- Sep 2015 to Aug 2026
37 permits since 2000 (architect on 36 permits, designer on 1 permit): 23 completed, 9 in progress, 3 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 17, 2026 | In progress issued Sep 2026 | 55 Spear St | Source Planning And Construction Inc | 18th floor: revision to bpa: 202606032408 room 18-009/ pantry and finishes to single sex rr was deferred. adressing architectural set and corresponding meps for this review.Details
18th floor: revision to bpa: 202606032408 room 18-009/ pantry and finishes to single sex rr was deferred. adressing architectural set and corresponding meps for this review. | $37,488 |
| Jul 15, 2026 | In progress issued Aug 2026 | 595 Market St | Skyline Construction | ti suite 1100: demo and replacement of ceiling system. lighting, casework and finishes, demo of some partitons, new full height partitions, modification mep upgradesDetails
ti suite 1100: demo and replacement of ceiling system. lighting, casework and finishes, demo of some partitons, new full height partitions, modification mep upgrades | $1,000,000 |
| Jun 23, 2026 | In progress issued Jul 2026 | 650 California St | Richlen Construction | 27th floor: selective renovation and minor demolition. new construction includes floor, wall and ceiling finishes, power and lighting. fire sprinkler and alarm are deffered submittals.Details
27th floor: selective renovation and minor demolition. new construction includes floor, wall and ceiling finishes, power and lighting. fire sprinkler and alarm are deffered submittals. | $1,184,490 |
| Jun 3, 2026 | In progress issued Jun 2026 | 55 Spear St | Source Planning And Construction Inc | spear street tower, 17th flr: t.i. selected demo of remaining soffite and partitions, primary demo under 202603137532. new construction will consist of new partitions and doors, ceilings, light fixtures and electrical distribution. meps.Details
spear street tower, 17th flr: t.i. selected demo of remaining soffite and partitions, primary demo under 202603137532. new construction will consist of new partitions and doors, ceilings, light fixtures and electrical distribution. meps. | $2,199 |
| Jun 3, 2026 | In progress issued Jun 2026 | 55 Spear St | Source Planning And Construction Inc | 18f t.i: demo done under permit. new partitons & doors, ceilings, lights, el distribution. mep included. including structural work. n unisex accessible toilet. see coversheet for cope. deffered submittal: fire alarm, fire sprinklers, network anchor + health review at pantry.Details
18f t.i: demo done under permit. new partitons & doors, ceilings, lights, el distribution. mep included. including structural work. n unisex accessible toilet. see coversheet for cope. deffered submittal: fire alarm, fire sprinklers, network anchor + health review at pantry. | $3,279,000 |
| May 27, 2026 | In progress issued Aug 2026 | 345 California St | Skyline Construction | 6/f & 7/f: installation office phone booth anchorage & structural details included.Details
6/f & 7/f: installation office phone booth anchorage & structural details included. | $66,000 |
| Mar 24, 2026 | Completed final sign-off Jun 2026 | 106 West Portal Av | G Swanson Constr. Inc. | add a new greeter desk focal wall to the existing lobby area. existing beverage bar to be removed and new closet added. scope of work includes typical electrical modifications as needed. ther are no planned alterations to the mechanical,plumbing,fire protection or overall building structureDetails
add a new greeter desk focal wall to the existing lobby area. existing beverage bar to be removed and new closet added. scope of work includes typical electrical modifications as needed. ther are no planned alterations to the mechanical,plumbing,fire protection or overall building structure | $65,000 |
| Mar 13, 2026 | In progress issued Mar 2026 | 1 Market St | Source Planning And Construction Inc | 18th fl - selective interior demo only (ab-017) ref fire 26-158Details
18th fl - selective interior demo only (ab-017) ref fire 26-158 | $70,000 |
| Mar 13, 2026 | In progress issued Mar 2026 | 1 Market St | Source Planning And Construction Inc | 17th fl - selective interior demo only (ab-017) ref 26-158Details
