Permit GraphShortlistSan Francisco building permits since 2000

Cookline Construction Inc

Contractor license
1005541
State license record
Based in
San Francisco
On San Francisco permits
Sep 2015 to Oct 2026
Last 24 months
30 permits filed

143 permits since 2000: 107 completed, 9 in progress, 22 never finaled, 5 expired or cancelled.

Of the 22 never-finaled permits, 4 are 3 to 5 years old, 17 are 5 to 10 years old, 1 is over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits (among their 100 most recent)

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Most recent permits

AllPergola or trellis 1Deck 2Stairs 3Kitchen remodel 30Bathroom remodel 11

Showing the 100 most recent of 143.

FiledOutcomeAddressWork described on the permitDeclared cost
Oct 14, 2026In progress
filed Oct 2026, not yet issued
82 14th Stref permit 202512262660. exterior canopy over exterior dining area. provide and install fire resistive canopy astme84,701 compliant. deferred submittal for cable tension structural.
Details
Permit
202610149416

ref permit 202512262660. exterior canopy over exterior dining area. provide and install fire resistive canopy astme84,701 compliant. deferred submittal for cable tension structural.

Open the permit page

$25,000
Oct 14, 2026In progress
filed Oct 2026, not yet issued
82 14th Strevision to permit 202512262660. added structural calculations and construction details to lattice wall/guardrail, suspended ceiling. all japanese carpentry supplemental.
Details
Permit
202610149411

revision to permit 202512262660. added structural calculations and construction details to lattice wall/guardrail, suspended ceiling. all japanese carpentry supplemental.

Open the permit page

$75,000
Sep 30, 2026In progress
filed Sep 2026, not yet issued
130 Clement Strevision to 202607275600; to remove mech, electrical, plumbing and fire supression as deferred submittal.
Details
Permit
202609308811

revision to 202607275600; to remove mech, electrical, plumbing and fire supression as deferred submittal.

Open the permit page

Sep 18, 2026In progress
issued Sep 2026
2139 Polk Strevision to 202607145009. add ac unitt furnace
Details
Permit
202609188372
Permit issued
Sep 21, 2026

revision to 202607145009. add ac unitt furnace

Open the permit page

$2,000
Aug 12, 2026Completed
final sign-off Nov 2026
537 Stevenson Strevision to pa 202508082687 (ref 202604169569) structural changes only to 2nd fl diaphragm connections @ collector to brick walls
Details
Permit
202608126425
Permit issued
Aug 14, 2026
Final sign-off
Nov 16, 2026

revision to pa 202508082687 (ref 202604169569) structural changes only to 2nd fl diaphragm connections @ collector to brick walls

Open the permit page

$1,500
Jul 27, 2026Completed
final sign-off Oct 2026
838 Divisadero Stfire damage repair at roof top mechanical systems, mechanitcal platflorms, non structual roof framing, and miscellaneous damage to area within the first and 2nd fl restaurants below. no new restaurant equipment, mechanical equipment that is damaged to be replaced only. no new plumbing fixtures.
Details
Permit
202607275616
Permit issued
Aug 12, 2026
Final sign-off
Oct 20, 2026

fire damage repair at roof top mechanical systems, mechanitcal platflorms, non structual roof framing, and miscellaneous damage to area within the first and 2nd fl restaurants below. no new restaurant equipment, mechanical equipment that is damaged to be replaced only. no new plumbing fixtures.

Open the permit page

$250,000
Jul 27, 2026In progress
issued Sep 2026
130 Clement Stcommercial interior t.i. remodel existing retail space with new flr and ceiling treatments, finishes, furniture, millwork and limited partitions changes. replace facade windows and door in kind. add show kithen. modify existing bathroom for barrier removal (grab bars).
Details
Permit
202607275600
Permit issued
Sep 9, 2026

commercial interior t.i. remodel existing retail space with new flr and ceiling treatments, finishes, furniture, millwork and limited partitions changes. replace facade windows and door in kind. add show kithen. modify existing bathroom for barrier removal (grab bars).

Open the permit page

$100,000
Jul 14, 2026In progress
issued Aug 2026
2139 Polk Stcommercial interior tenant improvement: remodel e cafte bakery with new service counter, floor and ceiling treatments, wall finishes, food service equipment, replace storefront glazing and limited non structural partition changes. accessibility upgrades include: rplace main entrance door, new sloped
Details
Permit
202607145009
Permit issued
Aug 27, 2026

commercial interior tenant improvement: remodel e cafte bakery with new service counter, floor and ceiling treatments, wall finishes, food service equipment, replace storefront glazing and limited non structural partition changes. accessibility upgrades include: rplace main entrance door, new sloped

Open the permit page

$175,000
Apr 16, 2026Completed
final sign-off Nov 2026
537 Stevenson Strevision 202508082687. remove sistering of joists and install beam , post, footing to strengten ground floor. revise collector and elevator detail
Details
Permit
202604169569
Permit issued
Apr 17, 2026
Final sign-off
Nov 16, 2026

revision 202508082687. remove sistering of joists and install beam , post, footing to strengten ground floor. revise collector and elevator detail

Open the permit page

$5,000
Mar 13, 2026Completed
final sign-off Apr 2026
420 Cortland Avti ground fl. convert from retail to retail & art studio. (n) 2 hour wall to separate retail from back of house ceramics studio.
Details
Permit
202603137569
Permit issued
Apr 6, 2026
Final sign-off
Apr 30, 2026

ti ground fl. convert from retail to retail & art studio. (n) 2 hour wall to separate retail from back of house ceramics studio.

Open the permit page

$7,002
Feb 5, 2026In progress
issued Feb 2026
416 Cortland Avelectrical power upgrade, converting to 3-phase
Details
Permit
202602055349
Permit issued
Feb 18, 2026

electrical power upgrade, converting to 3-phase

Open the permit page

$37,890
Feb 2, 2026In progress
issued May 2026
82 14th Stadd second floor addition 897 sf to an (e) restaurant.to add storage,seating, and supplemental kitchen area.add (n) stair access/egress fire,new 1hrrated walls and ceiling/roof assembly,interior finisehes,new mep construction for kitchen/roof mounted equipment.ada baths by 2019 code.f/s sep permit.
Details
Permit
202512262660
Permit issued
May 27, 2026

add second floor addition 897 sf to an (e) restaurant.to add storage,seating, and supplemental kitchen area.add (n) stair access/egress fire,new 1hrrated walls and ceiling/roof assembly,interior finisehes,new mep construction for kitchen/roof mounted equipment.ada baths by 2019 code.f/s sep permit.

