Block 3708, lot 043
595 Market St
The 200 most recent permits filed for this property.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 15, 2026 | In progress | 595 Market St | Skyline Construction | ti suite 1100: demo and replacement of ceiling system. lighting, casework and finishes, demo of some partitons, new full height partitions, modification mep upgrades | $1,000,000 |
| May 20, 2026 | Completed | 595 Market St | R M I Mechanical Contractors | 12/fl- ref 202604018691- add tranfer fan, ceiling supply diffusers and return air grilles, ductwork, relocate thermostats and air balance | $10,000 |
| Apr 23, 2026 | Completed | 595 Market St | Dome Construction Corp | 20th floor: office tenant retrofit, lighting fixtures and associated circuiting/constrols power and signal devices and associated wiring. ref app #202602266597 and 202604038850 | |
| Apr 23, 2026 | Completed | 595 Market St | R M I Mechanical Contractors | 20/f: relocate one water cooled heat pump, add one transfer fan, relocate one vav box, add supply diffusers and return air grilles. new ductwork, new condenser water piping, relocate thermostats and air balancing. ref bpa 202602266597 | $200,000 |
| Apr 23, 2026 | Completed | 595 Market St | R M I Mechanical Contractors | 22nd floor add 2 water cooled heat pumps, add 2 transfer fans, relocate on vav box, add supply diffusers & return air grilles. new ductwork, new condenser water piping, new heat pump thermostats, relocate vav thermostats, and air balancing. ref bldg permit # 202602266610. | $250,000 |
| Apr 23, 2026 | Completed | 595 Market St | Dome Construction Corp | 22nd floor: office tenant retrofit, lighting fixtures and associated circuiting/constrols power and signal devices and associated wiring. ref pa#202602266610 and 202604038844 | |
| Apr 3, 2026 | Completed | 595 Market St | Dome Construction Corp | revision to pa 202602266597 ste 2000 demo & construction of new non-structural partitions & new ceilings. no change to fixture counts, path of travel ref pa 202602135931 | |
| Apr 3, 2026 | Completed | 595 Market St | Dome Construction Corp | revision to pa 202602266610 ste 2200 & 2250 additional demo & construction of new non-structural partitions & new ceilings | |
| Apr 1, 2026 | Completed | 595 Market St | Dome Construction Corp | 12th fl, ste 1250 consist of demo & new construction of non-structural partition walls, doors, finishes, lighting & millwork. mep to be deferred submittal. no change to fixture quantities, occupancy loads, or path of travel (pa 202602135931). restroom ada compliance under pa 202512172039 | $200,000 |
| Mar 23, 2026 | Completed | 595 Market St | Ayoob & Peery Plumbing Co Inc | 12/f suite 1275-1285: as-built for fire sprinkler bpa 202602125832. update drawings for adjusted piping plan. ref t.i 202512171960 | |
| Mar 17, 2026 | In progress | 595 Market St | Source Planning And Construction Inc | suite 2450a: def mechanical & electrical for 202602135931. | $129,654 |
| Feb 26, 2026 | Completed | 595 Market St | Dome Construction Corp | 20th/f t.i. demo & new construction of non-structural partitions, doors, finishes, & lighting. ada upgrade at core restrooms, phone booth structural drawings. no change to fixture counts, occupancy loads, or path of traval, mep deferred | $1,168,299 |
| Feb 26, 2026 | Completed | 595 Market St | Dome Construction Corp | 22nd flr: interior demolition & new construction of non-structural partitions, door, finishes, & lighting. ada upgrades to the core restrooms. no changes to fixture counts. occupant loads, or path of travel. ref pa #202602135931. mep to be under deffered submittal. new phone booth structural drawing | $1,097,019 |
| Feb 13, 2026 | In progress | 595 Market St | Source Planning And Construction Inc | 24th fl suite 2450a: minor demolition of non structural elements including partitions, finishes, ceilings & lighting. construction of new office fronts and doors, same lobby, vestibule and lighting. includes restroom accessibility upgrades and building path of travel. mech & electrical on sep permit | $400,000 |
| Feb 12, 2026 | Completed | 595 Market St | Ayoob & Peery Plumbing Co Inc | 13/f suite 1300: add (12). relocate (15) fire sprinkler per ti. ref permit 202512171962. | $16,770 |
| Feb 12, 2026 | Completed | 595 Market St | Ayoob & Peery Plumbing Co Inc | 12/f suite 1275-1285: add (8). relocate (19) fire sprinkler per ti. ref permit 202512171960. | $16,770 |
| Feb 12, 2026 | Completed | 595 Market St | Ayoob & Peery Plumbing Co Inc | unit 1200: add 3 relocate 11 fire sprinkler per t.i. ref app #202512172039 | $8,695 |
| Feb 11, 2026 | Completed | 595 Market St | R M I Mechanical Contractors | ste 1200 - add 1 transfer fan, relocate 1 box, add diffusers, add registers & grilles. new ductwork, air balances and relocate thermostats. ref pa 202512172039 | $22,500 |
| Feb 11, 2026 | Completed | 595 Market St | R M I Mechanical Contractors | ste 1215-1285 - add 1 transfer fan, add diffusers, add registers & grilles, new ductwork, air balance and relocate thermostat. ref pa 202512171960 | $45,000 |
| Feb 11, 2026 | Completed | 595 Market St | R M I Mechanical Contractors | ste 1300 - add 1 transfer fan, relocate 1 vav box and add diffusers, add registers & grilles, new ductwork, air balance, and relocate thermostats. ref pa 202512171962 | $35,000 |
| Dec 17, 2025 | Completed | 595 Market St | Dome Construction Corp | 12th fl, suite 1200. interior demolition of non structural elements including but not limited to interior partitions, doors, finishes, and lighting. construction of break millwork, storage, lighting, finishes. also includes restroom ada accessibility upgrades. mep under sep permit | $350,000 |
