Velox Construction Inc/Velox Des & Const
- Based in
- San Francisco
- On San Francisco permits
- May 2017 to Aug 2026
- Last 24 months
- 25 permits filed
121 permits since 2000: 85 completed, 12 in progress, 14 never finaled, 10 expired or cancelled.
Of the 14 never-finaled permits, 12 are 3 to 5 years old, 2 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 121.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 6, 2026 | In progress issued Aug 2026 | 3252 19th St | new window on side of building (new opening)Details
new window on side of building (new opening) | $3,000 |
| Jul 24, 2026 | In progress issued Jul 2026 | 642 Clayton St | 2 bathrooms and 1 kitchen remodel in kind like for like. works include upgrade electrical and plumbing to code. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)3 and (k)5.Details
2 bathrooms and 1 kitchen remodel in kind like for like. works include upgrade electrical and plumbing to code. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)3 and (k)5. | $60,000 |
| Jul 14, 2026 | In progress filed Jul 2026, not yet issued | 1871 25th Av | renewal | |
| Jul 14, 2026 | Completed final sign-off Jul 2026 | 1871 25th Av | replace garage door.Details
replace garage door. | |
| Apr 24, 2026 | In progress issued May 2026 | 1272 08th Av | replacement of the (e) secondary exterior staircase and railing with a new staircase in (e) location. replacement of (e) door to ground floor to improve stair access. removal of (e) deteriorated sideing at 4th fl. and stair and lightwell walls and replace with new siding. (r) 3 gas wh with 3 hpwh.Details
replacement of the (e) secondary exterior staircase and railing with a new staircase in (e) location. replacement of (e) door to ground floor to improve stair access. removal of (e) deteriorated sideing at 4th fl. and stair and lightwell walls and replace with new siding. (r) 3 gas wh with 3 hpwh. | $65,000 |
| Apr 14, 2026 | Completed final sign-off Jun 2026 | 445 Octavia St | unit #7: kitchen renovation in like kind. new shower valve & tile walls. upgrade electrical sub panel.Details
unit #7: kitchen renovation in like kind. new shower valve & tile walls. upgrade electrical sub panel. | $30,000 |
| Apr 10, 2026 | Completed final sign-off Jun 2026 | 1045 Bush St | comply with nov # 202651112. kitchen and bath renovation in units 3 & 5.Details
comply with nov # 202651112. kitchen and bath renovation in units 3 & 5. | $30,000 |
| Feb 12, 2026 | Completed final sign-off Mar 2026 | 1047 Bush St | unit# 12: kitchen & bathroom remodel like for like, replacement of two windows in-kind one in bathroom one in kitchen , new electrical upgrade and a new panel, replace dishwasher and applicance.Details
unit# 12: kitchen & bathroom remodel like for like, replacement of two windows in-kind one in bathroom one in kitchen , new electrical upgrade and a new panel, replace dishwasher and applicance. | $15,000 |
| Feb 12, 2026 | Completed final sign-off Jun 2026 | 445 Octavia St | unit #5: revision to pa# 202601133715, install washer/dryer in kitchen.Details
unit #5: revision to pa# 202601133715, install washer/dryer in kitchen. | |
| Jan 13, 2026 | Completed final sign-off Jun 2026 | 445 Octavia St | unit #5: kitchen bathroom renovation. upgrade electrical & plumbing, install new subpanel, install new shower pan.Details
unit #5: kitchen bathroom renovation. upgrade electrical & plumbing, install new subpanel, install new shower pan. | $30,000 |
| Jan 12, 2026 | In progress issued Mar 2026 | 1077 Fell St | ref 202506269586 and 202405172393 as built to reflect and align site conditions with arch and struc plansDetails
ref 202506269586 and 202405172393 as built to reflect and align site conditions with arch and struc plans | |
| Dec 4, 2025 | Completed final sign-off Dec 2025 | 2048 Polk St | to comply with nov # 202545128: unit 211 - install grab bars outside of shower. item #4.Details
to comply with nov # 202545128: unit 211 - install grab bars outside of shower. item #4. | $600 |
| Dec 1, 2025 | Completed final sign-off Dec 2025 | 241 04th Av | to obtain final inspection for work approved under pa# 202405132027. all work is complete.Details
