Shield Fire & Safety Solutions Inc
- Based in
- Alameda
- On San Francisco permits
- Jan 2011 to Aug 2026
- Last 24 months
- 18 permits filed
81 permits since 2000: 54 completed, 12 in progress, 10 never finaled, 5 expired or cancelled.
Of the 10 never-finaled permits, 2 are 3 to 5 years old, 8 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 20, 2026 | In progress issued Aug 2026 | 1206 18th St | adding back flow to existing system. (ref pa# 2025-0611-8427 and fire-26-1345)Details
adding back flow to existing system. (ref pa# 2025-0611-8427 and fire-26-1345) | $10 |
| Jan 14, 2026 | In progress issued Jan 2026 | 733 Fillmore St | modifying (e) fire sprinkler system and adding extra f/s heads to cover new layout.Details
modifying (e) fire sprinkler system and adding extra f/s heads to cover new layout. | $13,500 |
| Dec 5, 2025 | Completed final sign-off May 2026 | 40 Sycamore St | install new fire sprinkler system for 2 new adus (ref pa 202407106115). installation as nfpa 13r. additional underground under this permit.Details
install new fire sprinkler system for 2 new adus (ref pa 202407106115). installation as nfpa 13r. additional underground under this permit. | $12,000 |
| Nov 19, 2025 | Completed final sign-off May 2026 | 635 Baker St | fire spinkler systme installation for added adu on the 4/f and egress passage on the 2/f and 3/f. bldg ref #202204111986.Details
fire spinkler systme installation for added adu on the 4/f and egress passage on the 2/f and 3/f. bldg ref #202204111986. | $12,000 |
| Nov 17, 2025 | In progress issued Nov 2025 | 1206 18th St | as built for pa 202506118427 fire sprinkler system. added 4 headsDetails
as built for pa 202506118427 fire sprinkler system. added 4 heads | |
| Nov 10, 2025 | Completed final sign-off Jul 2026 | 545 Eddy St | install new dry-chem pyro-chem system for existing vehicle paint/spray booth.Details
install new dry-chem pyro-chem system for existing vehicle paint/spray booth. | $12,000 |
| Oct 27, 2025 | Completed final sign-off Mar 2026 | 40 Sycamore St | install (n) fire sprinkler monitoring alarm system. ref 202407106115Details
install (n) fire sprinkler monitoring alarm system. ref 202407106115 | $8,000 |
| Oct 15, 2025 | Completed final sign-off Mar 2026 | 40 Sycamore St | install new fire sprinkler system for pa 202407106115Details
install new fire sprinkler system for pa 202407106115 | $12,000 |
| Sep 17, 2025 | In progress issued Sep 2025 | 1260 Sacramento St | to obtain a final inspection for work approved under 202403077303- all work is completeDetails
to obtain a final inspection for work approved under 202403077303- all work is complete | |
| Sep 11, 2025 | In progress issued Sep 2025 | 625 Market St | replacmemnt of accessible discontinue xl pipe pho duct on seven floors floors: 2,5,7,8,9,14& pent houseDetails
replacmemnt of accessible discontinue xl pipe pho duct on seven floors floors: 2,5,7,8,9,14& pent house | $20,000 |
| Jun 11, 2025 | In progress issued Jun 2025 | 1206 18th St | install new fire sprinkler system within existing remodel. ref 202301120085Details
install new fire sprinkler system within existing remodel. ref 202301120085 | $12,000 |
| Jun 11, 2025 | In progress issued Jun 2025 | 1719 Pine St | install new dedicated fire sprinkler monitoring system ref 202307242790Details
install new dedicated fire sprinkler monitoring system ref 202307242790 | $7,000 |
| Jun 3, 2025 | Completed final sign-off Nov 2025 | 4042 Fulton St | provide and install new water flow monitored fire alarm systemDetails
provide and install new water flow monitored fire alarm system | $6,000 |
| May 27, 2025 | In progress filed May 2025, not yet issued | 750 Bush St | add 1 fire sprinkler in draft curtainDetails
add 1 fire sprinkler in draft curtain | $2,700 |
| Feb 7, 2025 | Completed final sign-off Sep 2025 | 1401 Hyde St | as-built plans for permit 202410314095 to show pipe layout changes.Details
as-built plans for permit 202410314095 to show pipe layout changes. | |
| Feb 7, 2025 | Completed final sign-off Mar 2025 | 3325 24th St | installing hood suppresion fire system only in kitchen (buckeye bfr-10).Details
installing hood suppresion fire system only in kitchen (buckeye bfr-10). | $3,000 |
