Permit GraphShortlistSan Francisco building permits since 2000

Block 1763, lot 039

1300 09th Ave

City’s use
Commercial Retail
Built
1917
Stories
1
Units
4
Rooms
4 bathrooms
Building
6,875 sq ft
Lot
6,873 sq ft
Zoning
NC2
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

17 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jan 2, 2026Completed
final sign-off Jan 2026
1300 09th Avreplace existing jamba juice fabric on existing awnings with new fabric with signs: "gourmet sandwiches, salads & potato puffs" on both irving st. and 9th ave sides.
Details
Permit
202601023172
Status
complete
Filed
Jan 2, 2026
Permit issued
Jan 9, 2026
Final sign-off
Jan 13, 2026
Declared cost
$2,300
Address
1300 09th Av

replace existing jamba juice fabric on existing awnings with new fabric with signs: "gourmet sandwiches, salads & potato puffs" on both irving st. and 9th ave sides.

Open the permit page

$2,300
Jan 2, 2026Completed
final sign-off Jan 2026
1300 09th Avinstall (2) non-electric wall logo signs: "gregoire" above main doorway/entrance on both irving st. and 9th ave sides.
Details
Permit
202601023170
Status
complete
Filed
Jan 2, 2026
Permit issued
Jan 9, 2026
Final sign-off
Jan 13, 2026
Declared cost
$1,000
Address
1300 09th Av

install (2) non-electric wall logo signs: "gregoire" above main doorway/entrance on both irving st. and 9th ave sides.

Open the permit page

$1,000
Jan 2, 2026Completed
final sign-off Jan 2026
1300 09th AvCookline Construction Incremove existing jamba juice signs
Details
Permit
202601023168
Status
complete
Filed
Jan 2, 2026
Permit issued
Jan 9, 2026
Final sign-off
Jan 13, 2026
Declared cost
$2,000
Address
1300 09th Av

remove existing jamba juice signs

Open the permit page

$2,000
Jan 2, 2026Completed
final sign-off Mar 2026
1300 09th AvSign City Designsinstall (1) non-electric wall logo sign: "gregoire, home of the potato puff" on 9th ave.
Details
Permit
202601023173
Status
complete
Filed
Jan 2, 2026
Permit issued
Jan 9, 2026
Final sign-off
Mar 27, 2026
Declared cost
$4,500
Address
1300 09th Av

install (1) non-electric wall logo sign: "gregoire, home of the potato puff" on 9th ave.

Open the permit page

$4,500
Dec 16, 2025Completed
final sign-off Jan 2026
1300 09th AvInternational Fire Equipment Co Incorporinstall ul300 fire system for hood, duct and cook line protection
Details
Permit
202512161847
Status
complete
Filed
Dec 16, 2025
Permit issued
Dec 16, 2025
Final sign-off
Jan 8, 2026
Declared cost
$6,500
Address
1300 09th Av

install ul300 fire system for hood, duct and cook line protection

Open the permit page

$6,500
Aug 21, 2025Completed
final sign-off Jan 2026
1300 09th AvCookline Construction Inct.i. of e) gutted restaurant space for new restaurant. work included install of all new food service equipment, partial updated interior, finishes thru, demo of 1 e) walk-in cooler ( w/ infill/patch remaining) no exterior work
Details
Permit
202508213635
Status
complete
Filed
Aug 21, 2025
Permit issued
Oct 9, 2025
Final sign-off
Jan 13, 2026
Declared cost
$50,000
Address
1300 09th Av

t.i. of e) gutted restaurant space for new restaurant. work included install of all new food service equipment, partial updated interior, finishes thru, demo of 1 e) walk-in cooler ( w/ infill/patch remaining) no exterior work

Open the permit page

$50,000
Jun 17, 2020Never finaled
issued Jun 2020, no final
1300 09th Avstreet space
Details
Permit
M1211287
Status
issued
Filed
Jun 17, 2020
Permit issued
Jun 19, 2020
Address
1300 09th Av

street space

Open the permit page

May 26, 2020Expired or cancelled
cancelled Jan 2026
1300 09th Avreplace damaged wood strip moldings caulking seal and paint store front.
Details
Permit
202005267790
Status
cancelled
Filed
May 26, 2020
Declared cost
$38,400
Address
1300 09th Av

replace damaged wood strip moldings caulking seal and paint store front.