to obtain final inspection for work approved under pa# 202405132027. all work is complete. | |
| Nov 17, 2025 | In progress issued Nov 2025 | 174 22nd Av | unit # 3: kitchen and bathroom renovation and upgrade electrical and plumbing. install subpanel like for like.Details
unit # 3: kitchen and bathroom renovation and upgrade electrical and plumbing. install subpanel like for like. | $45,500 |
| Nov 14, 2025 | In progress issued Nov 2025 | 1077 Fell St | recommencement and completion of work approved under pa# 202304266513 and 202306099711.Details
recommencement and completion of work approved under pa# 202304266513 and 202306099711. | $31,000 |
| Nov 14, 2025 | In progress issued Nov 2025 | 1077 Fell St | recommencement and completion of work approved under pa# 202309267475 and 202405172393.Details
recommencement and completion of work approved under pa# 202309267475 and 202405172393. | $32,000 |
| Aug 20, 2025 | Completed final sign-off Jul 2026 | 1871 25th Av | revision to pa# 202507090461: 1/f-addition of (n) family room and (n) bathroom. 2/f-remodel (e) kitchen and (e) bathroom. 3/f-remodel (e) bathroom.Details
revision to pa# 202507090461: 1/f-addition of (n) family room and (n) bathroom. 2/f-remodel (e) kitchen and (e) bathroom. 3/f-remodel (e) bathroom. | $130,000 |
| Jul 22, 2025 | Completed final sign-off Sep 2025 | 11 Kronquist Ct | replace stucco on front facade in kind. 150 sq ft. no structural work.Details
replace stucco on front facade in kind. 150 sq ft. no structural work. | $8,000 |
| Jul 9, 2025 | Completed final sign-off Jul 2026 | 1871 25th Av | kitchen and two bathrooms renovation. no layout change. new angle stops, sub panel, gfci in both bathrooms and kitchen.Details
kitchen and two bathrooms renovation. no layout change. new angle stops, sub panel, gfci in both bathrooms and kitchen. | $60,000 |
| Jun 26, 2025 | In progress issued Jul 2025 | 1077 Fell St | revisions for approved pa 202405172393: structural work - this approved plan set inaccurately showed rear wall dimensions. new arch/structural plan show correct dimensions. minor structural revision.Details
revisions for approved pa 202405172393: structural work - this approved plan set inaccurately showed rear wall dimensions. new arch/structural plan show correct dimensions. minor structural revision. | $8,500 |
| Jun 9, 2025 | In progress filed Jun 2025, not yet issued | 741 Ellis St | removal of interior hallway doors in unit 3. remove jambs, patch and paint to match existingDetails
removal of interior hallway doors in unit 3. remove jambs, patch and paint to match existing | $4,000 |
| Apr 4, 2025 | Completed final sign-off May 2025 | 30 Lapham Wy | replace stucco in kind around rear window 16' x 30' not street visible. no structural work including wood sheathing and stud replacement in the scope of work.Details
replace stucco in kind around rear window 16' x 30' not street visible. no structural work including wood sheathing and stud replacement in the scope of work. | $7,000 |
| Dec 31, 2024 | Completed final sign-off Jun 2026 | 3735 Buchanan St | 4th flr. address on-site exploratory demo and comply wiht nov#: 202431789. renovate interior of 4th flr unit. modify and remove non structural partitions. remove drop ceilings, new non-structural partitions new doors and interior glazing. refinish floors and replace kitchen fixture &cabinets.Details
4th flr. address on-site exploratory demo and comply wiht nov#: 202431789. renovate interior of 4th flr unit. modify and remove non structural partitions. remove drop ceilings, new non-structural partitions new doors and interior glazing. refinish floors and replace kitchen fixture &cabinets. | $102,000 |
| Dec 12, 2024 | Completed final sign-off Sep 2025 | 133 Granville Wy | kitchen renovation, new subpanel with dedicated switch.Details
kitchen renovation, new subpanel with dedicated switch. | $35,000 |
| Nov 25, 2024 | Completed final sign-off Feb 2025 | 688 Haight St | address violation #202425655: to remove shower unit in commercial space & revert to last known legal condition (storage).Details
address violation #202425655: to remove shower unit in commercial space & revert to last known legal condition (storage). | $3,000 |
