Block 3707, lot 061
625 Market St
- City’s use
- Commercial Office
- Built
- 1907
- Stories
- 15
- Rooms
- 20 bathrooms
- Lot
- 5,032 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
83 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 18, 2025 | In progress issued Jan 2026 | 625 Market St | installation of one marble ceiling panel in building lobby of 625 market st including structural support. replacement of entry door threshold with new accessible threshold. no other changes to (e) lobby under this permit. no changes to building use, egress, or occupancy.Details
installation of one marble ceiling panel in building lobby of 625 market st including structural support. replacement of entry door threshold with new accessible threshold. no other changes to (e) lobby under this permit. no changes to building use, egress, or occupancy. | $7,000 | |
| Sep 11, 2025 | In progress issued Sep 2025 | 625 Market St | Shield Fire & Safety Solutions Inc | replacmemnt of accessible discontinue xl pipe pho duct on seven floors floors: 2,5,7,8,9,14& pent houseDetails
replacmemnt of accessible discontinue xl pipe pho duct on seven floors floors: 2,5,7,8,9,14& pent house | $20,000 |
| Apr 22, 2025 | Completed final sign-off May 2025 | 625 Market St | Pyro-Comm Systems, Inc. | existing fire alarm system voluntary upgrade. (1) cellular comm, new teleguard cellular comm added to existing fire alarm system control panel. new monitor moduleDetails
existing fire alarm system voluntary upgrade. (1) cellular comm, new teleguard cellular comm added to existing fire alarm system control panel. new monitor module | $3,500 |
| Nov 30, 2022 | Completed final sign-off Feb 2024 | 625 Market St | Bigham Taylor Roofing Co | reroofingDetails
reroofing | $97,000 |
| Oct 28, 2022 | Expired or cancelled cancelled Jan 2026 | 625 Market St | install (8) davits at top of building for window washingDetails
install (8) davits at top of building for window washing | $45,000 | |
| Aug 12, 2022 | Never finaled issued Aug 2022, no final | 625 Market St | Clune Construction Company L P | 1/f: updating wall finishes in the atm vestibule & lobby walls. no structural work or modfidication of layout or walls. maher n/a.Details
1/f: updating wall finishes in the atm vestibule & lobby walls. no structural work or modfidication of layout or walls. maher n/a. | $500 |
| Jul 19, 2022 | Completed final sign-off Oct 2022 | 625 Market St | Anderson, Rowe & Buckley, Inc. | fire sprinklers: relocate 2 pendant for bank of america on the 1/f looby area atm room. ref pa202202228381. maher /aDetails
fire sprinklers: relocate 2 pendant for bank of america on the 1/f looby area atm room. ref pa202202228381. maher /a | $1,000 |
| Jun 28, 2022 | Never finaled issued Jun 2022, no final | 625 Market St | Pyro-Comm Systems, Inc. | modification of (e) fa system: 1 ceiling mount strobe, 1 ceiling mount speaker/ strobe. ref 2018 0522 9757Details
modification of (e) fa system: 1 ceiling mount strobe, 1 ceiling mount speaker/ strobe. ref 2018 0522 9757 | $1,500 |
| Jun 1, 2022 | Completed final sign-off Dec 2022 | 625 Market St | H C I Systems Inc | ste 400 - install control relay module 1 for water source heat pump to be programmed & tested by hcl systemsDetails
ste 400 - install control relay module 1 for water source heat pump to be programmed & tested by hcl systems | $11,549 |
| Feb 22, 2022 | Never finaled issued Apr 2022, no final | 625 Market St | Clune Construction Company L P | lobby: the replace of 2 existing pendant light fixture clusters with 2 new surface mounted light fixtures to match (e) in the lobby. no change of occupancy. sprinkler under sep permit, if applic.Details
lobby: the replace of 2 existing pendant light fixture clusters with 2 new surface mounted light fixtures to match (e) in the lobby. no change of occupancy. sprinkler under sep permit, if applic. | $500 |
