Xuong Quach
- Listed as
- architect, engineer
- Firm
- Acco Engineering System
- Based in
- San Leandro
- On San Francisco permits
- Jun 2016 to Sep 2026
84 permits since 2000 (engineer on 82 permits, architect on 2 permits): 61 completed, 5 in progress, 16 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 9, 2026 | In progress issued Sep 2026 | 1160 Battery St | West Coast Build Aka Fairway Constructio | 3rd floor east: deferred mechanical and electrical. bldg bpa #202606042525Details
3rd floor east: deferred mechanical and electrical. bldg bpa #202606042525 | $1,935,750 |
| Aug 3, 2026 | In progress issued Aug 2026 | 303 02nd St | Field Construction Inc. | 5th fl: mechanical and electrical for pa#202604038836.Details
5th fl: mechanical and electrical for pa#202604038836. | $35,000 |
| Jul 21, 2026 | In progress issued Aug 2026 | 680 Folsom St | M C S Construction Services | deferred mech+ elec permit. ref 202604028744 - mech furn+ install new reheat vav box, new cooling only vav boxes , new fsd, transfer boot, heating hot water pipes, ductwork + air dist. relocate sound boot. elect: new power + signal devices throught the space, new t 24. lightings and control.Details
deferred mech+ elec permit. ref 202604028744 - mech furn+ install new reheat vav box, new cooling only vav boxes , new fsd, transfer boot, heating hot water pipes, ductwork + air dist. relocate sound boot. elect: new power + signal devices throught the space, new t 24. lightings and control. | $1,200,000 |
| Jul 13, 2026 | In progress issued Jul 2026 | 300 Mission St | Source Planning And Construction Inc | 14/f: mechanical for pa# 202605201633 provide new mains and lowside ductwork per new architectural layout. provide new transfer for serving server room. provide new water source heat pump serving board room.Details
14/f: mechanical for pa# 202605201633 provide new mains and lowside ductwork per new architectural layout. provide new transfer for serving server room. provide new water source heat pump serving board room. | $513,000 |
| Apr 25, 2025 | In progress issued Apr 2025 | 2 Embarcadero Center | Acco Engineered Systems Inc. Dba Acco En | rev to pa# 2025-0409-4014: revise title 24 acceptance testDetails
rev to pa# 2025-0409-4014: revise title 24 acceptance test | |
| Mar 27, 2025 | Completed final sign-off May 2025 | 655 Montgomery St | M C S Construction Services | deferred mech and electrical for pa # 2025-0304-1482 mechanical add new low pressure air dsitribution to office space. electrical new power & signal devices throughout space. new title 24 compliant lighting and controlsDetails
deferred mech and electrical for pa # 2025-0304-1482 mechanical add new low pressure air dsitribution to office space. electrical new power & signal devices throughout space. new title 24 compliant lighting and controls | $100,000 |
| Mar 24, 2025 | Completed final sign-off Jun 2025 | 101 California St | Hp Build | 42nd/f, ste 4200: ref to t.i. pa# 202412187066. mechanical & electricalDetails
42nd/f, ste 4200: ref to t.i. pa# 202412187066. mechanical & electrical | $25,061 |
| Dec 5, 2024 | Completed final sign-off Feb 2025 | 535 Mission St | M C S Construction Services | 21st fl - deferred electrical & mechanical permit ref 202410022156 mechanical. provide new ductwork & air dist to (e) vavs on 21st nstall 1 new whsp; elecrical new signal devices throughout space. new 2022 t24 compliant lighting & controlsDetails
21st fl - deferred electrical & mechanical permit ref 202410022156 mechanical. provide new ductwork & air dist to (e) vavs on 21st nstall 1 new whsp; elecrical new signal devices throughout space. new 2022 t24 compliant lighting & controls | $325,000 |
| Sep 11, 2024 | Completed final sign-off May 2025 | 1 Embarcadero Center | Gci, Inc | ste 1010 and 1050- 10/fl-ref 202408088249- demo vav cooling unit and reheat terminal units install (n) chw pump for new network room lighting fixtures, power and signalDetails
ste 1010 and 1050- 10/fl-ref 202408088249- demo vav cooling unit and reheat terminal units install (n) chw pump for new network room lighting fixtures, power and signal | $1,044,798 |
| Aug 23, 2024 | Completed final sign-off Feb 2025 | 1 Warriors Wy | Dpr Construction A | revision to pa 202403137744 changes inside revision to veranda layout; added dimensions for field clarifications; millwork and detail updates; and revised finish scheduleDetails
