Lars P. Mortensen
- Listed as
- architect, engineer
- Firm
- Acco Engineering Systems
- Based in
- San Leandro
- On San Francisco permits
- Aug 2019 to Sep 2026
84 permits since 2000 (engineer on 80 permits, architect on 4 permits): 65 completed, 15 in progress, 4 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 29, 2026 | In progress filed Sep 2026, not yet issued | 1 Beach St | revision to pa 202603097200 for fsd'sDetails
revision to pa 202603097200 for fsd's | $10,000 | |
| Sep 25, 2026 | In progress filed Sep 2026, not yet issued | 1 Beach St | Turner Construction Co | deferred mep for 202608206913 suite 150.Details
deferred mep for 202608206913 suite 150. | $187,000 |
| Sep 18, 2026 | In progress issued Sep 2026 | 101 California St | Hp Build | 45th floor: reference#202607305820 mechanical and electrical for the projectDetails
45th floor: reference#202607305820 mechanical and electrical for the project | $44,335 |
| Sep 16, 2026 | In progress issued Sep 2026 | 235 02nd St | Bcci Construction Company | revision to issued 202606253898. changes include elminating level 2 - lobby and copy room scope. eliminating level 3 unisex toilet and shower scope. minor reunions to light fixtures. millwork, finishes, and schedules.Details
revision to issued 202606253898. changes include elminating level 2 - lobby and copy room scope. eliminating level 3 unisex toilet and shower scope. minor reunions to light fixtures. millwork, finishes, and schedules. | |
| Sep 10, 2026 | In progress issued Sep 2026 | 71 Stevenson St | Marchetti Group | provide sheet metal modification to accomadate (n) t.i., furnish & install (n) transfer fan. ref. bpa#202607014426Details
provide sheet metal modification to accomadate (n) t.i., furnish & install (n) transfer fan. ref. bpa#202607014426 | $96,000 |
| Apr 15, 2026 | Completed final sign-off May 2026 | 4 Embarcadero Center | M C S Construction Services | 8/f: permit ref# 202512091273 - deferred mech and electrical permit. mech: minor air distribution ungrades to the common area restrooms and corridors. electrical: new lighting fixtures, associated circuiting/controls, power devices, associated wiring.Details
8/f: permit ref# 202512091273 - deferred mech and electrical permit. mech: minor air distribution ungrades to the common area restrooms and corridors. electrical: new lighting fixtures, associated circuiting/controls, power devices, associated wiring. | $100,000 |
| Apr 15, 2026 | Completed final sign-off Aug 2026 | 4 Embarcadero Center | M C S Construction Services | 8th fl - ref pa 202601204110 deferred mech & elec permit mech,. rework mechanical low side system to serve partial 8th floor layout. elec, lighting assoc circuiting/controls. power & signal devices & assoc wiringDetails
8th fl - ref pa 202601204110 deferred mech & elec permit mech,. rework mechanical low side system to serve partial 8th floor layout. elec, lighting assoc circuiting/controls. power & signal devices & assoc wiring | $150,000 |
| Mar 9, 2026 | In progress issued Jun 2026 | 1 Beach St | Turner Construction Co | ground floor: deferred mep to pa #202508294258Details
ground floor: deferred mep to pa #202508294258 | $1,292,400 |
| Jan 28, 2026 | In progress issued Feb 2026 | 1 Beach St | Turner Construction Co | ste 300 - deferred mep to 202511240285Details
ste 300 - deferred mep to 202511240285 | $700,000 |
| Jan 12, 2026 | In progress issued Feb 2026 | 1 Beach St | Turner Construction Co | level 1 and level 2: suites 100 and 200. deferred mep for 202509084794Details
level 1 and level 2: suites 100 and 200. deferred mep for 202509084794 | $2,146,752 |
| Jan 12, 2026 | In progress issued Feb 2026 | 1 Beach St | Turner Construction Co | 2nd fl, ste 250 deferred mep for pa 202509084793Details
2nd fl, ste 250 deferred mep for pa 202509084793 | $731,160 |