| Jan 24, 2022 | Completed final sign-off Jan 2023 | 625 Market St | Acco Engineered Systems Inc. Dba Acco En | remove & replace (1) 4.5-ton water source hear pump. (tag: w5hp.4-2) on the 4th fl with like for like replacement.Details
remove & replace (1) 4.5-ton water source hear pump. (tag: w5hp.4-2) on the 4th fl with like for like replacement. | $25,000 |
| Feb 16, 2021 | Never finaled issued Jul 2021, no final | 625 Market St | Sullivan / Thompson Masonry & Restoratio | ext facade: stone cladding repair spalls, add pins to broken stones,expoxy inject cracks.window wall repairs:replace (e) seals,weatherstripping,paint panels and mullions.fire escape repairs:scrape off loose and flaking paint,replace broken connections,replace missing bolts,coat with hi-performanceDetails
ext facade: stone cladding repair spalls, add pins to broken stones,expoxy inject cracks.window wall repairs:replace (e) seals,weatherstripping,paint panels and mullions.fire escape repairs:scrape off loose and flaking paint,replace broken connections,replace missing bolts,coat with hi-performance | $1,871,000 |
| Nov 13, 2020 | Completed final sign-off Feb 2021 | 625 Market St | H C I Systems Inc | installation of new audio/visual notification appliances throughout the area of work to meet proper coverage per nfpa 72 requirements due to ti. all new devices to be tied into new booster power supply provided. removal of existing & replacing them w/ new marked as ern on plans.Details
installation of new audio/visual notification appliances throughout the area of work to meet proper coverage per nfpa 72 requirements due to ti. all new devices to be tied into new booster power supply provided. removal of existing & replacing them w/ new marked as ern on plans. | $9,920 |
| Jul 10, 2020 | Completed final sign-off Apr 2021 | 625 Market St | Yerba Buena Builders Inc | 8/f: t.i includes demo of non structural partitions and bldg new non structural partitions. new accessible shower room and new mother's room are being added as a bldg amenity. all new or revised meps, life safety and sprinkler if neede will be design build and submitted under seperately.Details
8/f: t.i includes demo of non structural partitions and bldg new non structural partitions. new accessible shower room and new mother's room are being added as a bldg amenity. all new or revised meps, life safety and sprinkler if neede will be design build and submitted under seperately. | $95,000 |
| Feb 25, 2020 | Completed final sign-off Oct 2020 | 625 Market St | H C I Systems Inc | 15/f: install new audio/visual notification devices througout area of work, removal and replacement of devices marked "ern" on plans, removal of devices makred "er" on plans, and covered with blank plate if needed. ref pa# 201908148751Details
15/f: install new audio/visual notification devices througout area of work, removal and replacement of devices marked "ern" on plans, removal of devices makred "er" on plans, and covered with blank plate if needed. ref pa# 201908148751 | $13,550 |
| Oct 22, 2019 | Never finaled issued Oct 2019, no final | 625 Market St | Schmitt Heating Co Inc | extend supply air duct work into new private offices. install new transfer grills into private officeDetails
extend supply air duct work into new private offices. install new transfer grills into private office | $16,000 |
| Oct 17, 2019 | Never finaled issued Oct 2019, no final | 625 Market St | Wells Electrical, Inc | 15th floor: ref permit pa# 2019-0814-8751. title 24 lighting onlyDetails
15th floor: ref permit pa# 2019-0814-8751. title 24 lighting only | $15,000 |
| Oct 2, 2019 | Completed final sign-off Oct 2019 | 625 Market St | Incom Mechanical Inc | 15/f: relocate 31 upright to pendant add 2 new pendants. pendant protection for (e) upgrights like for like. ref t.i. 201908148751. maher n/a.Details