Open the permit page

$400,000
Jan 6, 2026Completed
final sign-off Apr 2026
416 Cortland Av1/fl- replace (e) rear door and windows with 1 (n) door
Details
Permit
202601063327
Permit issued
Jan 21, 2026
Final sign-off
Apr 30, 2026

1/fl- replace (e) rear door and windows with 1 (n) door

Open the permit page

$8,500
Jan 2, 2026Completed
final sign-off Jan 2026
1300 09th Avremove existing jamba juice signs
Details
Permit
202601023168
Permit issued
Jan 9, 2026
Final sign-off
Jan 13, 2026

remove existing jamba juice signs

Open the permit page

$2,000
Dec 10, 2025Completed
final sign-off Aug 2026
600 Guerrero Strevision to 202508193406 to include electrical load balancing and schedules. see orig permit for tenant improvement and accessibility features. no lighting proposed.
Details
Permit
202512101392
Permit issued
Apr 10, 2026
Final sign-off
Aug 25, 2026

revision to 202508193406 to include electrical load balancing and schedules. see orig permit for tenant improvement and accessibility features. no lighting proposed.

Open the permit page

$5,000
Nov 12, 2025Completed
final sign-off Apr 2026
416 Cortland Avdeferred electrical for pa #2025-0625-9393
Details
Permit
202511129400
Permit issued
Nov 12, 2025
Final sign-off
Apr 30, 2026

deferred electrical for pa #2025-0625-9393

Open the permit page

$32,795
Sep 22, 2025Completed
final sign-off Nov 2025
2240 Mission Stchange tile in customer bathrooms, (n) equipment at bar, remove (e) cabinets and replace with table and change countertops. replace wood wall panel like for like. change out fixtures and finishes like for like all work in kind.
Details
Permit
202509225860
Permit issued
Oct 10, 2025
Final sign-off
Nov 24, 2025

change tile in customer bathrooms, (n) equipment at bar, remove (e) cabinets and replace with table and change countertops. replace wood wall panel like for like. change out fixtures and finishes like for like all work in kind.

Open the permit page

$20,000
Sep 2, 2025Completed
final sign-off May 2026
888 Valencia Sttenant improvement to existing retail space. electrical work deferred from permit pa #202505166685. replace track lighting, change outlet locations.
Details
Permit
202509024391
Permit issued
Sep 11, 2025
Final sign-off
May 15, 2026

tenant improvement to existing retail space. electrical work deferred from permit pa #202505166685. replace track lighting, change outlet locations.

Open the permit page

$13,585
Aug 21, 2025Completed
final sign-off Jan 2026
1300 09th Avt.i. of e) gutted restaurant space for new restaurant. work included install of all new food service equipment, partial updated interior, finishes thru, demo of 1 e) walk-in cooler ( w/ infill/patch remaining) no exterior work
Details
Permit
202508213635
Permit issued
Oct 9, 2025
Final sign-off
Jan 13, 2026

t.i. of e) gutted restaurant space for new restaurant. work included install of all new food service equipment, partial updated interior, finishes thru, demo of 1 e) walk-in cooler ( w/ infill/patch remaining) no exterior work

Open the permit page

$50,000
Aug 19, 2025Completed
final sign-off Aug 2026
600 Guerrero Stti for (e) restaurant repair and remodel to bakery kitchen to add seating and type 2 exhaust hood and rooftop and lower, replace appliance . no change in floor area or occupancy . electrical permit under separte permit.
Details
Permit
202508193406
Permit issued
Apr 10, 2026
Final sign-off
Aug 25, 2026

ti for (e) restaurant repair and remodel to bakery kitchen to add seating and type 2 exhaust hood and rooftop and lower, replace appliance . no change in floor area or occupancy . electrical permit under separte permit.

Open the permit page

$66,000
Aug 12, 2025Completed
final sign-off Apr 2026
416 Cortland Avrear deck modification including removing e stairs at e deck, filling in area of e stairs with new deck area and new guard rail to match existing.
Details
Permit
202508122792
Permit issued
Jan 7, 2026
Final sign-off
Apr 30, 2026

rear deck modification including removing e stairs at e deck, filling in area of e stairs with new deck area and new guard rail to match existing.

Open the permit page

$6,890
Aug 8, 2025Completed
final sign-off Oct 2026
537 Stevenson Stprop h: change of use (e) b occupany bldg to proposed a occupancy. new elevator & sprinklers proposed under separate permits. new restrooms & modify (e) restrooms. modify stair well & demising walls per plan. installation of beverage service bars & walk-in refridgerator. no food program/kitchen.
Details
Permit
202508082687
Permit issued
Mar 4, 2026
Final sign-off
Oct 30, 2026

prop h: change of use (e) b occupany bldg to proposed a occupancy. new elevator & sprinklers proposed under separate permits. new restrooms & modify (e) restrooms. modify stair well & demising walls per plan. installation of beverage service bars & walk-in refridgerator. no food program/kitchen.