| Dec 17, 2025 | Completed final sign-off Feb 2026 | 600 Townsend St | Kr Johnston Construction Inc | 1/f suite 150: electrical and hvac into 2 new offices. ref t.i permit 202512040996Details
1/f suite 150: electrical and hvac into 2 new offices. ref t.i permit 202512040996 | $40,000 |
| Dec 10, 2025 | In progress issued Dec 2025 | 45 Fremont St | Novo Construction Inc | mechanical, electrical, and plumbing for t.i. work on 3rd, 10th and 11th floor. ref: 202510288298.Details
mechanical, electrical, and plumbing for t.i. work on 3rd, 10th and 11th floor. ref: 202510288298. | $25,000 |
| Dec 3, 2025 | In progress issued Jan 2026 | 1400 16th St | Acco Engineered Systems Inc. Dba Acco En | install new 6-ton fan coil to serve existing computer room. no exterior work.Details
install new 6-ton fan coil to serve existing computer room. no exterior work. | $40,000 |
| Oct 31, 2025 | Completed final sign-off Aug 2026 | 188 The Embarcadero | Novo Construction Inc | 1st floor-fitness room: mechanical and electrical and plumbing work for t.i, ref. pa #202508112719Details
1st floor-fitness room: mechanical and electrical and plumbing work for t.i, ref. pa #202508112719 | $22,000 |
| Oct 31, 2025 | Completed final sign-off Aug 2026 | 188 The Embarcadero | Novo Construction Inc | deferred mechanical and electrical ti for 1st floor-board room and 2nd floor library. reference pa 202508082645Details
deferred mechanical and electrical ti for 1st floor-board room and 2nd floor library. reference pa 202508082645 | $20,000 |
| Oct 17, 2025 | Completed final sign-off May 2026 | 333 Bush St | Source Planning And Construction Inc | 20th flr/ suite 2020. ref arch#: 202509044546. mech and electrical.Details
20th flr/ suite 2020. ref arch#: 202509044546. mech and electrical. | $120,000 |
| Oct 17, 2025 | In progress issued Oct 2025 | 1455 03rd St | Acco Engineered Systems Inc. Dba Acco En | 3rd floor: addition of one under floor vav box and alteration of lowside air distribution in area of work. ref pa #202506108366Details
3rd floor: addition of one under floor vav box and alteration of lowside air distribution in area of work. ref pa #202506108366 | $40,000 |
| Oct 2, 2025 | Completed final sign-off Jun 2026 | 222 02nd St | Novo Construction Inc | mechanical work on the 15th & 16th floor; additions of 1 new fsd at 15th and 1 on the 16th. ref pa 202504083894/202504043741Details
mechanical work on the 15th & 16th floor; additions of 1 new fsd at 15th and 1 on the 16th. ref pa 202504083894/202504043741 | $8,000 |
| Sep 3, 2025 | Completed final sign-off Jun 2026 | 1 Post St | Peacock Construction | floor 2; mechanical and electrical for office ti permit pa#202506138672Details
floor 2; mechanical and electrical for office ti permit pa#202506138672 | $10,000 |
| Aug 6, 2025 | In progress issued Aug 2025 | 1455 03rd St | Principal Builders Inc. | level 2: deferred mep for 202506108373Details
level 2: deferred mep for 202506108373 | $80,640 |
| Jul 30, 2025 | Completed final sign-off Nov 2025 | 88 Kearny St | Source Planning And Construction Inc | deferred mep for office ti permit 202507221279. rework (1) e - hvac box to accommodate 4 new offices, rework (1) e -vac cooling box for partial enclosed pantry area , install new 4 air diffusers and grilles and add 1 duck work, install insulation per t24. install (12) new 2x2 fixtures; install 11Details
deferred mep for office ti permit 202507221279. rework (1) e - hvac box to accommodate 4 new offices, rework (1) e -vac cooling box for partial enclosed pantry area , install new 4 air diffusers and grilles and add 1 duck work, install insulation per t24. install (12) new 2x2 fixtures; install 11 | $30,000 |
| Jul 22, 2025 | In progress issued Jul 2025 | 1455 03rd St | Acco Engineered Systems Inc. Dba Acco En | level 8: alteration of new lowside air distribution for conferenceDetails
