Block 0230, lot 028
1 Embarcadero Center
The 200 most recent permits filed for this property.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 1, 2026 | In progress | 1 Embarcadero Center | mechanical : ductwork terminal units and controls. electrical -power lighting and signal. ref 202505307558 | $410,000 | |
| Sep 25, 2026 | In progress | 1 Embarcadero Center | Peacock Construction | ste 1150 - electrical new light fixtures & associated controls, power & signal. ref pa 202608257086 | $297,000 |
| Aug 28, 2026 | In progress | 301 Clay St | Corporate Sign Systems | install 4 evacuation maps on the 8th floor | $1,520 |
| Aug 25, 2026 | In progress | 1 Embarcadero Center | Peacock Construction | 11th fl. suite 1150. t.i. includes demo of non structural partions and building new non structural partions. deferred mep fire protection and fire alarm (building is fully sprinklered) | $362,527 |
| Aug 17, 2026 | In progress | 1 Embarcadero Center | Vulcan Construction Inc | ste 3810 38/f: tenant improvement includes demo of non-structural partitions and building new non-structural partitions. all new or revised mep's and life safety work will be design build and submitted for permit separately. (building is fully sprinklered). | $245,000 |
| Aug 13, 2026 | In progress | 1 Embarcadero Center | Source Planning And Construction Inc | 11floor: high rise common corridor, elevator lobby, restroom lighting remodel. new lighting fixtures and associated circuiting/ controls ref bpa: 202512222453 | $85,000 |
| Aug 6, 2026 | In progress | 301 Clay St | Silverado Contractors Inc | 29th floor: selective demo of non load baearing partitions, removal of power+ data outlets,lighting, switches, associated devices. removal of suspended ceiling tiles, grid +related ceiling mounted devices. removal of (e) floor covering down to the substrate. all work is interior, non structural. | $300,000 |
| Jul 2, 2026 | In progress | 1 Embarcadero Center | construction of new security gates and screens to the existing stairways. interior exit. | $31,500 | |
| Jun 30, 2026 | Completed | 1 Embarcadero Center | Bilcor Inc | 5/f: install (1) call station rath 2400-808nspm w/ mushroom button (flush mount) for lock elevator lobby. install (1) call station signage. 2 way call station to integrate w/ building two way emergency communication system backbone infrastructure pa# 202008111563. ref 5th fl arch pa# 202605191540. | $10,000 |
| Jun 22, 2026 | In progress | 1 Embarcadero Center | Field Construction Inc. | 5th floor: mechanical & electrical for arch. ref.202605191540. provide and install new van boxes. demo the paneumatic thermostats and install new ddc thermostats. | $785,000 |
| Jun 17, 2026 | In progress | 1 Embarcadero Center | Discount Signs & Neon Inc | install (1) illuminated wall sign. | $7,000 |
| Jun 16, 2026 | Completed | 1 Embarcadero Center | Peacock Construction | 20th floor, suite 2050: deferred electrical: office tenant retrofit: lighting fictures, and associated circuiting/controls, power & signals devices & associated wiring. ref pa# 202604239930. | $138,000 |
| Jun 16, 2026 | Completed | 1 Embarcadero Center | Peacock Construction | 20th/f ste# 2050: ref to t.i. 202604239930: hvac modification to support interior t.i. central equipment is e) to remain | $209,000 |
| May 28, 2026 | Completed | 1 Embarcadero Center | Bilcor Inc | 8/f: install (1) call station rath 2400-808nspm with mushroom button (flush mount) for lock elevator lobby. install (1) call station signage. two way call station to integrate with building 2-way emergency communication system backtone infrastructure permit 202008111563. arch. ref 202603238043. | $1,332 |
| May 19, 2026 | In progress | 1 Embarcadero Center | Field Construction Inc. | 5th flr. t.i. single tenant flr, demo and nonstructure partitions +building back non-str. partitions and finishes. all new or revised mep+ life safety work deferred submittal (bldg is fully sprinklered). | $1,800,000 |
| May 7, 2026 | In progress | 1 Embarcadero Center | Gci, Inc | electrical power, lighting, and signal ref 202603238043 | $50,000 |
| Apr 30, 2026 | In progress | 1 Embarcadero Center | Gci, Inc | 8th floor. ref pa 202603238043 mechanical only - new vav boxes, demo pneumatic thermostat & install new ddc | $150,000 |
| Apr 23, 2026 | Completed | 1 Embarcadero Center | Peacock Construction | 20th floor/ suite 2050 t.i. include demo of non-structural partitions and building. new non-str partitions. all new or revise mep and life safety work will be design build and submitted separately. (bldg is fully sprinklered). | $500,000 |
| Apr 10, 2026 | In progress | 1 Embarcadero Center | 30/f: interior non-structural partitions modification, and reconfiguration interior ceiling modifications. interior finish replacement. related mechanical, electrical, and plumbing modifications. a non-egress stair connecting lvs 30 & 31. | $8,750,000 | |
| Apr 10, 2026 | In progress | 1 Embarcadero Center | Skyline Construction | 31/f: interior tenant improvement. related mechanical, electrical and plumbing modifications. limited area of floor slab demolition is included in this scope for a non-egress stair under seperate permit. | $2,750,000 |
| Mar 23, 2026 | In progress | 1 Embarcadero Center | Gci, Inc | 8th fl: consists of non-structural demo and construction of interior partitions, doors, finishes, ceilings, lighting, plumbing, mechanical and electrical switches. mep and fire/life safety deferred submittals. valuation based on ti costs only, mep costs deferred. | $2,900,000 |
| Feb 6, 2026 | In progress | 1 Embarcadero Center | Gci, Inc | 38th fl ref pa #2025-0530-7558: add a gender neutral restroom. relocate one wall to a conference room and add glazing to two office partitions. | |
