Block 5476, lot 009
1075 Le Conte Ave
- City’s use
- Multi-Family Residential
- Built
- 2013
- Stories
- 5
- Units
- 73
- Building
- 45,918 sq ft
- Lot
- 26,234 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
28 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 10, 2025 | Completed final sign-off Jun 2026 | 1075 Le Conte Av | Freestone Reconstruction Inc | 2nd and 5th floors: like in kind kitchen refresh @ studio units @ 15 units 2nd and 5th floors. cabinets, counter tops, appliances no floor plan changes.Details
2nd and 5th floors: like in kind kitchen refresh @ studio units @ 15 units 2nd and 5th floors. cabinets, counter tops, appliances no floor plan changes. | $248,168 |
| Feb 14, 2023 | Completed final sign-off Jul 2023 | 1075 Le Conte Av | United Systems Fire And Security Llc | emergency fire alarm control panel replacement; like-for-like replacement of all initiating devicesDetails
emergency fire alarm control panel replacement; like-for-like replacement of all initiating devices | $40,986 |
| Sep 24, 2018 | Completed final sign-off Nov 2018 | 1075 Le Conte Av | Thornstone Construction Group | repair drywall, 32 sqft of new insulation at trash room on 5th floor. damage to old insulation due to water leak. comply with complaint # 201889121 item 2.Details
repair drywall, 32 sqft of new insulation at trash room on 5th floor. damage to old insulation due to water leak. comply with complaint # 201889121 item 2. | $5,000 |
| Feb 26, 2014 | Completed final sign-off Apr 2014 | 1075 Le Conte Av | Interstate Restoration California Lp | revision to 201402218995. at locations with wall board replacements, install insulation, replace v metal framing at drop ceilings units 209 and 309, reinstall hvac ductingDetails
revision to 201402218995. at locations with wall board replacements, install insulation, replace v metal framing at drop ceilings units 209 and 309, reinstall hvac ducting | $35,000 |
| Feb 21, 2014 | Never finaled issued Feb 2014, no final | 1075 Le Conte Av | Interstate Restoration California Lp | replace damaged drywall in units 409, 309, 209, hallways, and 1st floor offices. reinstall (e) appliances and new cabinetry. used 5/8" type x gyp bd. maintain 1 -hr rated separation between all units and hallways.Details
replace damaged drywall in units 409, 309, 209, hallways, and 1st floor offices. reinstall (e) appliances and new cabinetry. used 5/8" type x gyp bd. maintain 1 -hr rated separation between all units and hallways. | $35,000 |
| Aug 21, 2013 | Completed final sign-off Sep 2013 | 1075 Le Conte Av | Siemens Industry, Inc. | addition of 73 duct detectors for new fso locations and 2 smoke detectors at door holders. all devices connect onto fire alarm system. pa ref#2013.0814.4281 (mechanical f/fsd additions)Details
addition of 73 duct detectors for new fso locations and 2 smoke detectors at door holders. all devices connect onto fire alarm system. pa ref#2013.0814.4281 (mechanical f/fsd additions) | $44,800 |
| Aug 14, 2013 | Completed final sign-off Nov 2013 | 1075 Le Conte Av | Cahill Contractors Inc | revision to pa#201007196949, replace fire dampers at supply air ducts with fire smoke dampers at each unit supply shaft penetration.Details
revision to pa#201007196949, replace fire dampers at supply air ducts with fire smoke dampers at each unit supply shaft penetration. | $48,000 |
| Aug 1, 2013 | Expired or cancelled cancelled Jan 2026 | 1075 Le Conte Av | basement 1-5 and roof 22 evacuation signs | $6,600 | |
| Aug 1, 2013 | Completed final sign-off Oct 2013 | 1075 Le Conte Av | Maguire Inc Dba Lahue And Associates | basement 1-5 and roof. 22 evacuation signsDetails
basement 1-5 and roof. 22 evacuation signs | $6,600 |
| May 31, 2013 | Never finaled issued May 2013, no final | 1075 Le Conte Av | street space | ||
| Sep 27, 2012 | Never finaled issued Sep 2012, no final | 1075 Le Conte Av | street space permit. | ||
| Sep 14, 2012 | Completed final sign-off Aug 2013 | 1075 Le Conte Av | Cahill Contractors Inc | 3 interior metal stairs, deferred submittal for 201007196949-s1Details
3 interior metal stairs, deferred submittal for 201007196949-s1 | $36,000 |
| Sep 10, 2012 | Completed final sign-off Aug 2013 | 1075 Le Conte Av | Cahill Contractors Inc | roof truss deferred structural details for 201007196949-s1Details
roof truss deferred structural details for 201007196949-s1 | $8,800 |
| Aug 15, 2012 | Completed final sign-off Oct 2013 | 1075 Le Conte Av | Siemens Industry, Inc. | installation addition of a new fire alarm system for the " mercy housing" building (low-rise)Details
installation addition of a new fire alarm system for the " mercy housing" building (low-rise) | $140,000 |