level 8: alteration of new lowside air distribution for conference | $84,000 |
| Jun 23, 2025 | Completed final sign-off Sep 2025 | 1 Post St | Clune Construction Company L P | suite 103 and 105-ref 202505227060 ti- alteration of low side air distrubution for the basement floor cafe. (n) power and signal devices throughout the space (n) title 24 compliant lighting and controls. no change to kitchen equipment.Details
suite 103 and 105-ref 202505227060 ti- alteration of low side air distrubution for the basement floor cafe. (n) power and signal devices throughout the space (n) title 24 compliant lighting and controls. no change to kitchen equipment. | $20,000 |
| Apr 3, 2025 | Completed final sign-off Jul 2025 | 71 Stevenson St | Marchetti Group | 18th fl ref pa #2025-0121-8674: modify existing ductwork to better serve tenant spaceDetails
18th fl ref pa #2025-0121-8674: modify existing ductwork to better serve tenant space | $16,750 |
| Mar 28, 2025 | Completed final sign-off Jul 2025 | 570 Pacific Av | Bevilacqua & Sons | install new low side duct per new tenant space layout. ref pa 202502100003Details
install new low side duct per new tenant space layout. ref pa 202502100003 | $200,000 |
| Jan 7, 2025 | Completed final sign-off Jun 2025 | 600 California St | Novo Construction Inc | mechanical and electrical for tenant improvement of the 15th fl. ref arch 2024-1025-3728Details
mechanical and electrical for tenant improvement of the 15th fl. ref arch 2024-1025-3728 | $175,000 |
| Dec 5, 2024 | Completed final sign-off Jan 2025 | 300 Mission St | M C S Construction Services | 20th fl- deferred mechanical & electrical ref pa # 2024-0813-8510 & 2024-1015-2929. mechanical: demo & install low side by ductwork per revised owner layout. electrical: new power & signal devices. new lighting & controlsDetails
20th fl- deferred mechanical & electrical ref pa # 2024-0813-8510 & 2024-1015-2929. mechanical: demo & install low side by ductwork per revised owner layout. electrical: new power & signal devices. new lighting & controls | $65,000 |
| Nov 1, 2024 | Completed final sign-off May 2025 | 225 Bush St | Novo Construction Inc | mech & electrical work for t.i. on 15th fl, ref to 202408057901Details
mech & electrical work for t.i. on 15th fl, ref to 202408057901 | $15,000 |
| Oct 16, 2024 | Completed final sign-off Feb 2025 | 181 Fremont St | Acco Engineered Systems Inc. Dba Acco En | 24&25/fl- install plumbing connection to (n) coffee and tea equipment. install of plumbing connections to (n) bevi water dispenser and refrigertorsDetails
24&25/fl- install plumbing connection to (n) coffee and tea equipment. install of plumbing connections to (n) bevi water dispenser and refrigertors | $49,000 |
| Sep 17, 2024 | Completed final sign-off Apr 2025 | 1515 03rd St | Principal Builders Inc. | level 6/mission bay 2- install 2 new tempered chilled water fan coils. install 1 new cooling only van. relocate & demo swirl diffusers as required. rebalance e) vav's as required. install new ductwork & pipe as requriedDetails
level 6/mission bay 2- install 2 new tempered chilled water fan coils. install 1 new cooling only van. relocate & demo swirl diffusers as required. rebalance e) vav's as required. install new ductwork & pipe as requried | $60,000 |
| Aug 30, 2024 | In progress issued Oct 2024 | 1515 03rd St | Principal Builders Inc. | level 5 - demo (e) ceiling & finishes. minor alterations to (e) non structural partitions, suspended ceiling, 9n) millwork & finishes & (n) lighting. demo previously under pa 202408098376Details
level 5 - demo (e) ceiling & finishes. minor alterations to (e) non structural partitions, suspended ceiling, 9n) millwork & finishes & (n) lighting. demo previously under pa 202408098376 | $3,999,516 |
