Permits filed here
128 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 17, 2026 | In progress filed Sep 2026, not yet issued | 353 Sacramento St | removal & reinstallation of existing entry door at the same location with a modified configuration on the ground floor. does not affect fixture quantities, occupant load calculations or path of travel. no site, landscape or use changes are proposed. building does not have a prking garage.Details
removal & reinstallation of existing entry door at the same location with a modified configuration on the ground floor. does not affect fixture quantities, occupant load calculations or path of travel. no site, landscape or use changes are proposed. building does not have a prking garage. | $130,000 | |
| Apr 29, 2026 | Completed final sign-off May 2026 | 353 Sacramento St | Anderson, Rowe & Buckley, Inc. | revision to pa 202601284683 correct sprinkler pipe size from 3" to 2"Details
revision to pa 202601284683 correct sprinkler pipe size from 3" to 2" | |
| Apr 15, 2026 | Completed final sign-off May 2026 | 353 Sacramento St | Pyro-Comm Systems, Inc. | 2nd flr. revised plans pa#: 202602065383 to show 5 added duct detectors and 5 relay modules. scope also includes 1 power supply, 2 smoke detectors, 1 monitor module, 1 control module 20 speaker strobes and ceiling strobes ref#; 202602065383.Details
2nd flr. revised plans pa#: 202602065383 to show 5 added duct detectors and 5 relay modules. scope also includes 1 power supply, 2 smoke detectors, 1 monitor module, 1 control module 20 speaker strobes and ceiling strobes ref#; 202602065383. | |
| Apr 1, 2026 | Completed final sign-off May 2026 | 353 Sacramento St | Anderson, Rowe & Buckley, Inc. | level 15: as built to permit 202601284684. plugged 2 sprinklers. relocate 64 uprights. add 3 uprights. relocate 32 pendents. add 5 pendents. total 104.Details
level 15: as built to permit 202601284684. plugged 2 sprinklers. relocate 64 uprights. add 3 uprights. relocate 32 pendents. add 5 pendents. total 104. | $55,000 |
| Feb 10, 2026 | In progress issued Feb 2026 | 353 Sacramento St | Pyro-Comm Systems, Inc. | 1 power supply, 1 control module, 1 monitor module, 1 smoke detector, 2 relay, modules, 5 ceiling strobes, 31 speaker strobes to be added. pa ref#: 202511109274.Details
1 power supply, 1 control module, 1 monitor module, 1 smoke detector, 2 relay, modules, 5 ceiling strobes, 31 speaker strobes to be added. pa ref#: 202511109274. | $11,000 |
| Feb 6, 2026 | In progress issued Feb 2026 | 353 Sacramento St | Pyro-Comm Systems, Inc. | fire alarm 1 power supply, 1 monitor module, 1 control module, 2 replay module, 9 ceiling strobe, 2 smoke detector, 20 speaker strobes to be added. ref pa 202512151741Details
fire alarm 1 power supply, 1 monitor module, 1 control module, 2 replay module, 9 ceiling strobe, 2 smoke detector, 20 speaker strobes to be added. ref pa 202512151741 | $11,000 |
| Jan 28, 2026 | Completed final sign-off May 2026 | 353 Sacramento St | Anderson, Rowe & Buckley, Inc. | fire sprinkler ti ref pa 202511109274 relocate 82, add 7 total 89Details
fire sprinkler ti ref pa 202511109274 relocate 82, add 7 total 89 | $45,835 |
| Nov 10, 2025 | Completed final sign-off May 2026 | 353 Sacramento St | Bcci Construction Company | 15th/fl: interior demo of non-structural elements including but not limited to interior partitions,doors,finishes,ceilings,lightening,mechanical,electrical outlets, switches and plumbing fixtures for new layout. refer to mep plans for information. new costruction interior partitions restroom (cont)Details
15th/fl: interior demo of non-structural elements including but not limited to interior partitions,doors,finishes,ceilings,lightening,mechanical,electrical outlets, switches and plumbing fixtures for new layout. refer to mep plans for information. new costruction interior partitions restroom (cont) | $1,250,000 |
| Jun 26, 2025 | Completed final sign-off Nov 2025 | 353 Sacramento St | C C I Commercial Construction & Improv | 17/fl: ti includes structural anchoring of existing phone booths. no revision to hvac, electrical, plumbing or life safety.Details
17/fl: ti includes structural anchoring of existing phone booths. no revision to hvac, electrical, plumbing or life safety. | $40,000 |