| Oct 2, 2024 | In progress issued Nov 2024 | 145 Webster St | 1' excavation to lower existing basement slab to create a 8-foot ceiling height, construct new permiter and isolated pad footings, relocate (e) water heater and furnace, construction of new bathroom and mechanical r00m in basement. basement to remain unoccupied and used for storage.Details
1' excavation to lower existing basement slab to create a 8-foot ceiling height, construct new permiter and isolated pad footings, relocate (e) water heater and furnace, construction of new bathroom and mechanical r00m in basement. basement to remain unoccupied and used for storage. | $60,000 |
| Sep 23, 2024 | Completed final sign-off Mar 2025 | 3400 Vicente St | exterior stucco repair. replace in kind approx 200 square feet on corner of buidling where cracking has occured.Details
exterior stucco repair. replace in kind approx 200 square feet on corner of buidling where cracking has occured. | $10,000 |
| Aug 9, 2024 | Completed final sign-off Oct 2024 | 216 Eddy St | adding one partition wall in basement.Details
adding one partition wall in basement. | $10,000 |
| Aug 5, 2024 | Completed final sign-off Oct 2024 | 1734 Lombard St | unit #7: bathroom remodel, new plumbing fixtures and light fixtures. one new shower pan.; no removal of walls. everything in kind.Details
unit #7: bathroom remodel, new plumbing fixtures and light fixtures. one new shower pan.; no removal of walls. everything in kind. | $20,000 |
| Jun 25, 2024 | Completed final sign-off Oct 2024 | 2415 Mission St | unit #7: window replacement in response to violation. aluminum wood clad, double hung, street facing, same location. to comply with nov #202422672 item #2.Details
unit #7: window replacement in response to violation. aluminum wood clad, double hung, street facing, same location. to comply with nov #202422672 item #2. | $800 |
| May 30, 2024 | Completed final sign-off Mar 2025 | 2315 Sacramento St | repair 5 stairs that cracked in like kind within facade, < 50%.Details
repair 5 stairs that cracked in like kind within facade, < 50%. | $10,000 |
| May 17, 2024 | In progress issued Oct 2024 | 1077 Fell St | rev to 202304266513; (e) bathroom layout changed; (e) kitchen layout changed; addition - lighting upgrade whole unit; replace 2-windows - like to like, not visible from street. ref to pa# 202306099711 & 202309267475Details
rev to 202304266513; (e) bathroom layout changed; (e) kitchen layout changed; addition - lighting upgrade whole unit; replace 2-windows - like to like, not visible from street. ref to pa# 202306099711 & 202309267475 | $36,000 |
| May 13, 2024 | Expired or cancelled expired Dec 2025 | 241 04th Av | front bldg: voluntary seismic upgradeDetails
front bldg: voluntary seismic upgrade | $11,000 |
| Mar 6, 2024 | Completed final sign-off Aug 2024 | 272 09th Av | unit # b: replace gas heater/insert in kind with new connection. drywall patch in unit and roof patch around (e) termination. in living roomDetails
unit # b: replace gas heater/insert in kind with new connection. drywall patch in unit and roof patch around (e) termination. in living room | $8,000 |
| Feb 8, 2024 | Completed final sign-off Feb 2024 | 575 Page St | water damage build back in kind. two locatin 25 sqft pert location. existing fire reated drywall to remain.Details
water damage build back in kind. two locatin 25 sqft pert location. existing fire reated drywall to remain. | $5,000 |
| Jan 18, 2024 | Completed final sign-off Dec 2025 | 241 04th Av | remodel of two apartments in an existing 2-family dwelling and conversion of (e) storage space to habitable space including remodel of 2 kitchens, 2 bathrooms and interior addition of 2 bathrooms and associated plumbing & full electrical upgrade.Details
remodel of two apartments in an existing 2-family dwelling and conversion of (e) storage space to habitable space including remodel of 2 kitchens, 2 bathrooms and interior addition of 2 bathrooms and associated plumbing & full electrical upgrade. | $400,000 |