| Aug 23, 2024 | Completed final sign-off Feb 2025 | 1 Warriors Wy | Dpr Construction A | revision to pa 202403137744 changes inside revision to veranda layout; added dimensions for field clarifications; millwork and detail updates; and revised finish scheduleDetails
revision to pa 202403137744 changes inside revision to veranda layout; added dimensions for field clarifications; millwork and detail updates; and revised finish schedule | |
| Jul 18, 2024 | Completed final sign-off Feb 2025 | 2 Folsom St | Swinerton Builders | 15th fl ti: new partitons, ceilings, fixtures, finishes & mepDetails
15th fl ti: new partitons, ceilings, fixtures, finishes & mep | $2,465,940 |
| Jul 12, 2024 | Completed final sign-off Sep 2026 | 120 Kearny St | Hathaway Dinwiddie Co. | flr 33-deferred mechanical submittal for pa# 2024-0515-2160Details
flr 33-deferred mechanical submittal for pa# 2024-0515-2160 | $195,000 |
| Apr 24, 2024 | Completed final sign-off Nov 2024 | 2 Folsom St | Swinerton Builders | 7th fl - interior ti includes 3 new training spaces, office space & storage space. new non-load bearing partitions, ceilings, finishes & mech/elecDetails
7th fl - interior ti includes 3 new training spaces, office space & storage space. new non-load bearing partitions, ceilings, finishes & mech/elec | $900,000 |
| Dec 15, 2023 | Completed final sign-off Jul 2024 | 215 Fremont St | Novo Construction Inc | 4/f: deferred mep for bpa# 202310108255: add new water source heat pumps; new transfer fans; demo and reinstall vav reheat and colling boxes as needed.Details
4/f: deferred mep for bpa# 202310108255: add new water source heat pumps; new transfer fans; demo and reinstall vav reheat and colling boxes as needed. | |
| Nov 20, 2023 | Completed final sign-off Nov 2024 | 680 Folsom St | Skyline Construction | 14th floor. mechanical & electrical system for 14th floor. interior ti for previously approved pa# 202310108347.Details
14th floor. mechanical & electrical system for 14th floor. interior ti for previously approved pa# 202310108347. | $350,000 |
| Nov 8, 2023 | Completed final sign-off Jul 2024 | 215 Fremont St | Novo Construction Inc | 3/f: deferred mep for bpa#202310108253Details
3/f: deferred mep for bpa#202310108253 | $250,000 |
| Oct 17, 2023 | Completed final sign-off Apr 2024 | 600 Montgomery St | Hathaway Dinwiddie Co. | 17th flr.interior tenant improvement w/ the addition of vavs to the existing hvac system and rebalance of hvac system after vav install and zone configuration. electrical scope covers the addition of office lighting and outlets running to the exiting 17th flr. electrical panel. ref#: 202307182408Details
17th flr.interior tenant improvement w/ the addition of vavs to the existing hvac system and rebalance of hvac system after vav install and zone configuration. electrical scope covers the addition of office lighting and outlets running to the exiting 17th flr. electrical panel. ref#: 202307182408 | $250,000 |
| Oct 3, 2023 | Completed final sign-off May 2024 | 1563 Mission St | Swinerton Builders | 4th floor: construction of new non-structural partions, acoustical grid and tile drywall ceilings, light fixtures, mill work and finishes. also includes upgraded meps.Details
4th floor: construction of new non-structural partions, acoustical grid and tile drywall ceilings, light fixtures, mill work and finishes. also includes upgraded meps. | $2,907,146 |
| Aug 31, 2023 | Completed final sign-off Jan 2024 | 185 Berry St | Hathaway Dinwiddie Co. | suite 1500: mep associated with ti bpa 202306069338Details
suite 1500: mep associated with ti bpa 202306069338 | $80,000 |
| Aug 24, 2023 | Completed final sign-off Feb 2024 | 595 Market St | Source Planning And Construction Inc | basement: mep for arch pa# 202303073171.Details
basement: mep for arch pa# 202303073171. | $300,000 |