| Dec 30, 2024 | In progress issued Dec 2024 | 1295 Page St | modify fire sprinkler system to meet new floor plan. relocating 3 sprinkler heads and removing 1 sprinkler head.Details
modify fire sprinkler system to meet new floor plan. relocating 3 sprinkler heads and removing 1 sprinkler head. | $5,000 |
| Oct 31, 2024 | Completed final sign-off Sep 2025 | 1401 Hyde St | altering (e) fire sprinkler system to protect new living spaces on 1st floorDetails
altering (e) fire sprinkler system to protect new living spaces on 1st floor | $15,000 |
| Aug 8, 2024 | In progress issued Aug 2024 | 715 Harrison St | furnish & install buckeye mister ul-300 system for e) kitchen hoodsDetails
furnish & install buckeye mister ul-300 system for e) kitchen hoods | $4,000 |
| Jul 11, 2024 | Completed final sign-off Mar 2025 | 2241 Jackson St | installing new fire sprinkler system to the adu space and it common areaDetails
installing new fire sprinkler system to the adu space and it common area | $15,000 |
| Jun 3, 2024 | Completed final sign-off Sep 2024 | 1295 Page St | revision to 202205174419 per field inspector request plans to demonstrace correct back flow preventor wilking 950 xl installedDetails
revision to 202205174419 per field inspector request plans to demonstrace correct back flow preventor wilking 950 xl installed | $200 |
| May 22, 2024 | Completed final sign-off Jul 2024 | 5701 Geary Bl | fire only- install (n) buckeye bf-15 hood and duct systemDetails
fire only- install (n) buckeye bf-15 hood and duct system | $3,500 |
| Apr 1, 2024 | In progress issued Apr 2024 | 1719 Pine St | installing new 2" underground cooper piping for fire services sprinklerDetails
installing new 2" underground cooper piping for fire services sprinkler | $7,000 |
| Mar 27, 2024 | Completed final sign-off Dec 2024 | 25 Yerba Buena Ln | replace one of two tanks: pcl-460 with new pcl-600. add 2 new nozzles & adjust nozzles. fire only suppression systemDetails
replace one of two tanks: pcl-460 with new pcl-600. add 2 new nozzles & adjust nozzles. fire only suppression system | $2,000 |
| Mar 27, 2024 | Completed final sign-off Apr 2024 | 2123 Polk St | nozzles adjustment (fire only)Details
nozzles adjustment (fire only) | $1,000 |
| Mar 7, 2024 | In progress issued Jul 2024 | 1260 Sacramento St | install new fire system for 1260 sacramento st and 61 pleasant st. (1) system up to 54 heads with (1) dedicated meter to feed both. ref pa#201801269697Details
install new fire system for 1260 sacramento st and 61 pleasant st. (1) system up to 54 heads with (1) dedicated meter to feed both. ref pa#201801269697 | $25,000 |
| Aug 28, 2023 | Never finaled issued Aug 2023, no final | 710 03rd St | fire suppression system: "giles" ventless hiid with hood 3 duct ansul system biledin.Details
fire suppression system: "giles" ventless hiid with hood 3 duct ansul system biledin. | $1,500 |
| Aug 23, 2023 | Completed final sign-off Jan 2024 | 827 Duboce Av | new fire sprinklers per nfpa 13d on ground floor only; ref 202210214879Details
new fire sprinklers per nfpa 13d on ground floor only; ref 202210214879 | $5,000 |
| Jul 24, 2023 | Never finaled issued Aug 2023, no final | 1719 Pine St | install new fire sprinkler system in new adu. ref pa202107224939. underground to be done by other/ seperate permitDetails
install new fire sprinkler system in new adu. ref pa202107224939. underground to be done by other/ seperate permit | $12,000 |
| Jun 12, 2023 | Completed final sign-off Jul 2023 | 260 Sagamore St | replace (e). install new hood & duct fire system ul-300 buckeye bfd-10.Details
replace (e). install new hood & duct fire system ul-300 buckeye bfd-10. | $3,500 |
| Oct 19, 2022 | Completed final sign-off Nov 2022 | 498 Broadway | installation of new buckeye hood duct systemDetails
installation of new buckeye hood duct system | $2,000 |
| May 17, 2022 | Completed final sign-off Sep 2024 | 1295 Page St | revision of bpa#202108045724 to reflect correct street name on site plan & water flow dataDetails
revision of bpa#202108045724 to reflect correct street name on site plan & water flow data | |
