Back to kitchen remodel contractors
Red Rock Hill Construction Llc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2018 to Feb 2026
- Last 24 months
- 12 permits filed
46 permits since 2000: 42 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
19 kitchen remodel permits: 16 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 147 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 31, 2025 | Completed final sign-off Sep 2026 | 1440 Francisco St | renovation of residential kitchen, demo of interior wall. new enlarged window (window not visible from street)Details
renovation of residential kitchen, demo of interior wall. new enlarged window (window not visible from street) | $39,345 |
| Sep 24, 2025 | Completed final sign-off Feb 2026 | 196 Precita Av | kitchen and bathroom remodel. new fixtures in same location, drywall, cabinets, coumtertops, new appliances in kitchen, new shower pan and tiles in bathroom. new electrical and plumbing. replace (1) entry door and (3) windows at the back of home. all work in kind. no structural or framing.Details
kitchen and bathroom remodel. new fixtures in same location, drywall, cabinets, coumtertops, new appliances in kitchen, new shower pan and tiles in bathroom. new electrical and plumbing. replace (1) entry door and (3) windows at the back of home. all work in kind. no structural or framing. | $49,250 |
| Jan 30, 2025 | Completed final sign-off Jul 2025 | 595 09th Av | kitchen remodel under pa # 2024-1209-6382. new plan configuration in the kitchen. replace the property line window with a larger window, not visible from the street. (n) washer & dryer.Details
kitchen remodel under pa # 2024-1209-6382. new plan configuration in the kitchen. replace the property line window with a larger window, not visible from the street. (n) washer & dryer. | $25,000 |
| Dec 9, 2024 | Completed final sign-off Jul 2025 | 595 09th Av | cosmetic kitchen remodel update fixtures staying in place. new cabinets, countertops, back splash, switches, lights, sink, fauce, appliances,etc. adjacent small "breakfast nook" included some new cabinets. refinish floor in these areas. add pantry "bump eat" for additional storage. sheetrock, tape,Details
cosmetic kitchen remodel update fixtures staying in place. new cabinets, countertops, back splash, switches, lights, sink, fauce, appliances,etc. adjacent small "breakfast nook" included some new cabinets. refinish floor in these areas. add pantry "bump eat" for additional storage. sheetrock, tape, | $70,000 |
| Jul 10, 2024 | Completed final sign-off Jan 2025 | 2 Clairview Ct | (1) full bath remodel (48 sq ft), (1) kitchen cabinet add on and new countertops. for bathroom demo to studs, no new walls. dvw stays in the same location, upgrade outlets and switches, for kitchen install new section of cabinets (4 only) w/ countertops throughout, tile backplash, new laminate floorDetails
(1) full bath remodel (48 sq ft), (1) kitchen cabinet add on and new countertops. for bathroom demo to studs, no new walls. dvw stays in the same location, upgrade outlets and switches, for kitchen install new section of cabinets (4 only) w/ countertops throughout, tile backplash, new laminate floor | $15,000 |
| May 1, 2024 | Completed final sign-off Sep 2024 | 20 Mizpah St | cut sheetrock for new electrical (both floors, powder room cosmetic update, clad ceiling kitchen w/ shoplap boards, new interior pre-hung doors to replace (e) add blocking btwn studs, fireplace mantle update (tile)Details
cut sheetrock for new electrical (both floors, powder room cosmetic update, clad ceiling kitchen w/ shoplap boards, new interior pre-hung doors to replace (e) add blocking btwn studs, fireplace mantle update (tile) | $45,000 |
| Feb 12, 2024 | Completed final sign-off Sep 2024 | 549 Liberty St | cosmetic kitchen remodel, new fixtures cabinets, appliances finishes, new island countertop, refinish hardwood floor, update in wall plumbing and electrical (all same in kind).Details
cosmetic kitchen remodel, new fixtures cabinets, appliances finishes, new island countertop, refinish hardwood floor, update in wall plumbing and electrical (all same in kind). | $30,000 |