| Jan 27, 2026 | Completed | 1 Embarcadero Center | Siemens Industry, Inc. | flr: 32/33; fire only work for the partial area remodels on floor 32 and 33 done under pa#: 202510217760; 2 speakers/strobes are added and an existing one is relocated. | $2,883 |
| Jan 27, 2026 | Completed | 1 Embarcadero Center | Skyline Construction | 16th/f ste#1600: the project generally consists of interior t.i. of ste# 1600 on 16th/f of an e) multi-story building | $85,000 |
| Jan 7, 2026 | Completed | 1 Embarcadero Center | Principal Builders Inc. | 32/fl- defferred submittal from 202510217760 for operable partition | |
| Dec 22, 2025 | In progress | 1 Embarcadero Center | Source Planning And Construction Inc | 11/f: interior improvements to elevator lobby, hallways, and restrooms on the 11th floor. including paint, lighting, toilet fixtures, partitions, and accessories, signage, carpet flooring, and ceramic tile. all walls to remain. | $400,000 |
| Nov 26, 2025 | Completed | 1 Embarcadero Center | Anderson, Rowe & Buckley, Inc. | 32fl and 33rd fl: fire sprinkler ti. relocate (11), adds (4), total (15). apn#202510217760 | $7,725 |
| Nov 19, 2025 | Completed | 1 Embarcadero Center | M C S Construction Services | 20th fl, ste 2020 deferred electrical permit ref pa 202509054626 new power & signal devices throughout space; new 2022 title 24 compliant light & controls in new phone room | $20,000 |
| Nov 14, 2025 | Completed | 1 Embarcadero Center | Acco Engineered Systems Inc. Dba Acco En | 45/fl- to tobatin final inspection for work approved under 201903064499. all work is complete | |
| Nov 13, 2025 | Completed | 1 Embarcadero Center | Source Planning And Construction Inc | 29th and 30 flr. communication stiar t.i. includes the remove of a non-egress interconnecting - stair and the infill of the slab opening. all new or revised life safety work will be design buildg and submitted separately. (bldg is fully sprinklered) | $198,000 |
| Nov 13, 2025 | Completed | 1 Embarcadero Center | Pioneer Fire Inc. | 21/f suite 2100: relocate 7 pendents. ref ti permit 202508284099 | $1,750 |
| Nov 4, 2025 | Completed | 1 Embarcadero Center | Principal Builders Inc. | 32nd and 33rd/f - deferred mep submittal per ti. ref pa# 202510217760 | $301,104 |
| Nov 4, 2025 | In progress | 1 Embarcadero Center | Siemens Industry, Inc. | 20th fl, ste 2020 - fire only work for remodel done under pa 202509054625; 1 strobe has been added | $621 |
| Oct 21, 2025 | In progress | 1 Embarcadero Center | M C S Construction Services | 21st fl - deferred elec permit ref pa 202508284099 associated circuiting/controls. power & signal devices & associated wiring | $75,000 |
| Oct 21, 2025 | Completed | 1 Embarcadero Center | Principal Builders Inc. | 32nd and 33rd floors: t.i. include the removal of non structural partitions and new non-structural partition, doors millwork and finishes. all new or revised hvac electrical, plumbing and life safety work will be design build and submitted separately. (bldg is fully sprinklered) | |
| Sep 10, 2025 | Completed | 1 Embarcadero Center | Source Planning And Construction Inc | 32nd floor: infill former stair opening 11' x 13' with new floor slab. | $198,000 |
| Sep 5, 2025 | Completed | 1 Embarcadero Center | M C S Construction Services | suite 2020 on 20/f: selective demolition of wiremold. construction of non-structural partitions, doors, lights, casework and finishes. no change in occupancy, use or area. | $41,400 |
| Aug 28, 2025 | In progress | 1 Embarcadero Center | M C S Construction Services | 21st/f, ste# 2100: t.i. included demo of non-strutuctural partitions, build new non-structural partitions. all new or revised meps, sprinkler, life safety work will be design build & separate permit | $275,000 |
| Aug 21, 2025 | Completed | 1 Embarcadero Center | Siemens Industry, Inc. | fire only work for the floor 38. remodel done under pa: 202505307558. additions are 1 smoke detector, 9 speakers, 13 speaker/strobes, and 2 strobes | $21,610 |
| Aug 8, 2025 | Completed | 1 Embarcadero Center | R L H Fire Protection Inc | fire sprinkler permit. relocate 47, add 5 and delete 12 pendent sprinklers, add 8 upright sprinkers on the 38/f. t.i #202505307558 | $35,000 |
| Jun 6, 2025 | Completed | 1 Embarcadero Center | Acco Engineered Systems Inc. Dba Acco En | to obtain final inspection for work approved under pa # 2021-0903-7772. all work is complete. | |
| May 30, 2025 | In progress | 1 Embarcadero Center | Gci, Inc | 38th fl: demolition of non structural interior partitions and doors. new construction to include doors, partitions, ceiling, lighting, plumbing finishes. mep, life safety & sprinkler modifications will be submitted as separate permits | $874,993 |
| Apr 18, 2025 | Completed | 1 Embarcadero Center | Gci, Inc | 12th/f: ref t.i. 202502130258. mech & electrical for t.i. | $10,000 |
| Apr 15, 2025 | Completed | 1 Embarcadero Center | Bilcor Inc | 12th fl: install 1 call station w/ mushroom button. 2 way backbone ref: 2020-0811-1563 arch: 2025-0213-0258 fls ref: 2025-0404-3698 | $1,000 |
| Apr 4, 2025 | Completed | 1 Embarcadero Center | Siemens Industry, Inc. | 12th fl - fire only work for ste 1200 ref pa 202502130258; additions and replacements are 7 smoke detectors, 2 duct detectors, 2 pull stations, 5 modules, 38 speakers, 45 speaker/strobes and 10 strobes | $90,000 |
| Mar 5, 2025 | Completed | 1 Embarcadero Center | Pioneer Fire Inc. | suite 1200. relocate (91) pendant heads. remove (10) pendents gcti#: 202502130258. | $20,200 |
| Feb 13, 2025 | Completed | 1 Embarcadero Center | Gci, Inc | interior selective demo of non structural elements including partitons, doors, finishes, ceilings, lighting, mech and elec outlets and switches. new consturction to include doors, partitons, lighting, ceilings, finishes, plumbing. includes rr accessibility upgrades. mep and fire/ls deferred permits | $1,660,000 |
