Scott B. Peterson
- Listed as
- architect
- On San Francisco permits
- Apr 2019 to Dec 2020
3 permits since 2000 (architect on 3 permits): 3 completed.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 1, 2020 | Completed final sign-off Jun 2022 | 440 Jackson St | Velox Construction Inc/Velox Des & Const | modify existing entry & interior side to comply with accessible business entrance program.Details
modify existing entry & interior side to comply with accessible business entrance program. | $30,000 |
| Apr 26, 2019 | Completed final sign-off Nov 2019 | 939 Ellis St | Aqualine Piping Inc. | interior waste line upgrades, 3 floor penetrations at entry level to the roof. total of 7 levels.Details
interior waste line upgrades, 3 floor penetrations at entry level to the roof. total of 7 levels. | $85,000 |
| Apr 26, 2019 | Completed final sign-off Feb 2020 | 939 Ellis St | Gidel & Kocal Construction Co Inc | all levels; barrier removal.Details
all levels; barrier removal. | $105,000 |