David Baker
- Listed as
- architect, designer, engineer
- Firm
- David Baker Architects
- Based in
- San Francisco
- On San Francisco permits
- Sep 2005 to May 2021
21 permits since 2000 (architect on 19 permits, designer on 1 permit, engineer on 1 permit): 15 completed, 4 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 10, 2021 | Expired or cancelled withdrawn Dec 2021 | 1101 Sutter St | construct new 14-story mixed-use buildingDetails
construct new 14-story mixed-use building | $40,000,000 | |
| Nov 23, 2020 | Completed final sign-off Aug 2023 | 833 Bryant St | Cahill Contractors Llc. | revision to pa #201902112589-s2 achitectural revise roof water proof epdm 100% affordable homeless housing projectDetails
revision to pa #201902112589-s2 achitectural revise roof water proof epdm 100% affordable homeless housing project | |
| Dec 16, 2019 | Completed final sign-off Dec 2024 | 1 Avenue Of The Palms | Webcor Construction Lp | mayor ed #17-02. priority processing. ab-004 attached. to erect 22 stories, type 1-a, 250 residential units with mixed-used building (b,a,r-2) parcel-c2.4Details
mayor ed #17-02. priority processing. ab-004 attached. to erect 22 stories, type 1-a, 250 residential units with mixed-used building (b,a,r-2) parcel-c2.4 | $130,240,000 |
| Feb 21, 2019 | Never finaled issued Mar 2019, no final | 1178 Folsom St | Transworld Construction | ref pa# 2015082653833 a proposed janitor room to be converted to a 2-hr protected room to place fire alarm eqipments, eercs,& two way comm. (all under sep permit) to enlarge elevator closet on the roof to become an elevator room per fire dept. suggestionDetails
ref pa# 2015082653833 a proposed janitor room to be converted to a 2-hr protected room to place fire alarm eqipments, eercs,& two way comm. (all under sep permit) to enlarge elevator closet on the roof to become an elevator room per fire dept. suggestion | |
| Aug 11, 2017 | Completed final sign-off Sep 2017 | 392 Fulton St | Intrepid Electronic Systems Inc | fire alarm system modification for t.i. pa#201608185373, address change pa#201707212577 change of address.Details
fire alarm system modification for t.i. pa#201608185373, address change pa#201707212577 change of address. | $4,000 |
| Aug 10, 2017 | Completed final sign-off Apr 2019 | 210 Taylor St | Cahill Contractors Inc | revision to foundation as previously approved in pa# 2016/02/17/9822-s1.Details
revision to foundation as previously approved in pa# 2016/02/17/9822-s1. | |
| Jul 20, 2017 | Completed final sign-off Jun 2018 | 388 Fulton St | revision to pa#201608185378, 201704043120, 201704144019, revision of mep permit to alter makeup air routing & water heater ventingDetails
revision to pa#201608185378, 201704043120, 201704144019, revision of mep permit to alter makeup air routing & water heater venting | ||
| May 25, 2017 | Expired or cancelled expired Dec 2018 | 801 Brannan St | Balfour Beatty Construction Llc | for record purposes only: revision to ab-005 approved pa# 2017-0124-7758. ** maher: n/a **Details
for record purposes only: revision to ab-005 approved pa# 2017-0124-7758. ** maher: n/a ** | |
| Apr 14, 2017 | Never finaled issued Apr 2017, no final | 388 Fulton St | move some gyp board walls, change doors and change counter height for t.i. of extg retail to become limitted restaurant. ref app#201608185378.Details
move some gyp board walls, change doors and change counter height for t.i. of extg retail to become limitted restaurant. ref app#201608185378. | ||
| Jan 24, 2017 | Completed final sign-off Dec 2018 | 801 Brannan St | Balfour Beatty Construction Llc | alteration to mechanical roof ventialation system to pa# 2013/09/04/5886-s , including mechanical ventilation of concelaed space associated wit roof area ** maher: n/a **Details
alteration to mechanical roof ventialation system to pa# 2013/09/04/5886-s , including mechanical ventilation of concelaed space associated wit roof area ** maher: n/a ** | $250,000 |
| Dec 20, 2016 | Completed final sign-off Mar 2017 | 588 Mission Bay Blvd North Bl | Nibbi Bros Assoc Inc. | revision to 201404042522s3, clarifies smoke detection in elevator hoistway and remove door hold-opens in exterior stair.Details
