Block 0307, lot 007
386 Geary St
- City’s use
- Commercial Hotel
- Built
- 1909
- Stories
- 13
- Units
- 152
- Building
- 72,079 sq ft
- Lot
- 6,329 sq ft
- Zoning
- C3G
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
78 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 16, 2025 | In progress issued Jan 2025 | 386 Geary St | Tri-Signal Integration Inc. | install celluor communicator | $5,750 |
| Jun 28, 2023 | Expired or cancelled cancelled Jan 2026 | 386 Geary St | Capitol Electric Const | one-for-one replacement of (e) light fixtures in (e) restaurant, no new wiring/circuit/controls.Details
one-for-one replacement of (e) light fixtures in (e) restaurant, no new wiring/circuit/controls. | $16,500 |
| Jun 6, 2023 | Completed final sign-off Jul 2023 | 386 Geary St | California Fire And Safety | property has 2 separate e fire suppression anausl systems that protect 2 e hoods. client is adding 2 new appliances to rear hood only.no additions to front hood.Details
property has 2 separate e fire suppression anausl systems that protect 2 e hoods. client is adding 2 new appliances to rear hood only.no additions to front hood. | $5,000 |
| Mar 20, 2023 | Completed final sign-off Jul 2023 | 386 Geary St | Richlen Construction | tenant improvement of (e) l'costa restaurant to seafood restaurant, non-structural low walls, equipment, finishes with associated electrical and new furniture.Details
tenant improvement of (e) l'costa restaurant to seafood restaurant, non-structural low walls, equipment, finishes with associated electrical and new furniture. | $25,000 |
| Dec 30, 2022 | Expired or cancelled cancelled Jan 2026 | 386 Geary St | barrier removal only for sf abe program. provide new recessed walk-off matt. abe#: abe202212305889Details
barrier removal only for sf abe program. provide new recessed walk-off matt. abe#: abe202212305889 | $5,000 | |
| Feb 25, 2020 | Never finaled issued Feb 2020, no final | 386 Geary St | street space | ||
| Dec 6, 2018 | Completed final sign-off Jan 2019 | 386 Geary St | Cookline Construction Inc | rev pa201812067599 furniture layout update for fire department occupancy.Details
rev pa201812067599 furniture layout update for fire department occupancy. | |
| Nov 26, 2018 | Never finaled issued Jan 2019, no final | 386 Geary St | Ad Art Inc. | new electric sign | $5,000 |
| Nov 14, 2018 | Completed final sign-off Jan 2019 | 386 Geary St | Cookline Construction Inc | revision to app#201805300527 for title 24 calcs w/new fixtures. n/a for maherDetails
revision to app#201805300527 for title 24 calcs w/new fixtures. n/a for maher | |
| May 30, 2018 | Completed final sign-off Jan 2019 | 386 Geary St | Cookline Construction Inc | ti - interior remodel of restaurant. new finishes in dining room. new prep area in kitchen no occupancy change. fully ada accessible spaceDetails
ti - interior remodel of restaurant. new finishes in dining room. new prep area in kitchen no occupancy change. fully ada accessible space | $155,000 |
| Apr 4, 2018 | Never finaled issued Apr 2018, no final | 386 Geary St | street space w/mta | ||
| Feb 6, 2018 | Never finaled issued Feb 2018, no final | 386 Geary St | street space | ||
| Jan 12, 2018 | Never finaled issued Jan 2018, no final | 386 Geary St | Jalilie Electric Inc /Ridgeway Electric | remove and replace extg dining room lighting with new. n/a for maherDetails
remove and replace extg dining room lighting with new. n/a for maher | $15,000 |
| Dec 29, 2017 | Never finaled issued Dec 2017, no final | 386 Geary St | Shield Fire & Safety Solutions Inc | installation of ul300 buckeye fire system. t.i. ref app#201308073760. n/a for maherDetails
installation of ul300 buckeye fire system. t.i. ref app#201308073760. n/a for maher | $2,700 |
| Dec 20, 2017 | Completed final sign-off Apr 2018 | 386 Geary St | Tri-Signal Integration Inc. | 1st flr: fati includes add 1 speaker/strobe to (e) nac circuit; relocate one speaker/strobe ref pa 201710121065 restaurant ti maher naDetails
1st flr: fati includes add 1 speaker/strobe to (e) nac circuit; relocate one speaker/strobe ref pa 201710121065 restaurant ti maher na | $1,500 |