| Oct 31, 2024 | In progress | 1 Embarcadero Center | Siemens Industry, Inc. | 10/f: suites 1010 & 1015: additions are 15 smoke detectors , 4 duct detectors, 2 pull stations, 8 moudules, 27 speakers, 41 speaker/strobe and 6 strobes. ref t.i. 202408088249. | $92,160 |
| Sep 30, 2024 | In progress | 1 Embarcadero Center | R L H Fire Protection Inc | fire sprinkler permit relocate 144, add 34 and delete 35 fire sprinklers on the 10th fl. ref pa 202408088249 | $56,000 |
| Sep 11, 2024 | Completed | 1 Embarcadero Center | Gci, Inc | ste 1010 and 1050- 10/fl-ref 202408088249- demo vav cooling unit and reheat terminal units install (n) chw pump for new network room lighting fixtures, power and signal | $1,044,798 |
| Aug 8, 2024 | Completed | 1 Embarcadero Center | Gci, Inc | 10th floor: shall consist of interior demo of non-structural elements- partitions, doors, finishes, ceilings, lighting, outlets, and switches. new construction includes doors, partitions, ceilings, lighting, plumbing, and finishes, and restroom accessiblity upgrades. mep and fls deferred. | $1,221,197 |
| May 23, 2024 | Completed | 1 Embarcadero Center | Evans & Son Inc | 34th/f: ref 201907035059. office t.i. to include replacement on lobby door to (n) non load bearing fire rated entry door. no change of occupancy or use | $15,000 |
| Feb 15, 2024 | In progress | 1 Embarcadero Center | Siemens Industry, Inc. | ref permit app 202305308849 fire only as built permit for the "gibson dunn" remodel on floor 26. 1 pull station was not installed at a location where it is not required. | |
| Feb 15, 2024 | In progress | 1 Embarcadero Center | Siemens Industry, Inc. | ref 202305318934 fire only "as built" permit for the "gibson dunn" remodel on the 27th fl; 1 duct detector added per the actual installation. | $2,679 |
| Jan 18, 2024 | Completed | 1 Embarcadero Center | Siemens Industry, Inc. | 25/f: fire only work for "spec suites" on flr 25; additions are 3 smoke detectors, 30 modules, 17 speakers, 24 speaker/strobes and 7 strobes. ref pa# 202305228292. | $44,890 |
| Jan 12, 2024 | Completed | 1 Embarcadero Center | Acco Engineered Systems Inc. Dba Acco En | modify boiler flue to vent to roof. ref 2019 0306 4499 | $483,402 |
| Dec 4, 2023 | In progress | 1 Embarcadero Center | Bilcor Inc | install (2) control relay, install (2) rath call station, install (2) call station signage two-way baclconey 2020-0811-1563 27th fl. arch permit 2023-0531-8934 26th fl. arch permit 2023-0530-8849 | $3,996 |
| Nov 22, 2023 | Completed | 1 Embarcadero Center | Source Planning And Construction Inc | 25th ref 202309136466 mech and elec spec suites (2520,2530, 2540) | $780,624 |
| Nov 2, 2023 | Completed | 1 Embarcadero Center | Peacock Construction | electrical new 2022 title 24 compliant lighting and control ref 202302141996 | $15,000 |
| Oct 24, 2023 | Completed | 1 Embarcadero Center | Evans & Son Inc | 34/f: minor interior only ti, limited to relocating 2-existing doors, lighting controls relocation. no new lighting fixtures or wiring or branch circuits, no changes to bldg life safety system devices. | $90,000 |
| Oct 24, 2023 | In progress | 1 Embarcadero Center | Siemens Industry, Inc. | fire only work for the "gibson dunn" remodel on floor 25. additions are smoke detector, 15 speakers, 8 speaker/strobes and 3 strobes. ref 202305228292. | $21,480 |
| Oct 18, 2023 | In progress | 1 Embarcadero Center | Everon Llc | floors# 25, 26, 27: revision 1 adt commercial to add (5) additional card readers. reference permit # 202308255298. | $5,000 |
| Oct 5, 2023 | Completed | 1 Embarcadero Center | Ayoob & Peery Plumbing Co Inc | 25th fl - add (38) relocate (72) fire sprinkler per ti. ref pa 2023-0913-6466 job #23-667 | $68,321 |
| Sep 22, 2023 | Never finaled | 1 Embarcadero Center | Golden Gate Fire Protection Inc | fire sprinkler t.i. relocate 8 pendents, delete 1 pendent and add 1 pendent on the 41/f. ref t.i #202306089520 | $5,580 |
| Sep 22, 2023 | Completed | 1 Embarcadero Center | M C S Construction Services | deferres electrical for 202306230692. new lighting & counter in conference rm: replace wall control for other (e) remains, new power & sigmal devices & associated wiring | $30,000 |
| Sep 13, 2023 | Completed | 1 Embarcadero Center | Source Planning And Construction Inc | 25/f: floor consists of minor demo of non-structural interior partitions and doors. new construction to include doors, partitions, ceilings, lighting, plumbing, and finishes. mep & fls deferred. | $1,350,000 |
| Sep 8, 2023 | Completed | 1 Embarcadero Center | Siemens Industry, Inc. | 13/f ste 1320: 1-speaker/strobe and 2 modules are added while 10-speaker/stroes and 2 strobes are relocated, ref pa# 202306089599 | $2,161 |
| Sep 8, 2023 | Completed | 1 Embarcadero Center | Siemens Industry, Inc. | 26/f gibson dunn: additions are 11-smoke detectors, 10-duct detectors, 4-pull stations, 3-modules, 27-speakers, 34-speaker/strobes, and 5-strobes, ref pa# 202305308849. | $95,500 |
| Sep 6, 2023 | Completed | 1 Embarcadero Center | Siemens Industry, Inc. | fire only 2ork for the gibson dunn remodel on floor 27. additions replacement 11 smoke detector, 8 duct detector,3 pull stations, 3 modules, 34 speakers, 37 speaker strobes, 6 strobes, ref 202305318934 | $99,320 |
| Aug 25, 2023 | Never finaled | 1 Embarcadero Center | R L H Fire Protection Inc | 13/f: ti upgrade of existing fire sprinkler system. relocate 18 pendents, add 5 pendent, delete 4 pendent, relocate 5 upright sprinklers, delete 1 upright sprinklers | $9,000 |
| Aug 25, 2023 | Never finaled | 1 Embarcadero Center | Everon Llc | floors 25,26,27: install and program all devices to create complete access control system. | $163,500 |
