Permit GraphShortlistSan Francisco building permits since 2000

Lindsay M Marion

License
M34738
Mechanical engineer
About the Board for Professional Engineers, Land Surveyors, and Geologists
Look up M34738 at the Board for Professional Engineers
Listed as
engineer
Firm
Flack + Lirtz
Based in
Sf
On San Francisco permits
Dec 2012 to Oct 2025

16 permits since 2000 (engineer on 16 permits): 8 completed, 4 in progress, 3 never finaled, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Bcci Construction Company (6), Skyline Construction (4), Gci, Inc (3), Swinerton Builders (2), C C I Commercial Construction & Improv
Architects
Nathan G Dison (3), Anne Torney, Carrie Byles, Don Dacumos, John Long, Leif Glomset, Mark Cavagnero, Suwanty Mulia
Engineers
Julian Moritz (5), Eric Witthaus, Jillian Mclead, Richard Pollack, Ron Klemencic

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Oct 23, 2025In progress
issued Dec 2025
560 Mission StGci, Increvision to 202501027602.smoke control zones to combine 1st & 2nd floors due to new opening @ 2nd fl level.updates to fsd schedule due to field verified information.added smoke control matrices.
Details
Permit
202509195753
Permit issued
Dec 3, 2025

revision to 202501027602.smoke control zones to combine 1st & 2nd floors due to new opening @ 2nd fl level.updates to fsd schedule due to field verified information.added smoke control matrices.

Open the permit page

Jul 10, 2025In progress
issued Sep 2025
560 Mission StGci, Increvision to pa #2025-0102-7602 to document various field/construction changes, general detailing and clarification per rfi responses at ground floor cafe, back of house area and 2nd level.
Details
Permit
202507100540
Permit issued
Sep 23, 2025

revision to pa #2025-0102-7602 to document various field/construction changes, general detailing and clarification per rfi responses at ground floor cafe, back of house area and 2nd level.

Open the permit page

$14,000
Jul 3, 2025Completed
final sign-off Feb 2026
345 California StSkyline Construction8/f: demo only permit. demo suite includs interior partition, finishes, millwork, plumbing and electrical fixtures.
Details
Permit
202507030167
Permit issued
Jul 22, 2025
Final sign-off
Feb 25, 2026

8/f: demo only permit. demo suite includs interior partition, finishes, millwork, plumbing and electrical fixtures.

Open the permit page

$120,000
Apr 25, 2025Completed
final sign-off Nov 2025
560 Mission StBcci Construction Company3rd fl- arch and mep for construction of temp print and mail room
Details
Permit
202504255235
Permit issued
Apr 28, 2025
Final sign-off
Nov 13, 2025

3rd fl- arch and mep for construction of temp print and mail room

Open the permit page

$60,000
Sep 25, 2024Completed
final sign-off Jan 2026
50 California StSkyline Construction35/fl-ref 202406265293 - office ti for finishes, walls, and floors to include mep work includes ductwork, lighting, power receptacles. mep deferred submitial
Details
Permit
202409251626
Permit issued
Nov 12, 2024
Final sign-off
Jan 5, 2026

35/fl-ref 202406265293 - office ti for finishes, walls, and floors to include mep work includes ductwork, lighting, power receptacles. mep deferred submitial

Open the permit page

$1,000,000
Aug 8, 2024In progress
issued Aug 2024
415 Mission StBcci Construction Company34th floor: modification to existing mechanical and electrical. relocate ducts and modify lightin. ref pa#202401023324.
Details
Permit
202408088259
Permit issued
Aug 9, 2024

34th floor: modification to existing mechanical and electrical. relocate ducts and modify lightin. ref pa#202401023324.

Open the permit page

$45,000
Jul 30, 2024Completed
final sign-off Jun 2025
55 Music Concourse DrC C I Commercial Construction & Improvrenovation of (e) cafe shop facility, removal of part of (e) ceilings. replace (e) equipment, relocation of (e) light fixtures and mechanical hvac.
Details
Permit
202407307608
Permit issued
Sep 20, 2024
Final sign-off
Jun 13, 2025

renovation of (e) cafe shop facility, removal of part of (e) ceilings. replace (e) equipment, relocation of (e) light fixtures and mechanical hvac.