| Dec 19, 2017 | Completed final sign-off Jan 2018 | 386 Geary St | Incom Mechanical Inc | pendant protection for extg uprights. 5 heads. ref app#201710121065. n/a for maherDetails
pendant protection for extg uprights. 5 heads. ref app#201710121065. n/a for maher | $1,500 |
| Nov 14, 2017 | Never finaled issued Nov 2017, no final | 386 Geary St | Tri-Signal Integration Inc. | penthouse area - add three (3) speakers to existing fire alarm system. ref pa #201308073760. n/a maher ordinanceDetails
penthouse area - add three (3) speakers to existing fire alarm system. ref pa #201308073760. n/a maher ordinance | $1,600 |
| Oct 31, 2017 | Never finaled issued Oct 2017, no final | 386 Geary St | street space w/mta | ||
| Oct 12, 2017 | Completed final sign-off Jan 2018 | 386 Geary St | Cookline Construction Inc | relocation of ada section of bar in gr fl restaurant. no other workDetails
relocation of ada section of bar in gr fl restaurant. no other work | $3,000 |
| Sep 7, 2017 | Never finaled issued Sep 2017, no final | 386 Geary St | Aquamatic Fire Protection | relocate & replace (17) pendent sprinklers. upgrade bracing for mains & branch lines. no underground work. ref pa #201308073760Details
relocate & replace (17) pendent sprinklers. upgrade bracing for mains & branch lines. no underground work. ref pa #201308073760 | $1,600 |
| Jul 24, 2017 | Completed final sign-off Oct 2018 | 386 Geary St | Marchetti Group | recommencemnt and completion of work approved under pa# 201308073760.Details
recommencemnt and completion of work approved under pa# 201308073760. | $200,000 |
| May 15, 2017 | Never finaled issued May 2017, no final | 386 Geary St | street space & mta parking meter | ||
| Nov 16, 2015 | Never finaled issued Jan 2017, no final | 386 Geary St | Ad Art Inc. | to erect electrical, wall, (2) single faced sign. ** maher: n/a **Details
to erect electrical, wall, (2) single faced sign. ** maher: n/a ** | $5,000 |
| Sep 21, 2015 | Never finaled issued Jun 2016, no final | 386 Geary St | Ad Art Inc. | erect electric single faced canopy sign. n/a for maher ordinance no. 155-13.Details
erect electric single faced canopy sign. n/a for maher ordinance no. 155-13. | $5,000 |
| Jan 20, 2015 | Never finaled issued May 2015, no final | 386 Geary St | Ad Art Inc. | erect a electric double faced projecting wall sign.Details
erect a electric double faced projecting wall sign. | $5,000 |
| Nov 24, 2014 | Completed final sign-off Mar 2015 | 386 Geary St | Tri-Signal Integration Inc. | mezzanine: add three speaker/strobes, one duct detector, one relay module and one relay to extg fa system. ref app#201405216424. n/a for the maher ordinance.Details
mezzanine: add three speaker/strobes, one duct detector, one relay module and one relay to extg fa system. ref app#201405216424. n/a for the maher ordinance. | $3,200 |
| Oct 23, 2014 | Never finaled issued Oct 2014, no final | 386 Geary St | street space | ||
| Oct 23, 2014 | Never finaled issued Oct 2014, no final | 386 Geary St | street space & mta | ||
| Aug 20, 2014 | Never finaled issued Aug 2014, no final | 386 Geary St | street space permit (renewal of permit # 1330936 - m506167)Details
street space permit (renewal of permit # 1330936 - m506167) | ||
| Aug 8, 2014 | Never finaled issued Aug 2014, no final | 386 Geary St | street space permit | ||
| Jul 22, 2014 | Never finaled issued Jul 2014, no final | 386 Geary St | street space | ||
| Jun 10, 2014 | Never finaled issued Jun 2014, no final | 386 Geary St | street space | ||
| Jun 4, 2014 | Completed final sign-off May 2015 | 386 Geary St | Aquamatic Fire Protection | 1st floor sprinkler t.i.: add/relocate (39) pendant sprinklers, add 4 upright sprinklers, add 2 sidewall sprinklers; compliance with ord 155-13 not requiredDetails
1st floor sprinkler t.i.: add/relocate (39) pendant sprinklers, add 4 upright sprinklers, add 2 sidewall sprinklers; compliance with ord 155-13 not required | $12,000 |
| May 21, 2014 | Completed final sign-off Mar 2015 | 386 Geary St | Marchetti Construction Inc. | interior improvement to new 2nd floor bar. new walls, fixtures, finishes, mech, & plmbg. mechanical work occurs at ground floor, 2nd floor, and roof. ** maher: compliance with ordinance no# 155-13 not required **Details
