Maxwell Beaumont
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Beaumont & Associates
- Based in
- Emeryville
- On San Francisco permits
- Mar 2003 to Sep 2026
221 permits since 2000 (architect on 206 permits, engineer on 9 permits, authorized agent-others on 5 permits, designer on 2 permits): 129 completed, 13 in progress, 36 never finaled, 43 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 221.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 25, 2026 | In progress filed Sep 2026, not yet issued | 225 Farallones St | remodel (e) rear portion residence. remodel (e) bathroom, (n) lighting throughout; new interior insulation; (n) sheetrock at wall & ceiling; (n) mini split hea pump & hp water heaterDetails
remodel (e) rear portion residence. remodel (e) bathroom, (n) lighting throughout; new interior insulation; (n) sheetrock at wall & ceiling; (n) mini split hea pump & hp water heater | $25,000 | |
| Sep 13, 2026 | In progress filed Sep 2026, not yet issued | 208 Winfield St | to address nov# 202658170; interior remodel of bathrooms, kitchen, laundry room & stair (guardrail/handrail); repair & replace in kind; to add fire - rated wall at the northeast property line; electrical upgrade to 125 amps. fixture count & location remains the same.Details
to address nov# 202658170; interior remodel of bathrooms, kitchen, laundry room & stair (guardrail/handrail); repair & replace in kind; to add fire - rated wall at the northeast property line; electrical upgrade to 125 amps. fixture count & location remains the same. | $150,000 | |
| May 4, 2026 | In progress issued Sep 2026 | 26 Lupine Av | Baytel | (e) upper deck off of condo will be repaired & replaced in-kind guardrails will be changed to hogwire panels, (e) lower deck off of studio to be repaired & replaced w/extending 3'-8", (n) guardrail to be installed. guardrail shall be hogwire panels. stairs will extend from lower deck into backDetails
(e) upper deck off of condo will be repaired & replaced in-kind guardrails will be changed to hogwire panels, (e) lower deck off of studio to be repaired & replaced w/extending 3'-8", (n) guardrail to be installed. guardrail shall be hogwire panels. stairs will extend from lower deck into back | $60,000 |
| Mar 16, 2026 | Completed final sign-off Jun 2026 | 121 Sagamore St | revision to appl #202201125841: remove windows at left wall (side) of (e) building create (n) 1 hr exterior wall on exterior of side.Details
revision to appl #202201125841: remove windows at left wall (side) of (e) building create (n) 1 hr exterior wall on exterior of side. | $10,000 | |
| Jul 24, 2025 | Completed final sign-off Jan 2026 | 53 Lapham Wy | Rozen Home Builders Inc | revision to pa#: 202409100483; 1) remove hallway closet. 2) reduce rear deck size. ref. bpa# 2024 1203 6115Details
revision to pa#: 202409100483; 1) remove hallway closet. 2) reduce rear deck size. ref. bpa# 2024 1203 6115 | |
| Feb 12, 2025 | Completed final sign-off May 2025 | 263 Central Av | O Vargas Construction Inc | remodel existing bathroom, add new shower in existing bathroom.Details
remodel existing bathroom, add new shower in existing bathroom. | $23,000 |
| Dec 3, 2024 | Completed final sign-off Jan 2026 | 53 Lapham Wy | Franklin's Construction | revision to pa# 202409100483. revise kitchen layout. revise bathroom size. convert portion of garage with new wall to unconditioned workshop area. reconfigure 2/f bathroom. upgrade electric to 200 amp. create furnace closet. add insulation to wall cavities.Details
revision to pa# 202409100483. revise kitchen layout. revise bathroom size. convert portion of garage with new wall to unconditioned workshop area. reconfigure 2/f bathroom. upgrade electric to 200 amp. create furnace closet. add insulation to wall cavities. | $4,000 |
| Nov 14, 2024 | In progress filed Nov 2024, not yet issued | 263 Central Av | remodel (e) bathroom. add new shower stall and remodel half bath at hall. interior work only.Details
remodel (e) bathroom. add new shower stall and remodel half bath at hall. interior work only. | $15,000 | |
| Nov 4, 2024 | Completed final sign-off Dec 2024 | 66 Martha Av | Cliff Point Construction Inc | ref pa 202409261652 existing deck. demo existing rebuild new, smaller deck. replace (e) deck due to extensive wood rot. reduce size of (e) deck 16'-0" x 16'-0" to a 16'-0" x 12'-0" deck will be clear redwoodDetails
ref pa 202409261652 existing deck. demo existing rebuild new, smaller deck. replace (e) deck due to extensive wood rot. reduce size of (e) deck 16'-0" x 16'-0" to a 16'-0" x 12'-0" deck will be clear redwood | $15,000 |
| Oct 1, 2024 | Expired or cancelled withdrawn Sep 2025 | 1115 Gilman Av | Brighter Legacy Builders Inc. | 1) convert attic storage into habitable space. 2) install new custom prefabircated spiral interior stairs.Details
1) convert attic storage into habitable space. 2) install new custom prefabircated spiral interior stairs. | $12,000 |
| Aug 23, 2024 | In progress issued Aug 2024 | 121 Sagamore St | revision to pa# 202311281546, reconfigure rear deck stairs, add new concrete footing, increase post & footing sizes.Details