| Jan 17, 2024 | Completed final sign-off Mar 2024 | 292 Clipper St | 4 new furnance to replace exiting units. 4 indiviual flues with 3' roof termination new gas connections. oval double wall pipe installed. dry wall patch, roof patch to comply with nov#: 202314756 hem 2. termination on center or roof. like for likeDetails
4 new furnance to replace exiting units. 4 indiviual flues with 3' roof termination new gas connections. oval double wall pipe installed. dry wall patch, roof patch to comply with nov#: 202314756 hem 2. termination on center or roof. like for like | $20,000 |
| Jan 12, 2024 | Completed final sign-off Feb 2025 | 3252 19th St | revision to approved permit# 201808167612: including the lighting plan, kitchen and bar equipment layout, relocate water heater, add funnel drain at backbar and updated mechanical plans, remove electrical water heater.Details
revision to approved permit# 201808167612: including the lighting plan, kitchen and bar equipment layout, relocate water heater, add funnel drain at backbar and updated mechanical plans, remove electrical water heater. | |
| Jan 10, 2024 | Completed final sign-off Aug 2024 | 145 Webster St | kitchen (1) and bathrooms (2) renovation in kind, new sub panel and shower panDetails
kitchen (1) and bathrooms (2) renovation in kind, new sub panel and shower pan | $60,000 |
| Dec 12, 2023 | Completed final sign-off Apr 2024 | 577 Page St | bathroom renovation with new shower and tile sub panel upgrade to include new dedicated circuit for bathroomDetails
bathroom renovation with new shower and tile sub panel upgrade to include new dedicated circuit for bathroom | $25,000 |
| Nov 30, 2023 | Completed final sign-off Jul 2024 | 6918 Fulton St | revision to pa#202309217136 to replace extg damaged windows and repair of rotted balcony framing in kind. street facing window. stucco replacement in kind. no color change alluminum wood clad, try to salvage pilasters.Details
revision to pa#202309217136 to replace extg damaged windows and repair of rotted balcony framing in kind. street facing window. stucco replacement in kind. no color change alluminum wood clad, try to salvage pilasters. | $25,000 |
| Nov 17, 2023 | Completed final sign-off Oct 2024 | 255 Waller St | front building: existing bathroom remodel on 2nd fl.Details
front building: existing bathroom remodel on 2nd fl. | $45,000 |
| Oct 23, 2023 | Completed final sign-off Apr 2024 | 617 Octavia St | kitchen window to stay same size replace transom above rear kitchen door. install new door in like kind, not street facing. rev to bpa#202308164518Details
kitchen window to stay same size replace transom above rear kitchen door. install new door in like kind, not street facing. rev to bpa#202308164518 | $1,500 |
| Sep 26, 2023 | Never finaled issued Sep 2023, no final | 1077 Fell St | revision to 202306099711. upgrade structural under dining rm & bath. replac floor joists. our new footingDetails
revision to 202306099711. upgrade structural under dining rm & bath. replac floor joists. our new footing | $15,000 |
| Sep 21, 2023 | Completed final sign-off Jul 2024 | 6918 Fulton St | to comply with complaint #202312477. repair sink and toilet. replace shower valve and repair water damage wall and floor.Details
to comply with complaint #202312477. repair sink and toilet. replace shower valve and repair water damage wall and floor. | $15,000 |
| Aug 28, 2023 | Completed final sign-off May 2025 | 326 Lexington St | residential interior improvements-bathroom remodel, new cabinets, new finish flooring. no exterior work.Details
residential interior improvements-bathroom remodel, new cabinets, new finish flooring. no exterior work. | $100,000 |
| Aug 17, 2023 | Completed final sign-off Oct 2023 | 1243 Noe St | replace tub and shower valve and drain, replace vanity and light fixtureDetails
replace tub and shower valve and drain, replace vanity and light fixture | $30,000 |
| Aug 16, 2023 | Completed final sign-off Apr 2024 | 617 Octavia St | one kitchen and one bathroom renovation in like kind. electrical and plumbing upgrade in unit, shower pan replacement.Details
one kitchen and one bathroom renovation in like kind. electrical and plumbing upgrade in unit, shower pan replacement. | $65,000 |
