Block 4058, lot 005
2289 03rd St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 9
- Rooms
- 13 bathrooms
- Building
- 10,950 sq ft
- Lot
- 5,998 sq ft
- Zoning
- M2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
32 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 29, 2022 | Never finaled issued Jun 2022, no final | 2289 03rd St | Tom Mccaffrey | to obtain final inspection for pa# 201604043824. all work is complete.Details
to obtain final inspection for pa# 201604043824. all work is complete. | |
| Jun 29, 2022 | Completed final sign-off Jul 2022 | 2291 03rd St | Tom Mccaffrey | to obtain final inspection for pa# 201808036429. all work is complete.Details
to obtain final inspection for pa# 201808036429. all work is complete. | |
| May 18, 2022 | Never finaled issued May 2022, no final | 2295 03rd St | Ha Fire Protection | install ul-300 fire suppression system hood & ductDetails
install ul-300 fire suppression system hood & duct | $1,500 |
| Feb 23, 2022 | Completed final sign-off Feb 2023 | 2295 03rd St | C T W Mechanical | remove (e) hood, exhaust fan, make up fan & replace with new hood, exhaust fan & make up fan.Details
remove (e) hood, exhaust fan, make up fan & replace with new hood, exhaust fan & make up fan. | $10,000 |
| Aug 3, 2018 | Expired or cancelled expired Jul 2022 | 2291 03rd St | Yu Kwan Construction Co. | 1/f -t.i. commercial ror ice cream and tea shop. constuct 30 l.f. of 1/2 wall and install cabinets.Details
1/f -t.i. commercial ror ice cream and tea shop. constuct 30 l.f. of 1/2 wall and install cabinets. | $25,000 |
| Feb 13, 2017 | Never finaled issued Feb 2017, no final | 632 20th St | Ad Art Inc. | electric wall sign, illuminated.Details
electric wall sign, illuminated. | $5,000 |
| Jan 26, 2017 | Completed final sign-off Feb 2017 | 632 20th St | Shield Fire & Safety Solutions Inc | modifing existing ansul system to meet ul 300 codes.Details
modifing existing ansul system to meet ul 300 codes. | $1,000 |
| Jan 10, 2017 | Never finaled issued Jan 2017, no final | 632 20th St | street spaceDetails
street space | ||
| Sep 29, 2016 | Completed final sign-off Feb 2017 | 632 20th St | Hive Builds Inc. | g/f -remodel of (e)restaurant,no change in occupancy,ada upgrades made, basement kitchen to be updated with new plumbing, electrical, storage, fixtures & equipment. interior only, no exterior changes; maher n/aDetails
g/f -remodel of (e)restaurant,no change in occupancy,ada upgrades made, basement kitchen to be updated with new plumbing, electrical, storage, fixtures & equipment. interior only, no exterior changes; maher n/a | $50,000 |
| Apr 4, 2016 | Never finaled issued Dec 2016, no final | 2289 03rd St | Tom Mccaffrey | install 2 new windows and replace t-1-11 siding w/hardy board. install compliant handrail and warning stripe @ entry stairDetails
install 2 new windows and replace t-1-11 siding w/hardy board. install compliant handrail and warning stripe @ entry stair | $2,500 |
| Mar 6, 2014 | Never finaled issued Mar 2014, no final | 2289 03rd St | Tom Mccaffrey | return clerestory with new wood window. no change in dimension. hopper style for b occupancy. compliance w/ the maher ordinance # 155-13 does not complyDetails
return clerestory with new wood window. no change in dimension. hopper style for b occupancy. compliance w/ the maher ordinance # 155-13 does not comply | $300 |
| Feb 20, 2014 | Completed final sign-off Apr 2014 | 2289 03rd St | Harrison Woodworking + Design | sheet rock over extg lath and plaster for smooth wall for wall paper. new lighting, elocate extg electrical. entry door with ada code door, gyp board ceiling.n/a for the maher ordinance #155-13Details
sheet rock over extg lath and plaster for smooth wall for wall paper. new lighting, elocate extg electrical. entry door with ada code door, gyp board ceiling.n/a for the maher ordinance #155-13 | $12,000 |
| Aug 8, 2013 | Completed final sign-off Nov 2013 | 628 20th St | One Inch To The Left, Inc. Dba Rarefield | remodel interior, new retail counter, new equipment, new ada bathroom and new lighting. ground floor only.Details
remodel interior, new retail counter, new equipment, new ada bathroom and new lighting. ground floor only. | $50,000 |
| May 7, 2013 | Never finaled issued May 2013, no final | 628 20th St | to obtain final inspection for work approved under pa#200506235847. all work is complete.Details
to obtain final inspection for work approved under pa#200506235847. all work is complete. | ||
| May 7, 2013 | Never finaled issued May 2013, no final | 628 20th St | to obtain final inspection for work approved under pa#200604038152. all work is complete.Details
to obtain final inspection for work approved under pa#200604038152. all work is complete. | ||
| May 3, 2013 | Completed final sign-off May 2013 | 2295 03rd St | International Fire Equip | installation of a ul 300 fire systemDetails
installation of a ul 300 fire system | $3,000 |
| Apr 9, 2013 | Completed final sign-off May 2013 | 2295 03rd St | All Food Service Installations | extg cafe/restaurant adding class 1 hood and associated equipment.Details
extg cafe/restaurant adding class 1 hood and associated equipment. | $20,000 |
| Apr 8, 2013 | Never finaled issued May 2013, no final | 628 20th St | barrier removal, modify (e) door alcove for accessibility. install ramp to access floor level. install 6 new windows & replace dry rot fascia. replace in kind.Details