revision to pa# 202311281546, reconfigure rear deck stairs, add new concrete footing, increase post & footing sizes. | $1,000 | |
| Aug 23, 2024 | Completed final sign-off Nov 2024 | 129 Sagamore St | revision to pa# 202212309493, reconfigure rear deck and landing, new 1-hr firewall at landing.Details
revision to pa# 202212309493, reconfigure rear deck and landing, new 1-hr firewall at landing. | $1,000 | |
| Aug 21, 2024 | In progress issued Aug 2024 | 3185 San Jose Av | unit 3185: convert dining to bedroom, add 1 bathroom, relocate kitchen. new tankless water heater. wall alteration for closet. nov 200727975 item #1 (repair rear stairs) under apn#202209273265.Details
unit 3185: convert dining to bedroom, add 1 bathroom, relocate kitchen. new tankless water heater. wall alteration for closet. nov 200727975 item #1 (repair rear stairs) under apn#202209273265. | $30,000 | |
| Jul 5, 2024 | Completed final sign-off Oct 2024 | 755 20th Av | Sky River Builder Inc | interior alterations to remove wall at living/dining rooms per plan set.Details
interior alterations to remove wall at living/dining rooms per plan set. | $30,000 |
| Jun 16, 2024 | Completed final sign-off Feb 2026 | 351 Valley St | A W Construction Company | demolish (e) storage & add (n)adu [a state adu (unit 2) at basement] instead with new living room, kitchen, bedrrom & bath.add (n) mechanical room, add (n) tank-less water heater & furnace.Details
demolish (e) storage & add (n)adu [a state adu (unit 2) at basement] instead with new living room, kitchen, bedrrom & bath.add (n) mechanical room, add (n) tank-less water heater & furnace. | $186,372 |
| May 9, 2024 | Completed final sign-off Mar 2026 | 830 Bush St | Kells Construction Inc., Bowen Construction-Painting & Waterproof | replace section of roof parapet "in kind" retrofit. street facing building facade to remain as existing.Details
replace section of roof parapet "in kind" retrofit. street facing building facade to remain as existing. | $60,000 |
| Feb 22, 2024 | In progress filed Feb 2024, not yet issued | 188 Flournoy St | Firm Construction Company | revision to permit# 201904168150: to address energy compliance changes due to installation of multi zone split heat pump and a single water heater. no other changes to permit set.Details
revision to permit# 201904168150: to address energy compliance changes due to installation of multi zone split heat pump and a single water heater. no other changes to permit set. | |
| Dec 18, 2023 | In progress issued Feb 2024 | 1552 Yosemite Av | revision to 201602240361. revision are to address the (e) conditions and to install emergency exit lighting. (e) conditions remain wth an ada complaint restroom, and two offices. offices are converted into cannabis lab and canabis tissue growth nursery. green house agriculture use per planning codeDetails
revision to 201602240361. revision are to address the (e) conditions and to install emergency exit lighting. (e) conditions remain wth an ada complaint restroom, and two offices. offices are converted into cannabis lab and canabis tissue growth nursery. green house agriculture use per planning code | $5,000 | |
| Nov 28, 2023 | In progress issued Jan 2024 | 121 Sagamore St | new rear deck (168sf).Details
new rear deck (168sf). | $8,000 | |
| Nov 22, 2023 | In progress issued Jan 2024 | 3183 San Jose Av | unit a: revision to 202207128303 change window sizes (non street visible), reconfigure kitchen, no change to ceiling height previously approvedDetails
unit a: revision to 202207128303 change window sizes (non street visible), reconfigure kitchen, no change to ceiling height previously approved | $3,000 | |
| Oct 25, 2023 | Completed final sign-off May 2024 | 1501 Church St | Red Rock Hill Construction Llc | to remove existing upper level deck due to wood rot. the existing cantilevered joists will be cut at the edge of bldg. the stairs leading to new deck will be replaced existing exterior lighting & electrical to remain unchanged. no other work to be performed.Details
to remove existing upper level deck due to wood rot. the existing cantilevered joists will be cut at the edge of bldg. the stairs leading to new deck will be replaced existing exterior lighting & electrical to remain unchanged. no other work to be performed. | $30,000 |
| Oct 13, 2023 | In progress issued Jun 2024 | 239 Noriega St | Car Construction | replace (e) foundation and slab, new 1/2 bathroom at existing laundry room in garageDetails
replace (e) foundation and slab, new 1/2 bathroom at existing laundry room in garage | $80,000 |
| Sep 25, 2023 | Completed final sign-off Nov 2024 | 1539 Church St | Advanced Design General Contractor | to comply with accessible business entrance program ord 51-16. ref abe 201912119684. request for "technical infeasibility" for 1539 church st. entry has 2 steps prior to arriving at front door. entry will have a door release button and a door buzzard to have accessibility to business.Details
to comply with accessible business entrance program ord 51-16. ref abe 201912119684. request for "technical infeasibility" for 1539 church st. entry has 2 steps prior to arriving at front door. entry will have a door release button and a door buzzard to have accessibility to business. | $7,500 |