Open the permit page

$700,000
Jul 16, 2025Completed
final sign-off Oct 2025
886 Valencia Stinstall scissor gate to front of storefront
Details
Permit
202507160963
Permit issued
Jul 21, 2025
Final sign-off
Oct 7, 2025

install scissor gate to front of storefront

Open the permit page

$10,000
Jul 8, 2025Completed
final sign-off Jul 2025
885 Brannan Strestaurant, chnge of ownership, limited construction, new equipment, health permit, outdoor seating
Details
Permit
202507080353
Permit issued
Jul 16, 2025
Final sign-off
Jul 24, 2025

restaurant, chnge of ownership, limited construction, new equipment, health permit, outdoor seating

Open the permit page

$6,500
Jun 25, 2025Completed
final sign-off Apr 2026
416 Cortland Avinterior tenant improvement including the renovation of non bearing interior partitoins and finishes, modification to the lighting, modification to the electrical and data, no change to building envelope or any shear bracing walls
Details
Permit
202506259393
Permit issued
Jul 28, 2025
Final sign-off
Apr 30, 2026

interior tenant improvement including the renovation of non bearing interior partitoins and finishes, modification to the lighting, modification to the electrical and data, no change to building envelope or any shear bracing walls

Open the permit page

$394,947
May 16, 2025Completed
final sign-off Oct 2025
888 Valencia Stt.i. to existing retail space consisting of new lighting and partition wall for storage wall for storage room. replace existing sink in kind. existing storefront entrance to remain. no change in occupancy. existing common restrooms in use to remain.
Details
Permit
202505166685
Permit issued
Jun 16, 2025
Final sign-off
Oct 7, 2025

t.i. to existing retail space consisting of new lighting and partition wall for storage wall for storage room. replace existing sink in kind. existing storefront entrance to remain. no change in occupancy. existing common restrooms in use to remain.

Open the permit page

$240,000
Apr 8, 2025Completed
final sign-off Oct 2025
690 Van Ness Avtenant improvement limited to upgrading (e) toilet facility to full ada compliance. no structural or exterior work. deferred mech, electrical, plumbing and alarm
Details
Permit
202504083907
Permit issued
May 22, 2025
Final sign-off
Oct 6, 2025

tenant improvement limited to upgrading (e) toilet facility to full ada compliance. no structural or exterior work. deferred mech, electrical, plumbing and alarm

Open the permit page

$118,000
Feb 18, 2025In progress
issued Jul 2025
2900 18th Stnew operator taking over existing retail sales kiosk. work to include new counter, millwork and equipment. all accessibility including ada path of travel and accessible bathroom accommodattions constructed under previously approved ref permit 201109265463.
Details
Permit
202502180511
Permit issued
Jul 2, 2025

new operator taking over existing retail sales kiosk. work to include new counter, millwork and equipment. all accessibility including ada path of travel and accessible bathroom accommodattions constructed under previously approved ref permit 201109265463.

Open the permit page

$40,000
Feb 5, 2025Completed
final sign-off May 2025
741 Diamond Stremodel of all kitchen equipment, service counters and finishes. (n) walk in refrigerator. plumbing and mechanical work. permit performed on a design build basis as required and submitted as a separate permit
Details
Permit
202502059698
Permit issued
Apr 10, 2025
Final sign-off
May 22, 2025

remodel of all kitchen equipment, service counters and finishes. (n) walk in refrigerator. plumbing and mechanical work. permit performed on a design build basis as required and submitted as a separate permit

Open the permit page

$50,000
Jan 29, 2025Completed
final sign-off Oct 2025
605 Cortland Avreplace (e) front window w/pass thru. replace front door, new elec, new mini split, upgrade bathroom, relocate (e) non load bearing wall, new front signage, replace awning, new interior finishes, new food counter, all work w/in (e) building envelope. no structural modification.
Details
Permit
202501299318
Permit issued
May 22, 2025
Final sign-off
Oct 24, 2025

replace (e) front window w/pass thru. replace front door, new elec, new mini split, upgrade bathroom, relocate (e) non load bearing wall, new front signage, replace awning, new interior finishes, new food counter, all work w/in (e) building envelope. no structural modification.

Open the permit page

$50,000
Oct 22, 2024Completed
final sign-off Jul 2025
16 West Portal Avti of (n) restaurant from previous restaurant. interior scope of work includes new finishes. installation of tyep 1 hood and minor layout changes. new plumbing and electrical. exterior work consists of new finishes within covered patio fire sprinkler and signage under separte permit.
Details
Permit
202410223462
Permit issued
Dec 17, 2024
Final sign-off
Jul 25, 2025

ti of (n) restaurant from previous restaurant. interior scope of work includes new finishes. installation of tyep 1 hood and minor layout changes. new plumbing and electrical. exterior work consists of new finishes within covered patio fire sprinkler and signage under separte permit.

Open the permit page

$600,000
Sep 12, 2024Completed
final sign-off Sep 2024
3330 Steiner Strevision to permit 202403218311. relocate rooftop mechanical units. repair (e) floor joist system.
Details
Permit
202409120668
Permit issued
Sep 24, 2024
Final sign-off
Sep 27, 2024

revision to permit 202403218311. relocate rooftop mechanical units. repair (e) floor joist system.

Open the permit page

Mar 21, 2024Completed
final sign-off Sep 2024
3330 Steiner Stti for restaurant to include interior partion , replacing kithcen equipment and associated mep. fire protection under sepearte permit. no exterior/facade work
Details
Permit
202403218311
Permit issued
May 28, 2024
Final sign-off
Sep 27, 2024

ti for restaurant to include interior partion , replacing kithcen equipment and associated mep. fire protection under sepearte permit. no exterior/facade work

Open the permit page

$218,000
Oct 20, 2023Never finaled
issued Oct 2023, no final
701 03rd Strevision to bpa# 202304256420 (t.i. of g/f bar/restaurant), revised mechanical equipment/duct layout.
Details
Permit
202310209178
Permit issued
Oct 26, 2023

revision to bpa# 202304256420 (t.i. of g/f bar/restaurant), revised mechanical equipment/duct layout.

Open the permit page

Oct 11, 2023Completed
final sign-off Dec 2023
198 Gough Stto comply w/ accessible business entrance program per ordinance 51-16, abe# 202210315193, remove salvage front door and reinstall w/ accessible strike side clearance, remove 2-sidelights flanking front door and provide 1-new sidelight.
Details
Permit
202310118395
Permit issued
Nov 27, 2023
Final sign-off
Dec 19, 2023

to comply w/ accessible business entrance program per ordinance 51-16, abe# 202210315193, remove salvage front door and reinstall w/ accessible strike side clearance, remove 2-sidelights flanking front door and provide 1-new sidelight.