| May 15, 2025 | Completed final sign-off Nov 2025 | 353 Sacramento St | recommencement and completion of work approved under pa #2021-0205-4132Details
recommencement and completion of work approved under pa #2021-0205-4132 | $45,000 | |
| Mar 24, 2022 | Never finaled issued Aug 2022, no final | 353 Sacramento St | Metropolitan Electrical Construction | cell site mod: r/r 6 panel antennas,install 1 new rectifier w/in (e) dc power plant.install (1) 6648 baseband within (e) fif rack.Details
cell site mod: r/r 6 panel antennas,install 1 new rectifier w/in (e) dc power plant.install (1) 6648 baseband within (e) fif rack. | $35,000 |
| Feb 5, 2021 | Expired or cancelled expired Nov 2025 | 353 Sacramento St | Western Machinery Electric, The Electrical Testing Company Llc | 23/f ph: maintenance work: in-kind replacement of (e) day tank (with the same size tank) for the (e) generator & replacement in-kind for the (e) fuel pump for fueling this day tank. (n) pump due to size will be moved adjacent to the (e) location.Details
23/f ph: maintenance work: in-kind replacement of (e) day tank (with the same size tank) for the (e) generator & replacement in-kind for the (e) fuel pump for fueling this day tank. (n) pump due to size will be moved adjacent to the (e) location. | $45,000 |
| Dec 2, 2020 | Completed final sign-off May 2022 | 353 Sacramento St | Acco Engineered Systems Inc. Dba Acco En | replace cooling tower, associated piping, & accessories. install additional steel support as needed. install new centrifucal separator. tower located on roof & not taller than existing. not visible from street.Details
replace cooling tower, associated piping, & accessories. install additional steel support as needed. install new centrifucal separator. tower located on roof & not taller than existing. not visible from street. | $415,000 |
| Mar 5, 2020 | Never finaled filed Mar 2020, never issued | 353 Sacramento St | evacuation signage for the 13th & 14th floors. 6 total signs.Details
evacuation signage for the 13th & 14th floors. 6 total signs. | $3,000 | |
| Mar 2, 2020 | Never finaled issued Mar 2020, no final | 353 Sacramento St | Novo Construction Inc | the fabrication and installation of acrylic evacuation maps to the front surface of the interior building wallsDetails
the fabrication and installation of acrylic evacuation maps to the front surface of the interior building walls | $2,535 |
| Aug 26, 2019 | Never finaled issued Aug 2019, no final | 353 Sacramento St | street spaceDetails
street space | ||
| Jun 12, 2019 | Never finaled issued Jun 2019, no final | 353 Sacramento St | street spaceDetails
street space | ||
| Apr 11, 2019 | Never finaled issued Apr 2019, no final | 353 Sacramento St | Centimark Corporation | reroof. rmeoce (e) gravel, install insulation. reinstall gravel over 15610sf tpo. solar reflectance 0.76 thermal emittance 0.84 sri 93.Details
reroof. rmeoce (e) gravel, install insulation. reinstall gravel over 15610sf tpo. solar reflectance 0.76 thermal emittance 0.84 sri 93. | $117,787 |
| Apr 13, 2018 | Never finaled issued Apr 2018, no final | 353 Sacramento St | Novo Construction Inc | electrical work for tenant improvement on the 20th fl. rev pa #201801269683Details
electrical work for tenant improvement on the 20th fl. rev pa #201801269683 | $5,000 |
| Sep 1, 2017 | Never finaled issued Sep 2017, no final | 353 Sacramento St | Westates Mechanical Corporation Inc | 1st floor lobby - relocation of fire sprinkler to new location total 33 new heads. n/a maher ordinanceDetails
1st floor lobby - relocation of fire sprinkler to new location total 33 new heads. n/a maher ordinance | $1,000 |
| Feb 1, 2017 | Never finaled issued Feb 2017, no final | 353 Sacramento St | Novo Construction Inc | electrical work for ti on 22/f. ref pa 2016-12-07-4362Details
electrical work for ti on 22/f. ref pa 2016-12-07-4362 | $5,000 |
| Feb 1, 2017 | Never finaled issued Feb 2017, no final | 353 Sacramento St | Novo Construction Inc | electrical work for ti on the 9th floor. ref pa 2016-1207-4359Details
electrical work for ti on the 9th floor. ref pa 2016-1207-4359 | $5,000 |