| Aug 15, 2023 | Completed final sign-off Apr 2026 | 301 Eureka St | E H B Construction, Edenavow Construction & Design | revision to pa# 2018-1204-7373, to reduce the new restroom from extending into a storage area which required engineering the new configuration will be within the (e) space & still meet ada requirements for restroom. there are no revisions to any other areas of the permitted set.Details
revision to pa# 2018-1204-7373, to reduce the new restroom from extending into a storage area which required engineering the new configuration will be within the (e) space & still meet ada requirements for restroom. there are no revisions to any other areas of the permitted set. | $1,500 |
| Aug 7, 2023 | Completed final sign-off Aug 2025 | 619 Bosworth St | Cej Construction Llc, Majestic Landscape | revision to 201912300893. revision to exterior staircase per inspector request. change 2/f kitchen layout.Details
revision to 201912300893. revision to exterior staircase per inspector request. change 2/f kitchen layout. | |
| Jun 23, 2023 | Completed final sign-off Aug 2023 | 2406 Funston Av | Ortizlaw Construction | additional work to pa 2023-0531-8906 per building inspector request add (2) 4x12 full width of garage and gate and 6x6 postsDetails
additional work to pa 2023-0531-8906 per building inspector request add (2) 4x12 full width of garage and gate and 6x6 posts | $1,000 |
| May 23, 2023 | Expired or cancelled withdrawn Jan 2025 | 238 Evelyn Wy | revision to approved permit 202110150550. this revision adds is a rear addition for the purpose of adding an adu unit instead of previously approved rooms down addition. this adu addition is consistent with gov. code, § 65852.2, subd. (g).Details
revision to approved permit 202110150550. this revision adds is a rear addition for the purpose of adding an adu unit instead of previously approved rooms down addition. this adu addition is consistent with gov. code, § 65852.2, subd. (g). | $20,000 | |
| May 1, 2023 | Completed final sign-off Sep 2023 | 3672 Sacramento St | Car Construction | to comply with nov 202288001, replace in-kind" existing rear stairsDetails
to comply with nov 202288001, replace in-kind" existing rear stairs | $50,000 |
| Apr 13, 2023 | Never finaled filed Apr 2023, never issued | 2607 San Jose Av | new addition (954 sf) basement conversion (329sf), to liv.space. rear addition-adu (348 sf), second floor addition (277 sf). new mini - split heat pump, new electrical meter (adu). 2- new bedroom,kitchen and bathroom at new adu.Details
new addition (954 sf) basement conversion (329sf), to liv.space. rear addition-adu (348 sf), second floor addition (277 sf). new mini - split heat pump, new electrical meter (adu). 2- new bedroom,kitchen and bathroom at new adu. | $250,000 | |
| Feb 1, 2023 | Completed final sign-off Nov 2023 | 512 Lisbon St | demolition of a type-v b, 1 story residential structure in the rear yard.Details
demolition of a type-v b, 1 story residential structure in the rear yard. | $4,000 | |
| Dec 30, 2022 | Completed final sign-off Nov 2024 | 129 Sagamore St | revision to bpa#202205063713, reduce rear deck size, relocate stair @ deckDetails
revision to bpa#202205063713, reduce rear deck size, relocate stair @ deck | ||
| Oct 21, 2022 | Never finaled issued Dec 2022, no final | 4128 18th St | accessible business entrance program per ordinance 51-16. to comply with abe program, abe#202210125019. front entry door will be supplied w/opening mechanism, panic hardware & (2) push pad door entry units.Details
accessible business entrance program per ordinance 51-16. to comply with abe program, abe#202210125019. front entry door will be supplied w/opening mechanism, panic hardware & (2) push pad door entry units. | $4,500 | |
| Oct 20, 2022 | Never finaled filed Oct 2022, never issued | 3181 San Jose Av | add new adu per government code section 65852.2. covert existing crawel space to new 597 sq ft adu. replace window. add new insulation. new kitchen and bathroom. new tankless water heater. relocate interior walls. nfpa 13 sprinkler system at (n) adu under deferred submittal.Details
add new adu per government code section 65852.2. covert existing crawel space to new 597 sq ft adu. replace window. add new insulation. new kitchen and bathroom. new tankless water heater. relocate interior walls. nfpa 13 sprinkler system at (n) adu under deferred submittal. | $60,000 | |
| Sep 29, 2022 | Completed final sign-off Feb 2023 | 661 Broadway | revision to pa# 201912311124. modification to parking layout onlyDetails
revision to pa# 201912311124. modification to parking layout only | ||
| Sep 27, 2022 | Completed final sign-off Sep 2023 | 3181 San Jose Av | replace (e) entry stairs to comply with his nov#200727975, item #1, dated 10/26/2007Details
replace (e) entry stairs to comply with his nov#200727975, item #1, dated 10/26/2007 | $5,000 | |
| Sep 8, 2022 | In progress issued Sep 2026 | 135 Hearst Av | Ortizlaw Construction | convert (e) 1st (garage level to new adu 620 sf) with 2 bedroom, 1 bathroom & kitchen. relocate garage door create adu street entry / access. new mini-split heat pump, new water heater.Details