| Aug 4, 2023 | Completed final sign-off Oct 2024 | 246 Grand View Av | stucco replacement, color change. revision to pa# 202307313319Details
stucco replacement, color change. revision to pa# 202307313319 | $10,000 |
| Aug 4, 2023 | Never finaled filed Aug 2023, never issued | 246 Grand View Av | revision to pa# 202307313319 (no plan). stucco replacement. color change. exterior electrical.Details
revision to pa# 202307313319 (no plan). stucco replacement. color change. exterior electrical. | $10,000 |
| Jul 31, 2023 | Completed final sign-off Oct 2023 | 181 23rd Av | 1 bathroom remodel in-kind. no changes on floor layout.Details
1 bathroom remodel in-kind. no changes on floor layout. | $30,000 |
| Jul 31, 2023 | Completed final sign-off Oct 2024 | 246 Grand View Av | stucco repair 100 sf (at the front) in like kind, replace damage.Details
stucco repair 100 sf (at the front) in like kind, replace damage. | $4,000 |
| Jul 12, 2023 | Completed final sign-off Jul 2023 | 704 Moultrie St | replace 1 exterior door in kind at rear patio. same size and same location. no structural work.Details
replace 1 exterior door in kind at rear patio. same size and same location. no structural work. | $1,400 |
| Jun 23, 2023 | Completed final sign-off Oct 2023 | 79 Valley St | repair water damage - drywall ceiling and walls. repalce water damaged ceiling cans. reinstall finish plumbing in bathrooms. reinstall finishes in bathroom. all non structural work.Details
repair water damage - drywall ceiling and walls. repalce water damaged ceiling cans. reinstall finish plumbing in bathrooms. reinstall finishes in bathroom. all non structural work. | $54,000 |
| Jun 9, 2023 | Never finaled issued Jul 2023, no final | 1077 Fell St | revision to pa 202304266513 layout change to (e) bathroom and kitchen. replace 2 windows (like for like & not visible from street). lighting upgrade in kitchen and dining roomDetails
revision to pa 202304266513 layout change to (e) bathroom and kitchen. replace 2 windows (like for like & not visible from street). lighting upgrade in kitchen and dining room | $10,700 |
| May 4, 2023 | Completed final sign-off Feb 2025 | 3252 19th St | revision to permit 201808167612. change in closet layout and ramps. change of use not in scope of work.Details
revision to permit 201808167612. change in closet layout and ramps. change of use not in scope of work. | |
| May 2, 2023 | Completed final sign-off May 2023 | 178 Parker Av | revision to pa#202304196019. to reflect changes requested by building inspectorDetails
revision to pa#202304196019. to reflect changes requested by building inspector | |
| May 2, 2023 | Completed final sign-off Apr 2025 | 583 Haight St | replace (e) storefront glazing. replace (e) entry door. repair/replace (e) g/f facade finishes.Details
replace (e) storefront glazing. replace (e) entry door. repair/replace (e) g/f facade finishes. | $12,000 |
| Apr 26, 2023 | Never finaled issued Apr 2023, no final | 1077 Fell St | work on lower unit - kitchen and bath remodel in kind. replace ceiling cans in kind (maintain 1 hr rated ceiling). upgrade (1) subpanel- plumbing as needed. no changes to floor layout. no changes to wall layout. no structural work.Details
work on lower unit - kitchen and bath remodel in kind. replace ceiling cans in kind (maintain 1 hr rated ceiling). upgrade (1) subpanel- plumbing as needed. no changes to floor layout. no changes to wall layout. no structural work. | $55,000 |
| Apr 19, 2023 | Completed final sign-off May 2023 | 176 Parker Av | compliance w/ ordinance of abatement #201305591, add 2 bathrooms (1per unit), add closets, repairs to yard space.Details
compliance w/ ordinance of abatement #201305591, add 2 bathrooms (1per unit), add closets, repairs to yard space. | $15,000 |
| Apr 19, 2023 | Completed final sign-off Jun 2023 | 460 Fillmore St | exploratory demo of exterior rear decks, comply with nov # 202306451. patch back in-kindDetails
exploratory demo of exterior rear decks, comply with nov # 202306451. patch back in-kind | $1,000 |
| Apr 18, 2023 | Expired or cancelled cancelled Jan 2026 | 3252 19th St | grade beam modified per structurals ref 201808167612Details
grade beam modified per structurals ref 201808167612 | |