| Aug 7, 2023 | Completed | 1 Embarcadero Center | M C S Construction Services | 25/f: revision to pa# 202303163759, revising hallway doors/partitions only to be non-rated. no change in occupancy or use. | |
| Aug 4, 2023 | Completed | 1 Embarcadero Center | R L H Fire Protection Inc | 27th fl - fire sprinkler permit. relocate 135, add 23 and delete 41 sprinklers. ref ti 2023-0531-8934 | $40,000 |
| Aug 4, 2023 | Completed | 1 Embarcadero Center | R L H Fire Protection Inc | 25th fl - fire sprinkler permit. relocate 36, add 11 and delete 11 sprinklers. ref ti 2023-0522-8292 | $14,000 |
| Aug 4, 2023 | Completed | 1 Embarcadero Center | R L H Fire Protection Inc | 26th fl - fire sprinkler permit. relocate 122, add 61 and delete 19 sprinklers. ref ti 2023-0530-8849 | $56,000 |
| Aug 3, 2023 | Completed | 1 Embarcadero Center | Siemens Industry, Inc. | fire only work for suite 4100 on fl 41. additions are 6 speaker/strobes. ref pa 202306089520. | $5,766 |
| Aug 3, 2023 | Completed | 1 Embarcadero Center | M C S Construction Services | 41/f: deferred electrical & mechanical: retrofit lighting fixtures & associated circuting/controls, power & signal devices & associated wiring, install (2) 4-pipe fan coil, duct work for new flr layout. ref pa# 202306089520. | $50,000 |
| Aug 1, 2023 | Completed | 1 Embarcadero Center | Gci, Inc | unit 2050: mechanical & electrical properties work for t.i. to consist of new terminal units, new ductwork, grilles & diffusers, demo of (e)grilles, difficusers as required, new lighting & controls. new power & signal. ref pa 202305047070 | $15,000 |
| Aug 1, 2023 | Completed | 1 Embarcadero Center | Gci, Inc | 35th fl - ti to include new non structural partitions, doors, hardware glazing and frmaes. new flooring finishes. mep & fire like safety under separate permit | $100,000 |
| Jul 13, 2023 | Never finaled | 1 Embarcadero Center | Siemens Industry, Inc. | 20th fl - fire only work for the sute 2050 remodel. additions are 1 smoke detector, 10 speaker/strobes and 3 strobes. ref pa 2023-0504-7070 | $12,193 |
| Jul 11, 2023 | Never finaled | 1 Embarcadero Center | Golden Gate Fire Protection Inc | 1st fl - fire sprinklers convert 4 uprights to 4 concealed pendents. ref pa 2023-0523-8344 | $1,000 |
| Jun 23, 2023 | Completed | 1 Embarcadero Center | M C S Construction Services | 11th fl. design build ti. demo noin struct partioins, doors, glazing, lighting, plumbing,finishes. replace removed fireproofing w new to maintain e fire ratings. construct new non structural partitions. e ceilig grid to remain. replace damaged parts, new act, lighting, millwork, finishes throughout. | $431,538 |
| Jun 21, 2023 | Completed | 1 Embarcadero Center | M C S Construction Services | 25/f: deferred electrical lighting & mechanical ductwork, ref pa# 2023-0316-3759. | $125,000 |
| Jun 21, 2023 | Never finaled | 1 Embarcadero Center | Pioneer Fire Inc. | add/relocate sprinlker heads to accomodate new build out gc 202305047070 | $2,317 |
| Jun 20, 2023 | Completed | 1 Embarcadero Center | Siemens Industry, Inc. | fire only work for the elevator lobby and core area on floor 25. additions are 3 smoke detectors and 6 speaker strobes. ref 202303163759 | $7,926 |
| Jun 9, 2023 | Completed | 1 Embarcadero Center | Skyline Construction | floor 25: deferred mep for pa # 202305228292. | $404,784 |
| Jun 8, 2023 | Completed | 1 Embarcadero Center | Skyline Construction | 27/f: deferred mep for 202305318934 | $1,324,800 |
| Jun 8, 2023 | Completed | 1 Embarcadero Center | Hathaway Dinwiddie Co. | ste 1320: 13th fl-tenant improvement involves (e) tenant space to include selective demo & construction of non-load bearing walls, new grid, ceiling tiles, new light fixtures, office doors, & frames, millwork & finishes. fire sprinkler & life safety alarm work under separate permit. | $400,000 |
| Jun 8, 2023 | Completed | 1 Embarcadero Center | M C S Construction Services | 41/f: design build t.i., rr/lobby remodel, demo of nonstructural partitions, doors, glazing, plumbing, vinishes, replace removed fire proofing w/new to match (e)fire ratings, new nonstruc partitions. (e) ceiling grid to remain, new act tiles, lighting, millwork, finishes | $870,830 |
| Jun 8, 2023 | Completed | 1 Embarcadero Center | Skyline Construction | 26th fl deferred mep for pa 2023-0530-8849 | $1,323,360 |
| Jun 8, 2023 | Completed | 1 Embarcadero Center | Ayoob & Peery Plumbing Co Inc | 25/f: add 1 relocate 16 fire sprinkler per t.i. 202303163759 | $10,559 |
| May 31, 2023 | Completed | 1 Embarcadero Center | Skyline Construction | 27th fl: t.i. new non-load bearing partitions, ceilings, and finishing. mep deferred. | $2,686,400 |
| May 30, 2023 | Completed | 1 Embarcadero Center | Skyline Construction | 26th fl new non load bearing partitions, ceilings, finishes. mep deferred | $2,683,480 |
| May 23, 2023 | Completed | 1 Embarcadero Center | Golden Gate Fire Protection Inc | fire sprinkler demo, relocate 4 uprights on the 1st fl | $2,480 |
| May 22, 2023 | Completed | 1 Embarcadero Center | Skyline Construction | 25/f: t.i work includes non-structural partitions, ceiling and finishes. mep deferred. | $750,000 |
| May 4, 2023 | Completed | 1 Embarcadero Center | Gci, Inc | interior commercial ti of (e) tenant space, includes non structural demo of (e) ti and build out of new including non structural partitions, doors and sidelites, suspened ceilings, casework, and finishes mep and life safety systems are design -build under separate permit | $575,693 |
| May 1, 2023 | Completed | 1 Embarcadero Center | Skyline Construction | 26/f & 27/f: new stair connection between floors | $78,000 |
| Apr 4, 2023 | Completed | 1 Embarcadero Center | Gci, Inc | suite 2820/2840: new power and signal devices throughout the space. title 24 compliant lighting, controls. relocate existing title 24 complaint led lighting in new space and mechanical work. ref ti permit 202212158465 | $100,000 |