| Dec 7, 2016 | Completed final sign-off Jun 2017 | 353 Sacramento St | Novo Construction Inc | 22nd floor: t.i. includes demo of nonstructural partitions and building. new nonstructural partitions. mep, life safety and sprinklers under seperate permit. bldg fully sprinklered. n/a for maherDetails
22nd floor: t.i. includes demo of nonstructural partitions and building. new nonstructural partitions. mep, life safety and sprinklers under seperate permit. bldg fully sprinklered. n/a for maher | $650,000 |
| Dec 7, 2016 | Completed final sign-off Jun 2017 | 353 Sacramento St | Novo Construction Inc | 9th floor: t.i. includes demo of nonstructural partitions and building. new nonstructural partitions. mep, life safety and sprinklers under seperate permit. bldg fully sprinklered. n/a for maherDetails
9th floor: t.i. includes demo of nonstructural partitions and building. new nonstructural partitions. mep, life safety and sprinklers under seperate permit. bldg fully sprinklered. n/a for maher | $550,000 |
| Nov 2, 2016 | Completed final sign-off May 2017 | 353 Sacramento St | basement- replace (2) existing boilers, (2) existing hot water pumps, add (2) new primary hot water pumps, install (1) new combustion air supply fan & modify piping & flue. n/a ordinance #155-13Details
basement- replace (2) existing boilers, (2) existing hot water pumps, add (2) new primary hot water pumps, install (1) new combustion air supply fan & modify piping & flue. n/a ordinance #155-13 | $300,000 | |
| Oct 27, 2016 | Completed final sign-off Oct 2016 | 353 Sacramento St | Tri-Signal Integration Inc. | 3rd floor as build drawings for pa 2016-1018-0538 fire alarm systemDetails
3rd floor as build drawings for pa 2016-1018-0538 fire alarm system | |
| Sep 2, 2016 | Completed final sign-off Oct 2016 | 353 Sacramento St | Ayoob & Peery Plumbing Co Inc | per ti add 18 and relocate 14 fire sprinklers and plug 13 outlets on the 3rd floor to conform with wall wall/ceiling layoutDetails
per ti add 18 and relocate 14 fire sprinklers and plug 13 outlets on the 3rd floor to conform with wall wall/ceiling layout | $6,593 |
| Dec 16, 2015 | Never finaled issued Dec 2015, no final | 353 Sacramento St | street spaceDetails
street space | ||
| Jan 12, 2015 | Completed final sign-off Jun 2015 | 353 Sacramento St | Principal Builders Inc. | title 24 electrical to install new lighting and power to new work on curently occupied tenant floor. please refer to permit #2014-1205-3151 for ti work. n/a ordinance #155-13Details
title 24 electrical to install new lighting and power to new work on curently occupied tenant floor. please refer to permit #2014-1205-3151 for ti work. n/a ordinance #155-13 | $60,000 |
| Dec 5, 2014 | Completed final sign-off Jun 2015 | 353 Sacramento St | Principal Builders Inc. | tenant improvement on 18th flr to demo non-structural partition, build new non-structural partitions. relocate doors and frames, add new millwork and finish. all mep, life safety and sprinkler work under seperate permit. n/a ordinance #155-13.Details
tenant improvement on 18th flr to demo non-structural partition, build new non-structural partitions. relocate doors and frames, add new millwork and finish. all mep, life safety and sprinkler work under seperate permit. n/a ordinance #155-13. | $573,735 |
| Dec 3, 2014 | Completed final sign-off Oct 2015 | 353 Sacramento St | Tri-Signal Integration Inc. | fire alarm ti-3rd floor: add 2 new strobe lights to extg strobe circuits. relocated 2 strobe lights and 2 speaker. ref app#201411071004. n/a for the maher.Details
fire alarm ti-3rd floor: add 2 new strobe lights to extg strobe circuits. relocated 2 strobe lights and 2 speaker. ref app#201411071004. n/a for the maher. | $1,500 |
| Dec 3, 2014 | Completed final sign-off Oct 2015 | 353 Sacramento St | Tri-Signal Integration Inc. | fire alarm ti- 8th floor add 1 notifaction device for construction plan 201411071004Details
fire alarm ti- 8th floor add 1 notifaction device for construction plan 201411071004 | $1,500 |
| Dec 9, 2013 | Completed final sign-off Jan 2014 | 353 Sacramento St | Tri-Signal Integration Inc. | 1st floor: replace cpu, power supply, loop cards, audio message generator, master telephone headset at existing fire alarm system. retest system 100% functions 10% extg devices.Details