15/f: relocate 31 upright to pendant add 2 new pendants. pendant protection for (e) upgrights like for like. ref t.i. 201908148751. maher n/a. | $4,500 |
| Sep 24, 2019 | Completed final sign-off Sep 2020 | 625 Market St | H C I Systems Inc | 15th fl - insstallation of new audio/visual notification appliance. removal of existing devices & replace w/new marked as "ern" on plans. removal of existing devices marked as "er" on plans due to tenantDetails
15th fl - insstallation of new audio/visual notification appliance. removal of existing devices & replace w/new marked as "ern" on plans. removal of existing devices marked as "er" on plans due to tenant | $13,550 |
| Aug 22, 2019 | Never finaled issued Aug 2019, no final | 625 Market St | street spaceDetails
street space | ||
| Aug 14, 2019 | Never finaled issued Aug 2019, no final | 625 Market St | Yerba Buena Builders Inc | 15th floor t.i includes the demo of non structural partitions and building new nono structural partitions. mep's, life safety and sprinklers design build submitted under separate permit. building fully sprinklered.Details
15th floor t.i includes the demo of non structural partitions and building new nono structural partitions. mep's, life safety and sprinklers design build submitted under separate permit. building fully sprinklered. | $450,000 |
| Nov 6, 2018 | Completed final sign-off Dec 2018 | 625 Market St | Yerba Buena Builders Inc | revision to pa 201503130876. penthouse & roof. elevator upgrade, revision per fire inspectorDetails
revision to pa 201503130876. penthouse & roof. elevator upgrade, revision per fire inspector | |
| Oct 31, 2018 | Expired or cancelled withdrawn Jan 2019 | 625 Market St | H C I Systems Inc | installation of new fire alarm devices due to elevator modernization. n smoke detectors to be installed on 1/f & 15/f elevator lobbies & elevator machine rm on penthouse lvl, fls basement, 2-14 fls have (e) smoke detectors & are to remain. new control relay modules to be instaled for elevator recallDetails
installation of new fire alarm devices due to elevator modernization. n smoke detectors to be installed on 1/f & 15/f elevator lobbies & elevator machine rm on penthouse lvl, fls basement, 2-14 fls have (e) smoke detectors & are to remain. new control relay modules to be instaled for elevator recall | |
| Oct 19, 2018 | Completed final sign-off Dec 2018 | 625 Market St | Yerba Buena Builders Inc | to obtain final inspection for work approved under pa# 201408224472 & 201503130876. all work is complete.Details
to obtain final inspection for work approved under pa# 201408224472 & 201503130876. all work is complete. | |
| May 22, 2018 | Completed final sign-off Nov 2022 | 625 Market St | Clune Construction Company L P | replacement of (e) atms w/newer models. atms are located more than 10' from storefront withing interior vestibule. installation of equipment with minor electrical and structural. no change in occupancies.Details
replacement of (e) atms w/newer models. atms are located more than 10' from storefront withing interior vestibule. installation of equipment with minor electrical and structural. no change in occupancies. | $156,162 |
| Apr 23, 2018 | Completed final sign-off Nov 2018 | 625 Market St | H C I Systems Inc | installation of new fire alarm devices due to elevator modernation. new smk det on 1st & 15th flr elevator lobbies & elevator machine rm on penthouse lvl. install new notification device inside elevator machinerm. new control relay module to be installedDetails
installation of new fire alarm devices due to elevator modernation. new smk det on 1st & 15th flr elevator lobbies & elevator machine rm on penthouse lvl. install new notification device inside elevator machinerm. new control relay module to be installed | $2,166 |