| Mar 28, 2023 | Completed | 1 Embarcadero Center | Golden Gate Fire Protection Inc | 13/flr-ste# 1350: fire sprinklers- relocate 8 pendant sprinklers and relocate 39 uprights, ref t.i # 2023-0214-1941. | $25,850 |
| Mar 24, 2023 | Completed | 1 Embarcadero Center | Siemens Industry, Inc. | fire only work to add 2 speaker strobes for the restrooms upgrade, ref permit 202303022890 | $1,922 |
| Mar 16, 2023 | Completed | 1 Embarcadero Center | M C S Construction Services | 25/f: restroom and elevator lobby remodel with new hallway non-structural partitions and new demising non-structural partitions. no change in occupancy, use, or area | $275,000 |
| Mar 14, 2023 | Never finaled | 1 Embarcadero Center | Siemens Industry, Inc. | 13th fl, ste 1350 remodel; additions are 1 smoke detector, 1 module and 10 speaker/strobes. ref pa 2022-1215-8467 | $10,930 |
| Mar 14, 2023 | Never finaled | 1 Embarcadero Center | Siemens Industry, Inc. | 28th sf - fire only work for the ste, 2820/2840 remodel; additions are 7 speaker/strobes, 4 strobes and 1 module. ref pa 2022-1215-8465 | $9,811 |
| Mar 2, 2023 | Completed | 1 Embarcadero Center | Peacock Construction | 15/f: upgrade restrooms to full compliance & new finishes in elevator lobby & common area corridors.no change in occupancy area or use. mep,life safety & sprinklers deferred. | $185,000 |
| Feb 16, 2023 | Completed | 1 Embarcadero Center | Golden Gate Fire Protection Inc | 28/f: relocate 13 fire sprinklers pendents. ref t.i pa 202212158465 | $8,060 |
| Feb 14, 2023 | Completed | 1 Embarcadero Center | Peacock Construction | demo of extg ratial suite at ground floor including removal of extg storefront. patch back of clg. wall, floors to create new privacy accessible open space. | $140,000 |
| Feb 14, 2023 | Completed | 1 Embarcadero Center | Gci, Inc | #1350 - new power & signal, new title 24. demo (e) duct & hvac equipment, install 5 new reheat vav boxes; install 9 new pneumatic thermostats for perimiter induction units | $350,000 |
| Feb 7, 2023 | Completed | 1 Embarcadero Center | Golden Gate Fire Protection Inc | fire sprinklers (demo) relocate 181 uprights on the 25th fl. and relocate 181 uprights on the 26th fl. | $197,652 |
| Dec 22, 2022 | Completed | 1 Embarcadero Center | Hathaway Dinwiddie Co. | interior demo and abatement of existing unoccupied 25th & 26th floors including non-structural partitions, ceilings, lighting, plumbing and finishes. replace any removed fire-proofing with new to maintain existing fire ratings. no change in occupancy, use or area. ab-017. | $215,000 |
| Dec 15, 2022 | Completed | 1 Embarcadero Center | Peacock Construction | 20th floor: non-structural demo upgrade toilet rooms to full t-24 compliance. new finishes in elevator lobby and common corridor. no change in occupancy, use, or area. mep, life safty, & sprinkler defered. | $157,000 |
| Dec 15, 2022 | Completed | 1 Embarcadero Center | Gci, Inc | 13th fl- suite 1350: t.i., demo of nonstructural partitions, building of new nonstrctural partitions. mep/fire life/safety under separate permit | $451,969 |
| Dec 15, 2022 | Completed | 1 Embarcadero Center | Hp Build | 16/f: approx 200 sq. ft. area, revision to (e) suite entry, demo of (e) wall partiiton, storefront, ceiling lights, new partition work, ceiling tilework, doors. no deferred work only trade permits. | $80,000 |
| Dec 15, 2022 | Completed | 1 Embarcadero Center | Gci, Inc | suite 2820/2840: t.i., demo of nonstructural partitions, building of new nonstrctural partitions. mep/fire life/safety under separate permit | $320,501 |
| Dec 15, 2022 | Completed | 1 Embarcadero Center | Gci, Inc | non structural demo. upgrade toilet rooms to full t24 compliance. new finishes in elev lobbyand common corridor. no change in occupancy, use or area. mep, ls, sprinlkers deferred. | $157,000 |
| Nov 14, 2022 | Never finaled | 1 Embarcadero Center | Siemens Industry, Inc. | 3/f: fire only work to obtain as built permit for pitchbook remodel, initial life safety 202208291432 | |
| Nov 2, 2022 | Completed | 1 Embarcadero Center | M C S Construction Services | ste 1520: deferred electrical permit only. new copy room with associated lighting/controls and power-signal requirments. new power in break room for point of use water heater and garbage disposal. pa 202208029710. | $50,000 |
| Oct 28, 2022 | Completed | 1 Embarcadero Center | Siemens Industry, Inc. | 15th fl - fire only work to add a strobe for the copy room; ref pa 2022-0802-9710 | $550 |
| Oct 7, 2022 | Completed | 1 Embarcadero Center | R L H Fire Protection Inc | fire sprinkler t.i. relocate pendent sprinkler, added pendent sprinkler. t.i. 202208029710. | $4,000 |
| Sep 22, 2022 | Completed | 1 Embarcadero Center | Source Planning And Construction Inc | 7/f: revision to bpa#202102114449, reduce scope of work - delete mep | |
| Sep 13, 2022 | Completed | 1 Embarcadero Center | M C S Construction Services | suite 340-350: mechanical & electrical title 24 compliance. ref t.i. pa 202207289448. | $199,000 |
| Sep 6, 2022 | Completed | 1 Embarcadero Center | Pioneer Fire Inc. | 3/f: fire sprinklers: relocate and replace 9 for new wall & ceiling. relocate and replace 10 for new wall & ceiling. add 14 uprights, and replce 18 (e). ref t.i. pa202207289448. maher n/a | $16,000 |
| Aug 29, 2022 | Completed | 1 Embarcadero Center | Siemens Industry, Inc. | fire only work for pitchbrook remodel on fl 3, additions are 1 module, 7 strobes, and 11 speaker strobes ref pa# 2022-0728-9448 | $11,300 |
| Aug 10, 2022 | Completed | 1 Embarcadero Center | Golden Gate Fire Protection Inc | fire sprinklers: relocate 6 upright spinker and relcoate 10 pendent sprinkler on the 44/f for new cooling vents. upgrade riser to galvanized pipe. ti ref pa# 201903064499 | $10,000 |