1st floor: replace cpu, power supply, loop cards, audio message generator, master telephone headset at existing fire alarm system. retest system 100% functions 10% extg devices. | $27,000 |
| Jul 29, 2013 | Completed final sign-off Dec 2013 | 353 Sacramento St | Tri-Signal Integration Inc. | 23rd floor - add 15 new strobes, 14 new speakers to existing fire alarm system. relcoate one smoke detector. ref pa #2013.07.19.2255Details
23rd floor - add 15 new strobes, 14 new speakers to existing fire alarm system. relcoate one smoke detector. ref pa #2013.07.19.2255 | $10,000 |
| Jul 29, 2013 | Completed final sign-off Aug 2013 | 353 Sacramento St | Tri-Signal Integration Inc. | 4th floor - add eight new strobes to existing circuit, replace two existing strobes with new, relcoate one existing speaker. ref pa #2013.07.17.2094Details
4th floor - add eight new strobes to existing circuit, replace two existing strobes with new, relcoate one existing speaker. ref pa #2013.07.17.2094 | $3,900 |
| Jul 11, 2013 | Never finaled issued Jul 2013, no final | 353 Sacramento St | Hawk Mechanical Inc | 19th floor: relocate grilles and thermostats. replace one thermostat. hvac work.Details
19th floor: relocate grilles and thermostats. replace one thermostat. hvac work. | $17,300 |
| Jun 25, 2013 | Completed final sign-off Aug 2013 | 353 Sacramento St | Tri-Signal Integration Inc. | 19th floor-add 4 strobes, 1 new speaker to (e) fire alarm system. relocate 1 strobe & 1 speakerDetails
19th floor-add 4 strobes, 1 new speaker to (e) fire alarm system. relocate 1 strobe & 1 speaker | $2,600 |
| Jun 13, 2013 | Completed final sign-off May 2025 | 353 Sacramento St | Ayoob & Peery Plumbing Co Inc | t.i: relocate 1 sprinkler for coverage. pa# 201305156973Details
t.i: relocate 1 sprinkler for coverage. pa# 201305156973 | $514 |
| May 23, 2013 | Completed final sign-off Aug 2013 | 353 Sacramento St | Tri-Signal Integration Inc. | 15th floor-relocate 2 speakers & 1 strobe at (e) fire alarm systemDetails
15th floor-relocate 2 speakers & 1 strobe at (e) fire alarm system | $1,300 |
| May 1, 2013 | Completed final sign-off Jul 2013 | 353 Sacramento St | Tri-Signal Integration Inc. | add one strobe to extg fire alarm system. relocate one strobe and one speaker.Details
add one strobe to extg fire alarm system. relocate one strobe and one speaker. | $1,400 |
| Feb 7, 2013 | Completed final sign-off Dec 2013 | 353 Sacramento St | Tri-Signal Integration Inc. | 12th and 13th floors:add 2 abbressable relay modules to extg fire alarm system.Details
12th and 13th floors:add 2 abbressable relay modules to extg fire alarm system. | $1,500 |
| Nov 27, 2012 | Completed final sign-off Dec 2012 | 353 Sacramento St | Tri-Signal Integration Inc. | relocate one smoke detector; one speaker, 8 strobes, add 9 speakers, 6 strobes, 1 sync mobile to existing fire alarm systemDetails
relocate one smoke detector; one speaker, 8 strobes, add 9 speakers, 6 strobes, 1 sync mobile to existing fire alarm system | $8,700 |
| Aug 20, 2012 | Completed final sign-off Sep 2012 | 353 Sacramento St | Tri-Signal Integration Inc. | add 9 strobes to existing fire alarem system. relocate 2 speakersDetails
add 9 strobes to existing fire alarem system. relocate 2 speakers | $4,700 |
| Nov 14, 2011 | Completed final sign-off Dec 2011 | 353 Sacramento St | Tri-Signal Integration Inc. | add five strobes, 1 power supply to existing fire alarm system. relocate 2 manual pull stations, 2 smoke detectors, 1 speakerDetails
add five strobes, 1 power supply to existing fire alarm system. relocate 2 manual pull stations, 2 smoke detectors, 1 speaker | $3,000 |
| Jul 11, 2011 | Completed final sign-off Aug 2011 | 353 Sacramento St | Tri-Signal Integration Inc. | 10th floor-add 5 strobes & 3 speakers to (e) fire alarm system. relocate 1 smoke detector & replace 2 (e) strobes with newDetails
10th floor-add 5 strobes & 3 speakers to (e) fire alarm system. relocate 1 smoke detector & replace 2 (e) strobes with new | $5,500 |
| Jun 2, 2010 | Completed final sign-off Aug 2010 | 353 Sacramento St | Tri-Signal Integration Inc. | 5th floor-add 1 strobe to (e) fire alarm systemDetails
5th floor-add 1 strobe to (e) fire alarm system | $1,200 |