| Feb 8, 2018 | Expired or cancelled cancelled Oct 2022 | 625 Market St | Electric Tech Construction Inc | the removal of cell equipment including antenna for at&t refDetails
the removal of cell equipment including antenna for at&t ref | $5,000 |
| Dec 1, 2016 | Completed final sign-off Aug 2017 | 625 Market St | G Swanson Constr. Inc. | full remodel of (e) banking center. 1. remove (e) teller ares. 2. new vault workroom & 2 new atas. 3. new 24 hour vestible. 4. new lighting per title 24. revisions to 201606249734Details
full remodel of (e) banking center. 1. remove (e) teller ares. 2. new vault workroom & 2 new atas. 3. new 24 hour vestible. 4. new lighting per title 24. revisions to 201606249734 | $350,000 |
| Feb 17, 2016 | Never finaled issued Feb 2016, no final | 625 Market St | Evans & Son Inc | ref pa 2015 0624 9734: structural ti work on 1st floor for bank vault walls and floor plateDetails
ref pa 2015 0624 9734: structural ti work on 1st floor for bank vault walls and floor plate | $5,000 |
| Feb 17, 2016 | Never finaled issued Feb 2016, no final | 625 Market St | Evans & Son Inc | ref pa 2015 0624 9734: structural work for bank ti on 1st floorDetails
ref pa 2015 0624 9734: structural work for bank ti on 1st floor | $5,000 |
| Nov 16, 2015 | Never finaled issued Oct 2016, no final | 625 Market St | Coast Sign Incorporated | install 3 windows vinyl signs. non electric, single faced. maher n/a.Details
install 3 windows vinyl signs. non electric, single faced. maher n/a. | $300 |
| Nov 16, 2015 | Never finaled issued Oct 2016, no final | 625 Market St | Coast Sign Incorporated | install 2 illuminated wall signs. electric, wall, single faced.Details
install 2 illuminated wall signs. electric, wall, single faced. | $3,000 |
| Sep 30, 2015 | Expired or cancelled cancelled Jan 2026 | 625 Market St | Transceive Communications Inc. | remove at&t antennas, brackets, cabling, equipment.Details
remove at&t antennas, brackets, cabling, equipment. | $1,900 |
| Jun 24, 2015 | Never finaled issued Nov 2015, no final | 625 Market St | G Swanson Constr. Inc., Evans & Son Inc | remodel of (e) bank space including new 24 hour vestible, new millwork, walls, lighting and finishes as well as new bank equipment. no change to use or occupancy. mep included- sprinklers and fire alarm separate-Details
remodel of (e) bank space including new 24 hour vestible, new millwork, walls, lighting and finishes as well as new bank equipment. no change to use or occupancy. mep included- sprinklers and fire alarm separate- | $1,200,000 |
| Mar 23, 2015 | Completed final sign-off Oct 2015 | 625 Market St | Matrix Hg Inc | administrative permit only to reference what address the completed scope of work was actually done at. no work is to be done on this permit. original pa# 201410017754 clarification of actual work location only.Details
administrative permit only to reference what address the completed scope of work was actually done at. no work is to be done on this permit. original pa# 201410017754 clarification of actual work location only. | |
| Mar 13, 2015 | Completed final sign-off Dec 2018 | 625 Market St | Yerba Buena Builders Inc | penthouse & roofing: revision to pa#201408224472, existing 2 hr. rated wall to remain, infill ventilation area opened up for machine installation. remove existing roof ventilator and replace with metal cap.Details
penthouse & roofing: revision to pa#201408224472, existing 2 hr. rated wall to remain, infill ventilation area opened up for machine installation. remove existing roof ventilator and replace with metal cap. | |