convert (e) 1st (garage level to new adu 620 sf) with 2 bedroom, 1 bathroom & kitchen. relocate garage door create adu street entry / access. new mini-split heat pump, new water heater. | $25,000 |
| Aug 11, 2022 | Completed final sign-off Jan 2023 | 3207 Market St | Matthew Kelly Construction Inc | revision to pa# 202203250864. change in framing of the rear deck. all other area of original permit unchanged.Details
revision to pa# 202203250864. change in framing of the rear deck. all other area of original permit unchanged. | |
| Jul 12, 2022 | Never finaled issued Jul 2022, no final | 3183 San Jose Av | 1/f unit a: remodel (e) unit a, new kitchen, bathroom, new windows, new electrical and lighting, new tankless waster heater, new mini split heat pump. new insulation at walls and ceiling.Details
1/f unit a: remodel (e) unit a, new kitchen, bathroom, new windows, new electrical and lighting, new tankless waster heater, new mini split heat pump. new insulation at walls and ceiling. | $30,000 | |
| Apr 5, 2022 | Never finaled filed Apr 2022, never issued | 1639 Hawes St | change of use from industial warehouse to food catering facility(food handling) ti of (e) commercial kitchen & restroom upgrade. (e) ktichen & restroom upgrade to meet ada. (e) kitchen to be remodeled. (n) electrical & (n) plumbing. address ada 1199 thomas aveDetails
change of use from industial warehouse to food catering facility(food handling) ti of (e) commercial kitchen & restroom upgrade. (e) ktichen & restroom upgrade to meet ada. (e) kitchen to be remodeled. (n) electrical & (n) plumbing. address ada 1199 thomas ave | $480,000 | |
| Mar 7, 2022 | Completed final sign-off Nov 2024 | 129 Sagamore St | revision to permit 202202147892. reframe (e) wall at west side. reframe (e) roof. replace additional foundation.Details
revision to permit 202202147892. reframe (e) wall at west side. reframe (e) roof. replace additional foundation. | $15,100 | |
| Feb 14, 2022 | Completed final sign-off Nov 2024 | 129 Sagamore St | 2/f: remodel existing. g/f: add one bedroom, one bathroom.Details
2/f: remodel existing. g/f: add one bedroom, one bathroom. | $60,000 | |
| Jan 12, 2022 | Never finaled issued Feb 2022, no final | 121 Sagamore St | remodel existing 2/f and 3/f. no work on garage level. no exterior work.Details
remodel existing 2/f and 3/f. no work on garage level. no exterior work. | $50,000 | |
| Dec 2, 2021 | In progress issued Jul 2026 | 1327 48th Av | Metzler Brothers General Contractors Inc | rear side horizontal residence addition on 1st floor. add roof deck to addition. add staircase from backyard to new roof deck. converting part of storage to access corridor to new bedroom. relocation washer and dryer. add new retractable canopy on top of new roof deck. changing existing kitchen winDetails
rear side horizontal residence addition on 1st floor. add roof deck to addition. add staircase from backyard to new roof deck. converting part of storage to access corridor to new bedroom. relocation washer and dryer. add new retractable canopy on top of new roof deck. changing existing kitchen win | $70,000 |
| Nov 18, 2021 | Never finaled issued Dec 2021, no final | 66 Latona St | revision to 201907025022 to delete 3rd fl kitchen remodel and 1/2 bath from scope of work.Details
revision to 201907025022 to delete 3rd fl kitchen remodel and 1/2 bath from scope of work. | ||
| Aug 12, 2021 | Completed final sign-off Mar 2022 | 2472 Vallejo St | Alex Builder | revision to pa 2021-0730-5443. relocate laundry & bath on top floor. slithg shift in window position due to field conditionDetails
revision to pa 2021-0730-5443. relocate laundry & bath on top floor. slithg shift in window position due to field condition | |
| Jul 30, 2021 | Completed final sign-off Mar 2022 | 2472 Vallejo St | Alex Builder | revision to bpa #2021/0603/1599. relocate bathroom and add strutural work at ground floor.(boa no. 21-015)Details
revision to bpa #2021/0603/1599. relocate bathroom and add strutural work at ground floor.(boa no. 21-015) | |
| Jun 29, 2021 | Never finaled issued Oct 2021, no final | 845 Lake St | Pellandini & Company | 4/f unit 15 aka 5: remodel of (e) kitchen and bathroom. new plumbing, electrical and lighting associated with the remodel. no work to be performed in other areas. building does not have a fire sprinkler system.Details
4/f unit 15 aka 5: remodel of (e) kitchen and bathroom. new plumbing, electrical and lighting associated with the remodel. no work to be performed in other areas. building does not have a fire sprinkler system. | $50,000 |
| Jun 14, 2021 | Completed final sign-off Jul 2024 | 320 San Carlos St | Schrobsdorff Construction | level 2: remodel of (e) laundry room and closet. new bathroom addition and reconfiguration of laundry and closet. new plumbing includes new water closet, new faucet, new shower, dryer exhaust and washer supply. relocate drain. new electrical includes new ligthing and vanity. new led recessesDetails