17th fl - selective interior demo only (ab-017) ref 26-158 | $70,000 |
| Dec 23, 2025 | In progress issued May 2026 | 55 Spear St | Swinerton Builders | 36th fl - minor ti to accomodate a new focus room and trade desk space. new wall powerDetails
36th fl - minor ti to accomodate a new focus room and trade desk space. new wall power | $800,000 |
| Nov 5, 2025 | Completed final sign-off Feb 2026 | 445 Powell St | Clune Construction Company L P | ab-017: decommissioning of bank of america. removal of bank furniture, equipment, vault and other bank elements related to bofa; removal of exterior atm; deposit box. scope of work will not public right of wayDetails
ab-017: decommissioning of bank of america. removal of bank furniture, equipment, vault and other bank elements related to bofa; removal of exterior atm; deposit box. scope of work will not public right of way | $110,000 |
| Jul 3, 2025 | Completed final sign-off Feb 2026 | 345 California St | Skyline Construction | 8/f: demo only permit. demo suite includs interior partition, finishes, millwork, plumbing and electrical fixtures.Details
8/f: demo only permit. demo suite includs interior partition, finishes, millwork, plumbing and electrical fixtures. | $120,000 |
| Mar 7, 2025 | Completed final sign-off Aug 2025 | 50 Fremont St | Gci, Inc | new tenant improvement project including demo of e conference rooms, modifications to existing breakroom layout and adding an additional unisex restroom, new millwork at existing breakroom, installation of new phone booths. mep deferred.Details
new tenant improvement project including demo of e conference rooms, modifications to existing breakroom layout and adding an additional unisex restroom, new millwork at existing breakroom, installation of new phone booths. mep deferred. | $600,000 |
| Jun 5, 2024 | Completed final sign-off Dec 2024 | 345 California St | Richlen Construction | 29th floor: t.i. in existing tenant space. demolition includes some walls, millwork, and finishes. new construction to include walls, doors, millwork, power, finishes, etc. no structural work is required. no change to occupancy type or building egress system.Details
29th floor: t.i. in existing tenant space. demolition includes some walls, millwork, and finishes. new construction to include walls, doors, millwork, power, finishes, etc. no structural work is required. no change to occupancy type or building egress system. | $200,000 |
| May 23, 2024 | Completed final sign-off Mar 2025 | 1 Embarcadero Center | Evans & Son Inc | 34th/f: ref 201907035059. office t.i. to include replacement on lobby door to (n) non load bearing fire rated entry door. no change of occupancy or useDetails
34th/f: ref 201907035059. office t.i. to include replacement on lobby door to (n) non load bearing fire rated entry door. no change of occupancy or use | $15,000 |
| Oct 24, 2023 | Completed final sign-off Mar 2025 | 1 Embarcadero Center | Evans & Son Inc | 34/f: minor interior only ti, limited to relocating 2-existing doors, lighting controls relocation. no new lighting fixtures or wiring or branch circuits, no changes to bldg life safety system devices.Details
34/f: minor interior only ti, limited to relocating 2-existing doors, lighting controls relocation. no new lighting fixtures or wiring or branch circuits, no changes to bldg life safety system devices. | $90,000 |
| Jun 14, 2023 | Expired or cancelled cancelled Jan 2026 | 8 Mission St | new exterior pergola @ (e) hotel's dining patioDetails
new exterior pergola @ (e) hotel's dining patio | $180,000 | |
| Nov 8, 2022 | Completed final sign-off Jan 2023 | 345 California St | Peacock Construction | 28th & 29th fl - revision to pa 2022-0621-6751 minor finishes changes and demo scope changes.Details
28th & 29th fl - revision to pa 2022-0621-6751 minor finishes changes and demo scope changes. | |
| Oct 12, 2022 | Never finaled issued Oct 2022, no final | 601 Montgomery St | Deb Construction Llc | revision to pa 2022-0505-3643 relocateion of it rack. "meeting room" revised to "offices". revise floor power & signal plan. relocationg floor furniture & equipment planDetails