| Aug 22, 2014 | Completed final sign-off Dec 2018 | 625 Market St | Yerba Buena Builders Inc | new elevator equip. & machine room. new raised mech. deck new ventilation opening at roof over (el) room. bldg (new) floor and non structural partitions. all new or revised hvac, electrical, plmg will be design-build and submitted for permit seperately if needed. bldg is fully sprinklered.Details
new elevator equip. & machine room. new raised mech. deck new ventilation opening at roof over (el) room. bldg (new) floor and non structural partitions. all new or revised hvac, electrical, plmg will be design-build and submitted for permit seperately if needed. bldg is fully sprinklered. | $1,100,000 |
| Dec 11, 2013 | Never finaled issued Dec 2013, no final | 625 Market St | street space permit w/mtaDetails
street space permit w/mta | ||
| Sep 26, 2012 | Completed final sign-off Dec 2012 | 625 Market St | H C I Systems Inc | all floors:replace the extg edwards 8500 fire alarm panels with new edwards est3 panels. all extg devices are 100% compatable and will not be modified. a new smoke detector shall be added above facp and 6 new bps will be added. all devices to be tested prior to final sign-offDetails
all floors:replace the extg edwards 8500 fire alarm panels with new edwards est3 panels. all extg devices are 100% compatable and will not be modified. a new smoke detector shall be added above facp and 6 new bps will be added. all devices to be tested prior to final sign-off | $48,400 |
| Sep 26, 2012 | Completed final sign-off Oct 2012 | 625 Market St | H C I Systems Inc | 14th floor:add new speaker strobes to an extg fire alarm system in a new ti space on 14th floor. this includes 9 speaker strobes, 1 bps, 1 synch module.Details
14th floor:add new speaker strobes to an extg fire alarm system in a new ti space on 14th floor. this includes 9 speaker strobes, 1 bps, 1 synch module. | $5,400 |
| Sep 6, 2012 | Completed final sign-off Sep 2012 | 625 Market St | Pioneer Fire Inc. | 14th floor-relocate or add fire sprinklers to accomodate new build out. 2 relocate pendentts & 3 added pendents. ti pa# 2012-0817-7606Details
14th floor-relocate or add fire sprinklers to accomodate new build out. 2 relocate pendentts & 3 added pendents. ti pa# 2012-0817-7606 | $1,600 |
| Aug 17, 2012 | Completed final sign-off Dec 2012 | 625 Market St | Skyline Construction | involves modifications of existing tenant improvement space to include minor demoltion & construction of non-load bearing partitions, partial new suspended ceiling, grid& tile, rrelocate lights fixtures, new electrical outlets, new office doors, sidelites, frames, new millwork and new finishes.Details
involves modifications of existing tenant improvement space to include minor demoltion & construction of non-load bearing partitions, partial new suspended ceiling, grid& tile, rrelocate lights fixtures, new electrical outlets, new office doors, sidelites, frames, new millwork and new finishes. | $210,000 |
| Jul 31, 2012 | Completed final sign-off Dec 2012 | 625 Market St | Skyline Construction | 14th floor -interior demoltion of non-structural partitions per ab-017.Details
14th floor -interior demoltion of non-structural partitions per ab-017. | $3,000 |
| Jan 12, 2011 | Expired or cancelled cancelled Jun 2013 | 625 Market St | install 20" tall wi-fi antennas at 2 locations on the roof. install realted wifi equipment within exsiting a t & t equipment area.Details
install 20" tall wi-fi antennas at 2 locations on the roof. install realted wifi equipment within exsiting a t & t equipment area. | $35,000 | |
| Jul 14, 2009 | Never finaled issued Jul 2009, no final | 625 Market St | street space permitDetails
street space permit | ||
| Apr 16, 2009 | Completed final sign-off Apr 2009 | 625 Market St | Red Hawk Fire & Security Ca Llc | 1 additional smoke detectorDetails
1 additional smoke detector | $200 |