| May 11, 2023 | Completed final sign-off Aug 2023 | 487 Vallejo St | remove and replace hardwood floors, kitchen cabinets, drywall , baseboards, repaint , new garden door slab, replace cast iron drain section (root intrusion) , in wall electric and plumbing to remain if code compliant. no wall alteration.Details
remove and replace hardwood floors, kitchen cabinets, drywall , baseboards, repaint , new garden door slab, replace cast iron drain section (root intrusion) , in wall electric and plumbing to remain if code compliant. no wall alteration. | $17,500 |
| Dec 2, 2022 | Completed final sign-off Apr 2023 | 567 Kansas St | kitchen and bathroom renovation, in kind. new fixtures, cabs, appliances, floor coverings, plumbing and electrical upgrade. walls to remain in place. skim coat walls and sand/paint. new baseboards and trim as needed.Details
kitchen and bathroom renovation, in kind. new fixtures, cabs, appliances, floor coverings, plumbing and electrical upgrade. walls to remain in place. skim coat walls and sand/paint. new baseboards and trim as needed. | $45,000 |
| Aug 29, 2022 | Completed final sign-off Dec 2022 | 567 Kansas St | demo lath and plaster: 2 bathrooms, 1 kitchen, dining room. replace with 5/8ths type x sheetrock.Details
demo lath and plaster: 2 bathrooms, 1 kitchen, dining room. replace with 5/8ths type x sheetrock. | $8,000 |
| Feb 4, 2022 | Completed final sign-off Oct 2022 | 300 Mangels Av | remodel bathroom & kitchen. remove itnerior partition walls, new cabintry, finisehs, plumbing, electrical, & lighting. no expansion of building evnelop or work at front facade.Details
remodel bathroom & kitchen. remove itnerior partition walls, new cabintry, finisehs, plumbing, electrical, & lighting. no expansion of building evnelop or work at front facade. | $60,000 |
| Jul 16, 2021 | Completed final sign-off Oct 2021 | 85 Cleary Ct | kitchen remodel unit 2: new cabinets, tile appliances, trim painting, ights, etc (cosmetic) layout to remain the sameDetails
kitchen remodel unit 2: new cabinets, tile appliances, trim painting, ights, etc (cosmetic) layout to remain the same | $20,000 |
| Jan 22, 2021 | Never finaled issued Jan 2021, no final | 530 24th Av | kitchen and bathroom renovation. new cabinets, tile, fixtures, appliance etc. some interiors like new flooring, doors, trim, etc. new windows (rear of bldg only). retrofit insurts.Details
kitchen and bathroom renovation. new cabinets, tile, fixtures, appliance etc. some interiors like new flooring, doors, trim, etc. new windows (rear of bldg only). retrofit insurts. | $45,000 |
| Oct 10, 2020 | Never finaled issued Nov 2020, no final | 738 Elizabeth St | kitchen renovation w/ doors to the rear yard. opening walls between (e) living, dining & kitchen areas, all at the 1st flr.Details
kitchen renovation w/ doors to the rear yard. opening walls between (e) living, dining & kitchen areas, all at the 1st flr. | $45,000 |
| Sep 9, 2020 | Completed final sign-off Feb 2021 | 2791 Greenwich St | kitchen new cabinets, countertops, backsplash, paint. bath, new shower pan, tile, vanity, recessed lights, paintDetails
kitchen new cabinets, countertops, backsplash, paint. bath, new shower pan, tile, vanity, recessed lights, paint | $33,000 |
| Jun 30, 2020 | Completed final sign-off Sep 2020 | 3 Vulcan Sw | kitchen & bath remodel inkind, (1) (n) retrofit patio door inkind to (e). (4) (n) retrofit windows @ back of home onlyDetails
kitchen & bath remodel inkind, (1) (n) retrofit patio door inkind to (e). (4) (n) retrofit windows @ back of home only | $38,000 |
| Jun 20, 2019 | Completed final sign-off Oct 2019 | 579 Buena Vista West Av | one kitchen remodel- new flooring, cabinets, appliances and paint.Details
one kitchen remodel- new flooring, cabinets, appliances and paint. | $22,000 |
| May 29, 2019 | Expired or cancelled cancelled Jun 2019 | 542 Castro St | small kitchenette remodel (8'x10'), new doors, trim, prep prime paint. like for like.Details
small kitchenette remodel (8'x10'), new doors, trim, prep prime paint. like for like. | $16,000 |
| Apr 2, 2019 | Completed final sign-off Jun 2019 | 1334 06th Av | cosmatic kitchen remodel new floor, cabinets, tile etc. no structural work included, light electricaland some plumbingDetails
cosmatic kitchen remodel new floor, cabinets, tile etc. no structural work included, light electricaland some plumbing | $18,000 |