Red Rock Hill Construction Llc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2018 to Feb 2026
- Last 24 months
- 12 permits filed
46 permits since 2000: 42 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 23, 2026 | Completed final sign-off Jul 2026 | 587 09th Av | remodel existing bathroom, in kind. new shower pan, new vanity, tiles, shower system, plumbing fixtures, lighting fixtures. new bathroom door. tiles will continue from bathroom floor into small breezeway outside bathroom. retrofit (1) window, facing backyard [uf<=0.27].Details
remodel existing bathroom, in kind. new shower pan, new vanity, tiles, shower system, plumbing fixtures, lighting fixtures. new bathroom door. tiles will continue from bathroom floor into small breezeway outside bathroom. retrofit (1) window, facing backyard [uf<=0.27]. | $18,000 |
| Oct 31, 2025 | Completed final sign-off Sep 2026 | 1440 Francisco St | renovation of residential kitchen, demo of interior wall. new enlarged window (window not visible from street)Details
renovation of residential kitchen, demo of interior wall. new enlarged window (window not visible from street) | $39,345 |
| Oct 20, 2025 | Completed final sign-off Jan 2026 | 909 Broderick St | to comply with physical inspection report #cc-8640 (partial - common areas like garage and backyard electrical and plumbing only). install insulation, 5/8" type x, drywall, fire tape for all exposed weed framing. no new framing/structural. install 3 new protective bollards at water heater/furnace(e)Details
to comply with physical inspection report #cc-8640 (partial - common areas like garage and backyard electrical and plumbing only). install insulation, 5/8" type x, drywall, fire tape for all exposed weed framing. no new framing/structural. install 3 new protective bollards at water heater/furnace(e) | $14,750 |
| Sep 24, 2025 | Completed final sign-off Feb 2026 | 196 Precita Av | kitchen and bathroom remodel. new fixtures in same location, drywall, cabinets, coumtertops, new appliances in kitchen, new shower pan and tiles in bathroom. new electrical and plumbing. replace (1) entry door and (3) windows at the back of home. all work in kind. no structural or framing.Details
kitchen and bathroom remodel. new fixtures in same location, drywall, cabinets, coumtertops, new appliances in kitchen, new shower pan and tiles in bathroom. new electrical and plumbing. replace (1) entry door and (3) windows at the back of home. all work in kind. no structural or framing. | $49,250 |
| Aug 11, 2025 | Completed final sign-off Sep 2025 | 179 Jordan Av | under 50% deck repair. replace deck boards, handrails, balusters & stair treads only. framing & footprint to remain as existing. deck located in backyard on 2nd level.Details
under 50% deck repair. replace deck boards, handrails, balusters & stair treads only. framing & footprint to remain as existing. deck located in backyard on 2nd level. | $12,000 |
| Jun 18, 2025 | Completed final sign-off Oct 2025 | 1128 Noe St | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $19,250 |
| May 16, 2025 | Completed final sign-off Sep 2025 | 618 29th St | replace front stair treads and risers. 2 adjacent landings cladding, less than 50%. 2 rows siding replaced, waterproof. apply waterproofing under stairDetails
replace front stair treads and risers. 2 adjacent landings cladding, less than 50%. 2 rows siding replaced, waterproof. apply waterproofing under stair | $17,000 |
| Feb 6, 2025 | Completed final sign-off Apr 2025 | 114 Lyon St | customer has water intrusion at roof and siding on 1 side of the building (north side) all 3 floors affected. remove and replace in kind for all facia boards, / insulation and siding approx 900sqft. new waterproofing, gutters, tyvek house trap. windows to remain. prep, prime and finish paint.Details
customer has water intrusion at roof and siding on 1 side of the building (north side) all 3 floors affected. remove and replace in kind for all facia boards, / insulation and siding approx 900sqft. new waterproofing, gutters, tyvek house trap. windows to remain. prep, prime and finish paint. | $17,000 |