| Apr 13, 2009 | Completed final sign-off Nov 2009 | 625 Market St | Capital Tower & Communications | modification to an (e) unmanned telecommunication facility consisting of running an (e) rbs 3003 radio cabinet & replacing it with a new rbs 3518 radio cabinets. adding 2 new rru (remote radio units), add 4 new pbc-02 battery backup cabinet & adding new runs at fire retariant coax cable.Details
modification to an (e) unmanned telecommunication facility consisting of running an (e) rbs 3003 radio cabinet & replacing it with a new rbs 3518 radio cabinets. adding 2 new rru (remote radio units), add 4 new pbc-02 battery backup cabinet & adding new runs at fire retariant coax cable. | $5,000 |
| Jan 12, 2009 | Completed final sign-off Apr 2009 | 625 Market St | Red Hawk Fire & Security Ca Llc | to obtain final inspection for work approved under pa# 200804159703. all work has been completed.Details
to obtain final inspection for work approved under pa# 200804159703. all work has been completed. | |
| Dec 22, 2008 | Completed final sign-off Apr 2009 | 625 Market St | Baycon - Bay Construction Inc. | renew pa# 2008/03/31/8334 to obtain final inspection. all work has been completed.Details
renew pa# 2008/03/31/8334 to obtain final inspection. all work has been completed. | |
| Jun 11, 2008 | Never finaled issued Jun 2008, no final | 625 Market St | street space only.Details
street space only. | ||
| May 16, 2008 | Never finaled issued May 2008, no final | 625 Market St | Automatic Fire Sprinklers Inc. | 3rd floor-install fire sprinkler on 3rd floor. modification to (e) fire sprinkler system area renovation, partial (e) piping remain with the rest to be removed. new hanger, new fire sprinkler will be installed. 47 heads totalDetails
3rd floor-install fire sprinkler on 3rd floor. modification to (e) fire sprinkler system area renovation, partial (e) piping remain with the rest to be removed. new hanger, new fire sprinkler will be installed. 47 heads total | $6,800 |
| Apr 15, 2008 | Expired or cancelled expired Apr 2009 | 625 Market St | Red Hawk Fire & Security Ca Llc | ti for fire alarm on the 3rd floor. add 8 speaker/strobes, 1 smoke detector and 2 strobes, 2 door holders, 1 manual pull station, 1 sync module. fire alarm certification required.Details
ti for fire alarm on the 3rd floor. add 8 speaker/strobes, 1 smoke detector and 2 strobes, 2 door holders, 1 manual pull station, 1 sync module. fire alarm certification required. | $8,000 |
| Mar 31, 2008 | Expired or cancelled expired Apr 2009 | 625 Market St | Baycon - Bay Construction Inc. | 3rd floor. revision to application 2000802205131. reconfigure breakroom, add one room. all revisions to mechanical, electrical, life safety on separate permit.Details
3rd floor. revision to application 2000802205131. reconfigure breakroom, add one room. all revisions to mechanical, electrical, life safety on separate permit. | |
| Feb 20, 2008 | Completed final sign-off Apr 2009 | 625 Market St | 3rd floor-demo of (e) non-structural partitions provide new, non-structural partitions for office (hvac, electrical, plumbing, sprinklers and life safety to be design build & submitted under seperate permit), building is fully sprinklered.Details
3rd floor-demo of (e) non-structural partitions provide new, non-structural partitions for office (hvac, electrical, plumbing, sprinklers and life safety to be design build & submitted under seperate permit), building is fully sprinklered. | $250,000 | |
| Dec 20, 2007 | Never finaled issued Dec 2007, no final | 625 Market St | street spaceDetails
street space | ||
| Nov 29, 2007 | Completed final sign-off Apr 2008 | 625 Market St | Baycon - Bay Construction Inc. | 3rd floor #300: demolition of interior doors, walls without affecting the core concrete walls. all demo related to non-bearing interior walls. exterior conc walls & windows & exits to remain untact. disability compliance will be addressed under t.i. permit. remove all (e) light fixture throughout.Details