| Mar 29, 2023 | Completed final sign-off Mar 2025 | 2315 Sacramento St | revision to permit #202106253235; 3/f unit 3: (e) kitchen and bathroom remodel, addition of (n) bathroom and laundry room, relocation of 2 (e) bedrooms and addition of (n) office. 4/f unit 4/5: remodel (e) kitchen and bathroom, addition (n) half bathroom and laundry room, addition of (n) bedroom.Details
revision to permit #202106253235; 3/f unit 3: (e) kitchen and bathroom remodel, addition of (n) bathroom and laundry room, relocation of 2 (e) bedrooms and addition of (n) office. 4/f unit 4/5: remodel (e) kitchen and bathroom, addition (n) half bathroom and laundry room, addition of (n) bedroom. | |
| Mar 17, 2023 | Completed final sign-off Aug 2023 | 720 York St | unit 115: revision to permit 202206216662 to accommodate penetration for mechanical ducts.Details
unit 115: revision to permit 202206216662 to accommodate penetration for mechanical ducts. | $5,000 |
| Mar 14, 2023 | Completed final sign-off Jul 2023 | 704 Moultrie St | repair cracked floor joist (living room area)Details
repair cracked floor joist (living room area) | $800 |
| Feb 7, 2023 | Expired or cancelled expired Jun 2025 | 3500 Market St | to comply with nov# 202293622 roof leaking repair; repair in kind.Details
to comply with nov# 202293622 roof leaking repair; repair in kind. | $1,000 |
| Feb 7, 2023 | Expired or cancelled expired Jun 2025 | 3500 Market St | to obtain final inspection for work approved under pa#: 201603162194 and 201606921229 all work is completeDetails
to obtain final inspection for work approved under pa#: 201603162194 and 201606921229 all work is complete | |
| Jan 18, 2023 | Completed final sign-off Apr 2025 | 583 Haight St | voluntary footing replacement.Details
voluntary footing replacement. | $50,000 |
| Jan 11, 2023 | Completed final sign-off Jul 2023 | 662 Clay St | revision to bpa# 202103116331, revise bathroom layout in basement.Details
revision to bpa# 202103116331, revise bathroom layout in basement. | |
| Dec 21, 2022 | Completed final sign-off Feb 2023 | 1487 Mcallister St | relocate and replace 2 windows in lightwell.Details
relocate and replace 2 windows in lightwell. | $2,500 |
| Oct 13, 2022 | Completed final sign-off Jul 2023 | 348 29th Av | revision to 202208170746. framing non-bearing walls to reduce the size of (e) bedroom to create hallway/utility space.Details
revision to 202208170746. framing non-bearing walls to reduce the size of (e) bedroom to create hallway/utility space. | |
| Oct 11, 2022 | Completed final sign-off Jan 2023 | 3925 18th St | unit b: kitchen and bathroom rennovation. upgrade electrical and plumbingDetails
unit b: kitchen and bathroom rennovation. upgrade electrical and plumbing | $45,000 |
| Oct 5, 2022 | Completed final sign-off Mar 2025 | 2315 Sacramento St | 1st/f unit 1: remodel & relocate (e) kitchen & bathroom. addition of 2 (n) baths & laundry. relocate (e) bedroom, addition of (n) bedroom. 2nd/f unit 2: remodel & relocate (e) kitchen & bathroom. addition of 2 (n) baths & laundry. relocate (e) bedroom, addition of 2 (n) bedroom.Details
1st/f unit 1: remodel & relocate (e) kitchen & bathroom. addition of 2 (n) baths & laundry. relocate (e) bedroom, addition of (n) bedroom. 2nd/f unit 2: remodel & relocate (e) kitchen & bathroom. addition of 2 (n) baths & laundry. relocate (e) bedroom, addition of 2 (n) bedroom. | $150,000 |
| Sep 30, 2022 | Never finaled issued Oct 2022, no final | 659 Merchant St | revision to 202010065955: relocate business entrance. omit proposed storefront exdent to business entrance only. (submit t.i. plans for health review if this will be a retail food facility)Details
revision to 202010065955: relocate business entrance. omit proposed storefront exdent to business entrance only. (submit t.i. plans for health review if this will be a retail food facility) | |
| Sep 16, 2022 | Never finaled issued Feb 2023, no final | 1 California St | ste 130: doing a modification to a permit. no doing a seperating wall. revision to pa# 202203049280Details
ste 130: doing a modification to a permit. no doing a seperating wall. revision to pa# 202203049280 | |