barrier removal, modify (e) door alcove for accessibility. install ramp to access floor level. install 6 new windows & replace dry rot fascia. replace in kind. | $12,000 | |
| Mar 27, 2013 | Completed final sign-off Oct 2013 | 628 20th St | non structural work to include wall and linoleum floor removal.Details
non structural work to include wall and linoleum floor removal. | $1,000 | |
| Oct 24, 2011 | Completed final sign-off Oct 2011 | 2295 03rd St | J B M Construction | revision to pa# 2010-1213-6610-revise max slop at front entry to level entry & revise front door swingDetails
revision to pa# 2010-1213-6610-revise max slop at front entry to level entry & revise front door swing | $200 |
| Dec 13, 2010 | Completed final sign-off Oct 2011 | 2295 03rd St | J B M Construction | comply with his nov# 201044165 (rear stairs), dated 4/27/10-combine 2 restaurant spaces, form 1 new large fast food restautant, open interior door, build divider 8' long, relocate storage room door. no work on kitchen equipment. change of occupancy from b to a-2.Details
comply with his nov# 201044165 (rear stairs), dated 4/27/10-combine 2 restaurant spaces, form 1 new large fast food restautant, open interior door, build divider 8' long, relocate storage room door. no work on kitchen equipment. change of occupancy from b to a-2. | $2,000 |
| Nov 12, 2010 | Completed final sign-off Nov 2012 | 636 20th St | underpinning of buildingDetails
underpinning of building | $25,000 | |
| Oct 12, 2010 | Completed final sign-off Jun 2011 | 2293 03rd St | Quality Painting Construction | interior refinish and remodel of 4 apt units. cover ex walls with gwb,new flooring, sound insulation at prty walls, remodel kitchens and baths, add new non load bearing partitions. seal ex fireplaces/flues. replace windows, skylights, add skylights, replace furnaces and water heatersDetails
interior refinish and remodel of 4 apt units. cover ex walls with gwb,new flooring, sound insulation at prty walls, remodel kitchens and baths, add new non load bearing partitions. seal ex fireplaces/flues. replace windows, skylights, add skylights, replace furnaces and water heaters | $100,000 |
| Jul 16, 2010 | Completed final sign-off Aug 2010 | 632 20th St | Fire Safety Supply Inc | to comply with nov# 200997004. upgrade fire supression system to hood and appliacnes to ul 300.Details
to comply with nov# 200997004. upgrade fire supression system to hood and appliacnes to ul 300. | $1,800 |
| Feb 26, 2009 | Expired or cancelled cancelled Jan 2026 | 628 20th St | repair bathroom and bedroom fire damage. fix windows and doors. patch sheetrock. electrical & plumbing separate permits.Details
repair bathroom and bedroom fire damage. fix windows and doors. patch sheetrock. electrical & plumbing separate permits. | ||
| Oct 2, 2007 | Expired or cancelled expired Mar 2009 | 632 20th St | Nielson Mechanical Inc. | installation of fire suppression system for an existing hoodDetails
installation of fire suppression system for an existing hood | $3,500 |
| Apr 3, 2006 | Expired or cancelled expired Mar 2007 | 628 20th St | reonfiguration of windows glazing on 20th street, relocation of door between cafe & pantry, relocatin of (e) heater in office., remaining door between office & courtyard., rvision to pa 200505243332 as buidtDetails
reonfiguration of windows glazing on 20th street, relocation of door between cafe & pantry, relocatin of (e) heater in office., remaining door between office & courtyard., rvision to pa 200505243332 as buidt | $3,500 | |
| Jul 27, 2005 | Completed final sign-off Apr 2006 | 2289 03rd St | (unit #2295 3rd street) permit #2005/05/24/3332 - pulled for 628-638 20th street is in actualityDetails
(unit #2295 3rd street) permit #2005/05/24/3332 - pulled for 628-638 20th street is in actuality | ||
| Jul 25, 2005 | Never finaled issued Jul 2005, no final | 628 20th St | S F Rents | 12" cap approx 25 ft long, foundation under windows where building fndtn below sidewalk. 5/8' anchorDetails
12" cap approx 25 ft long, foundation under windows where building fndtn below sidewalk. 5/8' anchor | $2,500 |
| Jun 23, 2005 | Expired or cancelled expired Nov 2011 | 628 20th St | S F Rents | replace old wooden windows with new dual glass wood windows, tempered as per codeDetails
replace old wooden windows with new dual glass wood windows, tempered as per code | $20,000 |
| May 24, 2005 | Completed final sign-off Apr 2006 | 628 20th St | interior remodeling of new coffee shop including new h.c. bathroom new counter, new entrywayDetails
interior remodeling of new coffee shop including new h.c. bathroom new counter, new entryway | $40,000 | |
| Feb 16, 2005 | Completed final sign-off Jun 2005 | 636 20th St | Blackford Construction | change 2 steps back to rriginal, install handrail, barried removal work only under this permitDetails
change 2 steps back to rriginal, install handrail, barried removal work only under this permit | $1,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Tom Mccaffrey (4), J B M Construction (2), S F Rents (2), Ad Art Inc., All Food Service Installations, Blackford Construction, C T W Mechanical, Fire Safety Supply Inc, Ha Fire Protection, Harrison Woodworking + Design, Hive Builds Inc., International Fire Equip, Nielson Mechanical Inc., One Inch To The Left, Inc. Dba Rarefield, Quality Painting Construction, Shield Fire & Safety Solutions Inc, Yu Kwan Construction Co.
- Architects
- Charles Hemminger (2), Maxwell A. Beaumont, Peter Petruzzi
- Engineers
- Matthew Wang, Tim Mathison
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.