| Dec 17, 2025 | Completed | 595 Market St | Dome Construction Corp | 13/f suite 1300: interior non-structural demo. construction of interior partitions, doors, finishes. mep deferred. work does not affect fixture quantities, occupant loads or path of travel. no exterior work. | $630,000 |
| Dec 17, 2025 | Completed | 595 Market St | Dome Construction Corp | 12/f suite 1275 and 1285: interior non-structural demo. construction of new demising walls, conference, break area, and office, ceilings, lighting and finishes. mep deferred. work does not affect fixture quantities, occupant load calcs or path of travel. no exterior work. | $700,000 |
| Dec 16, 2025 | In progress | 595 Market St | 11th fl, suite 1150: scope of work on the 11th floor, shall consist of interior demolition of non-structural elements including interior partitions, finishes, and llightinh. construction of new glazing wall, lighting, and finishes. mep under a seperate permit. | $133,000 | |
| Jul 25, 2025 | In progress | 595 Market St | Pioneer Fire Inc. | ste 2570 - relocate 1 pendent, add 1 pendent ref pa 202507171000 | $500 |
| Jul 17, 2025 | Completed | 595 Market St | 25th fl: installation of life safety and seismic requirements for (2) phone booths in and existing office. does not affect existing layout occupancy or egress. path of travel under previously approved pa # 2023-0307-3171. restroom under 2022-0913-2378.(no mech-e) | $25,000 | |
| Jun 12, 2025 | Completed | 595 Market St | Source Planning And Construction Inc | to comply with nov# 202538027 - repair walls within stairway #2 from floors 4-24 due to water damage, non-structural work. inkind | $20,000 |
| Apr 5, 2024 | In progress | 595 Market St | Matrix Hg Inc | 13th fl, #1350 - revision to pa 202310259457 t-24 pages were updated to show correct forms needed | |
| Nov 29, 2023 | In progress | 595 Market St | Gci, Inc | electrical power, lighing and signal restroom and corridor. ref 202306139988 | $43,316 |
| Nov 28, 2023 | In progress | 595 Market St | Gci, Inc | suite 1350: electrical - power, lighting & signal. ti 202306139988 | $5,000 |
| Oct 25, 2023 | In progress | 595 Market St | Gci, Inc | ste 1350:provide hvac to new tenant space. vav terminals with hot water reheat, water source heat pump to serve it. duct distribution to spaces to provide zone temperature control. | $180,000 |
| Sep 27, 2023 | In progress | 595 Market St | Intelligent Technologies & Services Inc | supply & install a complete proinert ig-541 fire suppression system w/detection & controls within idf-01 & idf-02 on the 13th fl. ref 202306139988. | $39,879 |
| Sep 15, 2023 | Never finaled | 595 Market St | Bilcor Inc | install 6 ceiling mount speaker strobes, 3 weatherproof speaker strobes, 1 control relay, arch permit 2023-0307-3171. | $6,660 |
| Aug 24, 2023 | Completed | 595 Market St | Source Planning And Construction Inc | basement: mep for arch pa# 202303073171. | $300,000 |
| Aug 18, 2023 | Completed | 595 Market St | Pioneer Fire Inc. | suite 1350: relocate (28) pendents. add (10) pendents. convert (3) pendents to uprights. ref pa 202308013439. | $6,150 |
| Aug 14, 2023 | Completed | 595 Market St | Source Planning And Construction Inc | suite 650: mech and electrical for 202305117566. | $125,000 |
| Aug 14, 2023 | Completed | 595 Market St | Anderson, Rowe & Buckley, Inc. | basement- (e) fire sprinkler system - tenant improvements. relocate 6 pendents, add 5 pendents, relocate 5 uprights. ref pa# 202303073171. | $10,000 |
| Aug 1, 2023 | Completed | 595 Market St | Gci, Inc | 13th fl, ste 1350 - revision to pa 2023-0613-9988 scope includes deletion of 1 non ada accessible gender neutral tenant restroom and rename to storage. revision to security walltypes, lighting plan, finishes and door schedule | |
| Jul 21, 2023 | Completed | 595 Market St | Golden Gate Fire Protection Inc | ste 650: fire sprinklers, relocate 4 pendents. ref pa# 202305117566 | $3,720 |
| Jun 23, 2023 | Completed | 595 Market St | Golden Gate Fire Protection Inc | 10th fl: add 2 pendent sprinklers in phone booths. ref pa# 202212309511. | $2,000 |
| Jun 13, 2023 | Completed | 595 Market St | Gci, Inc | ste 1350. tenant improvement demolition, construction, mep, and structural. includes security partitions, meeting room, break area, gender neutural restrooms, and common corridor. path of travel previously approved 202303073171. mep, life safety, sprinkler deferred submittal. | $900,000 |
| Jun 12, 2023 | Never finaled | 595 Market St | Bilcor Inc | install 5 ceiling mount speaker strobes. relocate 1 smoke detector arch ref 202304256433 | $3,300 |
| May 11, 2023 | Completed | 595 Market St | Source Planning And Construction Inc | suite 650: relocate suite entry door, construction of new it room, office doors and finishes.mep,life safety and sprinkler plans sep permit. path of travel and restrooms prevously approved per 202303073171 & 202203311302 | $450,000 |
| Apr 25, 2023 | Completed | 595 Market St | Richlen Construction | 23/f: interior ti of e business office space. work includes addition of no load bearing wall, network equipment room, mdf, doors, relocation of furniture and refresh of interior finishes. no structural work. no change in occupancy. no change in use or exterior work. | $110,000 |
| Mar 7, 2023 | Completed | 595 Market St | Source Planning And Construction Inc | basement - interior demo of non-structural elements including partition, doors finishes, ceiling and lighting. construction of new exercise room, storage, showers, finishes and ceiling and lighting. mep, life safety & sprinklers under separate permit. no hot tub, juice bar and no change in occupancy | $600,000 |