interior improvement to new 2nd floor bar. new walls, fixtures, finishes, mech, & plmbg. mechanical work occurs at ground floor, 2nd floor, and roof. ** maher: compliance with ordinance no# 155-13 not required ** | $94,000 |
| Mar 6, 2014 | Completed final sign-off May 2015 | 386 Geary St | Marchetti Construction Inc. | to comply with nov# 201448131, revision to app#201308073760 to eliminate construction of new additional handrail at stair #2. see attached ab-005.Details
to comply with nov# 201448131, revision to app#201308073760 to eliminate construction of new additional handrail at stair #2. see attached ab-005. | |
| Jan 29, 2014 | Completed final sign-off May 2015 | 386 Geary St | Tri-Signal Integration Inc. | ground & 1st floor: add two smoke detectors, three duct detectors, one pull station, one relay module, one control relay, eleven speaker/strobes, two strobes to existing fire alarm system. ref #2013.0802.3433. compliance with ordinance #155-13 not required.Details
ground & 1st floor: add two smoke detectors, three duct detectors, one pull station, one relay module, one control relay, eleven speaker/strobes, two strobes to existing fire alarm system. ref #2013.0802.3433. compliance with ordinance #155-13 not required. | $8,000 |
| Jan 21, 2014 | Never finaled issued Jan 2014, no final | 386 Geary St | street space and mta parking | ||
| Jan 7, 2014 | Completed final sign-off May 2014 | 386 Geary St | Aquamatic Fire Protection | 1st & 2nd floor (common area) - add/relocate (33) ssp, add/relcoate (17) ssu, add (10) sidewall sprinklers, plug (3) existing ssp, & upgrade all seismic bracing in area of work only. no underground work. ref pa #2013.08.02.3433. compliance with ordinance no. 155-13 not required.Details
1st & 2nd floor (common area) - add/relocate (33) ssp, add/relcoate (17) ssu, add (10) sidewall sprinklers, plug (3) existing ssp, & upgrade all seismic bracing in area of work only. no underground work. ref pa #2013.08.02.3433. compliance with ordinance no. 155-13 not required. | $21,500 |
| Dec 3, 2013 | Completed final sign-off May 2015 | 386 Geary St | interior improvements to ground floor restaurant and cafe. scope includes new walls, fixtures, finishes, mechanical, plmg to accommodate a kitchen, cafe, & restaurant. mech work occures at ground floor, 2nd fl, & roof. public assembly permit required. approved occ load for a-2 area is 173 occupantsDetails
interior improvements to ground floor restaurant and cafe. scope includes new walls, fixtures, finishes, mechanical, plmg to accommodate a kitchen, cafe, & restaurant. mech work occures at ground floor, 2nd fl, & roof. public assembly permit required. approved occ load for a-2 area is 173 occupants | $375,000 | |
| Oct 3, 2013 | Completed final sign-off Mar 2015 | 386 Geary St | Tri-Signal Integration Inc. | add one power supply. 16 smoke detectors, 14 control modules and monitor modules, 7 control relays, 32 strobes to extg fire alarm system. ref app#201308073760Details
add one power supply. 16 smoke detectors, 14 control modules and monitor modules, 7 control relays, 32 strobes to extg fire alarm system. ref app#201308073760 | $23,000 |
| Sep 12, 2013 | Never finaled issued May 2014, no final | 386 Geary St | Marchetti Construction Inc. | exterior work only, remove (e) metal and fabric awnings, replace (e) corner marquee signage with smaller signage; remove and replace existing g/f glazing, doors, and frames, repair existing finishes to remain, new exterior lighting, new metal awnings, new tile finishes below new g/f glazing.Details
exterior work only, remove (e) metal and fabric awnings, replace (e) corner marquee signage with smaller signage; remove and replace existing g/f glazing, doors, and frames, repair existing finishes to remain, new exterior lighting, new metal awnings, new tile finishes below new g/f glazing. | $375,000 |
| Aug 8, 2013 | Never finaled issued Aug 2013, no final | 386 Geary St | street space permit | ||