| Aug 17, 2022 | Completed final sign-off Jul 2023 | 348 29th Av | kitchen and bathroom remodel. add new half bath. replace sheet rock throughout unit. 5/8" type x.Details
kitchen and bathroom remodel. add new half bath. replace sheet rock throughout unit. 5/8" type x. | $70,000 |
| Aug 15, 2022 | Never finaled issued Oct 2022, no final | 1770 Fulton St | tenant improvement for a new limited restaurant.Details
tenant improvement for a new limited restaurant. | $50,000 |
| Aug 2, 2022 | Completed final sign-off Aug 2023 | 720 York St | title 24 mechanicali and electrical compliance for t.i. pa202206216662. maher n/a.Details
title 24 mechanicali and electrical compliance for t.i. pa202206216662. maher n/a. | |
| Jul 18, 2022 | Completed final sign-off Dec 2022 | 1487 Mcallister St | remodel (e) bathroom and kitchen, lighting upgrade in all rooms, electrical and plumbing. no exterior work.Details
remodel (e) bathroom and kitchen, lighting upgrade in all rooms, electrical and plumbing. no exterior work. | $55,000 |
| Jul 18, 2022 | Expired or cancelled cancelled Feb 2024 | 3201 Pierce St | unit 3211. one kitchen & one bathroom renovation. non structural.Details
unit 3211. one kitchen & one bathroom renovation. non structural. | $40,000 |
| Jun 21, 2022 | Completed final sign-off Aug 2023 | 720 York St | suite #115 -ti of existing office, wall extenisionsDetails
suite #115 -ti of existing office, wall extenisions | $80,000 |
| Jun 13, 2022 | Completed final sign-off Oct 2022 | 4908 03rd St | to obtain final inspection for work approved under pa# 201411131423. all work is complete.Details
to obtain final inspection for work approved under pa# 201411131423. all work is complete. | |
| May 13, 2022 | Never finaled issued May 2022, no final | 1045 14th St | unit #1045a :revision to stairs and windows. ref# bpa#2019-1204-8594Details
unit #1045a :revision to stairs and windows. ref# bpa#2019-1204-8594 | |
| May 9, 2022 | Completed final sign-off Jul 2023 | 662 Clay St | revision to pa# 202103116331. bathroom layout revision.Details
revision to pa# 202103116331. bathroom layout revision. | |
| May 3, 2022 | Expired or cancelled cancelled Jan 2026 | 640 Clay St | install 1 1/4 drain pipe from top of storage tank down side of building, pathc and secure pipe install 42" wall behind boilerDetails
install 1 1/4 drain pipe from top of storage tank down side of building, pathc and secure pipe install 42" wall behind boiler | $1,000 |
| Apr 15, 2022 | Completed final sign-off Dec 2024 | 246 Grand View Av | remodel extg kitchen and remodel extg half bathroom on 1st floor. remove extg bathroom and remodel extg bathroom on 2nd floor. addition of new bedroom, new office and new bathroom on attic. addition of 3 dormers. replace 3 (e) windows at front facade.Details
remodel extg kitchen and remodel extg half bathroom on 1st floor. remove extg bathroom and remodel extg bathroom on 2nd floor. addition of new bedroom, new office and new bathroom on attic. addition of 3 dormers. replace 3 (e) windows at front facade. | $100,000 |
| Mar 30, 2022 | Completed final sign-off Mar 2025 | 2315 Sacramento St | replace (e) foundations. voluntary seismic upgrade per ab-0-94 to comly with nov201715133.Details
replace (e) foundations. voluntary seismic upgrade per ab-0-94 to comly with nov201715133. | $160,000 |
| Mar 25, 2022 | Completed final sign-off Aug 2023 | 3223 Folsom St | to comply with nov# 202179497. legalize 2nd bedroom in unit 3223a.Details
to comply with nov# 202179497. legalize 2nd bedroom in unit 3223a. | $5,000 |
| Mar 4, 2022 | Never finaled issued Mar 2022, no final | 1 California St | ste 130 - light remodeling, painting, restoring cabinets, installing wood paneling, wood floors, replace electric water heater, install store signs, build sheetrock and wall and door to create storage area. sprinkler under sep permit, if applic.Details
ste 130 - light remodeling, painting, restoring cabinets, installing wood paneling, wood floors, replace electric water heater, install store signs, build sheetrock and wall and door to create storage area. sprinkler under sep permit, if applic. | $40,500 |