| Dec 30, 2022 | Completed | 595 Market St | Source Planning And Construction Inc | 10th fl: installation of life safety and seismic requirements for 2 new phone booths in (e) office. does not affect (e) layout, occupanc, or egress. | $15,000 |
| Dec 12, 2022 | Completed | 595 Market St | Bilcor Inc | ste 2570: install (7) ceiling mount speaker strobes. arch reference 202209293406 | $4,620 |
| Dec 12, 2022 | Completed | 595 Market St | Bilcor Inc | install (e) ceiling mount speaker strobe. relocate (e) ceiling mount speaker strobe. arch ref 202209132378 | $660 |
| Nov 21, 2022 | Completed | 595 Market St | Sc Builders, Inc | 25/f unit 2570 mechanical and electrical for pa 202209293406. | |
| Nov 21, 2022 | Completed | 595 Market St | Sc Builders, Inc | 25/f unit 2550 mechanical and electrical for 202209132378 | |
| Nov 1, 2022 | Completed | 595 Market St | R L H Fire Protection Inc | ste 2570 fire sprinklers permit relocate 19, add 2 and delete 6 pendent sprinklers. install 18 new uprights on the 25th floor. t.i. ref 202209293406. | $1,000 |
| Nov 1, 2022 | Completed | 595 Market St | R L H Fire Protection Inc | ste 2550 fire sprinklers permit. relocate 1 and add 1 sprinkler on the 25thfloor. t.i. 202209132378 | $1,000 |
| Sep 29, 2022 | Completed | 595 Market St | Sc Builders, Inc | interior demo of non structural items including partitoins, doors, finishes, ceiling, lighting. new offices, conference, break area finishes, ceiling,lighting. mep sep permit. path travel restrooms prev approved under 202008131727, 202209132378 | $520,910 |
| Sep 13, 2022 | Completed | 595 Market St | Sc Builders, Inc | interior demo of non structural elements including partions, doors, finsihes, ceilings, lighting. new phone room, breakroom, finishes. ada restroom upgrades. path travel prev apprvd under 202008131727 | $251,403 |
| May 19, 2022 | Completed | 595 Market St | Source Planning And Construction Inc | 6th fl ste 600: mechanical and electrical for architectural pa# 202203311300. | |
| Apr 11, 2022 | Completed | 595 Market St | Pioneer Fire Inc. | suite 600: relocate (e) pendants, convert some to uprights to provide coverage. ref bpa#202203311302 | $10,250 |
| Mar 31, 2022 | Completed | 595 Market St | Source Planning And Construction Inc | 6th flr-demo of ste partitions, doors, ceilings, millwork. construction of new partitions, doors, millwork, plumbing, ceiling and lighting and finishes. new finishes at common corridor & elevator lobby. mep, life safety, and sprinkler is under seperate permit. path of travel approved 202008131727. | $500,000 |
| Mar 15, 2022 | Completed | 595 Market St | Source Planning And Construction Inc | rev to pa 202111172568 movable framed glass doors/structural drawing | |
| Feb 24, 2022 | Completed | 595 Market St | Bcci Construction Company | 25/f: mep submittal to support approved arch drawings. ref pa 202201105661. | $70,000 |
| Feb 23, 2022 | Completed | 595 Market St | Ayoob & Peery Plumbing Co Inc | fire sprinkler 25th fl: add & relocate sprinklers per ti. add 3, relocate 6. ref pa# 202201105661. job #22-611. | $2,925 |
| Feb 11, 2022 | Completed | 595 Market St | Source Planning And Construction Inc | 11/f: title 24 compliance for mechanical and electrical. ref t.i. pa202111232992. maher n/a | $199,000 |
| Jan 20, 2022 | Completed | 595 Market St | Golden Gate Fire Protection Inc | 11th, ste 1190 relocate 21 pendent sprinklers. ref pa 2021-1123-2992 | $10,500 |
| Jan 20, 2022 | Completed | 595 Market St | Golden Gate Fire Protection Inc | 11th, ste 1100 relocate 60 pendent sprinklers. ref pa 2021-1117-2568 | $30,000 |
| Jan 10, 2022 | Completed | 595 Market St | Bcci Construction Company | 25th floor: demo and build back of nonstructural partitions. mep deferred. | $795,504 |
| Dec 6, 2021 | Never finaled | 595 Market St | Golden Gate Fire Protection Inc | 10/f: fire sprinkers; relocate 7 pendent sprinlers and relocate 140 uprights. ref t.i. pa202109017588. | $28,000 |
| Nov 23, 2021 | Completed | 595 Market St | Source Planning And Construction Inc | suite 1190: minor demo of partitions, doors, ceiling and finishes. new construction of partitions, doors, millwork, plumbing, ceiling and finishes. mep, life safety, fire sprinkler monitoring under sep permit. ref pa202008131727 & 202111102148. maher n/a | $215,000 |
| Nov 17, 2021 | Never finaled | 595 Market St | Source Planning And Construction Inc | 11/f suite 1100: ti to combine 2 existing suites into a single suite (#1100). demolition of (e) wall, finishes, replacement of ceiling system. lighting, millwork and finishes. new walls, doors. new 1 single use restroom and modify (e) mep system. | $1,800,000 |
| Nov 10, 2021 | Completed | 595 Market St | Source Planning And Construction Inc | 11th floor restroom upgrades. replacing interior partitions thoughout and accessibility upgrades. electric and plumbing under seperate trade permit. | $25,000 |
| Oct 28, 2021 | Completed | 595 Market St | Golden Gate Fire Protection Inc | fire sprinklers, relocate 17 pendents sprinklers on the 7th fl suite 810. add 1 pendent sprinkler on 8th fl suite 820 ti 202109098037 suite 810 202109017588 | $4,500 |
| Sep 1, 2021 | Completed | 595 Market St | Source Planning And Construction Inc | interior t.i. including non-load bearing wall, new ceilings, finishes. fire alarm and sprinklers on separate permit. | $850,000 |
| Jul 7, 2021 | Completed | 595 Market St | Pioneer Fire Inc. | suite 1600: relocate 8 pendent sprinklers, add 7 pendent sprinkler heads. gc t.i 202106021468 | $3,650 |
