Back to kitchen remodel contractors
Cookline Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2015 to Sep 2026
- Last 24 months
- 29 permits filed
141 permits since 2000: 103 completed, 12 in progress, 21 never finaled, 5 expired or cancelled.
Of the 21 never-finaled permits, 3 are 3 to 5 years old, 18 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
30 kitchen remodel permits: 27 completed, 2 in progress, 1 expired or cancelled. Typically 71 days from filing to permit and 196 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 2, 2026 | In progress issued May 2026 | 82 14th St | add second floor addition 897 sf to an (e) restaurant.to add storage,seating, and supplemental kitchen area.add (n) stair access/egress fire,new 1hrrated walls and ceiling/roof assembly,interior finisehes,new mep construction for kitchen/roof mounted equipment.ada baths by 2019 code.f/s sep permit.Details
add second floor addition 897 sf to an (e) restaurant.to add storage,seating, and supplemental kitchen area.add (n) stair access/egress fire,new 1hrrated walls and ceiling/roof assembly,interior finisehes,new mep construction for kitchen/roof mounted equipment.ada baths by 2019 code.f/s sep permit. | $400,000 |
| Aug 19, 2025 | Completed final sign-off Aug 2026 | 600 Guerrero St | ti for (e) restaurant repair and remodel to bakery kitchen to add seating and type 2 exhaust hood and rooftop and lower, replace appliance . no change in floor area or occupancy . electrical permit under separte permit.Details
ti for (e) restaurant repair and remodel to bakery kitchen to add seating and type 2 exhaust hood and rooftop and lower, replace appliance . no change in floor area or occupancy . electrical permit under separte permit. | $66,000 |
| Aug 8, 2025 | In progress issued Mar 2026 | 537 Stevenson St | prop h: change of use (e) b occupany bldg to proposed a occupancy. new elevator & sprinklers proposed under separate permits. new restrooms & modify (e) restrooms. modify stair well & demising walls per plan. installation of beverage service bars & walk-in refridgerator. no food program/kitchen.Details
prop h: change of use (e) b occupany bldg to proposed a occupancy. new elevator & sprinklers proposed under separate permits. new restrooms & modify (e) restrooms. modify stair well & demising walls per plan. installation of beverage service bars & walk-in refridgerator. no food program/kitchen. | $700,000 |
| Feb 5, 2025 | Completed final sign-off May 2025 | 741 Diamond St | remodel of all kitchen equipment, service counters and finishes. (n) walk in refrigerator. plumbing and mechanical work. permit performed on a design build basis as required and submitted as a separate permitDetails
remodel of all kitchen equipment, service counters and finishes. (n) walk in refrigerator. plumbing and mechanical work. permit performed on a design build basis as required and submitted as a separate permit | $50,000 |
| Apr 25, 2023 | Completed final sign-off Mar 2024 | 701 03rd St | revision to pa#201910235416. t.i. of a grd flr bar & restaurant. (n) non structural partitions & finishes, lightings. millwork & kitchen equipment. includes (n) mep work associated w/ project. fire sprinklers is design/built under a separate permit.Details
revision to pa#201910235416. t.i. of a grd flr bar & restaurant. (n) non structural partitions & finishes, lightings. millwork & kitchen equipment. includes (n) mep work associated w/ project. fire sprinklers is design/built under a separate permit. | $244,228 |
| Apr 20, 2023 | Completed final sign-off Oct 2023 | 470 Pacific Av | new hearth in (e) kitchen w/associated mep (fan/flue to roof) using coal max 250 lbs storage. fire alarm/sprinklers/hood & duct suppression system all under separate permits.Details
new hearth in (e) kitchen w/associated mep (fan/flue to roof) using coal max 250 lbs storage. fire alarm/sprinklers/hood & duct suppression system all under separate permits. | $30,000 |