| Jan 30, 2025 | Completed final sign-off Jul 2025 | 595 09th Av | kitchen remodel under pa # 2024-1209-6382. new plan configuration in the kitchen. replace the property line window with a larger window, not visible from the street. (n) washer & dryer.Details
kitchen remodel under pa # 2024-1209-6382. new plan configuration in the kitchen. replace the property line window with a larger window, not visible from the street. (n) washer & dryer. | $25,000 |
| Jan 8, 2025 | Completed final sign-off Jun 2025 | 179 Jordan Av | in-kind bathroom rmeodel. new fixtures, lights, flooring, shower pan, tile, vanity cabinets, freestanding tub all in same locations as (e). no reframing, no new windows.Details
in-kind bathroom rmeodel. new fixtures, lights, flooring, shower pan, tile, vanity cabinets, freestanding tub all in same locations as (e). no reframing, no new windows. | $43,000 |
| Dec 9, 2024 | Completed final sign-off Jul 2025 | 595 09th Av | cosmetic kitchen remodel update fixtures staying in place. new cabinets, countertops, back splash, switches, lights, sink, fauce, appliances,etc. adjacent small "breakfast nook" included some new cabinets. refinish floor in these areas. add pantry "bump eat" for additional storage. sheetrock, tape,Details
cosmetic kitchen remodel update fixtures staying in place. new cabinets, countertops, back splash, switches, lights, sink, fauce, appliances,etc. adjacent small "breakfast nook" included some new cabinets. refinish floor in these areas. add pantry "bump eat" for additional storage. sheetrock, tape, | $70,000 |
| Oct 24, 2024 | Completed final sign-off Jun 2025 | 155 Laidley St | demo decking addition "roof", 3 walls of stucco at addition.waterproofing,reinstall decking.restucco 3 walls where previously removed. some interior drywall replacement (where wet). prep, prime and (e) windows to remain.Details
demo decking addition "roof", 3 walls of stucco at addition.waterproofing,reinstall decking.restucco 3 walls where previously removed. some interior drywall replacement (where wet). prep, prime and (e) windows to remain. | $25,000 |
| Oct 1, 2024 | Completed final sign-off Feb 2025 | 8332 Geary Bl | remove terrazzo front stairs, demo 24" trenches of stucco at same place. install new plywood ramps on (e) framing, waterproof. apply stucco patches. prep, prim and finish paint.Details
remove terrazzo front stairs, demo 24" trenches of stucco at same place. install new plywood ramps on (e) framing, waterproof. apply stucco patches. prep, prim and finish paint. | $15,000 |
| Jul 10, 2024 | Completed final sign-off Oct 2024 | 237 Oxford St | demo sections of stucco at facade of building, install flashing and waterproofing at stairs and 1 window, apply new stucco, prime and paint. remove, seal, and reinstall existing. terrace stair treads (leaking issue), resurface (e) 4' x 4' concrete landing. approx. 120 sq ft of stucco repair.Details
demo sections of stucco at facade of building, install flashing and waterproofing at stairs and 1 window, apply new stucco, prime and paint. remove, seal, and reinstall existing. terrace stair treads (leaking issue), resurface (e) 4' x 4' concrete landing. approx. 120 sq ft of stucco repair. | $17,500 |
| Jul 10, 2024 | Completed final sign-off Jan 2025 | 2 Clairview Ct | (1) full bath remodel (48 sq ft), (1) kitchen cabinet add on and new countertops. for bathroom demo to studs, no new walls. dvw stays in the same location, upgrade outlets and switches, for kitchen install new section of cabinets (4 only) w/ countertops throughout, tile backplash, new laminate floorDetails
(1) full bath remodel (48 sq ft), (1) kitchen cabinet add on and new countertops. for bathroom demo to studs, no new walls. dvw stays in the same location, upgrade outlets and switches, for kitchen install new section of cabinets (4 only) w/ countertops throughout, tile backplash, new laminate floor | $15,000 |
| May 14, 2024 | Completed final sign-off Jul 2024 | 2760 22nd St | replacing the extg posts and concrete footings in kind due to dryrot damage. replace existing wood platform on grade in kind.Details
replacing the extg posts and concrete footings in kind due to dryrot damage. replace existing wood platform on grade in kind. | $15,000 |