level 2: remodel of (e) laundry room and closet. new bathroom addition and reconfiguration of laundry and closet. new plumbing includes new water closet, new faucet, new shower, dryer exhaust and washer supply. relocate drain. new electrical includes new ligthing and vanity. new led recesses | $25,000 |
| Jun 3, 2021 | Completed final sign-off Mar 2022 | 2472 Vallejo St | Alex Builder | boa no. 21-015. g/f: add new footing in lightwell and piers at (e) rear footing. infill of lightwell to property line. 2/f: add beams and joist reinforcements. interior remodel. infill lightwell with 3 ft setback and window. 3/f: removal of wall at property line and deck aboveDetails
boa no. 21-015. g/f: add new footing in lightwell and piers at (e) rear footing. infill of lightwell to property line. 2/f: add beams and joist reinforcements. interior remodel. infill lightwell with 3 ft setback and window. 3/f: removal of wall at property line and deck above | |
| May 14, 2021 | Completed final sign-off Oct 2022 | 1225 Quintara St | Handyman Heroes Inc. | ground floor remodel. relocate exterior stairs. replace and add new doors and windows. replace (e) skylights. new skylight.Details
ground floor remodel. relocate exterior stairs. replace and add new doors and windows. replace (e) skylights. new skylight. | $200,000 |
| Feb 18, 2021 | Never finaled filed Feb 2021, never issued | 1115 Gilman Av | revision to no plan pa# 201704204500. remodel (e) dewlling. new kitchen, bathroom, legalize attic bedrooms, raise roof 29" to obtain legal 2nd floor height. new m.e.p..Details
revision to no plan pa# 201704204500. remodel (e) dewlling. new kitchen, bathroom, legalize attic bedrooms, raise roof 29" to obtain legal 2nd floor height. new m.e.p.. | $140,000 | |
| Feb 12, 2021 | Completed final sign-off May 2022 | 340 Baker St | Alef Construction Corp | apt #6: to relocate (e) kitchen & bathroom (on 2nd fl). new electrical & plumbing. no fire sprinkler system.Details
apt #6: to relocate (e) kitchen & bathroom (on 2nd fl). new electrical & plumbing. no fire sprinkler system. | $40,000 |
| Jan 28, 2021 | Completed final sign-off Sep 2021 | 4077 18th St | request for technical infeasibility of city mandatory abe program for 2 commercial entries. 2 entries will be upgraded with door release button and/or door buzzard to have accessibility to businesses.Details
request for technical infeasibility of city mandatory abe program for 2 commercial entries. 2 entries will be upgraded with door release button and/or door buzzard to have accessibility to businesses. | $8,500 | |
| Jan 8, 2021 | Never finaled issued Feb 2021, no final | 150 San Buenaventura Wy | Mone Construction Co Inc | bathroom remodel. same area.Details
bathroom remodel. same area. | $20,000 |
| Dec 31, 2020 | Completed final sign-off Jun 2022 | 340 Baker St | Alef Construction Corp | apt# 8: remodel (e) kitchen & bathroom, new lighting in common areas (e) hallways, new elec, ligting & plumbing only in apt. 8 and hallways, no work performed in other areas, building does not have a fire sprinkler systemDetails
apt# 8: remodel (e) kitchen & bathroom, new lighting in common areas (e) hallways, new elec, ligting & plumbing only in apt. 8 and hallways, no work performed in other areas, building does not have a fire sprinkler system | $50,000 |
| Dec 16, 2020 | Never finaled issued Jun 2021, no final | 3763 17th St | Schrobsdorff Construction | remodel (e) closet, convert (e) window in closet to a door. (e) water heater will be moved & replaced w/ tankless. a (n) bathroom will be added in (e) footprint. bathroom will consist of toilet, sink & shower. (n) electrical, lighting & plumbing. bldg does not have fire sprinklers.Details
remodel (e) closet, convert (e) window in closet to a door. (e) water heater will be moved & replaced w/ tankless. a (n) bathroom will be added in (e) footprint. bathroom will consist of toilet, sink & shower. (n) electrical, lighting & plumbing. bldg does not have fire sprinklers. | $50,000 |
| Oct 19, 2020 | Completed final sign-off Aug 2025 | 514 Octavia St | merge with pa201911056443 & tenant improvement: install new oven, new dishwasher & new counter, per plans.Details
merge with pa201911056443 & tenant improvement: install new oven, new dishwasher & new counter, per plans. | $25,000 | |
| Jul 1, 2020 | Completed final sign-off Mar 2024 | 439 Cortland Av | Dliu Construction | convert existing retail space to food service. 20 seats for customer dine in. work scope for new 25' commerical hood, plumbing, and electrical. wet bar for soft drink. gas hood up.Details
convert existing retail space to food service. 20 seats for customer dine in. work scope for new 25' commerical hood, plumbing, and electrical. wet bar for soft drink. gas hood up. | $150,000 |
| Mar 12, 2020 | Completed final sign-off Apr 2024 | 327 Grant Av | Tech Hospitality Inc | installation of light fixtures outside on marlan pl. installation of security cameras outside on marlan pl & grant ave.Details
installation of light fixtures outside on marlan pl. installation of security cameras outside on marlan pl & grant ave. | $9,800 |
| Feb 25, 2020 | Never finaled issued Feb 2020, no final | 338 Hearst Av | Super Home Builders Inc. | revision to app# 202001232607. extend foundation to property line on left side.Details