| Nov 22, 2022 | Completed final sign-off Jun 2023 | 532 Columbus Av | t.i. remodel (e)grond floor restaurant space, new dining room interior finishes, new dough room & remodel of (e)bar & open kitcen w/partial height walls countertops, equipment, new floor, wall & ceiling inishes, kitchen scope includes nev plumbing, elec, removal of (2)exitisng hoods & replacementDetails
t.i. remodel (e)grond floor restaurant space, new dining room interior finishes, new dough room & remodel of (e)bar & open kitcen w/partial height walls countertops, equipment, new floor, wall & ceiling inishes, kitchen scope includes nev plumbing, elec, removal of (2)exitisng hoods & replacement | $468,090 |
| Feb 8, 2022 | Completed final sign-off Jun 2022 | 3870 17th St | exploratory demo, kitchen floor demo to explore plumbing option, and opening walls to explore outlets in kitchen. all holes to be filled with slurry and finishes to be replaced with same fire-rating.Details
exploratory demo, kitchen floor demo to explore plumbing option, and opening walls to explore outlets in kitchen. all holes to be filled with slurry and finishes to be replaced with same fire-rating. | $25,000 |
| Sep 29, 2021 | Completed final sign-off Aug 2022 | 1001 Minnesota St | expansion of (e) restaurant into adj space. (n) bar & bar equip; (n) ada & non-ada unisex washrooms as req; (n) aux kitchen w/ type ii hood; (e) kitchen remodel w/ (n) type 1 hood; (n) non-load bearing walls; (n) finishes, fixtures & equip;(n) unfixed tables & chairs.Details
expansion of (e) restaurant into adj space. (n) bar & bar equip; (n) ada & non-ada unisex washrooms as req; (n) aux kitchen w/ type ii hood; (e) kitchen remodel w/ (n) type 1 hood; (n) non-load bearing walls; (n) finishes, fixtures & equip;(n) unfixed tables & chairs. | $300,000 |
| Jul 22, 2021 | Completed final sign-off Nov 2021 | 701 Union St | t.i. of (e) g/f: new interior non-structural partitions and finisehs, lighting, millwork and kitchen equipment. plumbing, mechanical, electricval are defrred submittal.Details
t.i. of (e) g/f: new interior non-structural partitions and finisehs, lighting, millwork and kitchen equipment. plumbing, mechanical, electricval are defrred submittal. | $30,000 |
| Feb 10, 2021 | Completed final sign-off Jan 2022 | 355 11th St | tenant improvement of (e) ground flr restaurant dining area. no additions/alterations to (e) back of house kitchen or exterior. (n) non-structural partitions & finishes. replacing (e) light fixtures in dining area. mep/sprinkler under separate permit.Details
tenant improvement of (e) ground flr restaurant dining area. no additions/alterations to (e) back of house kitchen or exterior. (n) non-structural partitions & finishes. replacing (e) light fixtures in dining area. mep/sprinkler under separate permit. | $20,000 |
| Nov 20, 2020 | Completed final sign-off Apr 2022 | 2875 18th St | upgrade of (e) shell building commercial space into restaurant and bar with full kitchen facilitiesDetails
upgrade of (e) shell building commercial space into restaurant and bar with full kitchen facilities | $250,000 |
| Oct 26, 2020 | Completed final sign-off Apr 2022 | 4230 18th St | first time tenant improvement restaurant for ground floor; interior fixtures, furnishings, and equipment, interior finishes for the lobby, resturant, kitchen and bathroom, limited to level1. core and shell under separated permit #2018-0111-8381.Details
first time tenant improvement restaurant for ground floor; interior fixtures, furnishings, and equipment, interior finishes for the lobby, resturant, kitchen and bathroom, limited to level1. core and shell under separated permit #2018-0111-8381. | $148,000 |