| Aug 4, 2021 | Completed final sign-off Sep 2024 | 1295 Page St | install new sprinkler system. 19 heads.2" underground includedDetails
install new sprinkler system. 19 heads.2" underground included | $6,000 |
| Sep 25, 2020 | Expired or cancelled expired Oct 2024 | 1544 45th Av | renew permit application #201703201872; all work is completeDetails
renew permit application #201703201872; all work is complete | |
| Sep 10, 2020 | Completed final sign-off Jul 2021 | 943 York St | installing new sprinkler system to 2 unit duplex per nfpa 13/13r. total 59 heads. includes 9' underground 2" copper k brazed. sprinkler monitoring and ext bell per nfpa 72 under sep permit.Details
installing new sprinkler system to 2 unit duplex per nfpa 13/13r. total 59 heads. includes 9' underground 2" copper k brazed. sprinkler monitoring and ext bell per nfpa 72 under sep permit. | $17,000 |
| Sep 8, 2020 | Completed final sign-off May 2021 | 834 44th Av | renewal of firesprinkler permit #201612215537 for final inspection.Details
renewal of firesprinkler permit #201612215537 for final inspection. | |
| Jul 1, 2019 | Completed final sign-off Jul 2022 | 30 Randolph St | installing nfpa-13r fire sprinkler system to the legalized unit. fire water service by others. ref pa #201702088927.Details
installing nfpa-13r fire sprinkler system to the legalized unit. fire water service by others. ref pa #201702088927. | $10,000 |
| Mar 26, 2019 | Never finaled issued Mar 2019, no final | 36 05th St | ansul functional test, ref pa 201901099989Details
ansul functional test, ref pa 201901099989 | |
| Mar 15, 2019 | Completed final sign-off Apr 2019 | 301 King St | suite b: install ansul system into installed ventless hood system under pa#201902284056.Details
suite b: install ansul system into installed ventless hood system under pa#201902284056. | $2,500 |
| Jan 24, 2019 | Never finaled issued Jan 2019, no final | 98 Battery St | installation of ansul fire system for ventless hood pre piped. ref mep pa #201804176569 n/a for maherDetails
installation of ansul fire system for ventless hood pre piped. ref mep pa #201804176569 n/a for maher | $1,500 |
| Jan 24, 2019 | Expired or cancelled cancelled Aug 2023 | 301 King St | unit #b: fire suppration system (hood & duct). installation of 4 nozzles. n/a for maherDetails
unit #b: fire suppration system (hood & duct). installation of 4 nozzles. n/a for maher | $1,700 |
| Dec 13, 2018 | Completed final sign-off Aug 2020 | 1936 Irving St | upgrade fire system pyro chem ul-300 system in kitchen adjusting nozzles- building has no fire alarmDetails
upgrade fire system pyro chem ul-300 system in kitchen adjusting nozzles- building has no fire alarm | $1,500 |
| Aug 23, 2018 | Never finaled issued Aug 2018, no final | 1332 Castro St | fire system installation (hood & duct) buckeye bfr-15 6 nozzles.Details
fire system installation (hood & duct) buckeye bfr-15 6 nozzles. | $3,000 |
| Aug 23, 2018 | Completed final sign-off Sep 2018 | 400 Haight St | installation of new fire suppression system bullseye bfr-10 5 nozzles.Details
installation of new fire suppression system bullseye bfr-10 5 nozzles. | $2,500 |
| Aug 23, 2018 | Completed final sign-off Apr 2019 | 520 South Van Ness Av | #518: installation of new fire system (hood & duct) buckseye bfr-10110 9 nozzles.Details
#518: installation of new fire system (hood & duct) buckseye bfr-10110 9 nozzles. | $3,700 |
| Jul 12, 2018 | Completed final sign-off Feb 2019 | 3438 Balboa St | new fire suppression system hood & duct- building has no fire alarmDetails
new fire suppression system hood & duct- building has no fire alarm | $3,000 |
| Jun 28, 2018 | Never finaled issued Jul 2018, no final | 234 Townsend St | plan design and testing of vent less hood with ansul r loz systemDetails
plan design and testing of vent less hood with ansul r loz system | $1,500 |
| Jun 13, 2018 | Completed final sign-off Oct 2019 | 5800 Geary Bl | installation of new fire suppression system (hood & duct) buckeye bfr-15Details
installation of new fire suppression system (hood & duct) buckeye bfr-15 | $3,500 |
| May 30, 2018 | Never finaled issued May 2018, no final | 53 Stevenson St | installation of new fire supporting system buckeye bfr-10Details