| Jul 1, 2021 | Never finaled | 595 Market St | Source Planning And Construction Inc | 16th fl - revision to pa 2021-0602-1468 mechanical & electrical | $40,000 |
| Jun 30, 2021 | Completed | 595 Market St | Source Planning And Construction Inc | 4th floor:mechanical & electrical for arch set #202106041699 | $25,000 |
| Jun 29, 2021 | Completed | 595 Market St | Pioneer Fire Inc. | suite 400 & 1600: relocate 5 pendent heads, add 1 pendent sprinkler head in ste400; relocate 8 pendent heads, add 7 pendent heads in ste1600. t.i. 202106041699 & 202106021468. | $5,250 |
| Jun 4, 2021 | Completed | 595 Market St | Source Planning And Construction Inc | 4th fl:existing tenant improvement includes construction of non-load bearing partiitons, modification of ceiling grid & tile, light fixtures.relocating includes re-swithing.(n) office doors & frames salvage & reuse of (e) select materials,mep if needed will be design build separate submittal | $30,000 |
| Jun 2, 2021 | Completed | 595 Market St | R L H Fire Protection Inc | fire sprinkler system repair-modification replace diesel fire pump pressure operating relief valve. install pressure reducing valves on floors 18 through 23. | $66,518 |
| Jun 2, 2021 | Completed | 595 Market St | Source Planning And Construction Inc | 16/f: modification of (e) t.i. to include construction of non-load bearing partitions. modifications of ceiling grid, tile, light fixtures relocation including reswitching (n) office doors and frames, salvage + reuse of (e) selected material + (n) finishes meps design build separately | $115,596 |
| Nov 3, 2020 | Never finaled | 595 Market St | Intelligent Technologies & Services Inc | provide pre-action detection & bell within electrical room on 29th floor | $11,230 |
| Oct 26, 2020 | Never finaled | 595 Market St | Intelligent Technologies & Services Inc | provide pre-action detection & bell within electrical room on 29th floor. | $11,238 |
| Sep 12, 2020 | Completed | 595 Market St | Source Planning And Construction Inc | 21/f: deferred mep submittal for ti bpa#202008131727 | |
| Sep 1, 2020 | Never finaled | 595 Market St | Golden Gate Fire Protection Inc | fire sprinkler; relocate 91 pendent sprinklers and 32 uprights sprinklers on the 21st fl. ti# 202008131727 | $61,500 |
| Aug 13, 2020 | Completed | 595 Market St | Source Planning And Construction Inc | t.i on 21/f. minor demolition of partitions and doors. new partitions, doors, millwork, plumbing, ceiling and lighting and finishes. mech, electrical and sprinklers under sep permit. | $1,750,000 |
| Aug 10, 2020 | Completed | 595 Market St | Bilcor Inc | 29th and 30th floor: fire life safety: install 62 ceiling mount speaker, 15 smoke detectors with base, 13 duct detectors, 14 control relay modules, 1 dual monitor module. ref app#202001212381,202001212382,202003056224 | $69,300 |
| Jun 29, 2020 | Completed | 595 Market St | Pribuss Engineering Inc | 30th fl - modify sprinkler head locations to accomodate new ceiling & partition layout for new office space. 17 total relocated upright sprinklers = 32, total added upright sprinklers = 11, total (e) sprinklers relocated & changed out to pendent sprinklers = 4, total added pendent sprinklers = 42. | $72,988 |
| Jun 29, 2020 | Completed | 595 Market St | Pribuss Engineering Inc | 28th fl - modify sprinkler head locations to accomodate new ceiling & partition layout for new office space. 13 total (e) sprinklers relocated & changed out to upright sprinklers = 4 total relocated upright sprinklers = 46, total (e) sprinklers relocated & changed out to pendend sprinklers = 46, | $67,334 |
| Jun 29, 2020 | Completed | 595 Market St | Pribuss Engineering Inc | 29th fl - modify sprinkler head locations to accomodate new ceiling & partition layout for new office space. 17 total (e) sprinklers = 32, total added upright = 11, total (e) sprinklers relocated & changed out to upright sprinklers = 8, total (e) sprinklers relocated & changed out to pendent | $67,848 |
| Jun 29, 2020 | Completed | 595 Market St | Pribuss Engineering Inc | 27th fl - modify sprinkler head locations to accomodate new ciling and partition layout for new office space. 21 total (e) sprinklers relocated & changed out to upright sprinklers = 2 total relocated upright sprinklers = 57 total added upright sprinklers = 18 total (e) sprinklers relocated & changed | $70,418 |
| Jun 12, 2020 | Completed | 595 Market St | Bilcor Inc | 19/f: relocate (9) ceiling mount speaker strobes. sequence of operation remains unchanged. return to warm shell. reference ti#: 2020-0227-5552 | |
| May 20, 2020 | Never finaled | 595 Market St | Source Planning And Construction Inc | project is entirely demolition, including demolition of all non structural interior partitions, glazing, doors, millwork, ceiling, lighting. fire sprinkler under 202005077353. path of travel not required per ab017 | $150,000 |
| May 7, 2020 | Never finaled | 595 Market St | Golden Gate Fire Protection Inc | fire sprinklers, relocate 99 upright sprinklers for a demo plan | $51,975 |
| Mar 5, 2020 | Completed | 595 Market St | Dome Construction Corp | new stair finishes for existing exit access stair connecting floors 29 & 30, stair work consists of new finishes and minor structural detailing. | $400,000 |
| Feb 27, 2020 | Completed | 595 Market St | Source Planning And Construction Inc | 19th fl - demo of non structural partitions, glazing, doors, millwork, ceiling and lighting ref pa 2020-0226-5423 ab017 | $20,000 |
| Feb 26, 2020 | Completed | 595 Market St | Pioneer Fire Inc. | fire sprinklers return to warm shell on 19th fl. | $9,000 |
