Nathan G Dison
- Listed as
- architect
- Firm
- Gensler
- Based in
- San Francisco
- On San Francisco permits
- Jun 2023 to Mar 2026
24 permits since 2000 (architect on 24 permits): 10 completed, 11 in progress, 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 12, 2026 | In progress issued May 2026 | 2061 Chestnut St | Jrm Construction Management | revision to permit 202508132979. revision includes updates to partitions, demolition scope, layout, finishes, ceiling design, storefront elements, and fixtures. no electrical or life safety scope (to be deferred)Details
revision to permit 202508132979. revision includes updates to partitions, demolition scope, layout, finishes, ceiling design, storefront elements, and fixtures. no electrical or life safety scope (to be deferred) | $25,000 |
| Jan 28, 2026 | In progress issued Feb 2026 | 1 Warriors Wy | Dome Construction Corp | revision to pa#: 202506058032; blue office library modifications enclosed desk areas to make them into phone rooms, updated egress, construction, lighting locations, power locations, finishes.Details
revision to pa#: 202506058032; blue office library modifications enclosed desk areas to make them into phone rooms, updated egress, construction, lighting locations, power locations, finishes. | |
| Dec 11, 2025 | Completed final sign-off Mar 2026 | 4 Embarcadero Center | Source Planning And Construction Inc | demo of level 28-level 29 convenience stairs & slab in-fill.Details
demo of level 28-level 29 convenience stairs & slab in-fill. | $150,000 |
| Nov 20, 2025 | In progress filed Nov 2025, not yet issued | 1090 Dr Maya Angelou Ln | proj-25-0624; mou port: revision to add additional electrical sub-panel l-3c to in idf room 3018. ref pa# 202412247382 and port pa# b-2024-0274.Details
proj-25-0624; mou port: revision to add additional electrical sub-panel l-3c to in idf room 3018. ref pa# 202412247382 and port pa# b-2024-0274. | ||
| Aug 13, 2025 | In progress issued Nov 2025 | 2061 Chestnut St | Jrm Construction Management | ground floor tenant improvement. interior tenant fit out of an existing retail space. no change of use, interior partitions, ceiling grid remodel, installing new lighting, restroom demo and replacement, and new finishes.Details
ground floor tenant improvement. interior tenant fit out of an existing retail space. no change of use, interior partitions, ceiling grid remodel, installing new lighting, restroom demo and replacement, and new finishes. | $675,000 |
| Jul 8, 2025 | Completed final sign-off Oct 2025 | 4 Embarcadero Center | Source Planning And Construction Inc | 29th/f: interior t.i. of e) office. minor demo of 1 non-load bearing paritions, 1 e) door, frame, 3 hardware. minor finishes, new construction of non-load partition, new bldg standard doors, finishes, & hardware. conver e) copy rm into wellness rmDetails
29th/f: interior t.i. of e) office. minor demo of 1 non-load bearing paritions, 1 e) door, frame, 3 hardware. minor finishes, new construction of non-load partition, new bldg standard doors, finishes, & hardware. conver e) copy rm into wellness rm | $60,000 |
| Jun 20, 2025 | In progress filed Jun 2025, not yet issued | 1090 Dr Maya Angelou Ln | proj-25-0613 - mou-port: revision to gsw tenant improvement fro base building bathrooms. reference pa # 202412247382 proj-24-0610 & port permit #b-2024-0274.Details
proj-25-0613 - mou-port: revision to gsw tenant improvement fro base building bathrooms. reference pa # 202412247382 proj-24-0610 & port permit #b-2024-0274. | ||
| Jun 10, 2025 | Completed final sign-off Oct 2025 | 633 Folsom St | Principal Builders Inc. | interior tenant improvement work to add turnstiles as level 1 lobby.Details
interior tenant improvement work to add turnstiles as level 1 lobby. | $40,000 |
| Jun 5, 2025 | In progress issued Nov 2025 | 1 Warriors Wy | Dome Construction Corp | level 100 (blue) workplace ti: demo of non structural walls, ceilings & lights. construction of non structural walls, ceilings & lights, millwork, finishes & furniture. no increase or change in occupancyDetails
level 100 (blue) workplace ti: demo of non structural walls, ceilings & lights. construction of non structural walls, ceilings & lights, millwork, finishes & furniture. no increase or change in occupancy | $1,070,000 |
| Jun 5, 2025 | In progress filed Jun 2025, not yet issued | 1 Warriors Wy | level 001 (gold) workplace ti: demo of non structural walls, ceilings & lights. construction of non structural walls, ceilings & lights, millwork, finishes & furniture. no increase or change in occupancyDetails
level 001 (gold) workplace ti: demo of non structural walls, ceilings & lights. construction of non structural walls, ceilings & lights, millwork, finishes & furniture. no increase or change in occupancy | $269,640 | |
| May 23, 2025 | Completed final sign-off Oct 2026 | 1 Warriors Wy | Dpr Construction A | new pre.fabricated shipping container installed at exterior terrace.Details
new pre.fabricated shipping container installed at exterior terrace. | $10,000 |
| Jan 23, 2025 | In progress filed Jan 2025, not yet issued | 1090 Dr Maya Angelou Ln | proj-24-0610; mou-port: office tenant improvement of non-structural partitions, ceilings, doors,lighting, electrical, mechanical, plumbing, av & it on levels 3 and 4. new stepped aisle and stepped seating in slab opening. ref: permit application number #2024-1025-3714 for slab opening.Details
proj-24-0610; mou-port: office tenant improvement of non-structural partitions, ceilings, doors,lighting, electrical, mechanical, plumbing, av & it on levels 3 and 4. new stepped aisle and stepped seating in slab opening. ref: permit application number #2024-1025-3714 for slab opening. | $6,583,515 | |