Open the permit page

$218,191
Jul 25, 2024Completed
final sign-off Jan 2026
50 California StSkyline Construction36th/flr -ref ti 202405222693- mep work for office ti
Details
Permit
202407257297
Permit issued
Dec 16, 2024
Final sign-off
Jan 5, 2026

36th/flr -ref ti 202405222693- mep work for office ti

Open the permit page

$1,000,000
Jan 2, 2024In progress
issued Jan 2024
415 Mission StBcci Construction Company34/f: mep submittal to support approved architectural permit # 202310118444
Details
Permit
202401023324
Permit issued
Jan 12, 2024

34/f: mep submittal to support approved architectural permit # 202310118444

Open the permit page

$100,000
Sep 15, 2023Never finaled
issued Sep 2023, no final
415 Mission StBcci Construction Company31/f & 32/f: minor ti demo and patch work, noting changes to smoke control as a result of the removal of stairs on l32 and l33.
Details
Permit
202309156665
Permit issued
Sep 15, 2023

31/f & 32/f: minor ti demo and patch work, noting changes to smoke control as a result of the removal of stairs on l32 and l33.

Open the permit page

$200,000
Sep 15, 2023Never finaled
issued Sep 2023, no final
415 Mission StBcci Construction Company33/f, 34/f & 35/f: final conditions permit noting changes in smoke control as result of the (e) convenience stair being removed from l32-l33 and l33 slab infill uner pa# 202306230736.
Details
Permit
202309156685
Permit issued
Sep 15, 2023

33/f, 34/f & 35/f: final conditions permit noting changes in smoke control as result of the (e) convenience stair being removed from l32-l33 and l33 slab infill uner pa# 202306230736.

Open the permit page

$200,000
Jun 23, 2023Never finaled
issued Jul 2023, no final
415 Mission StBcci Construction Company31/f & 32/f: demo only of (e) convenience stair. 31/f & 32/f to remain unoccupied. convenience stairs @ levels 33, 34 & 35 to remain. new structural infill of stair opening on 32nd and 33rd floor. mechanical page included.
Details
Permit
202306230736
Permit issued
Jul 5, 2023

31/f & 32/f: demo only of (e) convenience stair. 31/f & 32/f to remain unoccupied. convenience stairs @ levels 33, 34 & 35 to remain. new structural infill of stair opening on 32nd and 33rd floor. mechanical page included.

Open the permit page

$200,000
Oct 13, 2022Completed
final sign-off Dec 2023
150 California StGci, Inc20th fl tenent improvement including new rooms, elevator lobby, reception, conference rooms, amenity space, mep, fixtures, finishes & equipment, and offices.
Details
Permit
202210134259
Permit issued
Nov 22, 2022
Final sign-off
Dec 7, 2023

20th fl tenent improvement including new rooms, elevator lobby, reception, conference rooms, amenity space, mep, fixtures, finishes & equipment, and offices.

Open the permit page

$920,000
Aug 30, 2021Expired or cancelled
cancelled Jan 2026
199 Fremont StSkyline Constructionflrs 11,12,15,16,18: buildout of new janitor closets, as req'd to bring current breakrooms up to health code. flrs 8,11,12,15,16,17,18: new water heaters proposed beneath (e) sinks. flrs 8,11,12,16,17,18: convert (e) storage rooms to break room storage. ref pa 201612144897.fire alarm/sprinklers def.
Details
Permit
202108307362

flrs 11,12,15,16,18: buildout of new janitor closets, as req'd to bring current breakrooms up to health code. flrs 8,11,12,15,16,17,18: new water heaters proposed beneath (e) sinks. flrs 8,11,12,16,17,18: convert (e) storage rooms to break room storage. ref pa 201612144897.fire alarm/sprinklers def.

Open the permit page

$155,000
Dec 18, 2012Completed
final sign-off Aug 2016
650 07th StSwinerton Builders1st floor -mechanical t.i. ( fire alarm & sprinklers under separate permit.), architectural t.i. under pa #2012.1016.2159. plan includes electrical t.i.
Details
Permit
201212186442
Permit issued
Jan 15, 2013
Final sign-off
Aug 30, 2016

1st floor -mechanical t.i. ( fire alarm & sprinklers under separate permit.), architectural t.i. under pa #2012.1016.2159. plan includes electrical t.i.

Open the permit page

Dec 12, 2012Completed
final sign-off Aug 2016
650 07th StSwinerton Buildersbasement - mechanical ti. ref. ti#2012-1016-2156. fire alarm & sprinklers under separate permit.
Details
Permit
201212126030
Permit issued
Jan 15, 2013
Final sign-off
Aug 30, 2016

basement - mechanical ti. ref. ti#2012-1016-2156. fire alarm & sprinklers under separate permit.

Open the permit page