revision to app# 202001232607. extend foundation to property line on left side. | |
| Feb 18, 2020 | Completed final sign-off Apr 2020 | 2834 Diamond St | J L Construction | refinish kitchen & cooking area floor. replace existing ada push button door releases to standard size buttons and relocate them to correct height requirement. no plumbing or electrical work.Details
refinish kitchen & cooking area floor. replace existing ada push button door releases to standard size buttons and relocate them to correct height requirement. no plumbing or electrical work. | $30,500 |
| Feb 10, 2020 | Expired or cancelled cancelled Jan 2026 | 3727 17th St | convert (e) closet in bedroom to (n) powder roomDetails
convert (e) closet in bedroom to (n) powder room | $5,000 | |
| Feb 7, 2020 | Never finaled issued Feb 2020, no final | 338 Hearst Av | Super Home Builders Inc. | revision to app#202001232607. replacement of additional foundation. revise foundation detail.Details
revision to app#202001232607. replacement of additional foundation. revise foundation detail. | $5,000 |
| Jan 31, 2020 | Never finaled filed Jan 2020, never issued | 2270 29th Av | Patrick Coakley Construction | referenced permit pa# 2019-0430-9317 s. new adu on 1st flr per ord# 95-17.Details
referenced permit pa# 2019-0430-9317 s. new adu on 1st flr per ord# 95-17. | $70,000 |
| Jan 28, 2020 | Completed final sign-off Jan 2023 | 1686 26th Av | Bowen Construction-Painting & Waterproof | underpinning extg foundation less then 12'-0 length.Details
underpinning extg foundation less then 12'-0 length. | $2,000 |
| Jan 23, 2020 | Never finaled issued Jan 2020, no final | 338 Hearst Av | Super Home Builders Inc. | replace existing slab foundationDetails
replace existing slab foundation | $12,000 |
| Jan 6, 2020 | Expired or cancelled expired Jul 2023 | 1682 26th Av | Bowen Construction-Painting & Waterproof | remodel (e) bathrom @ 2nd fl; convert (e) closet 1/2 bathroom @ 2nd flDetails
remodel (e) bathrom @ 2nd fl; convert (e) closet 1/2 bathroom @ 2nd fl | $15,000 |
| Dec 31, 2019 | Completed final sign-off Feb 2023 | 661 Broadway | ada accessibility upgrades @ 1st floor parking & guest roomsDetails
ada accessibility upgrades @ 1st floor parking & guest rooms | $50,000 | |
| Dec 30, 2019 | Completed final sign-off Aug 2025 | 619 Bosworth St | Cej Construction Llc | add 2 bedrooms to 1st fl. add 1 bath to 1st fl, rebuild staircase from ground to 2nd fl. add laundry rm with sink to 1st fl. relocate water heater. relocated gas meter. remove central furnace and ducts. rebuild back staircase. relocate door on 2nd fl denDetails
add 2 bedrooms to 1st fl. add 1 bath to 1st fl, rebuild staircase from ground to 2nd fl. add laundry rm with sink to 1st fl. relocate water heater. relocated gas meter. remove central furnace and ducts. rebuild back staircase. relocate door on 2nd fl den | $40,000 |
| Dec 19, 2019 | Never finaled issued Dec 2019, no final | 1824 23rd St | Atlas General Construction | revise plan to permit #201911066560. changes to kitchen design and changes to bathroom design.Details
revise plan to permit #201911066560. changes to kitchen design and changes to bathroom design. | |
| Dec 13, 2019 | Expired or cancelled cancelled Nov 2024 | 1739 Larkin St | interior remodel of 2nd fl - relocation of kitchen, living and dining. installation of master bathroom. adding staircase to connect 2nd to 1st fl. adding bathroom, wet bar and family room to 1st fl.Details
interior remodel of 2nd fl - relocation of kitchen, living and dining. installation of master bathroom. adding staircase to connect 2nd to 1st fl. adding bathroom, wet bar and family room to 1st fl. | $50,000 | |
| Dec 10, 2019 | Expired or cancelled withdrawn Oct 2021 | 126 Mullen Av | revision to app#201609309329. add new habitable basement floor 873 sq ft with new bedroom and bathroom. reconfigure door and windows. convert bedroom to loft. remove portion of extg rear deck.Details
revision to app#201609309329. add new habitable basement floor 873 sq ft with new bedroom and bathroom. reconfigure door and windows. convert bedroom to loft. remove portion of extg rear deck. | $45,000 | |
| Dec 3, 2019 | Completed final sign-off Jan 2020 | 1939 Oakdale Av | to comply with fire nov 1804-0182, dated 4/18/18 due to construction of (e) non-permitted spray booth, it will be demolish in order to remove novDetails
to comply with fire nov 1804-0182, dated 4/18/18 due to construction of (e) non-permitted spray booth, it will be demolish in order to remove nov | $2,500 | |
| Nov 22, 2019 | Completed final sign-off Jan 2021 | 37 Grace St | Carolan Construction | revision to pa# 2016/01/12/6879-s2 (arch / mep) for building & sffd review. ** maher: n/a **Details
revision to pa# 2016/01/12/6879-s2 (arch / mep) for building & sffd review. ** maher: n/a ** | |
| Nov 22, 2019 | Completed final sign-off Jan 2021 | 23 Grace St | Carolan Construction | revision to pa# 2016/01/12/6880-s2 (arch / mep) for building & sffd review. ** maher: n/a **Details
revision to pa# 2016/01/12/6880-s2 (arch / mep) for building & sffd review. ** maher: n/a ** | |
