Back to bathroom remodel contractors
Red Rock Hill Construction Llc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2018 to Feb 2026
- Last 24 months
- 12 permits filed
46 permits since 2000: 42 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 18 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 122 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 23, 2026 | Completed final sign-off Jul 2026 | 587 09th Av | remodel existing bathroom, in kind. new shower pan, new vanity, tiles, shower system, plumbing fixtures, lighting fixtures. new bathroom door. tiles will continue from bathroom floor into small breezeway outside bathroom. retrofit (1) window, facing backyard [uf<=0.27].Details
remodel existing bathroom, in kind. new shower pan, new vanity, tiles, shower system, plumbing fixtures, lighting fixtures. new bathroom door. tiles will continue from bathroom floor into small breezeway outside bathroom. retrofit (1) window, facing backyard [uf<=0.27]. | $18,000 |
| Sep 24, 2025 | Completed final sign-off Feb 2026 | 196 Precita Av | kitchen and bathroom remodel. new fixtures in same location, drywall, cabinets, coumtertops, new appliances in kitchen, new shower pan and tiles in bathroom. new electrical and plumbing. replace (1) entry door and (3) windows at the back of home. all work in kind. no structural or framing.Details
kitchen and bathroom remodel. new fixtures in same location, drywall, cabinets, coumtertops, new appliances in kitchen, new shower pan and tiles in bathroom. new electrical and plumbing. replace (1) entry door and (3) windows at the back of home. all work in kind. no structural or framing. | $49,250 |
| Jun 18, 2025 | Completed final sign-off Oct 2025 | 1128 Noe St | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $19,250 |
| Jan 8, 2025 | Completed final sign-off Jun 2025 | 179 Jordan Av | in-kind bathroom rmeodel. new fixtures, lights, flooring, shower pan, tile, vanity cabinets, freestanding tub all in same locations as (e). no reframing, no new windows.Details
in-kind bathroom rmeodel. new fixtures, lights, flooring, shower pan, tile, vanity cabinets, freestanding tub all in same locations as (e). no reframing, no new windows. | $43,000 |
| Jul 10, 2024 | Completed final sign-off Jan 2025 | 2 Clairview Ct | (1) full bath remodel (48 sq ft), (1) kitchen cabinet add on and new countertops. for bathroom demo to studs, no new walls. dvw stays in the same location, upgrade outlets and switches, for kitchen install new section of cabinets (4 only) w/ countertops throughout, tile backplash, new laminate floorDetails
(1) full bath remodel (48 sq ft), (1) kitchen cabinet add on and new countertops. for bathroom demo to studs, no new walls. dvw stays in the same location, upgrade outlets and switches, for kitchen install new section of cabinets (4 only) w/ countertops throughout, tile backplash, new laminate floor | $15,000 |
| Dec 11, 2023 | Completed final sign-off Jan 2024 | 5114 Diamond Heights Bl | unit #a: bathroom shower pan leak mitigation. relocate existing drain, remove and replace backboard and tile for bath floor and shower pan, 1/2 wall of 3 wall shower alcove only. remodel in kind.Details
unit #a: bathroom shower pan leak mitigation. relocate existing drain, remove and replace backboard and tile for bath floor and shower pan, 1/2 wall of 3 wall shower alcove only. remodel in kind. | $9,000 |
| Sep 18, 2023 | Completed final sign-off Dec 2023 | 120 Jordan Av | cosmetic bathroom update in kind. new tile , fixtures, shower pan , fan shower door, paint , vanity counter top, ect.Details
cosmetic bathroom update in kind. new tile , fixtures, shower pan , fan shower door, paint , vanity counter top, ect. | $17,000 |
| May 31, 2023 | Expired or cancelled cancelled Jan 2025 | 1372 La Playa | bathroom renovation in kind to (e) new vanity shower pan, shower wall tile, floor tile, new sheetrock and paint, new toilet, medicine cabinets/mirrors, new fixtures, no walls being moved or altered, some in wall plumbing & elec. to modernize for code complianceDetails
bathroom renovation in kind to (e) new vanity shower pan, shower wall tile, floor tile, new sheetrock and paint, new toilet, medicine cabinets/mirrors, new fixtures, no walls being moved or altered, some in wall plumbing & elec. to modernize for code compliance | $13,500 |