| Jan 21, 2020 | Completed | 595 Market St | Dome Construction Corp | mechanical, electrical, and plumbing for floor 29, fire sprinkler deferred. ref 202001212340 | $150,000 |
| Jan 21, 2020 | Completed | 595 Market St | Dome Construction Corp | interior tenant improvement for floor 28. mep under separate permit | $150,000 |
| Jan 21, 2020 | Expired or cancelled | 595 Market St | Bilcor Inc | fire alarm life safety ti, 1 control relay | $660 |
| Jan 21, 2020 | Completed | 595 Market St | Dome Construction Corp | interior tenant improvement for floor 27. mep under separate permit | $150,000 |
| Jan 21, 2020 | Completed | 595 Market St | Dome Construction Corp | mechanical, electrical, and plumbing for floor 30, fire sprinkler deferred. ref pa 202001212341. | $150,000 |
| Jan 21, 2020 | Completed | 595 Market St | Dome Construction Corp | interior tenant improvement for floor 29. mep under separate permit | $150,000 |
| Jan 21, 2020 | Completed | 595 Market St | Dome Construction Corp | mechanical, electrical, and plumbing for floor 28, fire sprinkler deferred. ref pa 202001212339. | $150,000 |
| Jan 21, 2020 | Completed | 595 Market St | Dome Construction Corp | mechanical, electrical, and plumbing for floor 27, fire sprinkler deferred. ref arch pa 202001212338. | $150,000 |
| Jan 21, 2020 | Completed | 595 Market St | Dome Construction Corp | interior tenant improvement for floor 30. mep under separate permit | $150,000 |
| Dec 3, 2019 | Completed | 595 Market St | Source Planning And Construction Inc | 4/f: revision to app#201807104110. installation of 2 exit signs amnd revised exterior deck dimensions to become ada compliant. | |
| Nov 18, 2019 | Never finaled | 595 Market St | Comfort Dynamics Inc. | rev to pa 201810193694. add smoke control matrix | |
| Nov 13, 2019 | Never finaled | 595 Market St | street space | ||
| Nov 12, 2019 | Completed | 595 Market St | Pribuss Engineering Inc | 27th, 28th, 29th, 30th floor: provide "shell" sprinkler coverage w/ upright sprinkler for demo of existing office space. relocate 335 sprinkler, add 2 sprinkler | $173,218 |
| Oct 29, 2019 | Completed | 595 Market St | Dome Construction Corp | 27th- 30th floors: restroom upgrades. replacing interior restroom finishes. new toilet partitions and paint. meps defferred. | $195,000 |
| Oct 29, 2019 | Completed | 595 Market St | Dome Construction Corp | 27th- 30th floors: demolition of partitions, glazing, doors, and lighting. fls to remain intact and operational during coarse of demo. meps defeered. demo onlyceiling demo included | $300,000 |
| Oct 15, 2019 | Never finaled | 595 Market St | Dome Construction Corp | 20th floor: partial scope office tenant retrofit, lighting, power signal, wiring, lighting and control. electrical only - no architectural changes. n/a for maher. | $70,000 |
| Sep 9, 2019 | Never finaled | 595 Market St | Source Planning And Construction Inc | 15th fl - revision to pa 2019-0627-4541 adding back in the scope the telescoping white boards. item paid in under original permit | |
| Sep 9, 2019 | Never finaled | 595 Market St | Source Planning And Construction Inc | 17 fl - revision to pa 2019-0627-4539 adding back in the scope the telescoping white boards. item paid in under original permit | |
| Aug 28, 2019 | Completed | 595 Market St | Mc Millan Electric, Dome Construction Corp | ref# 2019-0624-4181: electrical work for 23rd floor. partial-scope office tenant retrofit: lighting, power and signal, wiring, lighting and contols. | $200,000 |
| Aug 21, 2019 | Never finaled | 595 Market St | Source Planning And Construction Inc | mechanical electrical for permits 2019-0627-4541 and 2019-0627-4539 | |
| Aug 20, 2019 | Completed | 595 Market St | Ayoob & Peery Plumbing Co Inc | 23rd flr: add 10, relocate 24, plug 8, change out 8 sprinklers in order to conform with the new wall ceiling layout of tenant improvement. ref 201906244181 | $14,700 |
| Aug 6, 2019 | Completed | 595 Market St | All Temperature Service Air Conditioning | alteration of ductwork, vav boxes, air devices & thermostats ref 201906244181 | $220,000 |
| Aug 5, 2019 | Never finaled | 595 Market St | Source Planning And Construction Inc | 17th fl: ref pa# 201906274539; demo only | |
| Aug 5, 2019 | Never finaled | 595 Market St | Source Planning And Construction Inc | ref pa# 201906274541; demo only | |
| Jul 30, 2019 | Expired or cancelled | 595 Market St | basement - project is entirely demo per ab-017, including demo of 1 door and 1 non-structural interior partition. no ceiling work in this scope. | $5,000 | |
| Jul 15, 2019 | Completed | 595 Market St | Source Planning And Construction Inc | 9th floor: mechanical and electrical for 201905231503 tenant improvement; consisting of new registers and duct work; electrical included | $175,000 |
| Jul 15, 2019 | Completed | 595 Market St | Source Planning And Construction Inc | 9th floor: mechanical and electrical for conference room renovations 201903296624 (ti) consisting of new registers and duct work; electrical included | $60,000 |
| Jul 2, 2019 | Completed | 595 Market St | Pioneer Fire Inc. | f/s: relocate 6 pendents & 6 uprights. ref pa #201903296624. conference room. | $4,200 |
| Jul 2, 2019 | Completed | 595 Market St | Pioneer Fire Inc. | f/s for suite 910: relocate 9 pendents. ref pa #201905231503. | $4,100 |
| Jun 27, 2019 | Never finaled | 595 Market St | Source Planning And Construction Inc | 15th flr (e) tenant t.i. selective demo and construction of non load-bearing walls. (e) stairs too close together providing compartmentalization of 2-hr wall separation w/ 90 min s-doors. mep, life safety srpinklers under separate permit if needed. | $75,000 |