Open the permit page

$4,000
Jul 13, 2023Completed
final sign-off Oct 2023
470 Pacific Avrevision to pa# 202304206094, existing mua unit on roof to remain, associated mech, elec & lsf revisions.
Details
Permit
202307132039
Permit issued
Jul 21, 2023
Final sign-off
Oct 25, 2023

revision to pa# 202304206094, existing mua unit on roof to remain, associated mech, elec & lsf revisions.

Open the permit page

Apr 25, 2023Completed
final sign-off Mar 2024
701 03rd Strevision to pa#201910235416. t.i. of a grd flr bar & restaurant. (n) non structural partitions & finishes, lightings. millwork & kitchen equipment. includes (n) mep work associated w/ project. fire sprinklers is design/built under a separate permit.
Details
Permit
202304256420
Permit issued
Sep 5, 2023
Final sign-off
Mar 28, 2024

revision to pa#201910235416. t.i. of a grd flr bar & restaurant. (n) non structural partitions & finishes, lightings. millwork & kitchen equipment. includes (n) mep work associated w/ project. fire sprinklers is design/built under a separate permit.

Open the permit page

$244,228
Apr 20, 2023Completed
final sign-off Oct 2023
470 Pacific Avnew hearth in (e) kitchen w/associated mep (fan/flue to roof) using coal max 250 lbs storage. fire alarm/sprinklers/hood & duct suppression system all under separate permits.
Details
Permit
202304206094
Permit issued
Jun 29, 2023
Final sign-off
Oct 25, 2023

new hearth in (e) kitchen w/associated mep (fan/flue to roof) using coal max 250 lbs storage. fire alarm/sprinklers/hood & duct suppression system all under separate permits.

Open the permit page

$30,000
Apr 11, 2023Completed
final sign-off Oct 2023
701 03rd Strev to pa#2022-0907-2001: revised structural details for (n) windscreen on roof level
Details
Permit
202304115499
Permit issued
Apr 18, 2023
Final sign-off
Oct 3, 2023

rev to pa#2022-0907-2001: revised structural details for (n) windscreen on roof level

Open the permit page

Apr 5, 2023Completed
final sign-off Jul 2023
1906 Market Ste restaurant on gr fl change out equipment. revise front service counter
Details
Permit
202304055090
Permit issued
Jun 12, 2023
Final sign-off
Jul 21, 2023

e restaurant on gr fl change out equipment. revise front service counter

Open the permit page

$15,000
Jan 9, 2023Completed
final sign-off Mar 2023
3991 24th Strevision to 202204041466, sheet a2.2 only. convert area in basement for food prep
Details
Permit
202301099903
Permit issued
Feb 2, 2023
Final sign-off
Mar 16, 2023

revision to 202204041466, sheet a2.2 only. convert area in basement for food prep

Open the permit page

$30,000
Nov 22, 2022Completed
final sign-off Jun 2023
532 Columbus Avt.i. remodel (e)grond floor restaurant space, new dining room interior finishes, new dough room & remodel of (e)bar & open kitcen w/partial height walls countertops, equipment, new floor, wall & ceiling inishes, kitchen scope includes nev plumbing, elec, removal of (2)exitisng hoods & replacement
Details
Permit
202211227030
Permit issued
Dec 27, 2022
Final sign-off
Jun 7, 2023

t.i. remodel (e)grond floor restaurant space, new dining room interior finishes, new dough room & remodel of (e)bar & open kitcen w/partial height walls countertops, equipment, new floor, wall & ceiling inishes, kitchen scope includes nev plumbing, elec, removal of (2)exitisng hoods & replacement

Open the permit page

$468,090
Nov 9, 2022Completed
final sign-off Feb 2023
3560 18th Stadd single service station (cabinery and equipement-intended for health department review). cover wood trellis w/ polycarbonated sheets @ roof top dining area
Details
Permit
202211096173
Permit issued
Nov 16, 2022
Final sign-off
Feb 1, 2023

add single service station (cabinery and equipement-intended for health department review). cover wood trellis w/ polycarbonated sheets @ roof top dining area

Open the permit page

$5,000
Oct 5, 2022Completed
final sign-off Feb 2023
532 Columbus Av1st fl - select removal of interior non-structural partitions, countertops, equipment, fixtures & finishes per ab-017
Details
Permit
202210053775
Permit issued
Oct 12, 2022
Final sign-off
Feb 17, 2023

1st fl - select removal of interior non-structural partitions, countertops, equipment, fixtures & finishes per ab-017

Open the permit page

$50,000
Sep 7, 2022Completed
final sign-off Mar 2024
701 03rd Stti of an (e) roof level bar/lounge. new windscreeen on roof lvl. no mech, elec, plumbing work. no work to egress components. base bldg bpa#201605127267. related bpa#202111192789.
Details
Permit
202209072001
Permit issued
Jan 11, 2023
Final sign-off
Mar 1, 2024

ti of an (e) roof level bar/lounge. new windscreeen on roof lvl. no mech, elec, plumbing work. no work to egress components. base bldg bpa#201605127267. related bpa#202111192789.

Open the permit page

$887
Aug 31, 2022Never finaled
issued Jan 2023, no final
3621 18th Stinstall a new illuminated window sign "takeout & delivery"
Details
Permit
202208311630
Permit issued
Jan 6, 2023

install a new illuminated window sign "takeout & delivery"

Open the permit page

$750
Apr 7, 2022Completed
final sign-off Dec 2022
280 Spear Stground fl/ ste #1b t.i. non bearing interior walls- mep systems, wine bar and cabinets, brear room.
Details
Permit
202204071791
Permit issued
Jun 27, 2022
Final sign-off
Dec 21, 2022

ground fl/ ste #1b t.i. non bearing interior walls- mep systems, wine bar and cabinets, brear room.

Open the permit page

$142,000
Apr 4, 2022Completed
final sign-off Jan 2023
3991 24th Sttenant improvement: remodel (e) restaurant, replace hood, new mep.
Details
Permit
202204041466
Permit issued
Jun 30, 2022
Final sign-off
Jan 19, 2023

tenant improvement: remodel (e) restaurant, replace hood, new mep.