installation of new fire supporting system buckeye bfr-10 | $3,000 |
| May 14, 2018 | Completed final sign-off May 2018 | 901 Valencia St | nozzles replacement on the ansul fire system. work will be performed in resturant onlyDetails
nozzles replacement on the ansul fire system. work will be performed in resturant only | $1,500 |
| Jan 26, 2018 | Completed final sign-off May 2018 | 36 Monterey Bl | add 1 sprinkler head and relocate 15 sprinker headsDetails
add 1 sprinkler head and relocate 15 sprinker heads | $2,000 |
| Jan 24, 2018 | Never finaled issued Jan 2018, no final | 2934 24th St | installation of new fire suppression system buckeyeDetails
installation of new fire suppression system buckeye | $2,500 |
| Dec 29, 2017 | Completed final sign-off Feb 2018 | 288 Golden Gate Av | installation of buckeye fire system. t.i. ref app#201709290036. n/a for maherDetails
installation of buckeye fire system. t.i. ref app#201709290036. n/a for maher | $2,200 |
| Dec 29, 2017 | Never finaled issued Dec 2017, no final | 386 Geary St | installation of ul300 buckeye fire system. t.i. ref app#201308073760. n/a for maherDetails
installation of ul300 buckeye fire system. t.i. ref app#201308073760. n/a for maher | $2,700 |
| Oct 11, 2017 | Completed final sign-off Sep 2019 | 500 Presidio Av | modification to ansul system.Details
modification to ansul system. | $1,500 |
| Jul 14, 2017 | Expired or cancelled cancelled Jan 2019 | 3438 Balboa St | install new fire system for commercial kitchen. ref bldg permit app #201607212984Details
install new fire system for commercial kitchen. ref bldg permit app #201607212984 | $2,000 |
| Mar 20, 2017 | Expired or cancelled cancelled Feb 2022 | 1544 45th Av | design & install new nfpa 130 wet-pipe fire sprinkler system through out existing residence and new garage addition, total 41 sprinklers.Details
design & install new nfpa 130 wet-pipe fire sprinkler system through out existing residence and new garage addition, total 41 sprinklers. | $12,000 |
| Feb 23, 2017 | Completed final sign-off Apr 2019 | 2834 Jackson St | design & install a new nfpa 13r wet pipe fire sprinkler system throughout existing residence & 158 st ft addition. 60 srpinklers total. ref pa 2016-0705-1541; n/a maher ord. 155-13Details
design & install a new nfpa 13r wet pipe fire sprinkler system throughout existing residence & 158 st ft addition. 60 srpinklers total. ref pa 2016-0705-1541; n/a maher ord. 155-13 | $15,000 |
| Feb 9, 2017 | Never finaled issued Feb 2017, no final | 331 Clement St | installation of new fire suppression system for commercial hood. t.i. pa#201612024043Details
installation of new fire suppression system for commercial hood. t.i. pa#201612024043 | $2,000 |
| Jan 30, 2017 | Completed final sign-off Feb 2018 | 138 16th Av | installing new fire sprinklers system using nfpa 13d standard. ref app#201608034082 and 201701318324. change existing 1" domestic service to 2" combination meter. no underground work.Details
installing new fire sprinklers system using nfpa 13d standard. ref app#201608034082 and 201701318324. change existing 1" domestic service to 2" combination meter. no underground work. | $15,000 |
| Jan 26, 2017 | Completed final sign-off Feb 2017 | 632 20th St | modifing existing ansul system to meet ul 300 codes.Details
modifing existing ansul system to meet ul 300 codes. | $1,000 |
| Dec 21, 2016 | Completed final sign-off Apr 2021 | 834 44th Av | revised waterflow calculations revision to 2016-0929-9157 & water pumpDetails
revised waterflow calculations revision to 2016-0929-9157 & water pump | |
| Nov 15, 2016 | Completed final sign-off Apr 2017 | 2801 Jennings St | ground fl: installing new fire suppression system for commercial kitchen hood; maher n/aDetails
ground fl: installing new fire suppression system for commercial kitchen hood; maher n/a | $3,200 |
| Sep 29, 2016 | Completed final sign-off Apr 2021 | 834 44th Av | install new fire sprinklers system to cover all living area. ref. pa#201110046071.Details
install new fire sprinklers system to cover all living area. ref. pa#201110046071. | $24,000 |
| Aug 18, 2016 | Completed final sign-off Oct 2016 | 5454 Geary Bl | installing new fire suppression system for hood and duct.Details