| Aug 2, 2022 | Completed | 1 Embarcadero Center | M C S Construction Services | 15/f: non-struc demo and isntall new non-structural partitions, glazing, dfh, millwork, finishes. no changes in occupany, use or area, mep, sprinklers & fire safety deferred. maher n/a. | $149,610 |
| Jul 28, 2022 | Completed | 1 Embarcadero Center | M C S Construction Services | 3/f: interior ti: demo non structural partitions, new non structural partitions, design build for new or revised hvac, elec, plumbing, l/s | $376,000 |
| Jun 14, 2022 | Completed | 1 Embarcadero Center | Pioneer Fire Inc. | 27/f: convert 181 pendent sprinkler heads to upright. remove (14) upright spirnkler heads. maher n/a. | $22,500 |
| Jun 14, 2022 | Completed | 1 Embarcadero Center | M C S Construction Services | 27th fl: demo only permit. ab-017.includes demo of partitions,fixtures, (e)suspended ceiling grid & lights. convert existing fire sprinklers to upright/turn up to return to warm shell condition. ref sprinkler pa# 202206146248.(n)plumbing fixtures under separate permit. | $130,000 |
| Jun 2, 2022 | Never finaled | 1 Embarcadero Center | Siemens Industry, Inc. | 34th fl: fire only work for the "hsbc" remodel. 2 speaker/ strobes and 2 strobes are added. and 2 existing speaker/ strobes are relocated. ref pa# 202108065938. | $3,000 |
| Apr 25, 2022 | Completed | 1 Embarcadero Center | Bilcor Inc | 37th fl: fire life safety - install 1 call station. two-way ecs backbone infrastructure pa# 202008111563. arch pa# 202112134280. | $660 |
| Apr 22, 2022 | Completed | 1 Embarcadero Center | Siemens Industry, Inc. | 37th fl: fire only work for the "lincoln international" remodel. additions are 7 smoke detectors, 2 duct detectors, 3 pull stations, 5 modules, 41 speaker / strobes, & 3 strobes. ref pa# 202112134280. | $39,000 |
| Mar 22, 2022 | Completed | 1 Embarcadero Center | Golden Gate Fire Protection Inc | 37th floor: fire sprinkler ti; relocate 137 pendent sprinklers and relocate 4 uprights. ref 202112134280. | $70,000 |
| Mar 22, 2022 | Completed | 1 Embarcadero Center | R L H Fire Protection Inc | fire sprinkler permits relocate 4, add 5 and delete 4 spirnklers on the 34th floor. ref. 20210806593 | $3,000 |
| Mar 9, 2022 | Never finaled | 1 Embarcadero Center | Gci, Inc | mechanical install 2 new vav boxes, duct work for new vav redistribution elec-power lighting and signal | $180,000 |
| Dec 13, 2021 | Completed | 1 Embarcadero Center | Source Planning And Construction Inc | ste #3700: office t.i. full floor. mep include along with demo and structural work, finishes and fixtures on the 37th floor. | $3,500,000 |
| Sep 8, 2021 | Completed | 1 Embarcadero Center | M C S Construction Services | t-24 electrical to install new power and data for work stations and new lighting on controls. please see ref app #202107214814 for t.i. permit. | $10,000 |
| Sep 3, 2021 | Expired or cancelled | 1 Embarcadero Center | Acco Engineered Systems Inc. Dba Acco En | revision to pa 2019-0306-4499 replacements of (e) boilers to direct vent boilers | |
| Aug 6, 2021 | Completed | 1 Embarcadero Center | Siemens Industry, Inc. | 2nd fl: fire only work for ste 200. remodel on floor 2. 1 speaker/ strobe is added. ref pa# 202107214814. | $635 |
| Aug 6, 2021 | Completed | 1 Embarcadero Center | Gci, Inc | ti w/removal (e) walls & replaced with new. new interior finishes. removal of (e) interconnecting stair between 34th & 35th floor. close opening w/2-hr fire rated floor construction. fire alarm/sprinkler deferred permits. | $1,200,000 |
| Jul 21, 2021 | Completed | 1 Embarcadero Center | M C S Construction Services | 2nd fl. ti- to demo and construct non-structural partitons finishes, and suspended ceilings, mep, fire sprinkers and life safety deferred | $40,000 |
| Jul 19, 2021 | Completed | 1 Embarcadero Center | M C S Construction Services | mep deferred submittal. refer pa# 2021 0421 9049. | $20,000 |
| Jul 6, 2021 | Completed | 1 Embarcadero Center | Siemens Industry, Inc. | 20th fl - fire only work for the "otsuka" remodel. 1 smoke detector and 4 speakers/strobes are added, and 3 strobes are relocated. ref pa 2021-0421-9049 | $7,000 |
| Jun 16, 2021 | Completed | 1 Embarcadero Center | R L H Fire Protection Inc | fire sprinkler permit. relocate 17, add 2 and delete 1 sprinkler on the 20th floor. ti # 2021-0421-9049 | $5,000 |
| Jun 10, 2021 | Completed | 1 Embarcadero Center | C B F Inc | as-builts to 2020-0908-3672 to reflect address corrections for bike room fire alarm | $29,460 |
| May 27, 2021 | Never finaled | 1 Embarcadero Center | Bilcor Inc | fire life safety: two way comm -remove (6) existing viking temporary call boxes -install (6) new call station rath reference permit # 2020-0901-3108 | $3,960 |
| May 7, 2021 | Completed | 1 Embarcadero Center | Skyline Construction | 9th fl: revision to pa# 202010096255. selective demo of (e) suite & construct (n) single tenant fi including future sublease space. build (n) nono-structural partitions, finishes, revised ceiling, lighting, & life safety. ref pa# 202102054164. | $110,000 |
| Apr 26, 2021 | Completed | 1 Embarcadero Center | Siemens Industry, Inc. | fire only work for the "corridor" remodel on floor 9; additions are 3 speakers, as well as the relocation of 5 speaker/strobes. ref. permit app # 2020-1009-6255 | $4,175 |
| Apr 21, 2021 | Completed | 1 Embarcadero Center | M C S Construction Services | new non-structural partitions, new door and hardware, new lighting and ceilings, new wall and floor finishes, new millwork and furniture, new upgraded restrooms for ada compliance | $285,000 |
| Feb 11, 2021 | Completed | 1 Embarcadero Center | Source Planning And Construction Inc | 7th fl: non-structural demo. (n) non-structutal partitions, finishes, plumbing. no change in area, occupancy or use. mep, l/s, fire sprinklers under separate permit. | $157,000 |