Open the permit page

$100,000
Mar 17, 2022Completed
final sign-off Jun 2022
3870 17th Stref pa202202087570 (exporatory demo). t.i.: dining room ceiling demo, new dining room ceiling with new interior light fixtures. replace front door with updated ada operator & buttons. reference application # 202202087570
Details
Permit
202203170224
Permit issued
Mar 23, 2022
Final sign-off
Jun 22, 2022

ref pa202202087570 (exporatory demo). t.i.: dining room ceiling demo, new dining room ceiling with new interior light fixtures. replace front door with updated ada operator & buttons. reference application # 202202087570

Open the permit page

$35,000
Mar 17, 2022Never finaled
issued May 2022, no final
4230 18th Stinstall 1 electric, single faced wall sign. (lobby bar)
Details
Permit
202203170270
Permit issued
May 17, 2022

install 1 electric, single faced wall sign. (lobby bar)

Open the permit page

$1,200
Feb 16, 2022Completed
final sign-off Apr 2022
3621 18th Stexploratory demo. demo only to be completed on ground level in main dining area. (4) 24"x24" holes at wall and ceiling. patch holes to match existing.
Details
Permit
202202168113
Permit issued
Feb 16, 2022
Final sign-off
Apr 22, 2022

exploratory demo. demo only to be completed on ground level in main dining area. (4) 24"x24" holes at wall and ceiling. patch holes to match existing.

Open the permit page

$1,000
Feb 15, 2022Expired or cancelled
withdrawn Oct 2022
3621 18th Stdemo and combine two adjacent (e) restaruant spaces that are operated by the same teant. interior remodel of dining areas, back and to-go area, new front facade window & door configuration, new skylight.
Details
Permit
202202157991

demo and combine two adjacent (e) restaruant spaces that are operated by the same teant. interior remodel of dining areas, back and to-go area, new front facade window & door configuration, new skylight.

Open the permit page

$9,000
Feb 8, 2022Completed
final sign-off Jun 2022
3870 17th Stexploratory demo, kitchen floor demo to explore plumbing option, and opening walls to explore outlets in kitchen. all holes to be filled with slurry and finishes to be replaced with same fire-rating.
Details
Permit
202202087570
Permit issued
Feb 9, 2022
Final sign-off
Jun 22, 2022

exploratory demo, kitchen floor demo to explore plumbing option, and opening walls to explore outlets in kitchen. all holes to be filled with slurry and finishes to be replaced with same fire-rating.

Open the permit page

$25,000
Jan 31, 2022Never finaled
issued Feb 2022, no final
4230 18th Strev to pa202010267436. mechanical revision to add tankless gas water heaters (2) installation per dph request.
Details
Permit
202201317004
Permit issued
Feb 2, 2022

rev to pa202010267436. mechanical revision to add tankless gas water heaters (2) installation per dph request.

Open the permit page

Oct 29, 2021Completed
final sign-off Oct 2022
1399 18th Stvent one new ventless hood using (e) exhaust and supply duct. ref to 202109108192 issued w/o health dpt approval. this permit is only for health dpt to review & no work to perform on this permit.
Details
Permit
202110291494
Permit issued
Nov 2, 2021
Final sign-off
Oct 7, 2022

vent one new ventless hood using (e) exhaust and supply duct. ref to 202109108192 issued w/o health dpt approval. this permit is only for health dpt to review & no work to perform on this permit.

Open the permit page

Sep 29, 2021Completed
final sign-off Aug 2022
1001 Minnesota Stexpansion of (e) restaurant into adj space. (n) bar & bar equip; (n) ada & non-ada unisex washrooms as req; (n) aux kitchen w/ type ii hood; (e) kitchen remodel w/ (n) type 1 hood; (n) non-load bearing walls; (n) finishes, fixtures & equip;(n) unfixed tables & chairs.
Details
Permit
202109299493
Permit issued
Mar 14, 2022
Final sign-off
Aug 12, 2022

expansion of (e) restaurant into adj space. (n) bar & bar equip; (n) ada & non-ada unisex washrooms as req; (n) aux kitchen w/ type ii hood; (e) kitchen remodel w/ (n) type 1 hood; (n) non-load bearing walls; (n) finishes, fixtures & equip;(n) unfixed tables & chairs.

Open the permit page

$300,000
Sep 29, 2021Completed
final sign-off Oct 2022
3611 18th Stcombine 2 adjacent e restaurant spaces that are operated by same tenant. interior remodel of dining area, bar, to go area. new front facade window and door configuration.
Details
Permit
202109299451
Permit issued
Mar 11, 2022
Final sign-off
Oct 14, 2022

combine 2 adjacent e restaurant spaces that are operated by same tenant. interior remodel of dining area, bar, to go area. new front facade window and door configuration.

Open the permit page

$350,000
Jul 22, 2021Completed
final sign-off Nov 2021
701 Union Stt.i. of (e) g/f: new interior non-structural partitions and finisehs, lighting, millwork and kitchen equipment. plumbing, mechanical, electricval are defrred submittal.
Details
Permit
202107224895
Permit issued
Jul 22, 2021
Final sign-off
Nov 19, 2021

t.i. of (e) g/f: new interior non-structural partitions and finisehs, lighting, millwork and kitchen equipment. plumbing, mechanical, electricval are defrred submittal.