| Aug 1, 2023 | Completed final sign-off Dec 2023 | 1 Embarcadero Center | Gci, Inc | unit 2050: mechanical & electrical properties work for t.i. to consist of new terminal units, new ductwork, grilles & diffusers, demo of (e)grilles, difficusers as required, new lighting & controls. new power & signal. ref pa 202305047070Details
unit 2050: mechanical & electrical properties work for t.i. to consist of new terminal units, new ductwork, grilles & diffusers, demo of (e)grilles, difficusers as required, new lighting & controls. new power & signal. ref pa 202305047070 | $15,000 |
| Aug 1, 2023 | Completed final sign-off Dec 2023 | 3 Embarcadero Center | Gci, Inc | unit 1480: mechanical & electrical properties work for t.i. to consist of new ductwork, grilles & diffisuers as required. new lighting, controls, power & signal devices. ref pa 202305117614Details
unit 1480: mechanical & electrical properties work for t.i. to consist of new ductwork, grilles & diffisuers as required. new lighting, controls, power & signal devices. ref pa 202305117614 | $20,000 |
| Aug 1, 2023 | Completed final sign-off Dec 2023 | 2 Embarcadero Center | Gci, Inc | unit 2200: mechanical & electrical properties work for t.i. to consist of new ducktwork, grilles & diffusers, new lighting & controls, power & signal. ref pa 202305117552Details
unit 2200: mechanical & electrical properties work for t.i. to consist of new ducktwork, grilles & diffusers, new lighting & controls, power & signal. ref pa 202305117552 | $20,000 |
| Jul 24, 2023 | Completed final sign-off Dec 2023 | 1 Sansome St | Principal Builders Inc. | mep pa 2023-0426-6505Details
mep pa 2023-0426-6505 | $50,000 |
| Jul 21, 2023 | Completed final sign-off Apr 2024 | 735 Montgomery St | M C S Construction Services | 2/f: interior t.i. updates, deferred mechanical/electrical work permit. ref bpa#202302101802Details
2/f: interior t.i. updates, deferred mechanical/electrical work permit. ref bpa#202302101802 | $112,000 |
| Jun 6, 2023 | Never finaled issued Jun 2023, no final | 655 Montgomery St | Source Planning And Construction Inc | 19th fl: demo and renovate low-side duct to accomodate new floor plan. provide 2 new vav boxes. ref pa# 202302101726 & 202302101762Details
19th fl: demo and renovate low-side duct to accomodate new floor plan. provide 2 new vav boxes. ref pa# 202302101726 & 202302101762 | $109,450 |
| Apr 11, 2023 | Completed final sign-off Aug 2024 | 350 Parnassus Av | Dome Construction Corp | mep work for 202212087889. rooftop mechanical equipment added with ductwork to floors below.Details
mep work for 202212087889. rooftop mechanical equipment added with ductwork to floors below. | $756,000 |
| Apr 5, 2023 | Completed final sign-off Jul 2023 | 625 02nd St | Source Planning And Construction Inc | demo, relocate & add new duct work & grilles to serve new architectural layout, ref pa# 202303133545.Details
demo, relocate & add new duct work & grilles to serve new architectural layout, ref pa# 202303133545. | $32,000 |
| Mar 8, 2023 | Completed final sign-off Sep 2023 | 335 Powell St | Marchetti Group | demo ceiling & sidewall supply & return grilles. add new ceiling and sidewall supply and return grilles. ref t.i. pa#2022-1221-8859. mech review only.Details
demo ceiling & sidewall supply & return grilles. add new ceiling and sidewall supply and return grilles. ref t.i. pa#2022-1221-8859. mech review only. | $15,000 |
| Feb 7, 2023 | Completed final sign-off May 2023 | 505 Montgomery St | Hathaway Dinwiddie Co. | mep for bpa# 20220818-0781Details
mep for bpa# 20220818-0781 | $397,521 |
| Sep 23, 2022 | Completed final sign-off Feb 2023 | 4 Embarcadero Center | Source Planning And Construction Inc | 30th fl - mechanical and electrical for permit # 202207057733.Details
30th fl - mechanical and electrical for permit # 202207057733. | $700,000 |