| Feb 28, 2022 | Expired or cancelled expired Mar 2026 | 1511 Golden Gate Av | apt #9. to comply w/ item 2-6 nov #201900501. renovation of (1) kitchen and (1) bathroom. install new subpanel in kitchen & upgrade main stack line. install can lighting. new bathroom & shower pan angle stops. install new countertops & undermount sink. non street facing windows replaced. non structDetails
apt #9. to comply w/ item 2-6 nov #201900501. renovation of (1) kitchen and (1) bathroom. install new subpanel in kitchen & upgrade main stack line. install can lighting. new bathroom & shower pan angle stops. install new countertops & undermount sink. non street facing windows replaced. non struct | $30,000 |
| Jan 24, 2022 | Never finaled issued Jan 2022, no final | 134 Bartlett St | replace dryrot siding on south side of the building. siding is not street facing. approx. 1540 sqft. replace (2) gas tankless water heaters on side of the building. replace siding in like kind and paint 1540 sqft.Details
replace dryrot siding on south side of the building. siding is not street facing. approx. 1540 sqft. replace (2) gas tankless water heaters on side of the building. replace siding in like kind and paint 1540 sqft. | $33,400 |
| Jan 24, 2022 | Completed final sign-off May 2022 | 3798 Mission St | recommencement of work for pa 201508053416.Details
recommencement of work for pa 201508053416. | |
| Jan 21, 2022 | Completed final sign-off Jun 2024 | 877 Hayes St | ground floor: remodel extg kitchen/remodel extg bathroom. 1st floor: remodel extg kitchen/remodel extg half bathroom. 2nd floor: remodel 2 extg bathroom/addition of new bathroom. to comply with nov #202183714, 2021183699,202183568,202173849Details
ground floor: remodel extg kitchen/remodel extg bathroom. 1st floor: remodel extg kitchen/remodel extg half bathroom. 2nd floor: remodel 2 extg bathroom/addition of new bathroom. to comply with nov #202183714, 2021183699,202183568,202173849 | $180,000 |
| Jan 18, 2022 | Completed final sign-off Dec 2024 | 246 Grand View Av | addition of new bedroom on first floor. addition of new bathroom on first floor.Details
addition of new bedroom on first floor. addition of new bathroom on first floor. | $50,000 |
| Dec 13, 2021 | Completed final sign-off Aug 2022 | 766 Chestnut St | remodel e kitchen, bath, family room into new bedroom. all work on 2nd flDetails
remodel e kitchen, bath, family room into new bedroom. all work on 2nd fl | $55,000 |
| Dec 10, 2021 | Never finaled issued Dec 2021, no final | 764 Chestnut St | remodel (e) kitchen and bathroom; addition of washer & dryer; convert (e) family room to (n) bedroomDetails
remodel (e) kitchen and bathroom; addition of washer & dryer; convert (e) family room to (n) bedroom | $55,000 |
| Dec 1, 2021 | Completed final sign-off Jun 2022 | 363 Scott St | revision to pa 2021 0818 6677 (all work on upper unit). remodel (e) kitchen. remodel (e) bathroom on second fl. convert (e) half bath to full bath on second fl.Details
revision to pa 2021 0818 6677 (all work on upper unit). remodel (e) kitchen. remodel (e) bathroom on second fl. convert (e) half bath to full bath on second fl. | $50,000 |
| Oct 13, 2021 | Never finaled issued Oct 2021, no final | 1045 14th St | foundation rev to pa 201912048594 and 202106102149Details
foundation rev to pa 201912048594 and 202106102149 | |
| Oct 13, 2021 | Completed final sign-off May 2022 | 1001 Oak St | one kitchen remodel and one bathroom remodel. all in like kind. no structuralDetails
one kitchen remodel and one bathroom remodel. all in like kind. no structural | $30,000 |
| Oct 13, 2021 | Expired or cancelled expired Mar 2026 | 1511 Golden Gate Av | unit's 6 & 7: renovation of one kitchen and one bathroom. install new subpanel in kitchen and upgrade main stack line. install can lighting unit. new bathroom and shower pan angle stops. install new countertops and undermount sink. non street facing windows replaced.Details
unit's 6 & 7: renovation of one kitchen and one bathroom. install new subpanel in kitchen and upgrade main stack line. install can lighting unit. new bathroom and shower pan angle stops. install new countertops and undermount sink. non street facing windows replaced. | $60,000 |