From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

39 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Nov 3, 2026In progress
issued Nov 2026
222 Taylor StVelox Construction Inc/Velox Des & Constrecommencement and completion of work approved under pa# 2019-0918-1921.
Details
Permit
202611030265
Permit issued
Nov 3, 2026

recommencement and completion of work approved under pa# 2019-0918-1921.

Open the permit page

$165,000
Dec 5, 2023Completed
final sign-off Apr 2024
222 Taylor StBelfor Usa Group Incfor unit#: 615 and 813; remove and replace cabinets. remove and replace floors. detach and reset toilets. detach and reset kitchen applicances. drywall patch. like for like partial kitchen and bath remodels.
Details
Permit
202312051911
Permit issued
Dec 13, 2023
Final sign-off
Apr 1, 2024

for unit#: 615 and 813; remove and replace cabinets. remove and replace floors. detach and reset toilets. detach and reset kitchen applicances. drywall patch. like for like partial kitchen and bath remodels.

Open the permit page

$51,000
Jun 23, 2023Completed
final sign-off Jul 2023
222 Taylor StJohnson Controls Firerepair 6" underground piping for fire sprinkler system @ residential building that is leaking @ 6" 90 ell
Details
Permit
202306230702
Permit issued
Jun 23, 2023
Final sign-off
Jul 26, 2023

repair 6" underground piping for fire sprinkler system @ residential building that is leaking @ 6" 90 ell

Open the permit page

$18,580
Jan 15, 2021Never finaled
issued May 2021, no final
190 Eddy StLee's Signsinstall an illuminated single faced sign " yemen kitchen" 12.33 sf
Details
Permit
202101152809
Permit issued
May 7, 2021

install an illuminated single faced sign " yemen kitchen" 12.33 sf

Open the permit page

$2,900
Jan 15, 2021Never finaled
issued May 2021, no final
190 Eddy StLee's Signsinstall an illuminated single faced sign " mediterranean food" 13.77 sf
Details
Permit
202101152821
Permit issued
May 7, 2021

install an illuminated single faced sign " mediterranean food" 13.77 sf

Open the permit page

$2,900
Dec 4, 2020Completed
final sign-off Apr 2021
186 Eddy StCahill Contractors Llc.add a sump pump pit + pump to trash area of market retail area. remove portion of ground level concrete slab. pour sump pit walls & floor. install sump pump with connection to electrical + plumbing. install floor-grade cover. relocate hose bib.
Details
Permit
202012040241
Permit issued
Mar 2, 2021
Final sign-off
Apr 2, 2021

add a sump pump pit + pump to trash area of market retail area. remove portion of ground level concrete slab. pour sump pit walls & floor. install sump pump with connection to electrical + plumbing. install floor-grade cover. relocate hose bib.

Open the permit page

$60,000
Sep 11, 2020Completed
final sign-off Oct 2020
222 Taylor StSan Francisco Fire Protectiontenant improvement. install new notification appliance due to tenant improvement on 1st floor commercial area. install of new horn strobe & strobe.
Details
Permit
202009113972
Permit issued
Sep 30, 2020
Final sign-off
Oct 19, 2020

tenant improvement. install new notification appliance due to tenant improvement on 1st floor commercial area. install of new horn strobe & strobe.

Open the permit page

$8,300
Jun 12, 2020Never finaled
issued Jul 2020, no final
222 Taylor StErrc Systems Inc (Former Dishnet Direct)changes per errcs requirements v1.4. updated donor antenna, updated the programming for the bda, registered the bda per the requirements.
Details
Permit
202006128612
Permit issued
Jul 27, 2020

changes per errcs requirements v1.4. updated donor antenna, updated the programming for the bda, registered the bda per the requirements.

Open the permit page

Nov 27, 2019Completed
final sign-off Jun 2020
222 Taylor StEggli Landscape Contractoadd metal planters to existing occupied roof
Details
Permit
201911278330
Permit issued
Feb 13, 2020
Final sign-off
Jun 11, 2020

add metal planters to existing occupied roof

Open the permit page

$75,000
Oct 29, 2019Never finaled
issued Jan 2020, no final
186 Eddy StHamencorevision to 20180828565 to delete drinking fountain and revise bath size and layout
Details
Permit
201910295888
Permit issued
Jan 22, 2020

revision to 20180828565 to delete drinking fountain and revise bath size and layout