Open the permit page

$30,000
Jun 7, 2021Completed
final sign-off Jul 2022
1540 Mission Stinterior fit out of (e) retail tenant space for full service restaurant including partitions, ceiling, finishes, and mep
Details
Permit
202106071834
Permit issued
Oct 12, 2021
Final sign-off
Jul 19, 2022

interior fit out of (e) retail tenant space for full service restaurant including partitions, ceiling, finishes, and mep

Open the permit page

$2,273,000
May 6, 2021Expired or cancelled
cancelled Jan 2026
725 Grant Avinstall new roll down door at grant avenue entry with mechanism hidden inside wall and the gate is 75% open metal link
Details
Permit
202105069934

install new roll down door at grant avenue entry with mechanism hidden inside wall and the gate is 75% open metal link

Open the permit page

$5,000
Mar 1, 2021Completed
final sign-off Mar 2022
3157 Fillmore Stref. bpa#201908138701 & 201912311098 previously approved work, construct one wall to divide the interior back of house space & other to separate the restroom from the rest of the plan. includes new interior finishes/furnishings/equipment, mep's included. fire spirnkler/f.a. deferred.
Details
Permit
202103015588
Permit issued
Aug 20, 2021
Final sign-off
Mar 18, 2022

ref. bpa#201908138701 & 201912311098 previously approved work, construct one wall to divide the interior back of house space & other to separate the restroom from the rest of the plan. includes new interior finishes/furnishings/equipment, mep's included. fire spirnkler/f.a. deferred.

Open the permit page

$75,000
Feb 10, 2021Completed
final sign-off Jan 2022
355 11th Sttenant improvement of (e) ground flr restaurant dining area. no additions/alterations to (e) back of house kitchen or exterior. (n) non-structural partitions & finishes. replacing (e) light fixtures in dining area. mep/sprinkler under separate permit.
Details
Permit
202102104342
Permit issued
May 18, 2021
Final sign-off
Jan 21, 2022

tenant improvement of (e) ground flr restaurant dining area. no additions/alterations to (e) back of house kitchen or exterior. (n) non-structural partitions & finishes. replacing (e) light fixtures in dining area. mep/sprinkler under separate permit.

Open the permit page

$20,000
Feb 9, 2021Completed
final sign-off Feb 2021
554 Commercial Stto obtain final inspsection for work approved under permit application no:201701318316.
Details
Permit
202102094328
Permit issued
Feb 10, 2021
Final sign-off
Feb 23, 2021

to obtain final inspsection for work approved under permit application no:201701318316.

Open the permit page

$34,500
Feb 1, 2021Never finaled
issued Apr 2021, no final
2406 California Stinstall non electric double faced metal blade projecting sign: "pizzeria delfina"
Details
Permit
202102013729
Permit issued
Apr 28, 2021

install non electric double faced metal blade projecting sign: "pizzeria delfina"

Open the permit page

$800
Jan 14, 2021Completed
final sign-off Jun 2023
694 Valencia Strevision to pa#2020-0114-1881. structural drawings to support new mechanical units and revised structural drawings to accommodate existing conditions. also deffered mechanical permit for pa202001141881. maher n/a.
Details
Permit
202101142674
Permit issued
Apr 20, 2021
Final sign-off
Jun 29, 2023

revision to pa#2020-0114-1881. structural drawings to support new mechanical units and revised structural drawings to accommodate existing conditions. also deffered mechanical permit for pa202001141881. maher n/a.

Open the permit page

$30,000
Jan 13, 2021Completed
final sign-off Oct 2021
1399 Church Streplace (e) window with a new window, frame,size,opening to remain the same glas color to remain the same (front)
Details
Permit
202101132558
Permit issued
May 20, 2021
Final sign-off
Oct 13, 2021

replace (e) window with a new window, frame,size,opening to remain the same glas color to remain the same (front)

Open the permit page

$5,000
Nov 20, 2020Completed
final sign-off Apr 2022
2875 18th Stupgrade of (e) shell building commercial space into restaurant and bar with full kitchen facilities
Details
Permit
202011209352
Permit issued
Jun 23, 2021
Final sign-off
Apr 20, 2022

upgrade of (e) shell building commercial space into restaurant and bar with full kitchen facilities

Open the permit page

$250,000
Nov 13, 2020Completed
final sign-off Jan 2022
2406 California Stinterior remodel to reduce seating and increase retail pick-up area, window replacement, bathroom barrier removal, remove 1 bathroom, add counter space. new storefront and awning per plans.
Details
Permit
202011138899
Permit issued
Jan 21, 2021
Final sign-off
Jan 13, 2022

interior remodel to reduce seating and increase retail pick-up area, window replacement, bathroom barrier removal, remove 1 bathroom, add counter space. new storefront and awning per plans.

Open the permit page

$200,000
Oct 26, 2020Completed
final sign-off Apr 2022
4230 18th Stfirst time tenant improvement restaurant for ground floor; interior fixtures, furnishings, and equipment, interior finishes for the lobby, resturant, kitchen and bathroom, limited to level1. core and shell under separated permit #2018-0111-8381.
Details
Permit
202010267436
Permit issued
Jul 2, 2021
Final sign-off
Apr 18, 2022

first time tenant improvement restaurant for ground floor; interior fixtures, furnishings, and equipment, interior finishes for the lobby, resturant, kitchen and bathroom, limited to level1. core and shell under separated permit #2018-0111-8381.

Open the permit page

$148,000
Oct 24, 2020Never finaled
issued Jan 2021, no final
198 Gough Stinstall a security gate at storefront vestibule.
Details
Permit
202010247355
Permit issued
Jan 25, 2021

install a security gate at storefront vestibule.

Open the permit page

$5,000
Jun 22, 2020Completed
final sign-off Oct 2020
705 Divisadero Stretro-fit existing window to be operable, size of frame remains, replacing glass, color will remain same.
Details
Permit
202006228990
Permit issued
Jun 25, 2020
Final sign-off
Oct 14, 2020

retro-fit existing window to be operable, size of frame remains, replacing glass, color will remain same.

Open the permit page

$3,500
Feb 13, 2020Expired or cancelled
cancelled Jul 2024
833 22nd Stscope of work shall include a change of use and all work necessary for the construction of a new restaurant. work shall inlcude new kitchen equipment, lighting, bathrooms, finishes, load bearing & non loading bearing walls, accesible ramp, type-1 hood w/ exhaust to roof.
Details
Permit
202002134465

scope of work shall include a change of use and all work necessary for the construction of a new restaurant. work shall inlcude new kitchen equipment, lighting, bathrooms, finishes, load bearing & non loading bearing walls, accesible ramp, type-1 hood w/ exhaust to roof.