3rd floor #300: demolition of interior doors, walls without affecting the core concrete walls. all demo related to non-bearing interior walls. exterior conc walls & windows & exits to remain untact. disability compliance will be addressed under t.i. permit. remove all (e) light fixture throughout. | $16,000 |
| Feb 9, 2007 | Completed final sign-off Mar 2007 | 625 Market St | restroom bearrier removal, 2nd and 3rd floors, new fixtures, accessories, signage, paint and finishesDetails
restroom bearrier removal, 2nd and 3rd floors, new fixtures, accessories, signage, paint and finishes | $7,000 | |
| Apr 10, 2006 | Never finaled issued Apr 2006, no final | 625 Market St | street space permitDetails
street space permit | ||
| Nov 21, 2005 | Completed final sign-off Mar 2007 | 625 Market St | Dome Construction Corp | seismic strengthening of basement, g/f, mezzanine, 1st floor and 2nd & 3rd floorDetails
seismic strengthening of basement, g/f, mezzanine, 1st floor and 2nd & 3rd floor | $800,000 |
| Feb 14, 2005 | Expired or cancelled expired Oct 2007 | 625 Market St | Cosco Fire Protection Inc. | add 27 sprinkler head to 3rd fl, add 30 sprinkler head to 8th fl.Details
add 27 sprinkler head to 3rd fl, add 30 sprinkler head to 8th fl. | $9,800 |
| Jan 3, 2003 | Expired or cancelled expired Feb 2004 | 625 Market St | remove 1 wraparound style antenna and place 2 small allgon 7999 antennas, 1 per side of corner 8.5.xDetails
remove 1 wraparound style antenna and place 2 small allgon 7999 antennas, 1 per side of corner 8.5.x | $20,000 | |
| Aug 30, 2001 | Completed final sign-off Sep 2001 | 625 Market St | Peacock Construction Inc | fire life safety system upgrade & int demolition renewal 200010052437 for final 200006021603Details
fire life safety system upgrade & int demolition renewal 200010052437 for final 200006021603 | |
| Jul 24, 2001 | Expired or cancelled expired Feb 2002 | 625 Market St | install equipment racks in basement telco rm and install one wedge shaped antenna to n/w cornr of blDetails
install equipment racks in basement telco rm and install one wedge shaped antenna to n/w cornr of bl | $20,000 | |
| Jul 13, 2001 | Expired or cancelled expired Nov 2001 | 625 Market St | add smoke detector and non fire emergency door release 7th floor.Details
add smoke detector and non fire emergency door release 7th floor. | $2,500 | |
| Feb 14, 2001 | Completed final sign-off May 2001 | 625 Market St | Design Build Develp. Stru | seismic bracing - structural) revision to app#200005028771Details
seismic bracing - structural) revision to app#200005028771 | $500 |
| Jan 18, 2001 | Completed final sign-off May 2001 | 625 Market St | Design Build Develp. Stru | oti-3 2nd flr lsDetails
oti-3 2nd flr ls | $1,000 |
| Jan 17, 2001 | Completed final sign-off May 2001 | 625 Market St | Design Build Develp. Stru | oti-2 revision 2nd floor el,me,spDetails
oti-2 revision 2nd floor el,me,sp | $6,000 |
| Jan 8, 2001 | Completed final sign-off May 2001 | 625 Market St | Design Build Develp. Stru | life safety on basement only, seismic retrofit project under appr.#200005028771Details
life safety on basement only, seismic retrofit project under appr.#200005028771 | $2,000 |
| Jan 4, 2001 | Completed final sign-off May 2001 | 625 Market St | oti-1 el, me spr. l/sDetails
oti-1 el, me spr. l/s | $85,000 | |
| Oct 17, 2000 | Completed final sign-off May 2001 | 625 Market St | Design Build Develp. Stru | oti-2 2nd floor electrical,mechanical,lifesafty,sprinklerDetails
oti-2 2nd floor electrical,mechanical,lifesafty,sprinkler | $28,500 |
| Oct 16, 2000 | Expired or cancelled expired Apr 2001 | 625 Market St | relocate 38 sprinkler heads to accumulate new tile ceilingDetails