| May 1, 2024 | Completed final sign-off Sep 2024 | 20 Mizpah St | cut sheetrock for new electrical (both floors, powder room cosmetic update, clad ceiling kitchen w/ shoplap boards, new interior pre-hung doors to replace (e) add blocking btwn studs, fireplace mantle update (tile)Details
cut sheetrock for new electrical (both floors, powder room cosmetic update, clad ceiling kitchen w/ shoplap boards, new interior pre-hung doors to replace (e) add blocking btwn studs, fireplace mantle update (tile) | $45,000 |
| Feb 12, 2024 | Completed final sign-off Sep 2024 | 549 Liberty St | cosmetic kitchen remodel, new fixtures cabinets, appliances finishes, new island countertop, refinish hardwood floor, update in wall plumbing and electrical (all same in kind).Details
cosmetic kitchen remodel, new fixtures cabinets, appliances finishes, new island countertop, refinish hardwood floor, update in wall plumbing and electrical (all same in kind). | $30,000 |
| Dec 11, 2023 | Completed final sign-off Jan 2024 | 5114 Diamond Heights Bl | unit #a: bathroom shower pan leak mitigation. relocate existing drain, remove and replace backboard and tile for bath floor and shower pan, 1/2 wall of 3 wall shower alcove only. remodel in kind.Details
unit #a: bathroom shower pan leak mitigation. relocate existing drain, remove and replace backboard and tile for bath floor and shower pan, 1/2 wall of 3 wall shower alcove only. remodel in kind. | $9,000 |
| Oct 25, 2023 | Completed final sign-off May 2024 | 1501 Church St | to remove existing upper level deck due to wood rot. the existing cantilevered joists will be cut at the edge of bldg. the stairs leading to new deck will be replaced existing exterior lighting & electrical to remain unchanged. no other work to be performed.Details
to remove existing upper level deck due to wood rot. the existing cantilevered joists will be cut at the edge of bldg. the stairs leading to new deck will be replaced existing exterior lighting & electrical to remain unchanged. no other work to be performed. | $30,000 |
| Sep 18, 2023 | Completed final sign-off Dec 2023 | 120 Jordan Av | cosmetic bathroom update in kind. new tile , fixtures, shower pan , fan shower door, paint , vanity counter top, ect.Details
cosmetic bathroom update in kind. new tile , fixtures, shower pan , fan shower door, paint , vanity counter top, ect. | $17,000 |
| Sep 18, 2023 | Completed final sign-off Mar 2024 | 1056 Florida St | repair and/or replace less than 50% of front staircase in kind to existing. no threads , siding , fascia, handrails, ect. dryrott mitigation. existing pt framing to remain.Details
repair and/or replace less than 50% of front staircase in kind to existing. no threads , siding , fascia, handrails, ect. dryrott mitigation. existing pt framing to remain. | $9,500 |
| May 31, 2023 | Expired or cancelled cancelled Jan 2025 | 1372 La Playa | bathroom renovation in kind to (e) new vanity shower pan, shower wall tile, floor tile, new sheetrock and paint, new toilet, medicine cabinets/mirrors, new fixtures, no walls being moved or altered, some in wall plumbing & elec. to modernize for code complianceDetails
bathroom renovation in kind to (e) new vanity shower pan, shower wall tile, floor tile, new sheetrock and paint, new toilet, medicine cabinets/mirrors, new fixtures, no walls being moved or altered, some in wall plumbing & elec. to modernize for code compliance | $13,500 |
| May 31, 2023 | Completed final sign-off Aug 2023 | 638 De Haro St | shower pan replacement due to leak, patch sheetrock, new s.p. tile, wall tile (1 wall only and patch around pan perimeter) new paint, install trim kit on (e) value, new 2 port drain, some limited touch up painting in hallway, new baseboards in hallway at the ground fl. repairedDetails
shower pan replacement due to leak, patch sheetrock, new s.p. tile, wall tile (1 wall only and patch around pan perimeter) new paint, install trim kit on (e) value, new 2 port drain, some limited touch up painting in hallway, new baseboards in hallway at the ground fl. repaired | $5,000 |
| May 11, 2023 | Completed final sign-off Aug 2023 | 487 Vallejo St | remove and replace hardwood floors, kitchen cabinets, drywall , baseboards, repaint , new garden door slab, replace cast iron drain section (root intrusion) , in wall electric and plumbing to remain if code compliant. no wall alteration.Details