| Nov 6, 2019 | Completed final sign-off Sep 2020 | 1824 23rd St | 3rd fl: build one new bathroom. remodeling bathroom (one) divide into (tw0). remodeling kitchen (one), infill wall btwn kitchen and dining. infill dividing wall btw bath & bed.Details
3rd fl: build one new bathroom. remodeling bathroom (one) divide into (tw0). remodeling kitchen (one), infill wall btwn kitchen and dining. infill dividing wall btw bath & bed. | $60,000 | |
| Sep 18, 2019 | Completed final sign-off Oct 2019 | 274 Brannan St | Occidental Express | feature fire rated wall covering to walls, install work benches. install quiet curtains, install acoustic moss panels foliageDetails
feature fire rated wall covering to walls, install work benches. install quiet curtains, install acoustic moss panels foliage | $3,000 |
| Jul 24, 2019 | Expired or cancelled cancelled Jan 2026 | 274 Brannan St | 5th fl: install of receptacles on existing circuit (e201906202158). new interior partition walls & framed door/decorative coverings & plant fittings/new curtains. new janitorial sink.Details
5th fl: install of receptacles on existing circuit (e201906202158). new interior partition walls & framed door/decorative coverings & plant fittings/new curtains. new janitorial sink. | $3,000 | |
| Jul 17, 2019 | Completed final sign-off Sep 2023 | 667 Mississippi St | Jj Construction & Design Inc., Schrobsdorff Construction | change of use/change of occupancy to f1/m. tenant improvement for retail sales for dcp approval. mep & fire sprinkler under separate permit.Details
change of use/change of occupancy to f1/m. tenant improvement for retail sales for dcp approval. mep & fire sprinkler under separate permit. | $100,000 |
| Jul 16, 2019 | Completed final sign-off Feb 2021 | 22 Santa Marina St | comply w/ n.o.v 200231302. construct deck to access studio on 2nd flr of (e) house deck. height is 10'-6" off the (e) grade. a 311 neighborhood notification will be filed for deck approval.Details
comply w/ n.o.v 200231302. construct deck to access studio on 2nd flr of (e) house deck. height is 10'-6" off the (e) grade. a 311 neighborhood notification will be filed for deck approval. | $15,000 | |
| Jul 12, 2019 | Completed final sign-off Feb 2025 | 1210 40th Av | remove illegal construction walls at garage level.Details
remove illegal construction walls at garage level. | $2,000 | |
| Jun 25, 2019 | Expired or cancelled expired Nov 2025 | 454 Capitol Av | Sederap's Drywall Inc. | rev to pa201607192776. relocate preapproved adu kitchen and enlarge, add new bathroom.Details
rev to pa201607192776. relocate preapproved adu kitchen and enlarge, add new bathroom. | $8,000 |
| Jun 5, 2019 | Completed final sign-off Feb 2021 | 22 Santa Marina St | revision to pa 201904269098. studio will have bathroom remodel & to replace a door with a window in the kitchen. no additional work. electric & plumb are covered unper pa 201904269098.Details
revision to pa 201904269098. studio will have bathroom remodel & to replace a door with a window in the kitchen. no additional work. electric & plumb are covered unper pa 201904269098. | $30,000 | |
| May 16, 2019 | Expired or cancelled cancelled Jan 2026 | 338 Head St | revisio to 201812128162. relocate previously approved skylight. relocate previously approved ceiling box. add 2 skylights & roof parapetDetails
revisio to 201812128162. relocate previously approved skylight. relocate previously approved ceiling box. add 2 skylights & roof parapet | ||
| Apr 30, 2019 | Completed final sign-off Jan 2023 | 1682 26th Av | Bowen Construction-Painting & Waterproof | revision to 201604205267, 201903296613, replace footing at garageDetails
revision to 201604205267, 201903296613, replace footing at garage | $3,000 |
| Apr 24, 2019 | Completed final sign-off Dec 2019 | 542 Castro St | to remodel (e) kitchen, relocate bathroom door & increase opening into dining room, (n) electrical & plumbing in kitchenDetails
to remodel (e) kitchen, relocate bathroom door & increase opening into dining room, (n) electrical & plumbing in kitchen | $30,000 | |
| Apr 16, 2019 | Never finaled issued May 2023, no final | 188 Flournoy St | Firm Construction Company | per ordiance 95-17, scope of work is to legalize an existing unwarranted accessory dwelling unit (e) non legal adu is a two bedroom, one bath unit.Details
per ordiance 95-17, scope of work is to legalize an existing unwarranted accessory dwelling unit (e) non legal adu is a two bedroom, one bath unit. | $25,545 |
| Feb 11, 2019 | Never finaled issued Feb 2019, no final | 690 Arguello Bl | Pellandini & Company | unit 101:interior remodel to e codo. relocate interior wall and replace door between master bath and master closet, remove interior wall by kitchen, structural interior wall by kitchen, replace add light fixtures, plumbing, wall finishes, floorDetails
unit 101:interior remodel to e codo. relocate interior wall and replace door between master bath and master closet, remove interior wall by kitchen, structural interior wall by kitchen, replace add light fixtures, plumbing, wall finishes, floor | $100,000 |