revision to pa 2022-0505-3643 relocateion of it rack. "meeting room" revised to "offices". revise floor power & signal plan. relocationg floor furniture & equipment plan | |
| Sep 22, 2022 | Completed final sign-off May 2023 | 4 Embarcadero Center | Hitt Contracting Inc. | 37/f partial interior t.i. new partitions, privacy door, mep, relocating portion of (e) millwork. life safety deferred.Details
37/f partial interior t.i. new partitions, privacy door, mep, relocating portion of (e) millwork. life safety deferred. | $100,000 |
| Jun 28, 2022 | Completed final sign-off Feb 2023 | 580 California St | Peacock Construction | 17th fl: t.i.. provide water line for ref & coffee maker. select demo of (e) non-load bearing walls & ceiling system. new walls, ceilings & lighting. modifications of elec/lighting/hvac. pot previously approved under pa# 201904037033 & 201909161721)Details
17th fl: t.i.. provide water line for ref & coffee maker. select demo of (e) non-load bearing walls & ceiling system. new walls, ceilings & lighting. modifications of elec/lighting/hvac. pot previously approved under pa# 201904037033 & 201909161721) | $902,002 |
| Jun 21, 2022 | Completed final sign-off Jan 2023 | 345 California St | Peacock Construction | 28th fl. t.i to consist of minor demo, new construction to include new demising wall re-installation of raised floor system. 29th fl: adding stand alone new hvac cooling, minor changes to existing office space. mep, fire life safety under sep permit.Details
28th fl. t.i to consist of minor demo, new construction to include new demising wall re-installation of raised floor system. 29th fl: adding stand alone new hvac cooling, minor changes to existing office space. mep, fire life safety under sep permit. | $150,000 |
| May 5, 2022 | Completed final sign-off Jan 2023 | 601 Montgomery St | Deb Construction Llc | 1st fl: tenant improvement on existing space. new finishes, existing office converted to meeting rooms, partial ext facade renovation, new partition & electrical work.Details
1st fl: tenant improvement on existing space. new finishes, existing office converted to meeting rooms, partial ext facade renovation, new partition & electrical work. | $510,000 |
| Nov 17, 2021 | Never finaled issued Dec 2021, no final | 595 Market St | Source Planning And Construction Inc | 11/f suite 1100: ti to combine 2 existing suites into a single suite (#1100). demolition of (e) wall, finishes, replacement of ceiling system. lighting, millwork and finishes. new walls, doors. new 1 single use restroom and modify (e) mep system.Details
11/f suite 1100: ti to combine 2 existing suites into a single suite (#1100). demolition of (e) wall, finishes, replacement of ceiling system. lighting, millwork and finishes. new walls, doors. new 1 single use restroom and modify (e) mep system. | $1,800,000 |
| Nov 3, 2021 | Completed final sign-off Jul 2022 | 655 Montgomery St | Gci, Inc | 9/f: tenant improvement renovation. demo of existing partitions, ceilings, plumbing fixtures, casework, lighting. mep deferred submittal.Details
9/f: tenant improvement renovation. demo of existing partitions, ceilings, plumbing fixtures, casework, lighting. mep deferred submittal. | $2,000,000 |
| Aug 20, 2021 | Completed final sign-off Dec 2021 | 21 South Park | Skyline Construction | interior t.i. within occupied space. minor demo (n) non load bearing wall, door & finishes. no exterior work. no occupcy changes.Details
interior t.i. within occupied space. minor demo (n) non load bearing wall, door & finishes. no exterior work. no occupcy changes. | $720,000 |
| Aug 6, 2021 | Completed final sign-off Feb 2023 | 1 Embarcadero Center | Gci, Inc | ti w/removal (e) walls & replaced with new. new interior finishes. removal of (e) interconnecting stair between 34th & 35th floor. close opening w/2-hr fire rated floor construction. fire alarm/sprinkler deferred permits.Details
ti w/removal (e) walls & replaced with new. new interior finishes. removal of (e) interconnecting stair between 34th & 35th floor. close opening w/2-hr fire rated floor construction. fire alarm/sprinkler deferred permits. | $1,200,000 |