remove and replace hardwood floors, kitchen cabinets, drywall , baseboards, repaint , new garden door slab, replace cast iron drain section (root intrusion) , in wall electric and plumbing to remain if code compliant. no wall alteration. | $17,500 |
| Mar 31, 2023 | Completed final sign-off Apr 2023 | 45 Surrey St | in kind replacement of exising siding. leaks at window into crawlspace below. waterproof papaer, channel siding, prep, prime and paint at back of home, bay windows sections only. (16' wide x 25' high). in kind exterior trim replacement. install new batt installation all open bays not visible from stDetails
in kind replacement of exising siding. leaks at window into crawlspace below. waterproof papaer, channel siding, prep, prime and paint at back of home, bay windows sections only. (16' wide x 25' high). in kind exterior trim replacement. install new batt installation all open bays not visible from st | $15,000 |
| Dec 29, 2022 | Completed final sign-off Jan 2023 | 567 Kansas St | dryrot repair, replace some framing numbers at facade at stairway wall and left corner of staircase. demo stucco, lath, same back backing boards. replace with new stucco paper and cdx plywood. restucco staircase wall (left side only). existing stairs and right wall to remain.Details
dryrot repair, replace some framing numbers at facade at stairway wall and left corner of staircase. demo stucco, lath, same back backing boards. replace with new stucco paper and cdx plywood. restucco staircase wall (left side only). existing stairs and right wall to remain. | $3,500 |
| Dec 2, 2022 | Completed final sign-off Apr 2023 | 567 Kansas St | kitchen and bathroom renovation, in kind. new fixtures, cabs, appliances, floor coverings, plumbing and electrical upgrade. walls to remain in place. skim coat walls and sand/paint. new baseboards and trim as needed.Details
kitchen and bathroom renovation, in kind. new fixtures, cabs, appliances, floor coverings, plumbing and electrical upgrade. walls to remain in place. skim coat walls and sand/paint. new baseboards and trim as needed. | $45,000 |
| Aug 29, 2022 | Completed final sign-off Dec 2022 | 567 Kansas St | demo lath and plaster: 2 bathrooms, 1 kitchen, dining room. replace with 5/8ths type x sheetrock.Details
demo lath and plaster: 2 bathrooms, 1 kitchen, dining room. replace with 5/8ths type x sheetrock. | $8,000 |
| May 20, 2022 | Completed final sign-off Oct 2022 | 517 29th St | one master bathroom remodel in-kind to existing. fixtures stay in same place. new tile, fixtures, shower pan, vanity, lights, etc. no new wall & no existing wall relocation. new lighting shall comply with cec 150.0(k)5.Details
one master bathroom remodel in-kind to existing. fixtures stay in same place. new tile, fixtures, shower pan, vanity, lights, etc. no new wall & no existing wall relocation. new lighting shall comply with cec 150.0(k)5. | $22,000 |
| Mar 7, 2022 | Completed final sign-off May 2022 | 4229 26th St | master bathroom: replace valve, tile in shower. (n) lights/ vanityDetails
master bathroom: replace valve, tile in shower. (n) lights/ vanity | $19,000 |
| Feb 4, 2022 | Completed final sign-off Oct 2022 | 300 Mangels Av | remodel bathroom & kitchen. remove itnerior partition walls, new cabintry, finisehs, plumbing, electrical, & lighting. no expansion of building evnelop or work at front facade.Details
remodel bathroom & kitchen. remove itnerior partition walls, new cabintry, finisehs, plumbing, electrical, & lighting. no expansion of building evnelop or work at front facade. | $60,000 |
| Sep 27, 2021 | Completed final sign-off Oct 2021 | 845 Lake St | unit 6: new floor tile and wall tile for tub/shower, some demo new cement board and water proofing ( existing leak repaird by home owner's plumber)in kind- work in one bathroom in one unit only on the 3rd floor.Details
unit 6: new floor tile and wall tile for tub/shower, some demo new cement board and water proofing ( existing leak repaird by home owner's plumber)in kind- work in one bathroom in one unit only on the 3rd floor. | $4,500 |