Open the permit page

Oct 18, 2019Completed
final sign-off Apr 2020
222 Taylor StRcm Fire Protection Inc.ref pa# 201808288565; add & relocate speakers from (e) outlets
Details
Permit
201910184896
Permit issued
Oct 18, 2019
Final sign-off
Apr 30, 2020

ref pa# 201808288565; add & relocate speakers from (e) outlets

Open the permit page

$3,000
Sep 18, 2019Never finaled
issued Feb 2020, no final
222 Taylor StHome Again Restorationt.i. for a restaurant including new kitchen, prep area, walk in coolers, dining area, ada unisex toilet and associated utilities improvement
Details
Permit
201909181921
Permit issued
Feb 12, 2020

t.i. for a restaurant including new kitchen, prep area, walk in coolers, dining area, ada unisex toilet and associated utilities improvement

Open the permit page

$120,000
Sep 5, 2019Completed
final sign-off Nov 2019
222 Taylor StJohnson Controls Firefire alarm as built and revision to 201602179822, add 1 input module to the system ref 201908209261
Details
Permit
201909050688
Permit issued
Sep 5, 2019
Final sign-off
Nov 7, 2019

fire alarm as built and revision to 201602179822, add 1 input module to the system ref 201908209261

Open the permit page

Sep 5, 2019Completed
final sign-off Nov 2019
222 Taylor StCahill Contractors Increvision to 201602179822 modifications requested by mod. removal of bab-changing stations in community rm restrooms, addition of braille & raised letter exit routes. modifications to lift fixed approach ramp, addition of power assist to stair door
Details
Permit
201909050780
Permit issued
Sep 10, 2019
Final sign-off
Nov 14, 2019

revision to 201602179822 modifications requested by mod. removal of bab-changing stations in community rm restrooms, addition of braille & raised letter exit routes. modifications to lift fixed approach ramp, addition of power assist to stair door

Open the permit page

$500
Aug 20, 2019Expired or cancelled
cancelled Aug 2023
222 Taylor StJohnson Controls Firerev to pa# 201904087328; change to the system: add 1 monitor module and remove a dialer from 2 way system
Details
Permit
201908209261

rev to pa# 201904087328; change to the system: add 1 monitor module and remove a dialer from 2 way system

Open the permit page

$469
Jul 10, 2019Completed
final sign-off Nov 2019
222 Taylor StCahill Contractors Increv to pa 201602179822-s2; removal of bathroom at unit 152 and construction of shower room
Details
Permit
201907105554
Permit issued
Jul 29, 2019
Final sign-off
Nov 14, 2019

rev to pa 201602179822-s2; removal of bathroom at unit 152 and construction of shower room

Open the permit page

$5,000
Jul 10, 2019Completed
final sign-off Nov 2019
222 Taylor StCahill Contractors Increv to pa# 201602179822; to remove rooftop planters revised by erlier revision to this permit (201903014204)
Details
Permit
201907105560
Permit issued
Sep 10, 2019
Final sign-off
Nov 14, 2019

rev to pa# 201602179822; to remove rooftop planters revised by erlier revision to this permit (201903014204)

Open the permit page

Jun 7, 2019Never finaled
issued Sep 2019, no final
222 Taylor StCahill Contractors Incto erect indirect illuminated retail entrance sign (dalda community market)
Details
Permit
201906072912
Permit issued
Sep 10, 2019

to erect indirect illuminated retail entrance sign (dalda community market)

Open the permit page

$5,000
May 6, 2019Never finaled
issued May 2019, no final
222 Taylor Stadministration permit to add new address & change adress on pa #201602179822 from 210, 238 taylor st at block 0331, lot 001 & 011 from taylor street to new address 222 taylor street st (residential), and 186, 190 taylor street (commercial) at block 0331, lot 028.
Details
Permit
201905069784
Permit issued
May 6, 2019

administration permit to add new address & change adress on pa #201602179822 from 210, 238 taylor st at block 0331, lot 001 & 011 from taylor street to new address 222 taylor street st (residential), and 186, 190 taylor street (commercial) at block 0331, lot 028.

Open the permit page

Apr 30, 2019Never finaled
issued May 2019, no final
210 Taylor StCahill Contractors Increvisions to handrails + gates at maintenance room and roof to m.o.d requirements. rev to barn door and gate hardware to m.o.d requirements. ref. 201602179822 s2
Details
Permit
201904309327
Permit issued
May 28, 2019

revisions to handrails + gates at maintenance room and roof to m.o.d requirements. rev to barn door and gate hardware to m.o.d requirements. ref. 201602179822 s2