| Jun 27, 2019 | Never finaled | 595 Market St | Source Planning And Construction Inc | 17th flr (e) tenant t.i. selective demo and construction of non load-bearing walls. (e) stairs too close together providing compartmentalization of 2-hr wall separation w/ 90 min s-doors. mep, life safety srpinklers under separate permit if needed. | $75,000 |
| Jun 24, 2019 | Completed | 595 Market St | Dome Construction Corp | project consists of minor demo of partitions, doors, glazing lighting finishes. portion of e ceiling tile and grid to remain. new partitions, doors, millwork plumbing, ceiling lighting finishes, mechanical,elec, sprinkler, under sep permit | $1,250,000 |
| May 23, 2019 | Completed | 595 Market St | Source Planning And Construction Inc | suite 910 - 9th fl: minor domolition of partitions, doors, glazing, and finishes. select existinbg ceiling and lighting to remain. construction of new partitions, doors, millwork and finishes. mep, sprinkler modification under separate permit. | $250,000 |
| May 14, 2019 | Completed | 595 Market St | Pioneer Fire Inc. | 7th floor: relocate 44 uprights, 61 pendents and 3 concealors. ref app#201904157927 | $22,500 |
| May 9, 2019 | Completed | 595 Market St | M C S Construction Services | 7th flr remodel incl (n) non-structural load-bearing walls, ceiling, lighting, electrical, doors, finishes. | $750,000 |
| Apr 15, 2019 | Never finaled | 595 Market St | M C S Construction Services | suite 700: entirely demo- including demo of all non structural interior partitions, glazing doors, millwork, ceiling and lighting for future t.i. compliance to ab-017. maher n/a. | $70,000 |
| Mar 29, 2019 | Completed | 595 Market St | Source Planning And Construction Inc | suite 960. minor demo of partitions, doors, lighting, ceiling grid and finishes. construction of new partitions, door, ceiling, lighting and finishes. restroom barrier removal and new multi-tenant corridor finishes. mep, sprinkler modification is under separate permit. | $170,000 |
| Feb 6, 2019 | Completed | 595 Market St | Golden Gate Fire Protection Inc | fire sprinklers; relocate 2 pendent sprinklers on the 17th floor. ref pa 2018-1210-7853 | $1,300 |
| Jan 22, 2019 | Completed | 595 Market St | Source Planning And Construction Inc | 6th fl - mep for ti ref pa 2018-1031-4586 | |
| Jan 18, 2019 | Completed | 595 Market St | R L H Fire Protection Inc | 6th fl - fire sprinkler permit relocate 5 and delete 3 sprinklers. ref pa 2018-1031-4586 | $1,500 |
| Jan 18, 2019 | Completed | 595 Market St | R L H Fire Protection Inc | 2nd fl - fire sprinkler permit - relocate 4 and add 1 pendent. ref pa 2018-1210-7858 | $1,500 |
| Jan 17, 2019 | Completed | 595 Market St | Bilcor Inc | 5th fl - fire alarm ti install 20 ceiling speaker-strobes, install 1 ceiling strobe, install 4 smoke detectors, install 2 control relays, install 6 duct detectors, install 1 booster panel. ref pa 2018-1002-1945. maher n/a. | $25,500 |
| Jan 15, 2019 | Never finaled | 595 Market St | Source Planning And Construction Inc | electrical work for ti ref pa 2018-1210-7853. suite 1700 | |
| Jan 11, 2019 | Completed | 595 Market St | Source Planning And Construction Inc | 2nd flr - mech and ele for 201812107858 | $35,000 |
| Dec 10, 2018 | Completed | 595 Market St | Source Planning And Construction Inc | 17th fl - ti selectrive demo: new partitions. meps life safety & sprinklers under separate permit if needed | $95,000 |
| Dec 10, 2018 | Completed | 595 Market St | Source Planning And Construction Inc | 2nd fl - existing tenant space upgrade consruction of non-load bearing partitions etc., meps life safety and sprinklers under separate permit if needed | $24,000 |
| Dec 4, 2018 | Completed | 595 Market St | Source Planning And Construction Inc | 5th fl - mechanical & electrical for pa 2018-1002-1945 | $250,000 |
| Nov 5, 2018 | Completed | 595 Market St | Pioneer Fire Inc. | 5/f: relocate 43 pendents & remove 18 uprights ref 201810021945. maher n/a. | $15,000 |
| Oct 31, 2018 | Completed | 595 Market St | Source Planning And Construction Inc | 6th flr. demo of partitions, doors, glazing & finishes. (e) ceiling to remain. upgrade all lighting to title 24. construct (n) partitions, door, millwork, plumb & finishes. (e) mech, elect, fire alarm & sprinkler system mod under seperate permit | $130,000 |
| Oct 19, 2018 | Never finaled | 595 Market St | Comfort Dynamics Inc. | replace outside air, return air and exhaust air damper. | $35,000 |
| Oct 12, 2018 | Completed | 595 Market St | Source Planning And Construction Inc | 4th flr - ref 201807104110 amd 201809241130 mech/ele | |
| Oct 2, 2018 | Completed | 595 Market St | Source Planning And Construction Inc | 5/f, #500 - ti to include selective demo and construction of non load bearing partitions, new doors, finishes, millwork. mep & fire life safety under seperate permit | $200,000 |
| Sep 24, 2018 | Completed | 595 Market St | Source Planning And Construction Inc | 4th fl: rev to pa# 201807104110; small area of work conference room being made into (3) offices conf 416 to offices 430, 416, & 431 | |
| Sep 19, 2018 | Completed | 595 Market St | R L H Fire Protection Inc | 4th flr - fire sprinklers. relocate 55, add 4 and delete 17 sprinklers ref 201807104110 maher na | $15,000 |
| Sep 5, 2018 | Completed | 595 Market St | Anderson, Rowe & Buckley, Inc. | ref 201808298606 (e) fire sprinkler system ti relocate 21 sprinklers, add 4 sprinklers | $12,500 |