Open the permit page

$450,000
Dec 19, 2019Completed
final sign-off Aug 2020
1740 Ofarrell Stti: interior construction of restaurant, new finishes in dining room & bar. new restrooms, bar and kitchen.
Details
Permit
201912190025
Permit issued
Jan 30, 2020
Final sign-off
Aug 26, 2020

ti: interior construction of restaurant, new finishes in dining room & bar. new restrooms, bar and kitchen.

Open the permit page

$72,528
Sep 23, 2019Completed
final sign-off Mar 2020
4055 Irving Strev to pa: 201906183725: remodel interior replace (e) structural post. add new footing for post.
Details
Permit
201909232404
Permit issued
Sep 23, 2019
Final sign-off
Mar 27, 2020

rev to pa: 201906183725: remodel interior replace (e) structural post. add new footing for post.

Open the permit page

$10,000
Sep 19, 2019Completed
final sign-off Aug 2020
1890 Bryant Stexterior entry court scope of work only - include repair/replace existing exterior fence & entry gate. maher na
Details
Permit
201909192193
Permit issued
Jan 17, 2020
Final sign-off
Aug 13, 2020

exterior entry court scope of work only - include repair/replace existing exterior fence & entry gate. maher na

Open the permit page

$18,000
Sep 18, 2019Completed
final sign-off Aug 2020
1890 Bryant Stti to (e) a-2 restaurant. new operator taking over (e) restaurant, work to include - remodel kitchen & bar, new hvac and ele/lighting. no change of occupancy bld is fully sprinklered.
Details
Permit
201909182012
Permit issued
Feb 20, 2020
Final sign-off
Aug 13, 2020

ti to (e) a-2 restaurant. new operator taking over (e) restaurant, work to include - remodel kitchen & bar, new hvac and ele/lighting. no change of occupancy bld is fully sprinklered.

Open the permit page

$220,000
Sep 6, 2019Never finaled
issued Oct 2019, no final
2043 Fillmore Stfor dept of health review only due to omitted routing for pa 201811307113. no work conducted under this permit. maher n/a.
Details
Permit
201909060851
Permit issued
Oct 17, 2019

for dept of health review only due to omitted routing for pa 201811307113. no work conducted under this permit. maher n/a.

Open the permit page

Aug 27, 2019Completed
final sign-off Dec 2019
517 Clement Strevision to app#201906143500. tank type toilet in new ada restroom instead of previously approved wall mounted toilet. no other changes to scope- toilet spec change only.
Details
Permit
201908279993
Permit issued
Aug 30, 2019
Final sign-off
Dec 5, 2019

revision to app#201906143500. tank type toilet in new ada restroom instead of previously approved wall mounted toilet. no other changes to scope- toilet spec change only.

Open the permit page

Jul 31, 2019Completed
final sign-off Aug 2020
300 Grove Stdemo of interior non structural paritions and associated mech, ele, plumbing work gr and 2nd fl of 2 story building. demo of e roofing and roof mounted equipment. all work to comply with ab-017 providing full accessibilty in future permits. ti sep permit. maher not req
Details
Permit
201907317434
Permit issued
Jul 31, 2019
Final sign-off
Aug 7, 2020

demo of interior non structural paritions and associated mech, ele, plumbing work gr and 2nd fl of 2 story building. demo of e roofing and roof mounted equipment. all work to comply with ab-017 providing full accessibilty in future permits. ti sep permit. maher not req

Open the permit page

$40,000
Jul 18, 2019Completed
final sign-off Oct 2020
300 Grove Sttenant improvement "baia" of existing 2 story restaurant. storefront, new interior non-structural partitions, finishes/casework, lighting and new kitchen equipment. all mechanical, electrical and plumbing work under separate design/build permit. new door
Details
Permit
201907186327
Permit issued
Dec 20, 2019
Final sign-off
Oct 13, 2020

tenant improvement "baia" of existing 2 story restaurant. storefront, new interior non-structural partitions, finishes/casework, lighting and new kitchen equipment. all mechanical, electrical and plumbing work under separate design/build permit. new door

Open the permit page

$300,000
Jun 18, 2019Completed
final sign-off Mar 2020
4055 Irving Stremodel interior, add accessible water closet, return facade to original condition. (e) mechanical & lighting systems to remain.
Details
Permit
201906183725
Permit issued
Jul 22, 2019
Final sign-off
Mar 27, 2020

remodel interior, add accessible water closet, return facade to original condition. (e) mechanical & lighting systems to remain.

Open the permit page

$50,000
Jun 14, 2019Completed
final sign-off Sep 2019
2043 Fillmore Stinstallation of duct work and exhaust fan for pizza oven. ref app#201903256155
Details
Permit
201906143451
Permit issued
Jun 21, 2019
Final sign-off
Sep 5, 2019

installation of duct work and exhaust fan for pizza oven. ref app#201903256155

Open the permit page

$5,000
Jun 14, 2019Completed
final sign-off Dec 2019
517 Clement Sttenant improvement & change of use to new restaurant. work includes finishes, lighting, kitchen equipment, and storefront renovations.
Details
Permit
201906143500
Permit issued
Jul 31, 2019
Final sign-off
Dec 5, 2019

tenant improvement & change of use to new restaurant. work includes finishes, lighting, kitchen equipment, and storefront renovations.

Open the permit page

$251,000
May 31, 2019Completed
final sign-off Jun 2019
1226 09th Avto obtain final inspection for work approved under pa# 201604154918
Details
Permit
201905312105
Permit issued
May 31, 2019
Final sign-off
Jun 6, 2019

to obtain final inspection for work approved under pa# 201604154918

Open the permit page

May 24, 2019Completed
final sign-off Jun 2019
1226 09th Avchange of use. convert (e) "limited restaurant" to a bonafide "restaurant" w/ nfs documentation. no changes are propsed to design or layout.
Details
Permit
201905241645
Permit issued
May 31, 2019
Final sign-off
Jun 6, 2019

change of use. convert (e) "limited restaurant" to a bonafide "restaurant" w/ nfs documentation. no changes are propsed to design or layout.

