Cookline Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2015 to Sep 2026
- Last 24 months
- 29 permits filed
141 permits since 2000: 103 completed, 12 in progress, 21 never finaled, 5 expired or cancelled.
Of the 21 never-finaled permits, 3 are 3 to 5 years old, 18 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 80 days from filing to permit and 102 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 12, 2025 | Completed final sign-off Apr 2026 | 416 Cortland Av | rear deck modification including removing e stairs at e deck, filling in area of e stairs with new deck area and new guard rail to match existing.Details
rear deck modification including removing e stairs at e deck, filling in area of e stairs with new deck area and new guard rail to match existing. | $6,890 |
| Feb 7, 2019 | Completed final sign-off May 2019 | 702 Valencia St | minimal changes to be made to both food prep areas. including installation of new services station, pizza deck over, and dough prep line and some new light fixtures to replace existing. no ext changes. update (e) ada bathrooms to current code requirements.Details
minimal changes to be made to both food prep areas. including installation of new services station, pizza deck over, and dough prep line and some new light fixtures to replace existing. no ext changes. update (e) ada bathrooms to current code requirements. | $60,000 |