| Dec 2, 2022 | Completed final sign-off Apr 2023 | 567 Kansas St | kitchen and bathroom renovation, in kind. new fixtures, cabs, appliances, floor coverings, plumbing and electrical upgrade. walls to remain in place. skim coat walls and sand/paint. new baseboards and trim as needed.Details
kitchen and bathroom renovation, in kind. new fixtures, cabs, appliances, floor coverings, plumbing and electrical upgrade. walls to remain in place. skim coat walls and sand/paint. new baseboards and trim as needed. | $45,000 |
| Aug 29, 2022 | Completed final sign-off Dec 2022 | 567 Kansas St | demo lath and plaster: 2 bathrooms, 1 kitchen, dining room. replace with 5/8ths type x sheetrock.Details
demo lath and plaster: 2 bathrooms, 1 kitchen, dining room. replace with 5/8ths type x sheetrock. | $8,000 |
| May 20, 2022 | Completed final sign-off Oct 2022 | 517 29th St | one master bathroom remodel in-kind to existing. fixtures stay in same place. new tile, fixtures, shower pan, vanity, lights, etc. no new wall & no existing wall relocation. new lighting shall comply with cec 150.0(k)5.Details
one master bathroom remodel in-kind to existing. fixtures stay in same place. new tile, fixtures, shower pan, vanity, lights, etc. no new wall & no existing wall relocation. new lighting shall comply with cec 150.0(k)5. | $22,000 |
| Mar 7, 2022 | Completed final sign-off May 2022 | 4229 26th St | master bathroom: replace valve, tile in shower. (n) lights/ vanityDetails
master bathroom: replace valve, tile in shower. (n) lights/ vanity | $19,000 |
| Feb 4, 2022 | Completed final sign-off Oct 2022 | 300 Mangels Av | remodel bathroom & kitchen. remove itnerior partition walls, new cabintry, finisehs, plumbing, electrical, & lighting. no expansion of building evnelop or work at front facade.Details
remodel bathroom & kitchen. remove itnerior partition walls, new cabintry, finisehs, plumbing, electrical, & lighting. no expansion of building evnelop or work at front facade. | $60,000 |
| Sep 27, 2021 | Completed final sign-off Oct 2021 | 845 Lake St | unit 6: new floor tile and wall tile for tub/shower, some demo new cement board and water proofing ( existing leak repaird by home owner's plumber)in kind- work in one bathroom in one unit only on the 3rd floor.Details
unit 6: new floor tile and wall tile for tub/shower, some demo new cement board and water proofing ( existing leak repaird by home owner's plumber)in kind- work in one bathroom in one unit only on the 3rd floor. | $4,500 |
| Jan 22, 2021 | Never finaled issued Jan 2021, no final | 530 24th Av | kitchen and bathroom renovation. new cabinets, tile, fixtures, appliance etc. some interiors like new flooring, doors, trim, etc. new windows (rear of bldg only). retrofit insurts.Details
kitchen and bathroom renovation. new cabinets, tile, fixtures, appliance etc. some interiors like new flooring, doors, trim, etc. new windows (rear of bldg only). retrofit insurts. | $45,000 |
| Oct 22, 2020 | Completed final sign-off Dec 2020 | 617 03rd Av | bathroom remodel. new tile, shower pan, shower door, vanity, toilet, pocket door, trim, baseboards, prime and paint (cosmetic update)Details
bathroom remodel. new tile, shower pan, shower door, vanity, toilet, pocket door, trim, baseboards, prime and paint (cosmetic update) | $15,000 |
| Sep 9, 2020 | Completed final sign-off Feb 2021 | 2791 Greenwich St | kitchen new cabinets, countertops, backsplash, paint. bath, new shower pan, tile, vanity, recessed lights, paintDetails
kitchen new cabinets, countertops, backsplash, paint. bath, new shower pan, tile, vanity, recessed lights, paint | $33,000 |
| Jun 30, 2020 | Completed final sign-off Sep 2020 | 3 Vulcan Sw | kitchen & bath remodel inkind, (1) (n) retrofit patio door inkind to (e). (4) (n) retrofit windows @ back of home onlyDetails
kitchen & bath remodel inkind, (1) (n) retrofit patio door inkind to (e). (4) (n) retrofit windows @ back of home only | $38,000 |
| Jun 20, 2019 | Completed final sign-off Aug 2019 | 85 Cleary Ct | unit # 2: one bathroom update-new tile, apint , vanity and lights only. non structural.Details
unit # 2: one bathroom update-new tile, apint , vanity and lights only. non structural. | $10,000 |
| Oct 24, 2018 | Completed final sign-off Oct 2019 | 1388 22nd Av | cosmetic remodel of (e) bathroom. new tile, vanity, fixtures, light/fan combo, shower door, new shower pan.Details
cosmetic remodel of (e) bathroom. new tile, vanity, fixtures, light/fan combo, shower door, new shower pan. | $18,000 |