Open the permit page

May 8, 2019Completed
final sign-off Feb 2020
155 Montgomery Stsuite 151:new food service. demo and ti of flooring, ceiling, finishes, etc. new equipment and lighting. plumbing and elec
Details
Permit
201905080140
Permit issued
Jun 25, 2019
Final sign-off
Feb 21, 2020

suite 151:new food service. demo and ti of flooring, ceiling, finishes, etc. new equipment and lighting. plumbing and elec

Open the permit page

$100,000
Apr 30, 2019Completed
final sign-off Oct 2019
524 Post Streplace (e) accoustic tile ceiling gride/tile, light fixtures, mech supply grilles, sprinkler head covers in (e) kitchen. no change to (e) equip layout, mech systems or sprinkler lines
Details
Permit
201904309304
Permit issued
Jul 3, 2019
Final sign-off
Oct 25, 2019

replace (e) accoustic tile ceiling gride/tile, light fixtures, mech supply grilles, sprinkler head covers in (e) kitchen. no change to (e) equip layout, mech systems or sprinkler lines

Open the permit page

$20,000
Apr 24, 2019Completed
final sign-off Aug 2019
308 Broderick Stadd new partitions in existing restuarant space, add food service equipment under (e) hood. (e) hvac system to remain
Details
Permit
201904248803
Permit issued
May 17, 2019
Final sign-off
Aug 9, 2019

add new partitions in existing restuarant space, add food service equipment under (e) hood. (e) hvac system to remain

Open the permit page

$50,000
Apr 18, 2019Never finaled
issued May 2019, no final
108 South Parkref pa 201904107620; tenant improvement, refurbishing equipment
Details
Permit
201904188416
Permit issued
May 1, 2019

ref pa 201904107620; tenant improvement, refurbishing equipment

Open the permit page

Apr 10, 2019Completed
final sign-off Jul 2019
108 South Parknew finishes, new countertop, reconfigure bathrooms,
Details
Permit
201904107620
Permit issued
Apr 18, 2019
Final sign-off
Jul 26, 2019

new finishes, new countertop, reconfigure bathrooms,

Open the permit page

$125,000
Mar 27, 2019Completed
final sign-off Sep 2019
35 Kearny St1st flr, build out kitchen and dining area, build out basement prep kitchen, dishwasher, storage and restroom
Details
Permit
201903276333
Permit issued
May 8, 2019
Final sign-off
Sep 11, 2019

1st flr, build out kitchen and dining area, build out basement prep kitchen, dishwasher, storage and restroom

Open the permit page

$90,000
Mar 26, 2019Completed
final sign-off May 2019
702 Valencia Stprovide new type 2 hood for new pizza oven.
Details
Permit
201903266205
Permit issued
Apr 2, 2019
Final sign-off
May 20, 2019

provide new type 2 hood for new pizza oven.

Open the permit page

$5,000
Mar 25, 2019Completed
final sign-off Sep 2019
2043 Fillmore Strevision to pa 2018-1130-7113 mezzanine layout. elimination of partition wall & dry closet expansion
Details
Permit
201903256155
Permit issued
Jun 14, 2019
Final sign-off
Sep 10, 2019

revision to pa 2018-1130-7113 mezzanine layout. elimination of partition wall & dry closet expansion

Open the permit page

$15,000
Mar 21, 2019Completed
final sign-off Oct 2019
3560 18th Stadd accessible seating @ (e) bar, add accessible seating @ (e) counter, reconfigure bathroom for accessibility, limited updates & repair to commercial kitchen equipment & finishes
Details
Permit
201903215902
Permit issued
Apr 8, 2019
Final sign-off
Oct 23, 2019

add accessible seating @ (e) bar, add accessible seating @ (e) counter, reconfigure bathroom for accessibility, limited updates & repair to commercial kitchen equipment & finishes

Open the permit page

$200,000
Mar 14, 2019Expired or cancelled
cancelled Jan 2026
108 South Parkrevision to pa 201812218952. remove and replace flooring, adjust bar to add ada seating and paint walls. electrical and plumbing under seperate permits.
Details
Permit
201903145176

revision to pa 201812218952. remove and replace flooring, adjust bar to add ada seating and paint walls. electrical and plumbing under seperate permits.

Open the permit page

$40,000
Feb 15, 2019Completed
final sign-off Oct 2019
3560 18th Stremoval of select interior finishes and equipment. n/a for maher
Details
Permit
201902153152
Permit issued
Feb 19, 2019
Final sign-off
Oct 23, 2019

removal of select interior finishes and equipment. n/a for maher

Open the permit page

$18,000
Feb 12, 2019Never finaled
issued Jun 2019, no final
308 Broderick Stoutdoor seating only: sidewalk tables & chairs on (e) market hall. no construction or work to be done. outdoor electric heaters attached to facade under awning.
Details
Permit
201902122700
Permit issued
Jun 6, 2019

outdoor seating only: sidewalk tables & chairs on (e) market hall. no construction or work to be done. outdoor electric heaters attached to facade under awning.

Open the permit page

Feb 7, 2019Completed
final sign-off May 2019
702 Valencia Stminimal changes to be made to both food prep areas. including installation of new services station, pizza deck over, and dough prep line and some new light fixtures to replace existing. no ext changes. update (e) ada bathrooms to current code requirements.
Details
Permit
201902072297
Permit issued
Feb 19, 2019
Final sign-off
May 22, 2019

minimal changes to be made to both food prep areas. including installation of new services station, pizza deck over, and dough prep line and some new light fixtures to replace existing. no ext changes. update (e) ada bathrooms to current code requirements.

Open the permit page

$60,000
Feb 6, 2019Never finaled
issued Feb 2019, no final
387 Arguello Blpainting for non-structural sign (breck's)
Details
Permit
201902062286
Permit issued
Feb 11, 2019

painting for non-structural sign (breck's)

Open the permit page

$250
Feb 6, 2019Never finaled
issued Feb 2019, no final
387 Arguello Blinstallation of new awnings to replace former extg awnings.
Details
Permit
201902062283
Permit issued
Feb 11, 2019

installation of new awnings to replace former extg awnings.

Open the permit page

$7,500