Open the permit page

$38,400
Aug 19, 2013Never finaled
issued Aug 2013, no final
1310 09th Avstreet space
Details
Permit
M418187
Status
issued
Filed
Aug 19, 2013
Permit issued
Aug 19, 2013
Address
1310 09th Av

street space

Open the permit page

May 26, 2006Completed
final sign-off Jun 2006
1310 09th AvK.H. Lee Companyreroofing.
Details
Permit
200605262655
Status
complete
Filed
May 26, 2006
Permit issued
May 26, 2006
Final sign-off
Jun 13, 2006
Declared cost
$9,575
Address
1310 09th Av

reroofing.

Open the permit page

$9,575
Jun 20, 2005Never finaled
issued Jun 2005, no final
1300 09th Avto renew pa#2005/01/19/3559
Details
Permit
200506205479
Status
issued
Filed
Jun 20, 2005
Permit issued
Jun 20, 2005
Declared cost
$900
Address
1300 09th Av

to renew pa#2005/01/19/3559

Open the permit page

$900
Jun 7, 2005Completed
final sign-off Jun 2005
1300 09th AvHenley Constructionrenew pa no. 200407098444-200408272779 for final
Details
Permit
200506074471
Status
complete
Filed
Jun 7, 2005
Permit issued
Jun 7, 2005
Final sign-off
Jun 15, 2005
Declared cost
$1,000
Address
1300 09th Av

renew pa no. 200407098444-200408272779 for final

Open the permit page

$1,000
Jan 19, 2005Never finaled
issued Jan 2005, no final
1300 09th AvInternational Sign Identitieserect a single faced non-electric wall sign
Details
Permit
200501193556
Status
issued
Filed
Jan 19, 2005
Permit issued
Jan 19, 2005
Address
1300 09th Av

erect a single faced non-electric wall sign

Open the permit page

Jan 19, 2005Never finaled
issued Jan 2005, no final
1300 09th AvInternational Sign Identitieserect a double faced projecting non electric sign
Details
Permit
200501193559
Status
issued
Filed
Jan 19, 2005
Permit issued
Jan 19, 2005
Address
1300 09th Av

erect a double faced projecting non electric sign

Open the permit page

Aug 27, 2004Never finaled
issued Aug 2004, no final
1300 09th Avrev. topa#2004/07/09/8444 - scope of this rev. is to docucment the (e) push button door
Details
Permit
200408272779
Status
issued
Filed
Aug 27, 2004
Permit issued
Aug 27, 2004
Declared cost
$2,000
Address
1300 09th Av

rev. topa#2004/07/09/8444 - scope of this rev. is to docucment the (e) push button door

Open the permit page

$2,000
Jul 9, 2004Never finaled
issued Jul 2004, no final
1300 09th Avremodel (e)jamba juice,install (n)wall w/(n) door to seperate front & back of store.relocate manager
Details
Permit
200407098444
Status
issued
Filed
Jul 9, 2004
Permit issued
Jul 9, 2004
Declared cost
$20,000
Address
1300 09th Av

remodel (e)jamba juice,install (n)wall w/(n) door to seperate front & back of store.relocate manager

Open the permit page

$20,000
Feb 19, 2003Never finaled
issued Feb 2003, no final
1310 09th Avsidewalk repair
Details
Permit
M22924
Status
issued
Filed
Feb 19, 2003
Permit issued
Feb 19, 2003
Address
1310 09th Av

sidewalk repair

Open the permit page

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Cookline Construction Inc (2), International Sign Identities (2), Henley Construction, International Fire Equipment Co Incorpor, K.H. Lee Company, Sign City Designs
Architects
Stuart Hills
Designers
Peter Duerigen

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.