| Aug 29, 2018 | Never finaled | 595 Market St | Premier Structures Inc | minor demolition of paritions, doors, glazing, and finishes. e celing ro remain. construction of new partitons, doors, finishes. replace e light fixtures with new led fixtures, t24 controls. redistribute hvac as required for new layhout. install new reheat vav box and exhaust fan. plumbinb sprinkler | $90,000 |
| Aug 29, 2018 | Never finaled | 595 Market St | Premier Structures Inc | remove e light fixtures, replace with new led fixtures and t24 compliant controls. electrical only//including emergency lights.. vif | $15,000 |
| Jul 12, 2018 | Never finaled | 595 Market St | Premier Structures Inc | suite 1350 minor demo of partitions, doors, glazing and finishes. (e) ceiling and lighting to remain. construction of new partitions, doors and finishes. restroom barries removal, no new plm ot millwork. (e) mech, ele and sprinkler system modification under sep permit | $10,000 |
| Jul 10, 2018 | Completed | 595 Market St | Source Planning And Construction Inc | 4th floor. tenant improvement. new non-structural partitions, finishes and electrical. mep & fire life safety under separate permit | $100,000 |
| Jun 18, 2018 | Completed | 595 Market St | Gci, Inc | suite #600 - ele - new lighting & power ref 201803224317 no new fsd's - require revision to permit if mechanical set shows new fsd | |
| Jun 12, 2018 | Completed | 595 Market St | Anderson, Rowe & Buckley, Inc. | 6th floor suite 650 : fire sprinkler t.i. plugged sprinkler (2), relocated sprinkler (2), arch pa# 201803224317 | $2,000 |
| May 3, 2018 | Completed | 595 Market St | Source Planning And Construction Inc | 14th flr revisionto 201801240423 to correct the line of 2hr separation. reconfigure space. | |
| Mar 28, 2018 | Completed | 595 Market St | Source Planning And Construction Inc | 14th floor: mechanical and electrical permit for #201801249423 & 201805038103. | $400,000 |
| Mar 26, 2018 | Completed | 595 Market St | Golden Gate Fire Protection Inc | 14th flr -relocate 75 pendents, add 11 relocate 3 upright, plug off 13 pendents lending | $22,250 |
| Mar 22, 2018 | Completed | 595 Market St | Gci, Inc | 6th floor suite 650: project consists of minor demo partitions, doors, glazing & finishes. extg ceiling & lting to remain. new partitions, door, millwork, plmg & finishes. project includes restrm barrier removal. extg mchnical, elec. & sprinkler system modification under seperate permit. | $308,815 |
| Mar 22, 2018 | Never finaled | 595 Market St | Gci, Inc | 21 floor: project consists of barrier removal. work includes replacing all interior restrm finishes. scope includes nw toilet partitions, sinks and finishes. scope includes new toilet partitions, sinks and finishes. extg mechanical, electrical and sprinkler system modification under seperate permit. | $70,000 |
| Mar 16, 2018 | Expired or cancelled | 595 Market St | electrical plans only t-24 interior/exterior (e). r&r (e) lighting throughout maher na | $9,000 | |
| Jan 24, 2018 | Completed | 595 Market St | Source Planning And Construction Inc | 14th fl - interior ti, existing office space; (n) non-structural partitions, finishes and (n) ceiling grid. mep to be design build and submitted separately. life safety & sprinklers under separate permit (bldg fully srpinklered) | $975,000 |
| Oct 30, 2017 | Never finaled | 595 Market St | street space permit | ||
| Jul 25, 2017 | Completed | 595 Market St | Skyline Construction | 5th floor -restroom area- barrier removal work only. includes replacing restroom toilet stall partitions, sinks, finishes. any fire partitions and doors to be maintained. mep/fire sep permit. | $70,000 |
| Jul 25, 2017 | Completed | 595 Market St | Skyline Construction | 4th floor restroom area - barrier removal work only. includes replacing restroom stall partitions, sinks, finishes. fire rated partitions and doors to be maintained. mep/fire sep permit | $70,000 |
| Jul 24, 2017 | Never finaled | 595 Market St | streetspace | ||
| May 19, 2017 | Completed | 595 Market St | R L H Fire Protection Inc | fire sprinkler permit. relocate 2 and add 1 sprinkler on 25th fl | $1,000 |
| Feb 22, 2017 | Never finaled | 595 Market St | Bilcor Inc | 1st flr: fire alarm ti ref 2016-0606-9204: remove and reinstall 2 pull stations, remove and reinstall 2 smoke detectors. remove 3 ceiling mount speakers and 4 wall mount strobes; install 5 ceiling mount speaker/strobes. | $3,600 |
| Feb 10, 2017 | Completed | 595 Market St | Hathaway Dinwiddie Co. | ground floor: mechanical & electrical work for for arch permit 201606069204 | |
| Jan 18, 2017 | Completed | 595 Market St | Gci, Inc | tenant improvement including demolition and construction of new partitions, doors, finishes. existing ceiling and lighting to remain. mep, ls, sprinkler separate permit | $180,000 |
| Dec 21, 2016 | Completed | 595 Market St | Pribuss Engineering Inc | fire sprinkler t.i. under gc m733690; relocate 29, add 01, total 30x517.32= 15,520. | $15,520 |
| Oct 5, 2016 | Completed | 595 Market St | Rossi Builders Inc. | project consist of demising (e) ste 2150 to create two suites. demo of partition and construction of interior demising partition, door, frame, lighting relocation and finishes. mep,life safety and sprinkler under separate permit | $25,000 |
| Oct 3, 2016 | Never finaled | 595 Market St | Source Planning And Construction Inc | lower level- ref. architectural pa#201604053936, mechanical and electrical under this permit | $298,000 |
| Jul 26, 2016 | Completed | 595 Market St | Source Planning And Construction Inc | revision to 201604053938 (1st, 2nd & mezz on 2nd flrs) | |
| Jul 26, 2016 | Completed | 595 Market St | Hathaway Dinwiddie Co. | upgrade exterior facade on corner of market street & 2nd street include renovation of lobby entry store front & seating area outside. | $400,000 |