| Jan 12, 2010 | Completed final sign-off Feb 2010 | 353 Sacramento St | Tri-Signal Integration Inc. | 7th floor add one strobe & two speakers to existing fire alarm system.Details
7th floor add one strobe & two speakers to existing fire alarm system. | $2,000 |
| May 22, 2009 | Completed final sign-off Jun 2009 | 353 Sacramento St | Peacock Construction Inc | to obtain final inspection for work approved under pa#2007/06/28/5463. all work has been completed.Details
to obtain final inspection for work approved under pa#2007/06/28/5463. all work has been completed. | |
| May 22, 2009 | Completed final sign-off Jun 2009 | 353 Sacramento St | Peacock Construction Inc | to obtain final inspection for work approved under pa#2007/06/06/3151. all work has been completed.Details
to obtain final inspection for work approved under pa#2007/06/06/3151. all work has been completed. | |
| Mar 2, 2009 | Completed final sign-off Jun 2009 | 353 Sacramento St | Tri-Signal Integration Inc. | add 12 strobes to existing fire alarm system, relocate 13 speakers.Details
add 12 strobes to existing fire alarm system, relocate 13 speakers. | $5,000 |
| Oct 8, 2008 | Completed final sign-off Dec 2008 | 353 Sacramento St | Tri-Signal Integration Inc. | 19th floor-remove one smoke detector and one strobe from (e) fire alarm systemDetails
19th floor-remove one smoke detector and one strobe from (e) fire alarm system | $1,800 |
| Aug 25, 2008 | Never finaled issued Aug 2008, no final | 353 Sacramento St | Ayoob & Peery Plumbing Co Inc | at 6th fl: add, relocate fire sprinkler head per t.i. 77 sprinkler heads.Details
at 6th fl: add, relocate fire sprinkler head per t.i. 77 sprinkler heads. | $14,000 |
| Aug 20, 2008 | Never finaled issued Aug 2008, no final | 353 Sacramento St | Tri-Signal Integration Inc. | upgrade of fire alarm system on the 6th floor. relocate 5 smoke detectors and 6 speakers. replace and relocate 16 strobesDetails
upgrade of fire alarm system on the 6th floor. relocate 5 smoke detectors and 6 speakers. replace and relocate 16 strobes | $6,200 |
| Jul 16, 2008 | Completed final sign-off Mar 2009 | 353 Sacramento St | Tri-Signal Integration Inc. | 15th floor. relocate 3 smoke detectors, one speaker and 5 strobes. add 3 new strobes to existing fire alarm.Details
15th floor. relocate 3 smoke detectors, one speaker and 5 strobes. add 3 new strobes to existing fire alarm. | $4,200 |
| Jul 9, 2008 | Completed final sign-off Mar 2009 | 353 Sacramento St | Ayoob & Peery Plumbing Co Inc | 15th floor-relocate fire sprinkler per tenant improvements-19 heads relocatedDetails
15th floor-relocate fire sprinkler per tenant improvements-19 heads relocated | $3,500 |
| Mar 24, 2008 | Completed final sign-off Jun 2008 | 353 Sacramento St | Ayoob & Peery Plumbing Co Inc | relocate fire sprinkler heads per tenant improvement. total 32 heads.Details
relocate fire sprinkler heads per tenant improvement. total 32 heads. | $5,800 |
| Mar 18, 2008 | Completed final sign-off Jun 2008 | 353 Sacramento St | Tri-Signal Integration Inc. | 3rd floor: replace & relocate 10 smoke detectors, 14 strobes, relocate 5 speakers, add 1 relay module to (e) f.a. systemDetails
3rd floor: replace & relocate 10 smoke detectors, 14 strobes, relocate 5 speakers, add 1 relay module to (e) f.a. system | $4,800 |
| Aug 16, 2007 | Completed final sign-off Nov 2007 | 353 Sacramento St | Tri-Signal Integration Inc. | add 2 smoke detectors, five strobes, relocate 4 smoke detectors, 7 speakers, 11 strobesDetails
add 2 smoke detectors, five strobes, relocate 4 smoke detectors, 7 speakers, 11 strobes | $4,800 |
| May 22, 2007 | Completed final sign-off Jun 2007 | 353 Sacramento St | Peacock Construction Inc | renew pa#2006/08/25/0549, 2006/08/28/0711, 2006/03/14/6621 for final inspectionDetails
renew pa#2006/08/25/0549, 2006/08/28/0711, 2006/03/14/6621 for final inspection | |
| May 15, 2007 | Completed final sign-off Aug 2007 | 353 Sacramento St | Tri-Signal Integration Inc. | 18th floor: relocate fire alarm devices to (e) fire alarm system, 1 new, 2 relay modules (new), 1 strobe, fire alarm certification requiredDetails
18th floor: relocate fire alarm devices to (e) fire alarm system, 1 new, 2 relay modules (new), 1 strobe, fire alarm certification required | $5,000 |