| Sep 22, 2022 | Never finaled issued Nov 2022, no final | 1 Post St | Peacock Construction | ref to t.i. 202206307453. mech only. mech install (n) terminal units, ductwork, grilles & diffuser, (n) linear slot grillesw/ remote balancing dampers for conference rms. mew electrical, power, lighting & signal.Details
ref to t.i. 202206307453. mech only. mech install (n) terminal units, ductwork, grilles & diffuser, (n) linear slot grillesw/ remote balancing dampers for conference rms. mew electrical, power, lighting & signal. | $10,000 |
| Aug 16, 2022 | Completed final sign-off Apr 2023 | 525 Market St | Novo Construction Inc | mechanical work for tenant improvement on the 5th fl ref 202207067816Details
mechanical work for tenant improvement on the 5th fl ref 202207067816 | $10,000 |
| Aug 16, 2022 | Completed final sign-off Apr 2023 | 525 Market St | Novo Construction Inc | mechanical work for tenant improvement on the 32nd fl ref arch 202207067812Details
mechanical work for tenant improvement on the 32nd fl ref arch 202207067812 | $10,000 |
| Aug 10, 2022 | Completed final sign-off Jul 2025 | 640 Cesar Chavez St | Truebeck Construction | revision to pa#202105281321. revised south wall and occupant loading. revised west lot charger location and vehicle lift locations. other misc. details per plans.Details
revision to pa#202105281321. revised south wall and occupant loading. revised west lot charger location and vehicle lift locations. other misc. details per plans. | |
| Jun 22, 2022 | Completed final sign-off Jan 2023 | 1 Lombard St | Bcci Construction Company | 3rd fl office t.i. to include new partitions & mepDetails
3rd fl office t.i. to include new partitions & mep | $1,100,000 |
| May 19, 2022 | Completed final sign-off Nov 2022 | 415 Natoma St | M C S Construction Services | 13th fl: install new 2-pipe + 4 pipe fan powered terminal units to new ti spaces. install wshp to it room for oding. route outside air ductwork from (e) vav outside air supply to fan powered terminal units. new powerr + signal decives. 2019 t24 compliant lighting + controls. ref pa# 202203220602.Details
13th fl: install new 2-pipe + 4 pipe fan powered terminal units to new ti spaces. install wshp to it room for oding. route outside air ductwork from (e) vav outside air supply to fan powered terminal units. new powerr + signal decives. 2019 t24 compliant lighting + controls. ref pa# 202203220602. | $747,000 |
| Feb 11, 2022 | Completed final sign-off Jul 2022 | 595 Market St | Source Planning And Construction Inc | 11/f: title 24 compliance for mechanical and electrical. ref t.i. pa202111232992. maher n/aDetails
11/f: title 24 compliance for mechanical and electrical. ref t.i. pa202111232992. maher n/a | $199,000 |
| Jan 24, 2022 | Completed final sign-off Jan 2023 | 625 Market St | Acco Engineered Systems Inc. Dba Acco En | remove & replace (1) 4.5-ton water source hear pump. (tag: w5hp.4-2) on the 4th fl with like for like replacement.Details
remove & replace (1) 4.5-ton water source hear pump. (tag: w5hp.4-2) on the 4th fl with like for like replacement. | $25,000 |
| Nov 29, 2021 | Never finaled issued Nov 2021, no final | 505 Brannan St | Hathaway Dinwiddie Construct Co | deferred mech & elec submittal for pa# 202108307359. new hvac split system. electrical connections for hvac and desks. basement 1 level.Details
deferred mech & elec submittal for pa# 202108307359. new hvac split system. electrical connections for hvac and desks. basement 1 level. | $50,000 |
| Aug 31, 2021 | Completed final sign-off Jan 2022 | 875 Stevenson St | Novo Construction Inc | ti to (e) levels 4 & 5 to restore original ti mechanical and electrical work to consist of alterations of (e) lighting rework of low side duct distribution for occies & conference roomsDetails
ti to (e) levels 4 & 5 to restore original ti mechanical and electrical work to consist of alterations of (e) lighting rework of low side duct distribution for occies & conference rooms | $15,000 |