| Jun 16, 2016 | Completed | 595 Market St | Source Planning And Construction Inc | 1st, 2nd, & 2nd floor mez: electrical for project #201604053938 | |
| Jun 6, 2016 | Completed | 595 Market St | Hathaway Dinwiddie Co. | ground floor interior lobby to be demo of wall finishes flooring. renovation of interior lobby, elevator lobbies and elevator cabs. mep sprinkler & fire alarm on separate permit | $829,824 |
| May 5, 2016 | Expired or cancelled | 595 Market St | Pribuss Engineering Inc | basement: fire sprinkler ti - change out (e) double check backflow assembly to an ammis colt 300 w/osny | $10,000 |
| May 3, 2016 | Completed | 595 Market St | Richlen Construction | basement for electrical work only. ref #201509187366. | $94,535 |
| May 3, 2016 | Completed | 595 Market St | R L H Fire Protection Inc | 2nd flr: fire sprinkler permit, relocate 51, add 16 and delete 1 pendant. sprinklers relocate 1 upright on the 2nd flr, t.i. 201604053938. | $18,900 |
| May 3, 2016 | Completed | 595 Market St | R L H Fire Protection Inc | level 1: fire sprinkler permit, relocate 10 and add 7 pendant sprinklers,relocate 6,add 2 and delete 2 upright sprinklers on lower level 1, t.i. #201604053936. | $7,700 |
| Apr 19, 2016 | Completed | 595 Market St | Source Planning And Construction Inc | 16th flr: revision to ref pa 2016 0204 8835- continuation of the 2hr wall, door schedule change. breakroom area clarifications | |
| Apr 19, 2016 | Completed | 595 Market St | Source Planning And Construction Inc | 15th flr: revision to ref pa 2016 0204 8833 - clarification of 2hr wall | |
| Apr 5, 2016 | Completed | 595 Market St | Source Planning And Construction Inc | 1/f, 2/f & mezz on 2/f: interior t.i. of existing office space including mininal (n) non-structural partitions, finishes, electrical, (e) ceiling grid, tile & light fixtures to remain. electrical, plumbing to be design build & filed seperately. fire sprinklers & life safety under seperate permit. | $2,493,671 |
| Apr 5, 2016 | Completed | 595 Market St | Source Planning And Construction Inc | lower level: interior t.i. of existing office space including mininal (n) non-structural partitions, finishes, electrical and (n) light fixtures. no structural work to be performed. mep to be design build & filed seperately. | $273,000 |
| Mar 29, 2016 | Completed | 595 Market St | Golden Gate Fire Protection Inc | 15th & 16th floor fire sprinklers - relocate 43 pendant sprinklers on the 15th floor. relcoate 32 pendant sprinklers on the 16th floor. t.i. on 15th is 201602048833. & 16th is 201602048835. n/a maher ordinance | $38,625 |
| Mar 23, 2016 | Completed | 595 Market St | Source Planning And Construction Inc | barrier removal project - adding a platform lift & compliant stair in place of (2) existing non-compliant stairs. | $200,000 |
| Mar 17, 2016 | Completed | 595 Market St | Pribuss Engineering Inc | basement fire sprinkler - change out existing double check back flow assembly to an ammes colt 300 with os&y. | $10,000 |
| Mar 17, 2016 | Completed | 595 Market St | Pribuss Engineering Inc | 2nd floor mezzanine fire sprinkler - modify sprinkler piping that supplies the sprinkler that coveres below the 2nd floor mezzanine so that is is supplied from the 2nd floor sprinkler system. | $10,000 |
| Mar 7, 2016 | Completed | 595 Market St | Source Planning And Construction Inc | 16th flr: me for ref pa 2016-0204-8833 | |
| Mar 7, 2016 | Completed | 595 Market St | Source Planning And Construction Inc | 15th flr: mechanical and electrical for ref pa 2016-0204-8833 | $300,000 |
| Mar 7, 2016 | Completed | 595 Market St | Source Planning And Construction Inc | 16th flr revision to 2016 02048835 - drawings are for juice bar health dept review | |
| Feb 4, 2016 | Completed | 595 Market St | Source Planning And Construction Inc | 15th floor - interior ti: minimal (n) structural partitions. finishes (n) ceiling grid & tiles. mep, ls & sprinkler to be build & submitted separtely if needed. no structural work. building fully sprinklered | $975,000 |
| Feb 4, 2016 | Completed | 595 Market St | Source Planning And Construction Inc | 16th floor interior ti includes: minimal (n) non-structural partitions, finishes. (n) ceiling grid & tiles. mep, life safety & sprinklers to be design build and filed separately if needed. no structural, building fully sprinklered. | $975,000 |
| Feb 4, 2016 | Completed | 595 Market St | Source Planning And Construction Inc | 15/16th fl: demo only non structural partitions, associated power/telecom outlets, plumbing, finishes, existing grid and tile and lighting to remain ab017 | $46,000 |
| Feb 3, 2016 | Completed | 595 Market St | Pioneer Fire Inc. | relocate 44 pendents gc 201509187366 | $18,632 |
| Jan 13, 2016 | Never finaled | 595 Market St | Skyline Construction | mechanical & electrical for ti on the 23rd floor. ref pa 2015-0813-4202 | $20,000 |
| Jan 13, 2016 | Never finaled | 595 Market St | Skyline Construction | mechanical & electrical for ti on the 23rd floor. ref pa 2015-0813-4201 | $25,000 |
| Jan 12, 2016 | Never finaled | 595 Market St | Skyline Construction | mechanical & electrical for t.i. on 9/f. t.i. pa#201507232293 | $83,000 |
| Jan 11, 2016 | Never finaled | 595 Market St | Bilcor Inc | install 1 booster panel, 1 wall mount speaker-strobe, 1 smoke detector with base, 1 duct detector with housing, 3 control relay modules, 3 monitor modules. t.i. pa# 201512013795 | $1,500 |
| Jan 7, 2016 | Completed | 595 Market St | Source Planning And Construction Inc | basement/lower level - mechanical & electrical for pa 2015-1201-3795 | $80,000 |