| Apr 30, 2007 | Completed final sign-off May 2007 | 353 Sacramento St | Dome Construction Corp | renew for final 200609121980, 200609142254, 200610034033Details
renew for final 200609121980, 200609142254, 200610034033 | |
| Mar 30, 2007 | Completed final sign-off Aug 2007 | 353 Sacramento St | Dome Construction Corp | oti-1 18th floor el me ls spDetails
oti-1 18th floor el me ls sp | $225,000 |
| Dec 20, 2006 | Completed final sign-off Apr 2007 | 353 Sacramento St | Peacock Construction Inc | oti-3 (11th fl.) electrical and sprinkler work for the 11th fl tenant spaceDetails
oti-3 (11th fl.) electrical and sprinkler work for the 11th fl tenant space | $48,000 |
| Dec 6, 2006 | Completed final sign-off Apr 2007 | 353 Sacramento St | Peacock Construction Inc | oti-2 11th floor meDetails
oti-2 11th floor me | $48,000 |
| Nov 28, 2006 | Completed final sign-off Apr 2007 | 353 Sacramento St | Tri-Signal Integration Inc. | add 1 smoke detector and 2 strobes to existing circuits on fire alarm system suite 1140Details
add 1 smoke detector and 2 strobes to existing circuits on fire alarm system suite 1140 | $4,000 |
| Oct 3, 2006 | Expired or cancelled expired May 2007 | 353 Sacramento St | Dome Construction Corp | oti-4 7th floor, meDetails
oti-4 7th floor, me | $11,000 |
| Sep 14, 2006 | Expired or cancelled expired May 2007 | 353 Sacramento St | Dome Construction Corp | oti-3 7th floor spDetails
oti-3 7th floor sp | $3,200 |
| Sep 14, 2006 | Completed final sign-off May 2007 | 353 Sacramento St | Dome Construction Corp | oti-2 7th floor elDetails
oti-2 7th floor el | $29,000 |
| Sep 12, 2006 | Expired or cancelled expired May 2007 | 353 Sacramento St | Tri-Signal Integration Inc. | 7th floor-remove & add devices to (e) fire alarm control panel, t.i. suite 700. add 4 strobes.Details
7th floor-remove & add devices to (e) fire alarm control panel, t.i. suite 700. add 4 strobes. | $5,000 |
| Aug 30, 2006 | Never finaled issued Aug 2006, no final | 353 Sacramento St | demolition of serveral esiting officeDetails
demolition of serveral esiting office | $4,000 | |
| Aug 30, 2006 | Completed final sign-off May 2007 | 353 Sacramento St | Dome Construction Corp | oti: revision to 200607277828 demo const., finishes (design build) all work on 7th floor.Details
oti: revision to 200607277828 demo const., finishes (design build) all work on 7th floor. | $85,000 |
| Aug 28, 2006 | Expired or cancelled expired Jun 2007 | 353 Sacramento St | Peacock Construction Inc | oti-3 (10th fl) elDetails
oti-3 (10th fl) el | $12,000 |
| Jul 27, 2006 | Never finaled issued Jul 2006, no final | 353 Sacramento St | oti-1 (7th fl.) el, me, sl, spDetails
oti-1 (7th fl.) el, me, sl, sp | $77,500 | |
| Dec 16, 2005 | Completed final sign-off Jun 2006 | 353 Sacramento St | Dome Construction Corp | oti-3 mech/elec/ls 14th floorDetails
oti-3 mech/elec/ls 14th floor | $63,000 |
| Dec 6, 2005 | Completed final sign-off Jun 2006 | 353 Sacramento St | Dome Construction Corp | oti-2 14th fl spDetails
oti-2 14th fl sp | $3,800 |
| Jul 27, 2005 | Completed final sign-off Nov 2005 | 353 Sacramento St | Dome Construction Corp | oti-3 7th/fl fire alarm.Details
oti-3 7th/fl fire alarm. | $5,100 |
| Jul 11, 2005 | Completed final sign-off Nov 2005 | 353 Sacramento St | Dome Construction Corp | oti-2-7th/fl-el,me, sp.Details
oti-2-7th/fl-el,me, sp. | $76,000 |
| Jul 1, 2005 | Completed final sign-off Jun 2006 | 353 Sacramento St | Dome Construction Corp | oti- 1 architectural 14th floorDetails
oti- 1 architectural 14th floor | $53,000 |
| Jun 17, 2005 | Completed final sign-off Nov 2005 | 353 Sacramento St | Peacock Construction Inc | oti-1 18th floor el, me, sp, l/sDetails
oti-1 18th floor el, me, sp, l/s | $31,000 |
| May 11, 2005 | Completed final sign-off Nov 2005 | 353 Sacramento St | oti-1 7th/fl-el, me, ls, sp.Details
oti-1 7th/fl-el, me, ls, sp. | $55,000 | |
| Jan 7, 2005 | Completed final sign-off Apr 2005 | 353 Sacramento St | Peacock Construction Inc | oti-2, 8th/fl-ls, spDetails
oti-2, 8th/fl-ls, sp | $20,000 |
| Nov 23, 2004 | Completed final sign-off Apr 2005 | 353 Sacramento St | oti-1, 8th fl, el, me, ls. spDetails
oti-1, 8th fl, el, me, ls. sp | $50,000 | |
| Sep 16, 2004 | Completed final sign-off Oct 2004 | 353 Sacramento St | Dome Construction Corp | oti-3 14th floor l/sDetails