| Aug 7, 2013 | Never finaled issued Sep 2013, no final | 386 Geary St | Marchetti Construction Inc. | to meet reqd.# of accessible guest interior imprvmnt to guest rms on flrs 2 through 12 and penthouse 13. guest room accessibility upgrades; common space (stair) accessibility upgrades on guest room floor; penthouse guest room upgrade. no exterior work. to comply with nov#201124361.Details
to meet reqd.# of accessible guest interior imprvmnt to guest rms on flrs 2 through 12 and penthouse 13. guest room accessibility upgrades; common space (stair) accessibility upgrades on guest room floor; penthouse guest room upgrade. no exterior work. to comply with nov#201124361. | $325,000 |
| Aug 2, 2013 | Never finaled issued Nov 2013, no final | 386 Geary St | Marchetti Construction Inc. | ground & 1st floors t.i. to the ground: new stair connecting the 1st floor to geary st & mason street exit. upgrade of mechanical system. no exterior work, no change to number of guestrooms. life safety permits separate.Details
ground & 1st floors t.i. to the ground: new stair connecting the 1st floor to geary st & mason street exit. upgrade of mechanical system. no exterior work, no change to number of guestrooms. life safety permits separate. | $400,000 |
| Sep 17, 2012 | Completed final sign-off May 2015 | 386 Geary St | Marchetti Construction Inc. | interior demolition to an existing building ground floor and mezzanine. soft demo only- no construction under this permit. maintain life safety and sprinklers, minimum 1 standpipe, separation from stairwell and elevators. space shall remain vacant until (n) improvement permit.Details
interior demolition to an existing building ground floor and mezzanine. soft demo only- no construction under this permit. maintain life safety and sprinklers, minimum 1 standpipe, separation from stairwell and elevators. space shall remain vacant until (n) improvement permit. | $10,000 |
| May 16, 2012 | Never finaled issued May 2012, no final | 386 Geary St | street space with meters. | ||
| Apr 25, 2012 | Never finaled issued Apr 2012, no final | 386 Geary St | Tri-Signal Integration Inc. | floors 2,3, & 4:fire alarm upgrade for ada rooms: add 1 power supply. 3 smoke detectors, 3 control modules, 4 monitor modules, 3 relays, 6 strobes to extg fire alarm system.Details
floors 2,3, & 4:fire alarm upgrade for ada rooms: add 1 power supply. 3 smoke detectors, 3 control modules, 4 monitor modules, 3 relays, 6 strobes to extg fire alarm system. | $7,200 |
| Apr 13, 2012 | Never finaled issued Apr 2012, no final | 386 Geary St | street space permit & mta (201201242815)Details
street space permit & mta (201201242815) | ||
| Feb 24, 2012 | Completed final sign-off Jun 2012 | 386 Geary St | Aquamatic Fire Protection | relocate 28 e fire sprinklers on 1" drops for new t bar ceiling layout in common corridors on 2nd, 3rd and 4th floor onlyDetails
relocate 28 e fire sprinklers on 1" drops for new t bar ceiling layout in common corridors on 2nd, 3rd and 4th floor only | $10,000 |
| Feb 7, 2012 | Never finaled issued Feb 2012, no final | 386 Geary St | street space & mta parking meter | ||
| Jan 24, 2012 | Completed final sign-off May 2015 | 386 Geary St | Marchetti Construction Inc. | cosmetic upgrade to bathrooms on 2nd., 3rd. & 4th. floors. provide upgrade to 1-ada accessible bathroom on 2nd., 3rd. & 4th. only. install & apply (n) finishes on floor & walls & lights @ corridor ceilings.fire alarm on separate application & fire sprinklers.Details
cosmetic upgrade to bathrooms on 2nd., 3rd. & 4th. floors. provide upgrade to 1-ada accessible bathroom on 2nd., 3rd. & 4th. only. install & apply (n) finishes on floor & walls & lights @ corridor ceilings.fire alarm on separate application & fire sprinklers. | $730,000 |
| Oct 4, 2011 | Completed final sign-off Mar 2012 | 386 Geary St | Tri-Signal Integration Inc. | emergency fa panel replacement. e panel notifier vam 2020. new panel notifier nfs2-3030. the new facp is backwords compatible with all existing devices. replace panel and test 10% of field devices and 100 % of all system functions per approved sequence of operation included on pa # 2003-0-0922-5406Details