| Feb 5, 2021 | Completed | 1 Embarcadero Center | Skyline Construction | 9/f-revision to pa# 202010096255. structural reinforcement of floor at high density files. revised structural solution under delta 04 revision dated 2/1/21. | |
| Dec 2, 2020 | Completed | 1 Embarcadero Center | Siemens Industry, Inc. | 9th flr - fire alarm system additions and repl of 7 smoke detectors, 5 duct detectors, 1 strobe power supply, 9 modules, 27 speakers, 43 speaker/strobes, 7 strobes and 1 dlc card for the ogletree deakins remodel on floor 9. ref 202010096255. | $65,800 |
| Nov 12, 2020 | Completed | 1 Embarcadero Center | Golden Gate Fire Protection Inc | fire sprinkler only-ref # 2020-1009-6255. relocate 230 concel head & 7 uprights & plug off 12 previous for ogletree deakins | $118,500 |
| Nov 6, 2020 | Completed | 1 Embarcadero Center | D Kelly Construction Inc. | 24/f: install 2 new vav boxes and duct work. move one existing thermostat. reroute control to one existing induction unit | $16,500 |
| Nov 6, 2020 | Completed | 1 Embarcadero Center | D Kelly Construction Inc. | 23/f: install one vav box and associated duct work at (e) tenant space | $16,500 |
| Oct 9, 2020 | Completed | 1 Embarcadero Center | Skyline Construction | 9/f: demo of (e) suite & construction of t.i for single tenant future sublease space. new ceiling, lighting & partitions etc. meps, life safety, sprinklers & structural if needed under separate permit. (bldg fully sprinklered) | $4,300,000 |
| Sep 8, 2020 | Completed | 1 Embarcadero Center | Siemens Industry, Inc. | fire only work for bike storage remodel on street level. add (3) smoke detectors, (7) duct detectors, (2) pull stations, (1) strobe power supply, (19) speaker/strobes, (4) strobes. ref pa# 201908088265 | $29,460 |
| Sep 3, 2020 | Completed | 1 Embarcadero Center | Bilcor Inc | as built - fire life safety: bldg will be staffed with minimum of 2d trained onsite security personnel & 1 stationary engineer 24/7/365. the ecs will not be required to be equipped with automatic voice dial out to an offsite central monitoring location. ref original fa permit app#202008111563 | $660 |
| Aug 28, 2020 | Completed | 1 Embarcadero Center | Gci, Inc | 35/f: electrical only, reference bpa#202003167121. floor lighting & power systems | $150,000 |
| Aug 21, 2020 | Completed | 1 Embarcadero Center | Golden Gate Fire Protection Inc | 35th floor: fire sprinkler only. relocate 4 pendents for partners capital. ref app#202003167121 | $2,000 |
| Aug 21, 2020 | Completed | 1 Embarcadero Center | Golden Gate Fire Protection Inc | street level: fire sprinkler only. relocate 46 pendents sprinklers and relocate 79 uprights. t.i. ref app#201908088265 | $62,500 |
| Aug 11, 2020 | Completed | 1 Embarcadero Center | Bilcor Inc | fire life safety: install (1) command center,(1) distribution board,(1) system supervisor, (1) power supply,(1) power supply monitor,(1) fire alarm dual monitor module. | $3,960 |
| Aug 10, 2020 | Never finaled | 1 Embarcadero Center | Siemens Industry, Inc. | 35th floor: fire alarm addition of 1 speaker/strobe for the "main post partners" conference room. ref app#202003167121 | $635 |
| Mar 16, 2020 | Completed | 1 Embarcadero Center | Gci, Inc | 35/f: demo of (e) non structural partitions. new interior improvements (partitions non-structural, dfh, lighting, finishes, new furniture systems power & data) meps deferred | $25,000 |
| Mar 9, 2020 | Never finaled | 1 Embarcadero Center | Siemens Industry, Inc. | 5/f: f/a work due to t.i. addition of 8 smoke detectors, 3 duct detectors, 8 modules, 42 speaker/srtrobes and 7 strobes. ref pa 201912190024. maher n/a. | $44,200 |
| Feb 26, 2020 | In progress | 1 Embarcadero Center | Principal Builders Inc. | evacuation maps for 16th floor t.i. (2 total). | $880 |
| Jan 13, 2020 | Completed | 1 Embarcadero Center | Martin Sign Co Inc. | fabrication and installation of 6 evacuation maps on the 34th and 35th floor @ one embarcadero center. | $894 |
| Jan 6, 2020 | Completed | 1 Embarcadero Center | Siemens Industry, Inc. | 35th fl - fire alarm work for the core restrooms rmodel on floor 35, addition s are 5 smoke detectors and 6 speaker strobes ref 201907035059s | $6,985 |
| Dec 19, 2019 | Never finaled | 1 Embarcadero Center | Hathaway Dinwiddie Co. | 5th fl- t.i. includes demo of non-structural partitions, ceiling etc. and building, new non-structural partitions, mep's, life safety and sprinklers under separate permit (building fully sprinklered). add power door actuator per plans. | $1,800,000 |
| Dec 18, 2019 | Never finaled | 1 Embarcadero Center | Novo Construction Inc | revision to 201907035059 to add structural for stair railing at 34th/35th fl | $15,000 |
| Dec 4, 2019 | Completed | 1 Embarcadero Center | Gci, Inc | 14th floor: t.i- demo + new mill work: mep under separate permit. | $25,000 |
| Dec 3, 2019 | Completed | 1 Embarcadero Center | Peacock Construction | ref pa# 201908088265; mep | $319,000 |
| Oct 25, 2019 | Completed | 1 Embarcadero Center | Golden Gate Fire Protection Inc | 35/f: ste 3500: fire sprinkler system, relocate 68 pendents, add 4, relocate 3 uprights for 35/f. maher n/a. reference t.i. pa #201907035059. | $37,000 |
| Oct 22, 2019 | Never finaled | 1 Embarcadero Center | Siemens Industry, Inc. | 34th & 35th flrs fire alarm. fire alarm work for the "hsbc" remodels 34th and 35th floors; additions are 7 smoke detectors, 1 duct detector, 2 modules, 48 speaker/strobes and 14 strobes. ref pa 2019-0703-5059 | $44,200 |
| Oct 15, 2019 | Never finaled | 1 Embarcadero Center | Novo Construction Inc | rev to pa# 201907035059; to show mechanical and electrical revisions at network room at 3438 & 3551 on the 34th & 35th floors | |