| Jan 22, 2019 | Never finaled issued Mar 2020, no final | 338 Hearst Av | new adu (legalize extg) with 70 sq ft addition. 897 sq ft total area. per ordinance 95-17Details
new adu (legalize extg) with 70 sq ft addition. 897 sq ft total area. per ordinance 95-17 | $40,000 | |
| Dec 4, 2018 | Expired or cancelled expired Apr 2026 | 301 Eureka St | E H B Construction, Edenavow Construction & Design | to address the street entry to commercial non-confirming space. modify front entrance to meet accesible entry requiements. modify sidewalk, remodel (e) restroom to meet ada requirements, install wireless bollard push panels. (n) electrical for front doors. (n) plumbing for restroom.Details
to address the street entry to commercial non-confirming space. modify front entrance to meet accesible entry requiements. modify sidewalk, remodel (e) restroom to meet ada requirements, install wireless bollard push panels. (n) electrical for front doors. (n) plumbing for restroom. | $30,000 |
| Nov 14, 2018 | Completed final sign-off Mar 2019 | 4126 18th St | Alef Construction Corp | to build in kind back egress stairs. the current stairs have wood rot. new footings & size of timber will be changed to meet new code requirements. no work to be preformed to exterior or interior of bldg. no elect. andno plumbing to be performedDetails
to build in kind back egress stairs. the current stairs have wood rot. new footings & size of timber will be changed to meet new code requirements. no work to be preformed to exterior or interior of bldg. no elect. andno plumbing to be performed | $25,000 |
| Nov 7, 2018 | Completed final sign-off Dec 2018 | 1335 Vallejo St | Car Construction | change previous permit address 1337 vallejo per app#201803163868. change address to 1335 vallejo street.Details
change previous permit address 1337 vallejo per app#201803163868. change address to 1335 vallejo street. | $22,500 |
| Oct 2, 2018 | Completed final sign-off Apr 2019 | 541 Hill St | Jeff Mc Cord Construction Co | revision to 201807205140 repair (e) floor framework - add new support piersDetails
revision to 201807205140 repair (e) floor framework - add new support piers | $2,000 |
| Aug 28, 2018 | Never finaled issued Sep 2018, no final | 38 Bryant St | Super Home Builders Inc. | unit 709 - remodel kitchen & bathroom. no change to plumbing fixtures. add closet - remove non bearing wall at kitchen. relocate electrical subpanelDetails
unit 709 - remodel kitchen & bathroom. no change to plumbing fixtures. add closet - remove non bearing wall at kitchen. relocate electrical subpanel | $10,000 |
| Aug 27, 2018 | Completed final sign-off Jul 2023 | 1682 26th Av | Bowen Construction-Painting & Waterproof | per adu ordinance# 162-17, covert (e) lower floor to adu. add (n) gas wall furnace and (n) water heater. work only to add kitchen ref permit. pa# 201604205267:Details
per adu ordinance# 162-17, covert (e) lower floor to adu. add (n) gas wall furnace and (n) water heater. work only to add kitchen ref permit. pa# 201604205267: | $8,000 |
| Aug 21, 2018 | Expired or cancelled expired Jun 2025 | 808 Divisadero St | Los Compadres Construction | install (2) type 1 hoods ref t.i. pa#201710030229. hood and duct extinguishing system and fire under separate permit(s). maher n/a.Details
install (2) type 1 hoods ref t.i. pa#201710030229. hood and duct extinguishing system and fire under separate permit(s). maher n/a. | $26,000 |
| Aug 2, 2018 | Expired or cancelled cancelled Oct 2022 | 2360 Post St | to install a spray booth, a paint prep area and remodel the extg offfice to include an ada restroom. booth is 9x13 booth. ansol system will be under seperate permit. use of flammale finisher - 18 gal of polyurethane spray (liquid). requires compliance w/ cfc ch. 24,flammable exhaust.Details
to install a spray booth, a paint prep area and remodel the extg offfice to include an ada restroom. booth is 9x13 booth. ansol system will be under seperate permit. use of flammale finisher - 18 gal of polyurethane spray (liquid). requires compliance w/ cfc ch. 24,flammable exhaust. | $37,000 | |
| Jul 20, 2018 | Completed final sign-off Apr 2019 | 541 Hill St | Jeff Mc Cord Construction Co | full interior remodel of apartment unit. remove extg wall, new bathroom. install new electrical outlets, lighting, new kitchen remodel. new sliding door and window at rear. new rear deck 18" above grade.Details
full interior remodel of apartment unit. remove extg wall, new bathroom. install new electrical outlets, lighting, new kitchen remodel. new sliding door and window at rear. new rear deck 18" above grade. | $60,000 |
| Jun 29, 2018 | Expired or cancelled withdrawn Jan 2020 | 1939 Oakdale Av | remodel rear of bldg to meet codes, (n) pre-manfact spray booth will be installed.Details
remodel rear of bldg to meet codes, (n) pre-manfact spray booth will be installed. | $180,000 | |
| Jun 21, 2018 | Completed final sign-off Jul 2019 | 417 Castro St | All Food Service Installations | extg restaurant to replace extg hood, re-route extg gas line, new equipment, automatic front door opener. n/a for maherDetails
extg restaurant to replace extg hood, re-route extg gas line, new equipment, automatic front door opener. n/a for maher | $20,000 |