emergency fa panel replacement. e panel notifier vam 2020. new panel notifier nfs2-3030. the new facp is backwords compatible with all existing devices. replace panel and test 10% of field devices and 100 % of all system functions per approved sequence of operation included on pa # 2003-0-0922-5406 | $11,000 |
| Aug 31, 2011 | Never finaled issued Oct 2011, no final | 386 Geary St | Marchetti Construction Inc. | voluntary seismic/structural strengthening, new concrete shear walls on interior face of (e) walls from basement to 8th floor.Details
voluntary seismic/structural strengthening, new concrete shear walls on interior face of (e) walls from basement to 8th floor. | $2,000,000 |
| May 10, 2011 | Never finaled issued May 2011, no final | 386 Geary St | to obtain final inspection for work approved under pa# 200712311642. all work is complete.Details
to obtain final inspection for work approved under pa# 200712311642. all work is complete. | ||
| Feb 3, 2011 | Completed final sign-off Apr 2011 | 386 Geary St | Pribuss Engineering Inc | fire sprinklers ti on floors 5,6,7,8, and penthouse. add 5 headsDetails
fire sprinklers ti on floors 5,6,7,8, and penthouse. add 5 heads | $2,573 |
| Aug 23, 2010 | Never finaled issued Aug 2010, no final | 386 Geary St | street space and mta | ||
| Apr 9, 2009 | Never finaled issued Apr 2009, no final | 386 Geary St | street space permit only. | ||
| Sep 26, 2008 | Never finaled issued Sep 2008, no final | 386 Geary St | Aquamatic Fire Protection | relocate (e) sprinklers due to interior remodel on the 2nd thru 8th floors-9 sprinklers per floor, 54 totalDetails
relocate (e) sprinklers due to interior remodel on the 2nd thru 8th floors-9 sprinklers per floor, 54 total | $6,000 |
| Sep 16, 2008 | Never finaled issued Sep 2008, no final | 386 Geary St | Tri-Signal Integration Inc. | basement level-add two smoke detectors to (e) fire alarm system.Details
basement level-add two smoke detectors to (e) fire alarm system. | $2,600 |
| Aug 8, 2008 | Completed final sign-off Oct 2008 | 386 Geary St | Fidelity Roof Company | re-roof remaining portion of hotel roof not .additional work not on permit 2008 0211 4481Details
re-roof remaining portion of hotel roof not .additional work not on permit 2008 0211 4481 | $151,561 |
| Jul 22, 2008 | Never finaled issued Jul 2008, no final | 386 Geary St | Aquamatic Fire Protection | revision to 200806255275 added hanger detail due to field plumbing inspector. 9th - 12th floors.Details
revision to 200806255275 added hanger detail due to field plumbing inspector. 9th - 12th floors. | |
| Jul 21, 2008 | Never finaled issued Jul 2008, no final | 386 Geary St | gues rms: 9-12 fl, install ductwork & bathrm, exhaust fan, reconnect (e) exhaust ductwork above 12/f to top of (n) shaft. 2-8 fl: install bath exhaust fan in guest rms in 2 hour gyp board, title shafts, repair opening in shafts per det. provided replacement of fan on roof for exhaust from ductwork.Details
gues rms: 9-12 fl, install ductwork & bathrm, exhaust fan, reconnect (e) exhaust ductwork above 12/f to top of (n) shaft. 2-8 fl: install bath exhaust fan in guest rms in 2 hour gyp board, title shafts, repair opening in shafts per det. provided replacement of fan on roof for exhaust from ductwork. | $50,000 | |
| Jun 30, 2008 | Never finaled issued Jun 2008, no final | 386 Geary St | Aquamatic Fire Protection | penthouse-revise (e) fire sprinkler piping relocate 11 (e) sprinklers and add 3 due to tenant remodel to interior wallsDetails
penthouse-revise (e) fire sprinkler piping relocate 11 (e) sprinklers and add 3 due to tenant remodel to interior walls | $1,600 |
| Jun 30, 2008 | Expired or cancelled expired Jan 2011 | 386 Geary St | revision to appl #200712311642 - floors 9 to 12 fill in exist floor openings at plumbing shafe walls , create new 1-hour shaft for bathroom exhaust. showers are reverting back to original tubs except #914 at 9th floor.Details
revision to appl #200712311642 - floors 9 to 12 fill in exist floor openings at plumbing shafe walls , create new 1-hour shaft for bathroom exhaust. showers are reverting back to original tubs except #914 at 9th floor. | $10,000 | |