| May 20, 2021 | Completed final sign-off Dec 2021 | 575 Market St | Field Construction Inc. | mechanical - install new restroom exhaust terminals including ductwork & grilles. install new grilles serving elevator lobbies. install new fire smoke dampers. electrical - power, lighting & signal.Details
mechanical - install new restroom exhaust terminals including ductwork & grilles. install new grilles serving elevator lobbies. install new fire smoke dampers. electrical - power, lighting & signal. | $115,000 |
| May 5, 2021 | Completed final sign-off Dec 2021 | 575 Market St | Field Construction Inc. | ste 2900: ref pa# 202012150979. mechanical: demo ductwork & piping, install new fire smoke detectors at shaft, install new supply air duct, install new lighting & vav terminal. electrical: lighting, power & signal.Details
ste 2900: ref pa# 202012150979. mechanical: demo ductwork & piping, install new fire smoke detectors at shaft, install new supply air duct, install new lighting & vav terminal. electrical: lighting, power & signal. | $190,000 |
| May 5, 2021 | Completed final sign-off Apr 2022 | 575 Market St | Field Construction Inc. | ste 2750: mechanical: install new fan powered terminal units including ductwork, grilles, thermostats & piping, relocate existing grilles & thermostats to accomodate arch layout. electrical: lighting, power & signal. ref pa# 202012100759Details
ste 2750: mechanical: install new fan powered terminal units including ductwork, grilles, thermostats & piping, relocate existing grilles & thermostats to accomodate arch layout. electrical: lighting, power & signal. ref pa# 202012100759 | $140,000 |
| May 3, 2021 | Completed final sign-off Dec 2021 | 575 Market St | Field Construction Inc. | ste 2800: electrical - lighting, power & signal. ref pa# 202012150972. mechanical - install 4 (n) fsd, (n) supply air ducts, heater hot water, vav term units.Details
ste 2800: electrical - lighting, power & signal. ref pa# 202012150972. mechanical - install 4 (n) fsd, (n) supply air ducts, heater hot water, vav term units. | $10,000 |
| Apr 27, 2021 | Completed final sign-off Apr 2022 | 120 Kearny St | Acco Engineered Systems Inc. Dba Acco En | demo vane-axial fans, duct transitions, and adjacent sound trap baffles. install supply and exhaust fan walls.Details
demo vane-axial fans, duct transitions, and adjacent sound trap baffles. install supply and exhaust fan walls. | $750,000 |
| Mar 25, 2021 | Completed final sign-off May 2021 | 909 Montgomery St | Charles Pankow Builders Ltd | 4th fl: electrical & mechanical design. title 24. ref pa# 202010196842.Details
4th fl: electrical & mechanical design. title 24. ref pa# 202010196842. | $35,000 |
| Mar 25, 2021 | Completed final sign-off Jan 2022 | 1990 Folsom St | Truebeck Construction | deferred mep from pa# 202009113999. install lowside duct + grilles as needed to serve early care + education spaces, rebalance (e) exhaust fan. instlal laundry exhaust fan + lint trap.Details
deferred mep from pa# 202009113999. install lowside duct + grilles as needed to serve early care + education spaces, rebalance (e) exhaust fan. instlal laundry exhaust fan + lint trap. | $300,000 |
| Mar 19, 2021 | Completed final sign-off Sep 2025 | 505 Montgomery St | Clune Construction Company L P | 13-fl: deferred submittal to pa 202011138879. mechanical work: install new ducts and grills. relocate (e) thermostats. relocate and rebalance exhaust fans, vav termnal boxes. upgrade 3 pneumatic vav terminal boxes.Details
13-fl: deferred submittal to pa 202011138879. mechanical work: install new ducts and grills. relocate (e) thermostats. relocate and rebalance exhaust fans, vav termnal boxes. upgrade 3 pneumatic vav terminal boxes. | $110,000 |