relocate 38 sprinkler heads to accumulate new tile ceiling | $8,000 | |
| Oct 5, 2000 | Expired or cancelled expired Sep 2001 | 625 Market St | fire/ life safety syste upgrade to 7th fl.Details
fire/ life safety syste upgrade to 7th fl. | $7,000 | |
| Sep 28, 2000 | Expired or cancelled withdrawn Oct 2000 | 625 Market St | archit bldg under ap #200004217849 provide mech & elect sprinkler & fire alarm per plan life safetyDetails
archit bldg under ap #200004217849 provide mech & elect sprinkler & fire alarm per plan life safety | ||
| Aug 31, 2000 | Completed final sign-off Sep 2001 | 625 Market St | Peacock Construction Inc | oti-1 7/f el me ls spDetails
oti-1 7/f el me ls sp | $190,000 |
| Jun 2, 2000 | Completed final sign-off Sep 2001 | 625 Market St | Peacock Construction Inc | demolition of existing interior partition as close on the 7th flor only-non structural, int paritionDetails
demolition of existing interior partition as close on the 7th flor only-non structural, int parition | $5,000 |
| Jun 1, 2000 | Expired or cancelled expired Feb 2004 | 625 Market St | Edwards Systems Technology Inc/Est Servi | add strobles to 5th floor & bring up to current fire code-adding duct detectorDetails
add strobles to 5th floor & bring up to current fire code-adding duct detector | $5,110 |
| May 16, 2000 | Expired or cancelled expired Sep 2000 | 625 Market St | street spaceDetails
street space | ||
| May 2, 2000 | Completed final sign-off May 2001 | 625 Market St | seismic bracing basement 1st & 2/f restrm & stair upgrade at basement 2/f restrms alreay in for permDetails
seismic bracing basement 1st & 2/f restrm & stair upgrade at basement 2/f restrms alreay in for perm | $350,000 | |
| Apr 28, 2000 | Expired or cancelled expired Feb 2004 | 625 Market St | Swenson Construction Co., Inc. | oti-1 el me ls sp 5/fDetails
oti-1 el me ls sp 5/f | $15,000 |
| Apr 28, 2000 | Expired or cancelled expired Feb 2004 | 625 Market St | Swenson Construction Co., Inc. | oti-2 el sp 5/fDetails
oti-2 el sp 5/f | $10,000 |
| Apr 21, 2000 | Expired or cancelled expired Sep 2001 | 625 Market St | oti-1 2/f el me ls spDetails
oti-1 2/f el me ls sp | $45,000 | |
| Mar 24, 2000 | Completed final sign-off Aug 2000 | 625 Market St | Arrow Sign Company | erect sign non-electric, wall.Details
erect sign non-electric, wall. | $7,000 |
| Feb 17, 2000 | Expired or cancelled expired Feb 2004 | 625 Market St | Swenson Construction Co., Inc. | oti-1 el, me, ls, sp 5th floorDetails
oti-1 el, me, ls, sp 5th floor | $45,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- H C I Systems Inc (8), Yerba Buena Builders Inc (6), Design Build Develp. Stru (5), Baycon - Bay Construction Inc. (3), Clune Construction Company L P (3), Evans & Son Inc (3), Peacock Construction Inc (3), Red Hawk Fire & Security Ca Llc (3), Swenson Construction Co., Inc. (3), Coast Sign Incorporated (2), G Swanson Constr. Inc. (2), Pyro-Comm Systems, Inc. (2), Skyline Construction (2), Acco Engineered Systems Inc. Dba Acco En, Anderson, Rowe & Buckley, Inc., Arrow Sign Company, Automatic Fire Sprinklers Inc., Bigham Taylor Roofing Co, Capital Tower & Communications, Cosco Fire Protection Inc., Dome Construction Corp, Edwards Systems Technology Inc/Est Servi, Electric Tech Construction Inc, Incom Mechanical Inc, Matrix Hg Inc, Pioneer Fire Inc., Schmitt Heating Co Inc, Shield Fire & Safety Solutions Inc, Sullivan / Thompson Masonry & Restoratio, Transceive Communications Inc., Wells Electrical, Inc
- Architects
- Jeffrey Schmierer (3), Joseph Remling (2), Paul Bosman (2), Andrew Weber, Carol Clark, Hugh Edward Murphy, Melissa Pesci, Michael Downey
- Engineers
- Alex Filatov, Blake Dilsworth, Eric Kreager, Hector Pedraza, Joseph A. Remling, Lars P. Mortensen, Mhc Engineers, Steamline Engineer Steamline Engineering, Wilson Lee