| Jun 25, 2008 | Never finaled issued Jun 2008, no final | 386 Geary St | Aquamatic Fire Protection | floor 9-11 & penthouse floor- relocate existing sprinklers and revise piping due to interior remodel on 9,10,11,12 and penthouse floors.Details
floor 9-11 & penthouse floor- relocate existing sprinklers and revise piping due to interior remodel on 9,10,11,12 and penthouse floors. | $5,000 |
| May 21, 2008 | Never finaled issued May 2008, no final | 386 Geary St | street space permit only. | ||
| Feb 11, 2008 | Never finaled issued Feb 2008, no final | 386 Geary St | Fidelity Roof Company | reroofing | $46,483 |
| Dec 31, 2007 | Expired or cancelled expired Jan 2011 | 386 Geary St | create 8 accessible bathrooms. relocate/oher (e) walls to allow accomations access 1111b.4.6. remodel guest room remodel thru cut hotel.Details
create 8 accessible bathrooms. relocate/oher (e) walls to allow accomations access 1111b.4.6. remodel guest room remodel thru cut hotel. | $765,000 | |
| Sep 12, 2007 | Completed final sign-off Jan 2008 | 386 Geary St | t/i for room 408,9o4 bathroom remodel 6ft. non-bearing partition, remove soffitt.new plumbing fixturesDetails
t/i for room 408,9o4 bathroom remodel 6ft. non-bearing partition, remove soffitt.new plumbing fixtures | $30,000 | |
| Mar 20, 2007 | Expired or cancelled expired Feb 2008 | 386 Geary St | Tri-Signal Integration Inc. | add 3 smoke detectors to (e) fire alarm systemDetails
add 3 smoke detectors to (e) fire alarm system | $4,000 |
| Jan 12, 2006 | Completed final sign-off Jan 2006 | 386 Geary St | Nowaks Heating & Air Condition, Inc | move (e) class i exhaust blowers & gease duct from roof,combine mep #473348 in use on 11/17/2005Details
move (e) class i exhaust blowers & gease duct from roof,combine mep #473348 in use on 11/17/2005 | $111,000 |
| Aug 25, 2005 | Never finaled issued Aug 2005, no final | 386 Geary St | street space | ||
| Mar 4, 2005 | Never finaled issued Mar 2005, no final | 386 Geary St | Corish Electric Corporation | revision to app #200309225406 to monitor sprinkler main riser on floor 1-12+penthouseDetails
revision to app #200309225406 to monitor sprinkler main riser on floor 1-12+penthouse | $800 |
| Sep 13, 2004 | Never finaled issued Sep 2004, no final | 386 Geary St | fire alarm upgrade in basementDetails
fire alarm upgrade in basement | $5,400 | |
| Sep 22, 2003 | Never finaled issued Mar 2004, no final | 386 Geary St | National Systems Integration | addition to (e) fire detection system to monitor individual floor sprinkler tampers (new) also newDetails
addition to (e) fire detection system to monitor individual floor sprinkler tampers (new) also new | $19,426 |
| Jul 3, 2003 | Never finaled issued Sep 2003, no final | 386 Geary St | Pribuss Engineering Inc | upgrade to extg fire sprinkler system/maxwell hotelDetails
upgrade to extg fire sprinkler system/maxwell hotel | $210,000 |
| Jan 15, 2003 | Never finaled issued Jan 2003, no final | 386 Geary St | Intellisec | install magnetic door holder & 2 smoke detectors for 1/f door to kitchen @1/f landingDetails
install magnetic door holder & 2 smoke detectors for 1/f door to kitchen @1/f landing | $3,600 |
| Dec 19, 2002 | Never finaled issued Dec 2002, no final | 386 Geary St | Kim Construction | change wall interior- rm 215 & 219 make h.c. unit - fire alarm sep- peb mixDetails
change wall interior- rm 215 & 219 make h.c. unit - fire alarm sep- peb mix | $6,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Tri-Signal Integration Inc. (10), Aquamatic Fire Protection (8), Marchetti Construction Inc. (8), Ad Art Inc. (4), Cookline Construction Inc (4), Fidelity Roof Company (2), Pribuss Engineering Inc (2), California Fire And Safety, Capitol Electric Const, Corish Electric Corporation, Incom Mechanical Inc, Intellisec, Jalilie Electric Inc /Ridgeway Electric, Kim Construction, Marchetti Group, National Systems Integration, Nowaks Heating & Air Condition, Inc, Richlen Construction, Shield Fire & Safety Solutions Inc
- Architects
- Brian Milford (4), Peter Petruzzi (3), Ahmad Mohazab, Ariane Lebrilla
- Engineers
- D. Townsend Brown, Pak Hui
- Designers
- Alexander Joseph Pacheco, Tri-Signal Integration Inc.
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.