Open the permit page

$1,000
Apr 8, 2019Completed
final sign-off Feb 2020
210 Taylor StJohnson Controls Fireas built - rev to 201602179822/s5 2013 codes which were applc for orig. revised sprk montdevices, added smk sensor in ele rms w/power supply, added smk sensor w/sounder /co ease in unit on 2-8 flrd. moved power supplym revise addresses, changed 6 duct det to in duct, moved 1 corrdor device
Details
Permit
201904087328
Permit issued
Apr 8, 2019
Final sign-off
Feb 5, 2020

as built - rev to 201602179822/s5 2013 codes which were applc for orig. revised sprk montdevices, added smk sensor in ele rms w/power supply, added smk sensor w/sounder /co ease in unit on 2-8 flrd. moved power supplym revise addresses, changed 6 duct det to in duct, moved 1 corrdor device

Open the permit page

Apr 1, 2019Completed
final sign-off Sep 2019
210 Taylor StCahill Contractors Llc.evac map permit only.
Details
Permit
201904016806
Permit issued
Apr 1, 2019
Final sign-off
Sep 6, 2019

evac map permit only.

Open the permit page

$10,000
Mar 1, 2019Completed
final sign-off Nov 2019
210 Taylor StCahill Contractors Increvision to pa 2016-0217-9822s2 and 2019-0102-9503 including addition of roof farm and revised pavig to roof level, revised community kitchen configuration, and landscape details including tree pit surrounds and turf specification
Details
Permit
201903014204
Permit issued
Apr 1, 2019
Final sign-off
Nov 14, 2019

revision to pa 2016-0217-9822s2 and 2019-0102-9503 including addition of roof farm and revised pavig to roof level, revised community kitchen configuration, and landscape details including tree pit surrounds and turf specification

Open the permit page

Jan 28, 2019Completed
final sign-off Nov 2019
210 Taylor StSun Light & Powerrevision to #2016-0217-9822 (s8). installing sunpower spr-x22-360-com instead of spr-p17-340-com, same number of modules, kw increases to 38.16 kw. also installing solar edge p 800p optimizers instead of p7305 to accomodate the larger kw size. changes due to equipment availability.
Details
Permit
201901281415
Permit issued
Feb 19, 2019
Final sign-off
Nov 22, 2019

revision to #2016-0217-9822 (s8). installing sunpower spr-x22-360-com instead of spr-p17-340-com, same number of modules, kw increases to 38.16 kw. also installing solar edge p 800p optimizers instead of p7305 to accomodate the larger kw size. changes due to equipment availability.

Open the permit page

Jan 2, 2019Completed
final sign-off Nov 2019
210 Taylor StCahill Contractors Incmod project, priority processing. revision to permit #201602179822s2, addition of wheelchair lift & accessible floor with added signage, minor electric changes, landscapint and mep approved amendments.
Details
Permit
201901029503
Permit issued
Jan 9, 2019
Final sign-off
Nov 13, 2019

mod project, priority processing. revision to permit #201602179822s2, addition of wheelchair lift & accessible floor with added signage, minor electric changes, landscapint and mep approved amendments.

Open the permit page

$35,000
Dec 11, 2018Never finaled
issued Dec 2018, no final
210 Taylor Ststreet space
Details
Permit
M1015527
Permit issued
Dec 11, 2018

street space

Open the permit page

Dec 7, 2018Completed
final sign-off Nov 2019
210 Taylor StCahill Contractors Incadded fire sprinkler backfloe pipe added fire pump to backflow room and fire doors. revision to 201602179822
Details
Permit
201812077728
Permit issued
Dec 11, 2018
Final sign-off
Nov 15, 2019

added fire sprinkler backfloe pipe added fire pump to backflow room and fire doors. revision to 201602179822

Open the permit page

$10,000
Dec 5, 2018Completed
final sign-off Dec 2019
210 Taylor StRcm Fire Protection Inc.revision to addendum 201602179822-s4. water flow changed (fire only)
Details
Permit
201812057515
Permit issued
Jan 9, 2019
Final sign-off
Dec 5, 2019

revision to addendum 201602179822-s4. water flow changed (fire only)

Open the permit page

Nov 5, 2018Completed
final sign-off Nov 2019
210 Taylor StCahill Contractors Increv to pa# 201602179822 s2; to include smoke detector at elevator shaft, fire protection to recessed wall fixtures addition of errcs room & rotted shaft, locations of 2-way comms, added door to stair 1, accelographs added
Details
Permit
201811054932
Permit issued
Nov 19, 2018
Final sign-off
Nov 14, 2019

rev to pa# 201602179822 s2; to include smoke detector at elevator shaft, fire protection to recessed wall fixtures addition of errcs room & rotted shaft, locations of 2-way comms, added door to stair 1, accelographs added

Open the permit page

Aug 28, 2018Completed
final sign-off Nov 2020
210 Taylor StCahill Contractors Inc, Hamencotenant improvement of retail space on eddy into food market (14'-0" ground floor ceiling height) ref bpa# 2016-0217-9822.
Details
Permit
201808288565
Permit issued
Jan 9, 2019
Final sign-off
Nov 2, 2020

tenant improvement of retail space on eddy into food market (14'-0" ground floor ceiling height) ref bpa# 2016-0217-9822.