oti-3 14th floor l/s | $14,500 |
| Aug 13, 2004 | Completed final sign-off Oct 2004 | 353 Sacramento St | Dome Construction Corp | oti-2, 14th floor, el, me, sp.Details
oti-2, 14th floor, el, me, sp. | $36,500 |
| Jul 2, 2004 | Completed final sign-off Oct 2004 | 353 Sacramento St | Dome Construction Corp | oti-1, 14/f el,fs,ls,meDetails
oti-1, 14/f el,fs,ls,me | $46,000 |
| Jun 18, 2004 | Completed final sign-off Aug 2004 | 353 Sacramento St | Peacock Construction Inc | oti-2 16th floor l/s, spDetails
oti-2 16th floor l/s, sp | $30,000 |
| May 17, 2004 | Completed final sign-off Jun 2004 | 353 Sacramento St | Peacock Construction Inc | oti-2, 15th floor- ls, spDetails
oti-2, 15th floor- ls, sp | $12,000 |
| Apr 21, 2004 | Completed final sign-off Jun 2004 | 353 Sacramento St | Peacock Construction Inc | oti-1 15th fl, suite 1520, el, me,ls,spDetails
oti-1 15th fl, suite 1520, el, me,ls,sp | $100,000 |
| Mar 26, 2004 | Completed final sign-off May 2004 | 353 Sacramento St | Dpr Construction Inc | oti-2, 22nd fl, el, me, ls, spDetails
oti-2, 22nd fl, el, me, ls, sp | $200,000 |
| Jul 10, 2003 | Never finaled issued Jul 2003, no final | 353 Sacramento St | oti-1, 2nd floor, el, me, ls, spDetails
oti-1, 2nd floor, el, me, ls, sp | $28,000 | |
| Jun 25, 2003 | Completed final sign-off Sep 2003 | 353 Sacramento St | oti-2 10th floor, le, me, ls, spDetails
oti-2 10th floor, le, me, ls, sp | $56,000 | |
| May 21, 2003 | Completed final sign-off Sep 2003 | 353 Sacramento St | oti- 10th floor el me ls spDetails
oti- 10th floor el me ls sp | $86,000 | |
| May 20, 2003 | Completed final sign-off Jul 2003 | 353 Sacramento St | Peacock Construction Inc | oti-2 18th fl, ls,spDetails
oti-2 18th fl, ls,sp | $5,000 |
| Apr 15, 2003 | Completed final sign-off Jul 2003 | 353 Sacramento St | Peacock Construction Inc | oti-1 18th floorDetails
oti-1 18th floor | $84,500 |
| Apr 2, 2003 | Expired or cancelled expired Jan 2004 | 353 Sacramento St | Cosco Fire Protection Inc. | relocate 8 heads (sprinkler) interior work onlyDetails
relocate 8 heads (sprinkler) interior work only | $2,500 |
| Dec 20, 2002 | Completed final sign-off Aug 2003 | 353 Sacramento St | Peacock Construction Inc | oti-1 = remdition of (e) electrical, finishes minor construction of non rated clg- high partitions,Details
oti-1 = remdition of (e) electrical, finishes minor construction of non rated clg- high partitions, | $125,000 |
| Dec 11, 2002 | Expired or cancelled expired Jan 2004 | 353 Sacramento St | Intellisec | tenant improvement on 5 floors for fire alarm system. chantes to 200206078461 on basement levelDetails
tenant improvement on 5 floors for fire alarm system. chantes to 200206078461 on basement level | |
| Oct 11, 2002 | Completed final sign-off Dec 2002 | 353 Sacramento St | Taslimi Construction Co Inc | oti-2 20th flr,el,me,spDetails
oti-2 20th flr,el,me,sp | $22,000 |
| Sep 3, 2002 | Completed final sign-off Dec 2002 | 353 Sacramento St | Taslimi Construction Co Inc | oti-1, 20th floor, el, me, ls,spDetails
oti-1, 20th floor, el, me, ls,sp | $160,000 |
| Jul 31, 2002 | Expired or cancelled expired Jan 2004 | 353 Sacramento St | Richlen Construction | oti-2 rev 19th floor elDetails
oti-2 rev 19th floor el | |
| Jun 25, 2002 | Completed final sign-off Aug 2002 | 353 Sacramento St | Richlen Construction | oti-2 19/f el me sp no change in occupancyDetails
oti-2 19/f el me sp no change in occupancy | $100,000 |
| Jun 7, 2002 | Completed final sign-off Oct 2002 | 353 Sacramento St | Richlen Construction | oti-1 19th fl el,me,ls,spDetails
oti-1 19th fl el,me,ls,sp | $225,000 |
| Jun 7, 2002 | Never finaled issued Jun 2002, no final | 353 Sacramento St | Metropolitan Electrical Construction | upgrade to life safty system basement/1st floor/8th floor/21st floor/penthouseDetails
upgrade to life safty system basement/1st floor/8th floor/21st floor/penthouse | $100,000 |
| Feb 28, 2002 | Completed final sign-off May 2002 | 353 Sacramento St | Skyline Construction | oti-3,3rd flr, mech onlyDetails
oti-3,3rd flr, mech only | $5,500 |
| Feb 27, 2002 | Completed final sign-off May 2002 | 353 Sacramento St | Skyline Construction | oti-2, 3rd floor ltg, sprDetails
oti-2, 3rd floor ltg, spr | $28,000 |