revision to 201404042522s3, clarifies smoke detection in elevator hoistway and remove door hold-opens in exterior stair. | |
| Dec 16, 2016 | Completed final sign-off Jan 2018 | 801 Brannan St | Balfour Beatty Construction Llc | revision to pa #201309045886 - roof ventilation & draft stopping requirements- n/a maher ordinanceDetails
revision to pa #201309045886 - roof ventilation & draft stopping requirements- n/a maher ordinance | $200,000 |
| Aug 18, 2016 | Completed final sign-off Aug 2018 | 388 Fulton St | change of use. tenant improvement of an (e) retair space to become a limited restaurant (bakery) w/ work including gyp board walls, finishes, commercial kitchen (deferred), casework, lighting, painting.Details
change of use. tenant improvement of an (e) retair space to become a limited restaurant (bakery) w/ work including gyp board walls, finishes, commercial kitchen (deferred), casework, lighting, painting. | $40,000 | |
| Aug 8, 2016 | Completed final sign-off Aug 2017 | 388 Fulton St | pa #201303273113 approved dwgs show an automatically-closing fire & smoke curtain protecting the trash chute compartment opening,which is now changed to an automatically closing fire & smoke door.new door meets the 60-minute fire protection rating.Details
pa #201303273113 approved dwgs show an automatically-closing fire & smoke curtain protecting the trash chute compartment opening,which is now changed to an automatically closing fire & smoke door.new door meets the 60-minute fire protection rating. | $1,000 | |
| Jul 28, 2016 | Never finaled issued Dec 2018, no final | 2675 Folsom St | erect 4 stories 117 residential with double car stacker parking in basement, no fire pump on lot nos. 006,007 and 024 (lots will be merged in future)Details
erect 4 stories 117 residential with double car stacker parking in basement, no fire pump on lot nos. 006,007 and 024 (lots will be merged in future) | $32,000,000 | |
| Jun 27, 2016 | Never finaled issued Jun 2016, no final | 1751 Carroll Av | Nibbi Bros Assoc Inc. | assembly permit revision to include a-2 occupancy ref 201211073775s2Details
assembly permit revision to include a-2 occupancy ref 201211073775s2 | |
| May 12, 2016 | Completed final sign-off May 2017 | 1380 07th St | James E Roberts-Obayashi Corporation | correction notice from dbi: all f1 type flex units (#l01,l02,l03,l04,l05,l06,l16,l17,l18,1l9,l20,l21,l22 & l23) label storage area only above bathroom due to lack of headroom as indicated in drawings, reference pa 201112070234.Details
correction notice from dbi: all f1 type flex units (#l01,l02,l03,l04,l05,l06,l16,l17,l18,1l9,l20,l21,l22 & l23) label storage area only above bathroom due to lack of headroom as indicated in drawings, reference pa 201112070234. | |
| Feb 17, 2016 | Completed final sign-off Oct 2019 | 210 Taylor St | Cahill Contractors Llc., Cahill Contractors Inc | erect 9 story, type 1, zero basement, 113 dwelling unit and retail building.Details
erect 9 story, type 1, zero basement, 113 dwelling unit and retail building. | $40,000,000 |
| Jul 31, 2014 | Completed final sign-off Apr 2017 | 1380 07th St | Rcm Fire Protection Inc. | install new 8-inch fire service off of 8-inch main on hubbell st per nfpa 13 & 24. above ground piping of sprinkler and standpipe system under separate application. ref. 201112070234; maher n/aDetails
install new 8-inch fire service off of 8-inch main on hubbell st per nfpa 13 & 24. above ground piping of sprinkler and standpipe system under separate application. ref. 201112070234; maher n/a | $7,000 |
| Apr 4, 2014 | Completed final sign-off Jun 2017 | 588 Mission Bay Blvd North Bl | Pmn Design Elect Inc Dba Design Elc, Nibbi Bros Assoc Inc. | erect 5 story 200 residential unit and commercial 5 story type iii construction.Details
erect 5 story 200 residential unit and commercial 5 story type iii construction. | $33,857,234 |
| Sep 28, 2005 | Completed final sign-off Nov 2005 | 145 Taylor St | revision to pa 200209277669Details
revision to pa 200209277669 |