installing new fire suppression system for hood and duct. | $3,100 |
| Apr 5, 2016 | Expired or cancelled expired Jan 2019 | 2700 16th St | 1st flr: installation of fire suppression systemDetails
1st flr: installation of fire suppression system | $3,500 |
| Jan 29, 2016 | Completed final sign-off Apr 2016 | 430 Broadway | install new fire suppression system for hood and duct in commercial kitchenDetails
install new fire suppression system for hood and duct in commercial kitchen | $3,000 |
| Jan 8, 2016 | Completed final sign-off Feb 2016 | 1466 Hyde St | install new ul 300 fire suppression system for hood and ductDetails
install new ul 300 fire suppression system for hood and duct | $3,000 |
| Oct 5, 2015 | Completed final sign-off Aug 2016 | 2400 Vallejo St | install new underground pipe for combo system (sprinklers & dosmetic). ref. to pa#201507101195. n/a ordinance#144-13Details
install new underground pipe for combo system (sprinklers & dosmetic). ref. to pa#201507101195. n/a ordinance#144-13 | $5,000 |
| Sep 15, 2015 | Completed final sign-off Apr 2017 | 425 Market St | 1st floor installing new fire suppression system for commercial kitchen hood. ref app#201501266675(28 fremont street) n/a maher ordinance.Details
1st floor installing new fire suppression system for commercial kitchen hood. ref app#201501266675(28 fremont street) n/a maher ordinance. | $7,000 |
| Aug 25, 2015 | Completed final sign-off Jan 2016 | 2250 Jerrold Av | unit #13: adding 17 sprinkler head and relocate 12 sprinkler heads of (e) sprinkler system ref pa 2015 0625 9882. maher naDetails
unit #13: adding 17 sprinkler head and relocate 12 sprinkler heads of (e) sprinkler system ref pa 2015 0625 9882. maher na | $6,500 |
| Aug 24, 2015 | Completed final sign-off Aug 2015 | 245 05th St | add 14 sprinkler heads, relocate 4 sprinkler heads. as built 201507101193 revision to existing planDetails
add 14 sprinkler heads, relocate 4 sprinkler heads. as built 201507101193 revision to existing plan | $9,252 |
| Aug 14, 2015 | Completed final sign-off Nov 2015 | 3854 Geary Bl | installation of fire suppression system bucketye bfr-15Details
installation of fire suppression system bucketye bfr-15 | $2,500 |
| Jul 10, 2015 | Completed final sign-off Aug 2016 | 2400 Vallejo St | install new residential fire sprinkler system, 72 heads maher nobd per approved arch'sDetails
install new residential fire sprinkler system, 72 heads maher nobd per approved arch's | $16,000 |
| Jul 10, 2015 | Completed final sign-off Aug 2015 | 245 05th St | add 14 fire sprinklers. relocate 4 existing fire sprinklers.201105317083 and 201407161393Details
add 14 fire sprinklers. relocate 4 existing fire sprinklers.201105317083 and 201407161393 | $3,500 |
| Feb 24, 2015 | Completed final sign-off Jul 2015 | 1700 Mission St | installation of hood and duct fire suppression system buckeye bfr-10. compliance with maher ordinance no 155-13 no required.Details
installation of hood and duct fire suppression system buckeye bfr-10. compliance with maher ordinance no 155-13 no required. | $2,600 |
| Feb 6, 2014 | Completed final sign-off Jun 2014 | 1115 Polk St | ti of (e) sprinkler system. new backflow preventer. add 54 new sprinklers, t.i. pa# 201211214704.Details
ti of (e) sprinkler system. new backflow preventer. add 54 new sprinklers, t.i. pa# 201211214704. | $18,000 |
| Apr 16, 2013 | Completed final sign-off Apr 2013 | 1121 Polk St | installation of fire suppression system for commercial kitchenDetails
installation of fire suppression system for commercial kitchen | $3,200 |
| Feb 26, 2013 | Completed final sign-off Apr 2013 | 4625 Geary Bl | install new fire suppression system for commercial kitchen.Details
install new fire suppression system for commercial kitchen. | $5,500 |
| Sep 27, 2011 | Completed final sign-off Dec 2011 | 974 Valencia St | installation of hood and duct suppression system for kitchen equipment.Details
installation of hood and duct suppression system for kitchen equipment. | $3,000 |
| Jan 28, 2011 | Completed final sign-off Mar 2011 | 2425 Mission St | 1st floor - installation of hood & duct suppression system.Details