| Aug 14, 2012 | Completed final sign-off Oct 2013 | 1075 Le Conte Av | Rcm Fire Protection Inc. | provide an automatic sprinkler system throughout the building & a class i standpipe system @ three stairwells. system designed as light hazard ordinary in garage. 1102 sprinklers total. ug was approved under pa # 2012-05-30-1447. swi 1/16/13.Details
provide an automatic sprinkler system throughout the building & a class i standpipe system @ three stairwells. system designed as light hazard ordinary in garage. 1102 sprinklers total. ug was approved under pa # 2012-05-30-1447. swi 1/16/13. | $300,000 |
| May 30, 2012 | Completed final sign-off Aug 2013 | 1075 Le Conte Av | Rcm Fire Protection Inc. | install underground fire service to bldg up to 5'-0 outside of bldg which will then meet the fire service. 8 inches underground- sprinklers under separate permitDetails
install underground fire service to bldg up to 5'-0 outside of bldg which will then meet the fire service. 8 inches underground- sprinklers under separate permit | $7,500 |
| Apr 4, 2012 | Completed final sign-off Aug 2013 | 1075 Le Conte Av | Cahill Contractors Inc | minor revision to approved pa# 201111048282. no work in the public right of way or on adjacent lotsDetails
minor revision to approved pa# 201111048282. no work in the public right of way or on adjacent lots | $17,500 |
| Nov 4, 2011 | Completed final sign-off Aug 2013 | 1075 Le Conte Av | Cahill Contractors Inc | install shoring system with tiebacks along 3rd street & le conte avenue. ref pa# 2010/07/19/6949.Details
install shoring system with tiebacks along 3rd street & le conte avenue. ref pa# 2010/07/19/6949. | $160,000 |
| Jul 19, 2010 | Completed final sign-off Nov 2013 | 1075 Le Conte Av | Cahill Contractors Inc | erect 73 dwelling units, 5 stories residential/parking building.Details
erect 73 dwelling units, 5 stories residential/parking building. | $18,000,000 |
| Jun 24, 2010 | Completed final sign-off Oct 2010 | 6600 03rd St | Cahill Contractors Inc | demolish motel for 44 dwelling unitDetails
demolish motel for 44 dwelling unit | $25,000 |
| Dec 28, 2005 | Completed final sign-off Dec 2005 | 6600 03rd St | Fire Protection Retrofit Specialist | to renew expires pa# 2004/02/24/7037 for final only.Details
to renew expires pa# 2004/02/24/7037 for final only. | |
| Jul 1, 2005 | Never finaled issued Jul 2005, no final | 6600 03rd St | San Francisco Fire Protection | monitor new fire pump for sprinkler systemDetails
monitor new fire pump for sprinkler system | $4,000 |
| May 17, 2005 | Completed final sign-off Dec 2005 | 6600 03rd St | Occidental Express | closing in of 2 wndws in fire spinkler equipment room to create an 1 hr enclosure wndw to be removedDetails
closing in of 2 wndws in fire spinkler equipment room to create an 1 hr enclosure wndw to be removed | $2,500 |
| Feb 24, 2004 | Never finaled issued Apr 2004, no final | 6600 03rd St | Fire Protection Retrofit Specialist | installa fire sprinkler system to comply with ord. #170-02Details
installa fire sprinkler system to comply with ord. #170-02 | $41,550 |
| Jun 10, 2003 | Completed final sign-off Aug 2003 | 6600 03rd St | Occidental Express | establish legality of (e) room to comply with nov #200339212Details
establish legality of (e) room to comply with nov #200339212 | $1,000 |
| Aug 2, 2001 | Expired or cancelled expired Dec 2001 | 6600 03rd St | loose steps to be replaced;replace dryrot bathroom floor, room #4 per nov-200119201Details
loose steps to be replaced;replace dryrot bathroom floor, room #4 per nov-200119201 | $500 | |
| Jan 9, 2001 | Completed final sign-off Jan 2001 | 6600 03rd St | to renew permit32000/08/02/6775 for final inspection.Details
to renew permit32000/08/02/6775 for final inspection. | ||
| Aug 2, 2000 | Expired or cancelled expired Dec 2000 | 6600 03rd St | comply w/dbi report dated 7/18/2000, need to be screwed in tight at loose stairway, steps & railingDetails
comply w/dbi report dated 7/18/2000, need to be screwed in tight at loose stairway, steps & railing | $1,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Cahill Contractors Inc (7), Fire Protection Retrofit Specialist (2), Interstate Restoration California Lp (2), Occidental Express (2), Rcm Fire Protection Inc. (2), Siemens Industry, Inc. (2), Freestone Reconstruction Inc, Maguire Inc Dba Lahue And Associates, San Francisco Fire Protection, Thornstone Construction Group, United Systems Fire And Security Llc
- Architects
- Sally Roth
- Engineers
- David Baker, Timothy Mathison
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.