| Dec 2, 2020 | Completed final sign-off Apr 2022 | 120 Kearny St | Acco Engineered Systems Inc. Dba Acco En | demo vaneaxial fans, duct transitions, & adjacent sound trap baffles. install supply & exhaust fan walls. fans located on 38th fl mechanical penthouse.Details
demo vaneaxial fans, duct transitions, & adjacent sound trap baffles. install supply & exhaust fan walls. fans located on 38th fl mechanical penthouse. | $750,000 |
| Dec 2, 2020 | Completed final sign-off May 2022 | 353 Sacramento St | Acco Engineered Systems Inc. Dba Acco En | replace cooling tower, associated piping, & accessories. install additional steel support as needed. install new centrifucal separator. tower located on roof & not taller than existing. not visible from street.Details
replace cooling tower, associated piping, & accessories. install additional steel support as needed. install new centrifucal separator. tower located on roof & not taller than existing. not visible from street. | $415,000 |
| Nov 30, 2020 | Completed final sign-off Mar 2021 | 575 Market St | Gci, Inc | 23rd fl: mechanical - fire smoke dampers, supply air, relocating hot water, vav terminals, restroom exhaust. electrical - power, lighting. plumbing. reference ti pa# 202009244909.Details
23rd fl: mechanical - fire smoke dampers, supply air, relocating hot water, vav terminals, restroom exhaust. electrical - power, lighting. plumbing. reference ti pa# 202009244909. | |
| Nov 17, 2020 | Never finaled issued Dec 2020, no final | 375 Brannan St | Acco Engineered Systems Inc. Dba Acco En | remove and replace 2 split systems.Details
remove and replace 2 split systems. | $38,700 |
| Jul 7, 2020 | Completed final sign-off May 2021 | 55 02nd St | Field Construction Inc. | hvac upgrades with new vav's for a spec suite on the 24th fl. ref pa #201912119252. maher naDetails
hvac upgrades with new vav's for a spec suite on the 24th fl. ref pa #201912119252. maher na | $85,000 |
| Feb 26, 2020 | Completed final sign-off Oct 2020 | 270 Brannan St | Novo Construction Inc | 3rd fl - mechanical work for ti & electrical relocation and new installation of restroom grilles & ductwork to accomodate restroom renovation. ref pa 2019-1125-8055Details
3rd fl - mechanical work for ti & electrical relocation and new installation of restroom grilles & ductwork to accomodate restroom renovation. ref pa 2019-1125-8055 | $3,000 |
| Feb 5, 2020 | Completed final sign-off Nov 2020 | 410 Townsend St | Novo Construction Inc | revision to pa# 2020-0113-1713. to reuse heat pump 1-20Details
revision to pa# 2020-0113-1713. to reuse heat pump 1-20 | |
| Dec 16, 2019 | Completed final sign-off Nov 2020 | 353 Sacramento St | Novo Construction Inc | 13th & 14th fl - mechanical and plumbing work for tenant improvement. ref pa 2019-1010-4093Details
13th & 14th fl - mechanical and plumbing work for tenant improvement. ref pa 2019-1010-4093 | $250,000 |
| Dec 4, 2019 | Completed final sign-off Jul 2020 | 410 Townsend St | Novo Construction Inc | 2nd & 3rd fl - mep for tenant improvement. ref pa 2019-1107-6718Details
2nd & 3rd fl - mep for tenant improvement. ref pa 2019-1107-6718 | $800,000 |
| Nov 21, 2019 | Completed final sign-off Jan 2020 | 143 02nd St | Hp Build | 2nd fl - mechenical & electrical for project 2019-0829-0216 also cover correction for deferred submittal listDetails
2nd fl - mechenical & electrical for project 2019-0829-0216 also cover correction for deferred submittal list | |
| Sep 19, 2019 | Completed final sign-off Jun 2020 | 300 Clay St | Gci, Inc | fire damper replacement. ref app#201901251216. n/a for maherDetails
fire damper replacement. ref app#201901251216. n/a for maher | $125,000 |
| Aug 23, 2019 | Completed final sign-off Apr 2021 | 650 Townsend St | Clune Construction Company L P | mep to permits 201906102944 & 201906103001Details
mep to permits 201906102944 & 201906103001 |