| Jul 16, 2021 | Completed final sign-off Oct 2021 | 85 Cleary Ct | kitchen remodel unit 2: new cabinets, tile appliances, trim painting, ights, etc (cosmetic) layout to remain the sameDetails
kitchen remodel unit 2: new cabinets, tile appliances, trim painting, ights, etc (cosmetic) layout to remain the same | $20,000 |
| Jan 22, 2021 | Never finaled issued Jan 2021, no final | 530 24th Av | kitchen and bathroom renovation. new cabinets, tile, fixtures, appliance etc. some interiors like new flooring, doors, trim, etc. new windows (rear of bldg only). retrofit insurts.Details
kitchen and bathroom renovation. new cabinets, tile, fixtures, appliance etc. some interiors like new flooring, doors, trim, etc. new windows (rear of bldg only). retrofit insurts. | $45,000 |
| Oct 22, 2020 | Completed final sign-off Dec 2020 | 617 03rd Av | bathroom remodel. new tile, shower pan, shower door, vanity, toilet, pocket door, trim, baseboards, prime and paint (cosmetic update)Details
bathroom remodel. new tile, shower pan, shower door, vanity, toilet, pocket door, trim, baseboards, prime and paint (cosmetic update) | $15,000 |
| Oct 10, 2020 | Never finaled issued Nov 2020, no final | 738 Elizabeth St | kitchen renovation w/ doors to the rear yard. opening walls between (e) living, dining & kitchen areas, all at the 1st flr.Details
kitchen renovation w/ doors to the rear yard. opening walls between (e) living, dining & kitchen areas, all at the 1st flr. | $45,000 |
| Sep 9, 2020 | Completed final sign-off Feb 2021 | 2791 Greenwich St | kitchen new cabinets, countertops, backsplash, paint. bath, new shower pan, tile, vanity, recessed lights, paintDetails
kitchen new cabinets, countertops, backsplash, paint. bath, new shower pan, tile, vanity, recessed lights, paint | $33,000 |
| Jun 30, 2020 | Completed final sign-off Sep 2020 | 3 Vulcan Sw | kitchen & bath remodel inkind, (1) (n) retrofit patio door inkind to (e). (4) (n) retrofit windows @ back of home onlyDetails
kitchen & bath remodel inkind, (1) (n) retrofit patio door inkind to (e). (4) (n) retrofit windows @ back of home only | $38,000 |
| Sep 10, 2019 | Completed final sign-off Sep 2019 | 742 Elizabeth St | to partially comply with nov201981061, cosmetic repair, trim and stucco (20sf), paint. no structural work. replace in-kind.Details
to partially comply with nov201981061, cosmetic repair, trim and stucco (20sf), paint. no structural work. replace in-kind. | $4,000 |
| Jun 20, 2019 | Completed final sign-off Oct 2019 | 579 Buena Vista West Av | one kitchen remodel- new flooring, cabinets, appliances and paint.Details
one kitchen remodel- new flooring, cabinets, appliances and paint. | $22,000 |
| Jun 20, 2019 | Completed final sign-off Aug 2019 | 85 Cleary Ct | unit # 2: one bathroom update-new tile, apint , vanity and lights only. non structural.Details
unit # 2: one bathroom update-new tile, apint , vanity and lights only. non structural. | $10,000 |
| May 29, 2019 | Expired or cancelled cancelled Jun 2019 | 542 Castro St | small kitchenette remodel (8'x10'), new doors, trim, prep prime paint. like for like.Details
small kitchenette remodel (8'x10'), new doors, trim, prep prime paint. like for like. | $16,000 |
| Apr 2, 2019 | Completed final sign-off Jun 2019 | 1334 06th Av | cosmatic kitchen remodel new floor, cabinets, tile etc. no structural work included, light electricaland some plumbingDetails
cosmatic kitchen remodel new floor, cabinets, tile etc. no structural work included, light electricaland some plumbing | $18,000 |
| Nov 8, 2018 | Completed final sign-off Mar 2019 | 2067 42nd Av | replace two front windows on upper floor at front of house with aluminum wood clad or fiberglass-based windows. new transom window light at bottom of sliding glass window in existing opening. u < 0.32Details
replace two front windows on upper floor at front of house with aluminum wood clad or fiberglass-based windows. new transom window light at bottom of sliding glass window in existing opening. u < 0.32 | $6,700 |
| Oct 24, 2018 | Completed final sign-off Oct 2019 | 1388 22nd Av | cosmetic remodel of (e) bathroom. new tile, vanity, fixtures, light/fan combo, shower door, new shower pan.Details
cosmetic remodel of (e) bathroom. new tile, vanity, fixtures, light/fan combo, shower door, new shower pan. | $18,000 |