| Oct 9, 2019 | Completed | 1 Embarcadero Center | Gci, Inc | suite 3500: redistribute (e) ductwork & isntall 6 new vav box; making connections to base building (e) panels.connecting power to light fixtures, outleets & tenant equipment. ref pa#201908138669. | $350,000 |
| Oct 4, 2019 | Completed | 1 Embarcadero Center | Siemens Industry, Inc. | fire alarm work for the "main post partners" remodel on floor 35; additions are 1 smoke detector, 21 speaker/strobes, and 1 strobe. ref pa #201908138669. maher na | $13,880 |
| Sep 26, 2019 | Completed | 1 Embarcadero Center | Siemens Industry, Inc. | fire alarm as built permit for the "restrooms" remodels on floors 17,18 and 19; this permit set of drawings reflects the replacement of 6 existing duct detectors with new units at the same location | $4,755 |
| Sep 19, 2019 | Completed | 1 Embarcadero Center | Pioneer Fire Inc. | relocate fire sprinklers to accomodate new build out ref 201907035059 | $61,825 |
| Sep 11, 2019 | Never finaled | 1 Embarcadero Center | Siemens Industry, Inc. | fire alarm work for the "suite 710" remodel on the 7th fl. addition of 1 speaker /strobe. ref pa 2019-0805-7827 | $650 |
| Sep 6, 2019 | Completed | 1 Embarcadero Center | suite 1310: non-structural demo. (n) non-structural partitions, doors, finishes. no change in occup, use or area. mep, life safety & sprinklers under sep permit. maher na | $13,891 | |
| Aug 26, 2019 | Completed | 1 Embarcadero Center | Siemens Industry, Inc. | fire alarm floors 17, 18, 19 add 6 speakers. 6 storbes | $5,460 |
| Aug 13, 2019 | Completed | 1 Embarcadero Center | 2nd fl - non-structural, demo (n), non-structural partitions, electrical outlets. no change in occupancy use or area. mep, life safety, srpinklers under separate permit | $6,004 | |
| Aug 13, 2019 | Completed | 1 Embarcadero Center | Gci, Inc | #3500 - new interior improvements - demo (e) non structural partitions, new finishes, glazinf, plm, mepsf deferred | $1,000,000 |
| Aug 8, 2019 | Completed | 1 Embarcadero Center | Peacock Construction | 1st fl - retail & sales space ti including demo of non-structural partitions and bldg new non structural partitions, mep. life safety and sprinklers under separate permit/design build. (building is fully sprinklered) | $580,000 |
| Aug 5, 2019 | Never finaled | 1 Embarcadero Center | Siemens Industry, Inc. | 38th flr - as built revision to 201905211187 to obtain permit for life safety work in suite 3860. changes result in the same number of fire alarm devices, but different types ref 201903205739 | |
| Aug 5, 2019 | Completed | 1 Embarcadero Center | M C S Construction Services | 7th floor:non structural demo new non struc partitions, millwork, finishes. no change in occupancy, use, or area. mep sprinkler, lf, sep permit | $64,944 |
| Aug 5, 2019 | Completed | 1 Embarcadero Center | M C S Construction Services | 7th floor: non structural demo. relocate of toilets accessories and accessible stalls. no change in occupany, use or area. mep,sprinkler, life safety sep permit barrier removal only | $21,906 |
| Jul 9, 2019 | Never finaled | 1 Embarcadero Center | Novo Construction Inc | 35th fl - non-structural demo, (n) non-structural partitions, electrical, lighting, finishes, toilet room upgrades. mep, life safety & sprinklers under sep. permit. no change in area, occupancy, or use. maher na | $210,000 |
| Jul 3, 2019 | Completed | 1 Embarcadero Center | fl. 34 & 35; remodel of (e) office space for new office needs n/a maher includes mep | $3,700,000 | |
| Jun 27, 2019 | Completed | 1 Embarcadero Center | Bilcor Inc | 17/18/19 floors: 2 way communication: install 3 call stations, 1 dual monitor module and 1 line fault monitor. maher n/a. | $3,300 |
| Jun 21, 2019 | Never finaled | 1 Embarcadero Center | street space | ||
| Jun 20, 2019 | Never finaled | 1 Embarcadero Center | Siemens Industry, Inc. | fire alarm work for the medical remodel on fl 18, addition s are 6 smoke det, 6 modules, 2 speakes, 41. spkr/strobes, 14 strobes | $41,700 |
| Jun 20, 2019 | Completed | 1 Embarcadero Center | Siemens Industry, Inc. | 19th flr. fire alarm work for the 1 medical remodel on floor 19 additions are 6 smokoe detectores, 7 modules, 2 speakers, 51 speaker strobes, 15 strobes maher not req | $49,100 |
| Jun 20, 2019 | Completed | 1 Embarcadero Center | Siemens Industry, Inc. | 17th flr. fire alarm work for the 1 medical remodel on floor 17 additions are 6 smoke detectors, 6 modules, 2 speakers, 45 speaker strobes, 16 strobes | $45,350 |
| Jun 18, 2019 | Completed | 1 Embarcadero Center | Source Planning And Construction Inc | revision to 201903025739 to reconfigure office space | |
| Jun 10, 2019 | Completed | 1 Embarcadero Center | Siemens Industry, Inc. | 11/f: fa work to obtain permit #2 for the "suite 1120" remodel on flr 11 due to arch changes; additions are 5 speaker, and 5 speaker/strobes are being relocated from the permit#1 ref 201904309267 | $3,170 |
| Jun 3, 2019 | Expired or cancelled | 1 Embarcadero Center | R L H Fire Protection Inc | 16th flr, fire sprinklers. relocate 111, add 20 and delete 23 sprinklers. ref p.a 201904168087. | $33,000 |
| May 30, 2019 | Completed | 1 Embarcadero Center | Source Planning And Construction Inc | 13th flr, suite 1320/1360 mech/ele for 201903205738 | |
| May 30, 2019 | Completed | 1 Embarcadero Center | Source Planning And Construction Inc | 38th flr, suite 3860. mechanical, electrical for t.i pa 201903205739. | $81,000 |
| May 30, 2019 | Completed | 1 Embarcadero Center | Source Planning And Construction Inc | 3rd flr, suites 340 and 360. mechanical, electrical for t.i pa 201903205737. n/a for maher. | $80,000 |
| May 30, 2019 | Never finaled | 1 Embarcadero Center | Source Planning And Construction Inc | revision to pa's 201904309267 & 201809251272. 11th flr, suite 1120. mechanical, electrical for t.i pa 201812107852. |