| Feb 13, 2020 | Expired or cancelled cancelled Jul 2024 | 833 22nd St | scope of work shall include a change of use and all work necessary for the construction of a new restaurant. work shall inlcude new kitchen equipment, lighting, bathrooms, finishes, load bearing & non loading bearing walls, accesible ramp, type-1 hood w/ exhaust to roof.Details
scope of work shall include a change of use and all work necessary for the construction of a new restaurant. work shall inlcude new kitchen equipment, lighting, bathrooms, finishes, load bearing & non loading bearing walls, accesible ramp, type-1 hood w/ exhaust to roof. | $450,000 |
| Dec 19, 2019 | Completed final sign-off Aug 2020 | 1740 Ofarrell St | ti: interior construction of restaurant, new finishes in dining room & bar. new restrooms, bar and kitchen.Details
ti: interior construction of restaurant, new finishes in dining room & bar. new restrooms, bar and kitchen. | $72,528 |
| Sep 18, 2019 | Completed final sign-off Aug 2020 | 1890 Bryant St | ti to (e) a-2 restaurant. new operator taking over (e) restaurant, work to include - remodel kitchen & bar, new hvac and ele/lighting. no change of occupancy bld is fully sprinklered.Details
ti to (e) a-2 restaurant. new operator taking over (e) restaurant, work to include - remodel kitchen & bar, new hvac and ele/lighting. no change of occupancy bld is fully sprinklered. | $220,000 |
| Jul 18, 2019 | Completed final sign-off Oct 2020 | 300 Grove St | tenant improvement "baia" of existing 2 story restaurant. storefront, new interior non-structural partitions, finishes/casework, lighting and new kitchen equipment. all mechanical, electrical and plumbing work under separate design/build permit. new doorDetails
tenant improvement "baia" of existing 2 story restaurant. storefront, new interior non-structural partitions, finishes/casework, lighting and new kitchen equipment. all mechanical, electrical and plumbing work under separate design/build permit. new door | $300,000 |
| Jun 14, 2019 | Completed final sign-off Dec 2019 | 517 Clement St | tenant improvement & change of use to new restaurant. work includes finishes, lighting, kitchen equipment, and storefront renovations.Details
tenant improvement & change of use to new restaurant. work includes finishes, lighting, kitchen equipment, and storefront renovations. | $251,000 |
| Apr 30, 2019 | Completed final sign-off Oct 2019 | 524 Post St | replace (e) accoustic tile ceiling gride/tile, light fixtures, mech supply grilles, sprinkler head covers in (e) kitchen. no change to (e) equip layout, mech systems or sprinkler linesDetails
replace (e) accoustic tile ceiling gride/tile, light fixtures, mech supply grilles, sprinkler head covers in (e) kitchen. no change to (e) equip layout, mech systems or sprinkler lines | $20,000 |
| Mar 27, 2019 | Completed final sign-off Sep 2019 | 35 Kearny St | 1st flr, build out kitchen and dining area, build out basement prep kitchen, dishwasher, storage and restroomDetails
1st flr, build out kitchen and dining area, build out basement prep kitchen, dishwasher, storage and restroom | $90,000 |
| Mar 21, 2019 | Completed final sign-off Oct 2019 | 3560 18th St | add accessible seating @ (e) bar, add accessible seating @ (e) counter, reconfigure bathroom for accessibility, limited updates & repair to commercial kitchen equipment & finishesDetails
add accessible seating @ (e) bar, add accessible seating @ (e) counter, reconfigure bathroom for accessibility, limited updates & repair to commercial kitchen equipment & finishes | $200,000 |
| May 30, 2018 | Completed final sign-off Jan 2019 | 386 Geary St | ti - interior remodel of restaurant. new finishes in dining room. new prep area in kitchen no occupancy change. fully ada accessible spaceDetails
ti - interior remodel of restaurant. new finishes in dining room. new prep area in kitchen no occupancy change. fully ada accessible space | $155,000 |
| May 4, 2018 | Completed final sign-off Mar 2019 | 1001 Howard St | bini's kitchen - ti of (e) restaurant space to become a restaurant with work including gyp board walls, finishes, commercial kitchen, millwork, lighting and paintingDetails
