatty Construction Llc, Bay City Mechanical Inc, Benjamin Gilmore Bolles, Eco Fire Sprinklers Inc, Gidel & Kocal Construction Co Inc, Granite Excavation & Demolition Inc, Kaiser Foundation Health Plan Inc, Priority Architectural Graphics Dba Prio, The Lawson Roofing Co Inc., Webcor Construction Lp
- Architects
- Sujendra Mishra (5), Daniel Roach (3), Scott B. Peterson (2), Michael Moores
- Engineers
- Jason Lau (3), Craig Ristow (2), Eunice Yoon (2), Erwin O'toole, Eunice Yoon
- Designers
- Keith Lattin
- Pmt consultant/expediters
- Southwest Sign Co.