Back to bathroom remodel contractors
Cookline Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2015 to Sep 2026
- Last 24 months
- 29 permits filed
141 permits since 2000: 103 completed, 12 in progress, 21 never finaled, 5 expired or cancelled.
Of the 21 never-finaled permits, 3 are 3 to 5 years old, 18 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 7 completed, 3 in progress, 1 expired or cancelled. Typically 56 days from filing to permit and 155 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 27, 2026 | In progress issued Sep 2026 | 130 Clement St | commercial interior t.i. remodel existing retail space with new flr and ceiling treatments, finishes, furniture, millwork and limited partitions changes. replace facade windows and door in kind. add show kithen. modify existing bathroom for barrier removal (grab bars).Details
commercial interior t.i. remodel existing retail space with new flr and ceiling treatments, finishes, furniture, millwork and limited partitions changes. replace facade windows and door in kind. add show kithen. modify existing bathroom for barrier removal (grab bars). | $100,000 |
| Feb 2, 2026 | In progress issued May 2026 | 82 14th St | add second floor addition 897 sf to an (e) restaurant.to add storage,seating, and supplemental kitchen area.add (n) stair access/egress fire,new 1hrrated walls and ceiling/roof assembly,interior finisehes,new mep construction for kitchen/roof mounted equipment.ada baths by 2019 code.f/s sep permit.Details
add second floor addition 897 sf to an (e) restaurant.to add storage,seating, and supplemental kitchen area.add (n) stair access/egress fire,new 1hrrated walls and ceiling/roof assembly,interior finisehes,new mep construction for kitchen/roof mounted equipment.ada baths by 2019 code.f/s sep permit. | $400,000 |
| Sep 22, 2025 | Completed final sign-off Nov 2025 | 2240 Mission St | change tile in customer bathrooms, (n) equipment at bar, remove (e) cabinets and replace with table and change countertops. replace wood wall panel like for like. change out fixtures and finishes like for like all work in kind.Details
change tile in customer bathrooms, (n) equipment at bar, remove (e) cabinets and replace with table and change countertops. replace wood wall panel like for like. change out fixtures and finishes like for like all work in kind. | $20,000 |
| Feb 18, 2025 | In progress issued Jul 2025 | 2900 18th St | new operator taking over existing retail sales kiosk. work to include new counter, millwork and equipment. all accessibility including ada path of travel and accessible bathroom accommodattions constructed under previously approved ref permit 201109265463.Details
new operator taking over existing retail sales kiosk. work to include new counter, millwork and equipment. all accessibility including ada path of travel and accessible bathroom accommodattions constructed under previously approved ref permit 201109265463. | $40,000 |
| Jan 29, 2025 | Completed final sign-off Oct 2025 | 605 Cortland Av | replace (e) front window w/pass thru. replace front door, new elec, new mini split, upgrade bathroom, relocate (e) non load bearing wall, new front signage, replace awning, new interior finishes, new food counter, all work w/in (e) building envelope. no structural modification.Details
replace (e) front window w/pass thru. replace front door, new elec, new mini split, upgrade bathroom, relocate (e) non load bearing wall, new front signage, replace awning, new interior finishes, new food counter, all work w/in (e) building envelope. no structural modification. | $50,000 |
| Nov 13, 2020 | Completed final sign-off Jan 2022 | 2406 California St | interior remodel to reduce seating and increase retail pick-up area, window replacement, bathroom barrier removal, remove 1 bathroom, add counter space. new storefront and awning per plans.Details
interior remodel to reduce seating and increase retail pick-up area, window replacement, bathroom barrier removal, remove 1 bathroom, add counter space. new storefront and awning per plans. | $200,000 |
| Oct 26, 2020 | Completed final sign-off Apr 2022 | 4230 18th St | first time tenant improvement restaurant for ground floor; interior fixtures, furnishings, and equipment, interior finishes for the lobby, resturant, kitchen and bathroom, limited to level1. core and shell under separated permit #2018-0111-8381.Details
first time tenant improvement restaurant for ground floor; interior fixtures, furnishings, and equipment, interior finishes for the lobby, resturant, kitchen and bathroom, limited to level1. core and shell under separated permit #2018-0111-8381. | $148,000 |
| Feb 13, 2020 | Expired or cancelled cancelled Jul 2024 | 833 22nd St | scope of work shall include a change of use and all work necessary for the construction of a new restaurant. work shall inlcude new kitchen equipment, lighting, bathrooms, finishes, load bearing & non loading bearing walls, accesible ramp, type-1 hood w/ exhaust to roof.Details
scope of work shall include a change of use and all work necessary for the construction of a new restaurant. work shall inlcude new kitchen equipment, lighting, bathrooms, finishes, load bearing & non loading bearing walls, accesible ramp, type-1 hood w/ exhaust to roof. | $450,000 |
| Apr 10, 2019 | Completed final sign-off Jul 2019 | 108 South Park | new finishes, new countertop, reconfigure bathrooms,Details
new finishes, new countertop, reconfigure bathrooms, | $125,000 |
| Mar 21, 2019 | Completed final sign-off Oct 2019 | 3560 18th St | add accessible seating @ (e) bar, add accessible seating @ (e) counter, reconfigure bathroom for accessibility, limited updates & repair to commercial kitchen equipment & finishesDetails
add accessible seating @ (e) bar, add accessible seating @ (e) counter, reconfigure bathroom for accessibility, limited updates & repair to commercial kitchen equipment & finishes | $200,000 |
| Feb 7, 2019 | Completed final sign-off May 2019 | 702 Valencia St | minimal changes to be made to both food prep areas. including installation of new services station, pizza deck over, and dough prep line and some new light fixtures to replace existing. no ext changes. update (e) ada bathrooms to current code requirements.Details
minimal changes to be made to both food prep areas. including installation of new services station, pizza deck over, and dough prep line and some new light fixtures to replace existing. no ext changes. update (e) ada bathrooms to current code requirements. | $60,000 |