| Jan 29, 2021 | Completed final sign-off Aug 2022 | 456 Montgomery St | Pacific Ridge Builders Inc | suite 1400: t.i.: new non-load bearing, non-rated walls.mod (e) lighting, electrical ahd hvac controle. rmeodel (e) 14th restroom to meet 2019 cbc ch11b accessibility requirement. fire/life safety under sep permit. maher n/a.Details
suite 1400: t.i.: new non-load bearing, non-rated walls.mod (e) lighting, electrical ahd hvac controle. rmeodel (e) 14th restroom to meet 2019 cbc ch11b accessibility requirement. fire/life safety under sep permit. maher n/a. | $220,000 |
| Sep 26, 2020 | Completed final sign-off Jun 2021 | 101 California St | Bcci Construction Company | 37/f: selected demo of non-load bearing walls & ceiling systems. new finishes and electrical throughout. mep deffered. maher n/aDetails
37/f: selected demo of non-load bearing walls & ceiling systems. new finishes and electrical throughout. mep deffered. maher n/a | $175,000 |
| Oct 8, 2019 | Never finaled issued Oct 2019, no final | 525 Market St | Service West Inc | level 20: interior t.i to install a new door and demountable partition to an existing team room on the 20 floor.Details
level 20: interior t.i to install a new door and demountable partition to an existing team room on the 20 floor. | $11,210 |
| Oct 1, 2019 | Expired or cancelled cancelled Feb 2020 | 500 Folsom St | Clune Construction Company L P | revision to app#201902072310. atm vestibule revision per ocii. revise rcp at atm vestibule with new ve light fixtures. change light, weight concrete to foam for raised floor. n/a for maherDetails
revision to app#201902072310. atm vestibule revision per ocii. revise rcp at atm vestibule with new ve light fixtures. change light, weight concrete to foam for raised floor. n/a for maher | $7,000 |
| Jul 22, 2019 | Completed final sign-off Mar 2022 | 1 Market St | Source Planning And Construction Inc | 20th flr - ti reconfiguragtimg (e) space. defferred permit for life safety (mech/ele included)Details
20th flr - ti reconfiguragtimg (e) space. defferred permit for life safety (mech/ele included) | $600,000 |
| Jul 22, 2019 | Completed final sign-off Sep 2020 | 1 Market St | Source Planning And Construction Inc | 21st flr - ti reconfiguraging (e) space. defferred permit for life safety (mech/ele included)Details
21st flr - ti reconfiguraging (e) space. defferred permit for life safety (mech/ele included) | $750,000 |
| Jul 3, 2019 | Completed final sign-off Oct 2020 | 1 Embarcadero Center | fl. 34 & 35; remodel of (e) office space for new office needs n/a maher includes mepDetails
fl. 34 & 35; remodel of (e) office space for new office needs n/a maher includes mep | $3,700,000 | |
| Feb 7, 2019 | Completed final sign-off Sep 2020 | 500 Folsom St | Clune Construction Company L P | 1/f: suite 116/117: t.i. for a (n) bank in (n) constructed building. build (n) non-load bearing interior partitions, doors, furniture and office equipment. fire alarm & sprinklers under sep permit. maher n/a.Details
1/f: suite 116/117: t.i. for a (n) bank in (n) constructed building. build (n) non-load bearing interior partitions, doors, furniture and office equipment. fire alarm & sprinklers under sep permit. maher n/a. | $1,401,000 |
| Aug 17, 2017 | Completed final sign-off Oct 2017 | 580 California St | Richlen Construction | rev to pa#201708033770. suite 1700: modifying (e) millwork - add accent paint dolor & decorative load wall.Details
rev to pa#201708033770. suite 1700: modifying (e) millwork - add accent paint dolor & decorative load wall. | |
| Sep 21, 2015 | Completed final sign-off Dec 2015 | 114 Sansome St | Clune Construction Company L P | 7/f suite 750: minor demo, frame, drywall (3) new rooms, modify, replumb sink as necessary, ceiling patching, flooring, paint. install (1) split system hat pump. (sprinkler modification of area affected under deferred submittal). maher naDetails
7/f suite 750: minor demo, frame, drywall (3) new rooms, modify, replumb sink as necessary, ceiling patching, flooring, paint. install (1) split system hat pump. (sprinkler modification of area affected under deferred submittal). maher na | $120,000 |