19 permits since 2000 (engineer on 18 permits, architect on 1 permit): 14 completed, 2 in progress, 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 21, 2026 | Completed final sign-off Aug 2026 | 595 Pacific Av | Principal Builders Inc. | 2/f: revision to pa#: 202602246389. adding (2) new phone booths with new supporting power.Details
2/f: revision to pa#: 202602246389. adding (2) new phone booths with new supporting power. | $8,000 |
| Apr 10, 2026 | In progress issued Jun 2026 | 1 Embarcadero Center | Skyline Construction | 31/f: interior tenant improvement. related mechanical, electrical and plumbing modifications. limited area of floor slab demolition is included in this scope for a non-egress stair under seperate permit.Details
31/f: interior tenant improvement. related mechanical, electrical and plumbing modifications. limited area of floor slab demolition is included in this scope for a non-egress stair under seperate permit. | $2,750,000 |
| Apr 10, 2026 | In progress issued Jun 2026 | 1 Embarcadero Center | 30/f: interior non-structural partitions modification, and reconfiguration interior ceiling modifications. interior finish replacement. related mechanical, electrical, and plumbing modifications. a non-egress stair connecting lvs 30 & 31.Details
30/f: interior non-structural partitions modification, and reconfiguration interior ceiling modifications. interior finish replacement. related mechanical, electrical, and plumbing modifications. a non-egress stair connecting lvs 30 & 31. | $8,750,000 | |
| Dec 11, 2025 | Completed final sign-off Mar 2026 | 4 Embarcadero Center | Source Planning And Construction Inc | demo of level 28-level 29 convenience stairs & slab in-fill.Details
demo of level 28-level 29 convenience stairs & slab in-fill. | $150,000 |
| Nov 13, 2025 | Completed final sign-off Mar 2026 | 1 Embarcadero Center | Source Planning And Construction Inc | 29th and 30 flr. communication stiar t.i. includes the remove of a non-egress interconnecting - stair and the infill of the slab opening. all new or revised life safety work will be design buildg and submitted separately. (bldg is fully sprinklered)Details
29th and 30 flr. communication stiar t.i. includes the remove of a non-egress interconnecting - stair and the infill of the slab opening. all new or revised life safety work will be design buildg and submitted separately. (bldg is fully sprinklered) | $198,000 |
| Sep 10, 2025 | Completed final sign-off Jan 2026 | 1 Embarcadero Center | Source Planning And Construction Inc | 32nd floor: infill former stair opening 11' x 13' with new floor slab.Details
32nd floor: infill former stair opening 11' x 13' with new floor slab. | $198,000 |
| Dec 13, 2023 | Completed final sign-off Dec 2024 | 4 Embarcadero Center | Gci, Inc | removal of interconnecting staircase and infill slab between floors 31 and 32. no change of occupancy or use.Details
removal of interconnecting staircase and infill slab between floors 31 and 32. no change of occupancy or use. | $65,481 |
| Feb 4, 2022 | Never finaled issued Feb 2022, no final | 292 Battery St | G L C Construction Company Inc | intall 2 new atm units. structural work only.Details
intall 2 new atm units. structural work only. | $3,000 |
| Feb 4, 2022 | Never finaled issued Feb 2022, no final | 460 Sutter St | G L C Construction Company Inc | intall 2 new atm units. structural work only.Details
intall 2 new atm units. structural work only. | $3,000 |
| Feb 4, 2022 | Completed final sign-off Oct 2022 | 303 02nd St | G L C Construction Company Inc | intall 2 new atm units. structural work only.Details
intall 2 new atm units. structural work only. | $3,000 |
| Nov 4, 2021 | Never finaled issued Dec 2021, no final | 4 Embarcadero Center | Source Planning And Construction Inc | demo of inter connecting staircase and infill slab between floors 12 & 13 no change in occupancy or useDetails
demo of inter connecting staircase and infill slab between floors 12 & 13 no change in occupancy or use | $200,000 |
| Aug 6, 2021 | Completed final sign-off Feb 2023 | 1 Embarcadero Center | Gci, Inc | ti w/removal (e) walls & replaced with new. new interior finishes. removal of (e) interconnecting stair between 34th & 35th floor. close opening w/2-hr fire rated floor construction. fire alarm/sprinkler deferred permits.Details
ti w/removal (e) walls & replaced with new. new interior finishes. removal of (e) interconnecting stair between 34th & 35th floor. close opening w/2-hr fire rated floor construction. fire alarm/sprinkler deferred permits. | $1,200,000 |
| Feb 27, 2020 | Completed final sign-off May 2023 | 75 Industrial St | Adam Lewis Construction Company | install new interior steel stairs (interior). ref bpa# 2017-1221-7098.Details
install new interior steel stairs (interior). ref bpa# 2017-1221-7098. | $5,000 |
| Apr 22, 2019 | Completed final sign-off Jul 2020 | 275 Battery St | Hathaway Dinwiddie Co. | ground fl ti to existing restaurant space, expansion of 275 lounge, no exterior changes, new non-rated partitions, restrooms, electrical & plumbing. (ref pa #201603293403, demolition permit pa #201805159190)Details
ground fl ti to existing restaurant space, expansion of 275 lounge, no exterior changes, new non-rated partitions, restrooms, electrical & plumbing. (ref pa #201603293403, demolition permit pa #201805159190) | $376,671 |
| Dec 21, 2017 | Completed final sign-off Sep 2023 | 75 Industrial St | Adam Lewis Construction Company | revision to pa #201612144986. remove (e) interior partitions. remove (e) concrete stair-on-grade & replace with (n) metal stair. add walls and doors. add (n) lighting. add (n) mechanical system, (n) electrical outlets and lighting. (n) liquid co2 storage and distribution system.Details
revision to pa #201612144986. remove (e) interior partitions. remove (e) concrete stair-on-grade & replace with (n) metal stair. add walls and doors. add (n) lighting. add (n) mechanical system, (n) electrical outlets and lighting. (n) liquid co2 storage and distribution system. | |
| Aug 3, 2017 | Completed final sign-off Jun 2018 | 45 Fremont St | Richlen Construction | 2nd fl structural support for interior folding wall in ti. ref pa 2017-0421-4519 n/a for maher.Details
2nd fl structural support for interior folding wall in ti. ref pa 2017-0421-4519 n/a for maher. | $6,000 |
| Nov 3, 2016 | Completed final sign-off Sep 2018 | 233 Franconia St | Luke Gilligan Inc. | project proposes new retaining & garden walls as part of landscaping. ref pa #201401085795.Details
project proposes new retaining & garden walls as part of landscaping. ref pa #201401085795. | $15,750 |
| Feb 10, 2016 | Completed final sign-off Mar 2018 | 456 Lake St | Metro Construction Inc. | soft story retrofit per sfbc chapter 34b, fema p-807Details
soft story retrofit per sfbc chapter 34b, fema p-807 | $82,000 |
| Feb 2, 2016 | Completed final sign-off Jun 2016 | 2 Embarcadero Center | Principal Builders Inc. | structural work to remove slab and construct communicating stair between floors 18 and 19. ref. to t.i. pa# 201601076570. n/a ordinance #155-13Details
structural work to remove slab and construct communicating stair between floors 18 and 19. ref. to t.i. pa# 201601076570. n/a ordinance #155-13 | $317,795 |