| Nov 20, 2024 | In progress filed Nov 2024, not yet issued | 1090 Dr Maya Angelou Ln | proj-24-0607;mou-port: alt permit for demo of a portion of the (e) 4th flr slab, for a future stair connection between lvl 3 and lvl 4 to be submitted under a separate t.i. permit. work includes the construction of a 2 hr. rated smoke barrier to allow for smoke control around the (n) floor opening.Details
proj-24-0607;mou-port: alt permit for demo of a portion of the (e) 4th flr slab, for a future stair connection between lvl 3 and lvl 4 to be submitted under a separate t.i. permit. work includes the construction of a 2 hr. rated smoke barrier to allow for smoke control around the (n) floor opening. | $221,000 | |
| Nov 12, 2024 | Completed final sign-off Feb 2025 | 1 Warriors Wy | Dpr Construction A | space 11: new fire fixture at backyard patio, work includes electrical and plumbing.Details
space 11: new fire fixture at backyard patio, work includes electrical and plumbing. | $10,000 |
| Oct 2, 2024 | Completed final sign-off Jun 2025 | 45 Fremont St | Skyline Construction | work on 33rd flr. demo of existing conference froom. demo of slab between 33 and 34 flr. constructino of single level stair connection. minor mepDetails
work on 33rd flr. demo of existing conference froom. demo of slab between 33 and 34 flr. constructino of single level stair connection. minor mep | $110,000 |
| Oct 1, 2024 | Completed final sign-off Jun 2025 | 45 Fremont St | Skyline Construction | 34/f partial floor - office tenant improvement. architecture and mep. new offices.Details
34/f partial floor - office tenant improvement. architecture and mep. new offices. | $375,000 |
| Aug 23, 2024 | Completed final sign-off Feb 2025 | 1 Warriors Wy | Dpr Construction A | revision to pa 202403137744 changes inside revision to veranda layout; added dimensions for field clarifications; millwork and detail updates; and revised finish scheduleDetails
revision to pa 202403137744 changes inside revision to veranda layout; added dimensions for field clarifications; millwork and detail updates; and revised finish schedule | |
| Mar 29, 2024 | Completed final sign-off Aug 2024 | 4 Embarcadero Center | Source Planning And Construction Inc | 28 and 29th floor office ti to (e) office space to include soft demo, replace fixtures and finishes. build new non-bearing partitions, doors and finishes (total area 795sf) deferred meps and fire alarm.Details
28 and 29th floor office ti to (e) office space to include soft demo, replace fixtures and finishes. build new non-bearing partitions, doors and finishes (total area 795sf) deferred meps and fire alarm. | $130,000 |
| Mar 27, 2024 | Completed final sign-off Feb 2025 | 1 Warriors Wy | Dpr Construction A | tenant improvement of (e) space to (n) sports bar & supporting back of house spaces. scope includes non-load bearing partitions, ceiling, millwork,finishes,lighting,mechanical,eletrical, audiovisual, and plumbingDetails
tenant improvement of (e) space to (n) sports bar & supporting back of house spaces. scope includes non-load bearing partitions, ceiling, millwork,finishes,lighting,mechanical,eletrical, audiovisual, and plumbing | $11,435,000 |
| Jan 31, 2024 | In progress issued Feb 2024 | 415 Mission St | Bcci Construction Company | 34/f: revision to approved architectural and mep set pa# 202310118444 and 202401023324. new non-load bearing, electrical, ceiling, lighting, floor finishes and furnishings.Details
34/f: revision to approved architectural and mep set pa# 202310118444 and 202401023324. new non-load bearing, electrical, ceiling, lighting, floor finishes and furnishings. | |
| Oct 11, 2023 | In progress issued Oct 2023 | 415 Mission St | Bcci Construction Company | 34th fl: small alternation to include a broadcast studio video editing and presentation space, prject will include non load bearing partitions, mep defferred. structural drawings included.Details
34th fl: small alternation to include a broadcast studio video editing and presentation space, prject will include non load bearing partitions, mep defferred. structural drawings included. | $150,000 |
| Sep 15, 2023 | Never finaled issued Sep 2023, no final | 415 Mission St | Bcci Construction Company | 33/f, 34/f & 35/f: final conditions permit noting changes in smoke control as result of the (e) convenience stair being removed from l32-l33 and l33 slab infill uner pa# 202306230736.Details
33/f, 34/f & 35/f: final conditions permit noting changes in smoke control as result of the (e) convenience stair being removed from l32-l33 and l33 slab infill uner pa# 202306230736. | $200,000 |
| Sep 15, 2023 | Never finaled issued Sep 2023, no final | 415 Mission St | Bcci Construction Company | 31/f & 32/f: minor ti demo and patch work, noting changes to smoke control as a result of the removal of stairs on l32 and l33.Details
31/f & 32/f: minor ti demo and patch work, noting changes to smoke control as a result of the removal of stairs on l32 and l33. | $200,000 |
| Jun 23, 2023 | Never finaled issued Jul 2023, no final | 415 Mission St | Bcci Construction Company | 31/f & 32/f: demo only of (e) convenience stair. 31/f & 32/f to remain unoccupied. convenience stairs @ levels 33, 34 & 35 to remain. new structural infill of stair opening on 32nd and 33rd floor. mechanical page included.Details
31/f & 32/f: demo only of (e) convenience stair. 31/f & 32/f to remain unoccupied. convenience stairs @ levels 33, 34 & 35 to remain. new structural infill of stair opening on 32nd and 33rd floor. mechanical page included. | $200,000 |