| Feb 4, 2002 | Completed final sign-off May 2002 | 353 Sacramento St | Skyline Construction | oti-1 3rd floor ltg mech lsDetails
oti-1 3rd floor ltg mech ls | $60,000 |
| Dec 14, 2000 | Expired or cancelled cancelled Aug 2001 | 353 Sacramento St | R L H Fire Protection Inc | oti-2 23rd floor spDetails
oti-2 23rd floor sp | $2,300 |
| Nov 30, 2000 | Expired or cancelled expired Mar 2001 | 353 Sacramento St | Metropolitan Electrical Construction | replace 11 ex strobes with new sync strobes add new power booster at 8th floor locationDetails
replace 11 ex strobes with new sync strobes add new power booster at 8th floor location | $3,500 |
| Nov 10, 2000 | Expired or cancelled cancelled Jul 2001 | 383 Sacramento St | Hok Construction Inc | relocte fire alarm devices, add new fire alarm devicesDetails
relocte fire alarm devices, add new fire alarm devices | $7,661 |
| Oct 25, 2000 | Expired or cancelled expired Oct 2001 | 353 Sacramento St | barrier removal project to upgrade restrooms to meet accessbility requrements, work involves demolitDetails
barrier removal project to upgrade restrooms to meet accessbility requrements, work involves demolit | $80,000 | |
| Oct 25, 2000 | Expired or cancelled withdrawn Jan 2001 | 353 Sacramento St | oti-1, 11th floor, el, me, lsDetails
oti-1, 11th floor, el, me, ls | $25,000 | |
| Oct 11, 2000 | Completed final sign-off Dec 2000 | 383 Sacramento St | Ayoob & Peery Plumbing Co Inc | relocate fire sprinkler heads per tenant imprvement @ 1st floor onlyDetails
relocate fire sprinkler heads per tenant imprvement @ 1st floor only | $2,500 |
| Sep 27, 2000 | Expired or cancelled expired Mar 2001 | 353 Sacramento St | Corporate Builders Inc | oti-1 23/fDetails
oti-1 23/f | $5,000 |
| Aug 24, 2000 | Expired or cancelled cancelled Aug 2001 | 353 Sacramento St | oti-1 el me l/s 23rd floorDetails
oti-1 el me l/s 23rd floor | $75,000 | |
| Aug 18, 2000 | Completed final sign-off Dec 2000 | 353 Sacramento St | oti-2,1st floor, el,me,spDetails
oti-2,1st floor, el,me,sp | $1,000 | |
| Aug 14, 2000 | Completed final sign-off Dec 2000 | 353 Sacramento St | oti-1, ground floor, el, me, ls, sp.Details
oti-1, ground floor, el, me, ls, sp. | $105,000 | |
| Jul 10, 2000 | Expired or cancelled expired Mar 2002 | 353 Sacramento St | Peacock Construction Inc | oti-1 el me me ls 4th floorDetails
oti-1 el me me ls 4th floor | $45,000 |
| Jun 28, 2000 | Expired or cancelled cancelled May 2001 | 353 Sacramento St | installation of fiber optic communication cablesDetails
installation of fiber optic communication cables | $50,000 | |
| Apr 28, 2000 | Completed final sign-off Jul 2000 | 353 Sacramento St | oti-4 ls, 9th floorDetails
oti-4 ls, 9th floor | $25,000 | |
| Apr 20, 2000 | Completed final sign-off Jul 2000 | 353 Sacramento St | oti--2: el, me9th floorDetails
oti--2: el, me9th floor | $70,000 | |
| Apr 20, 2000 | Expired or cancelled expired Mar 2002 | 353 Sacramento St | Peacock Construction Inc | oti-2 4th floor spDetails
oti-2 4th floor sp | $2,150 |
| Apr 11, 2000 | Expired or cancelled expired Oct 2000 | 353 Sacramento St | Peacock Construction Inc | oti-2, 6th floor, ls, sp.Details
oti-2, 6th floor, ls, sp. | $20,000 |
| Mar 28, 2000 | Completed final sign-off Jul 2000 | 353 Sacramento St | oti-1 9/f el me ls spDetails
oti-1 9/f el me ls sp | $200,000 | |
| Mar 27, 2000 | Expired or cancelled expired Apr 2001 | 353 Sacramento St | Peacock Construction Inc | oti-1 el me ls sp 6th floorDetails
oti-1 el me ls sp 6th floor | $90,000 |
| Mar 17, 2000 | Expired or cancelled expired Mar 2002 | 353 Sacramento St | oti 1 4th floor, el,me,ls & spDetails
oti 1 4th floor, el,me,ls & sp | $90,000 | |
| Mar 17, 2000 | Expired or cancelled expired Mar 2001 | 353 Sacramento St | barrier removal,water closets,hardship applicationDetails
barrier removal,water closets,hardship application | $45,000 | |
| Feb 8, 2000 | Expired or cancelled cancelled Jun 2002 | 353 Sacramento St | oti-1: 15th floor- minor demolition, const. of new partitions, minor elec. & lightning rev.Details
oti-1: 15th floor- minor demolition, const. of new partitions, minor elec. & lightning rev. | $90,000 | |
| Jan 26, 2000 | Expired or cancelled expired Aug 2000 | 353 Sacramento St | oti-2, 18th fl, ls, spDetails
oti-2, 18th fl, ls, sp | $20,000 |