Open the permit page

$600,000
Jun 12, 2018Never finaled
issued Jun 2018, no final
210 Taylor Ststreet space
Details
Permit
M937708
Permit issued
Jun 12, 2018

street space

Open the permit page

Jun 6, 2018Completed
final sign-off Nov 2019
210 Taylor StCahill Contractors Llc.rev to pa# 201602179822 s2; revision of fire rattng to electric closet-sheet g602 to show 2-hr fire rating, to be consistent with the rest of approved set for s-2
Details
Permit
201806061154
Permit issued
Jun 12, 2018
Final sign-off
Nov 14, 2019

rev to pa# 201602179822 s2; revision of fire rattng to electric closet-sheet g602 to show 2-hr fire rating, to be consistent with the rest of approved set for s-2

Open the permit page

Mar 27, 2018Completed
final sign-off Apr 2019
210 Taylor StCahill Contractors Llc.exterior metal framing. ref pa #2016-0217-9822.
Details
Permit
201803274658
Permit issued
Jun 12, 2018
Final sign-off
Apr 25, 2019

exterior metal framing. ref pa #2016-0217-9822.

Open the permit page

$200,000
Feb 15, 2018Completed
final sign-off Sep 2019
210 Taylor StRcm Fire Protection Inc.revision to 201801118439, changes to underground
Details
Permit
201802151411
Permit issued
Feb 15, 2018
Final sign-off
Sep 16, 2019

revision to 201801118439, changes to underground

Open the permit page

$11,089
Jan 11, 2018Completed
final sign-off Sep 2019
210 Taylor StRcm Fire Protection Inc.install apprx 15'-0" of 6" e900 puc pipe connecting up stream of (n) 6" ames c800bfg & ames 6" in building riser. point of connections shall be from face of common on eddy st. connecting to the new 6" fire service provide by others from 8 in main on eddy st. ref pa#201602179822.
Details
Permit
201801118439
Permit issued
Jan 19, 2018
Final sign-off
Sep 16, 2019

install apprx 15'-0" of 6" e900 puc pipe connecting up stream of (n) 6" ames c800bfg & ames 6" in building riser. point of connections shall be from face of common on eddy st. connecting to the new 6" fire service provide by others from 8 in main on eddy st. ref pa#201602179822.

Open the permit page

$4,000
Jan 9, 2018Completed
final sign-off Apr 2019
210 Taylor StCahill Contractors Llc.metal stairs, deferred submittal for new construction
Details
Permit
201801098118
Permit issued
Apr 3, 2018
Final sign-off
Apr 25, 2019

metal stairs, deferred submittal for new construction

Open the permit page

$200,000
Dec 14, 2017Never finaled
issued Dec 2017, no final
210 Taylor Ststreet space
Details
Permit
M866607
Permit issued
Dec 14, 2017

street space

Open the permit page

Aug 18, 2017Completed
final sign-off Apr 2019
210 Taylor StCahill Contractors Llc.tower crane foundation permit
Details
Permit
201708185215
Permit issued
Oct 11, 2017
Final sign-off
Apr 29, 2019

tower crane foundation permit

Open the permit page

$50,000
Aug 10, 2017Completed
final sign-off Apr 2019
210 Taylor StCahill Contractors Increvision to foundation as previously approved in pa# 2016/02/17/9822-s1.
Details
Permit
201708104457
Permit issued
Sep 15, 2017
Final sign-off
Apr 25, 2019

revision to foundation as previously approved in pa# 2016/02/17/9822-s1.

Open the permit page

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Cahill Contractors Inc (11), Cahill Contractors Llc. (6), Johnson Controls Fire (4), Rcm Fire Protection Inc. (4), Hamenco (2), Lee's Signs (2), Belfor Usa Group Inc, Eggli Landscape Contracto, Errc Systems Inc (Former Dishnet Direct), Home Again Restoration, San Francisco Fire Protection, Sun Light & Power, Velox Construction Inc/Velox Des & Const
Architects
David Baker (5), John Onken (3), Daniel Simons, Eugene Sin, Sally T Roth
Engineers
Matthew D Brooks
Authorized agents
Wendy Ho

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.