bini's kitchen - ti of (e) restaurant space to become a restaurant with work including gyp board walls, finishes, commercial kitchen, millwork, lighting and painting | $60,000 |
| Jan 10, 2018 | Completed final sign-off Apr 2018 | 2234 Chestnut St | demo, remove all service equip & cabintry. add new walls for trash rm. non load bearing - ele & plm work req'd foe new plan. remove type ii hood. install stone counter at retail & (e) kitchen area to remain. install flooring & other furnishes per plan. new paint. install owner provided new equip.Details
demo, remove all service equip & cabintry. add new walls for trash rm. non load bearing - ele & plm work req'd foe new plan. remove type ii hood. install stone counter at retail & (e) kitchen area to remain. install flooring & other furnishes per plan. new paint. install owner provided new equip. | $75,000 |
| Oct 16, 2017 | Completed final sign-off Oct 2018 | 855 Brannan St | 1/f #b3- 1st time t.i. for new restaurant in a new construction bldg. work to include new partitions, counter seating, take out window, walk-in refrig., storage area, commercial kitchen, title 24, mechanical. signage under separate permit. n/a ordinance #155-13Details
1/f #b3- 1st time t.i. for new restaurant in a new construction bldg. work to include new partitions, counter seating, take out window, walk-in refrig., storage area, commercial kitchen, title 24, mechanical. signage under separate permit. n/a ordinance #155-13 | $550,000 |
| Jun 29, 2017 | Completed final sign-off Jun 2019 | 1226 09th Av | t.i. to extg restaurant new cafe area, new kitchen area, new fixtures, lighting , new ada compliant rest rooms. fire safty under seperate permitDetails
t.i. to extg restaurant new cafe area, new kitchen area, new fixtures, lighting , new ada compliant rest rooms. fire safty under seperate permit | $600,000 |
| Jun 16, 2017 | Completed final sign-off Nov 2018 | 396 Harrison St | interior tenant improvement construction of full service restaurant including bar, kitchen, and dining rm. lighting elec, plumbing, mech work new restroomsDetails
interior tenant improvement construction of full service restaurant including bar, kitchen, and dining rm. lighting elec, plumbing, mech work new restrooms | $315,000 |
| Aug 10, 2016 | Completed final sign-off Oct 2017 | 690 Indiana St | to build full service restaurant on the ground floor of a new bldg. work includes load bearing intirior walls, new flooring, wall paint and sound damping ceiling tiles, new kitchen and open coffee bar with accessible service counter, seating, new lighting, dishwashing, cooking/kichen equipmentDetails
to build full service restaurant on the ground floor of a new bldg. work includes load bearing intirior walls, new flooring, wall paint and sound damping ceiling tiles, new kitchen and open coffee bar with accessible service counter, seating, new lighting, dishwashing, cooking/kichen equipment | $200,000 |
| Oct 14, 2015 | Completed final sign-off Nov 2015 | 2400 Lombard St | install type 1 hood exhaust unit in kitchen. revision to pa#201505297577. ul 300 fire suppression system separate permit. n/a ordinance #155-13Details
install type 1 hood exhaust unit in kitchen. revision to pa#201505297577. ul 300 fire suppression system separate permit. n/a ordinance #155-13 | $16,000 |
| Sep 21, 2015 | Completed final sign-off Aug 2016 | 330 Gough St | revision to pa 2014 0604 7456 r2 restaurant ti- include interior walls, floor & ceiling finishes, kitchen equipment, restrooms, and light fixtures. sprinklers under seperate permit. maher naDetails
revision to pa 2014 0604 7456 r2 restaurant ti- include interior walls, floor & ceiling finishes, kitchen equipment, restrooms, and light fixtures. sprinklers under seperate permit. maher na | $220,000 |