revision to pa 202403137744 changes inside revision to veranda layout; added dimensions for field clarifications; millwork and detail updates; and revised finish schedule | |
| Feb 28, 2024 | Completed final sign-off Apr 2024 | 3 Embarcadero Center | M C S Construction Services | 11th fl, ste 1120 - deferred mech & elect. pa 202401123863 & 202403067187 mech. demo & replacement of grilles, registers & diffusers for office refresh. demo & install new dual duct vav boxes. electrical lighting fixtures & associated circuiting/controls. power & signal devices & associated wiringDetails
11th fl, ste 1120 - deferred mech & elect. pa 202401123863 & 202403067187 mech. demo & replacement of grilles, registers & diffusers for office refresh. demo & install new dual duct vav boxes. electrical lighting fixtures & associated circuiting/controls. power & signal devices & associated wiring | $150,000 |
| Jan 8, 2024 | Completed final sign-off Mar 2024 | 222 02nd St | Aecore Inc. | 4th fl - ref pa 2023-1122-1285. revision to pa 2023-1130-1637 new ductwork to serve renovated office space. ref pa 2024-0108-3556Details
4th fl - ref pa 2023-1122-1285. revision to pa 2023-1130-1637 new ductwork to serve renovated office space. ref pa 2024-0108-3556 | $7,776 |
| Sep 21, 2023 | Completed final sign-off Mar 2024 | 2 Folsom St | Swinerton Builders | 10/f: mep associated with bpa#202307202583Details
10/f: mep associated with bpa#202307202583 | $257,000 |
| Sep 21, 2023 | Completed final sign-off Apr 2024 | 2 Folsom St | Swinerton Builders | 9/f: mep associated with bpa#202307202579Details
9/f: mep associated with bpa#202307202579 | $450,000 |
| Jul 10, 2023 | Completed final sign-off Nov 2023 | 829 Kearny St | Pinnacle Constructing | 1/f: mep work t.i. 202208241201.Details
1/f: mep work t.i. 202208241201. | $150,000 |
| May 10, 2023 | Completed final sign-off Aug 2023 | 535 Mission St | M C S Construction Services | 22/f suite 2250: deferred mechanical and electrical. ref permit 202303103421Details
22/f suite 2250: deferred mechanical and electrical. ref permit 202303103421 | $120,000 |
| Jan 6, 2023 | Never finaled issued Jan 2023, no final | 185 Berry St | Acco Engineered Systems Inc. Dba Acco En | revision to permit 202208110319. piping updates. demo backflow preventer and reroute piping.Details
revision to permit 202208110319. piping updates. demo backflow preventer and reroute piping. | |
| Nov 2, 2022 | Completed final sign-off Sep 2023 | 235 02nd St | Bcci Construction Company | 4th floor-mep to support approved arch for office ti. ref pa 202209273191.Details
4th floor-mep to support approved arch for office ti. ref pa 202209273191. | $198,000 |
| Oct 12, 2022 | Never finaled issued Oct 2022, no final | 185 Berry St | Acco Engineered Systems Inc. Dba Acco En | remove back flow preventer. revision to pa# 202208110319Details
remove back flow preventer. revision to pa# 202208110319 | |
| Oct 7, 2022 | Completed final sign-off May 2023 | 153 Townsend St | Acco Engineered Systems Inc. Dba Acco En | like for like replacement of 2 ac units. not visible from street.Details
like for like replacement of 2 ac units. not visible from street. | $996,000 |
| Sep 30, 2022 | Completed final sign-off Sep 2023 | 120 Kearny St | Acco Engineered Systems Inc. Dba Acco En | demo (e) dampers w/pneumatic controls & add new dampers w/ddc controls, demo (e) chw valves w/pneumatic controls & add new chw valves w/ddc controls.Details
demo (e) dampers w/pneumatic controls & add new dampers w/ddc controls, demo (e) chw valves w/pneumatic controls & add new chw valves w/ddc controls. | $630,000 |
| Sep 13, 2022 | Completed final sign-off Dec 2022 | 575 Market St | Source Planning And Construction Inc | 18/f-suite 1800: mechanical & electrical for bpa#202204192484Details
18/f-suite 1800: mechanical & electrical for bpa#202204192484 | $140,000 |
| Aug 11, 2022 | Never finaled issued Aug 2022, no final | 185 Berry St | Acco Engineered Systems Inc. Dba Acco En | boiler replacement. demo 4 (e) boilers and replace with 3 new boilers on existing penthouse.Details
boiler replacement. demo 4 (e) boilers and replace with 3 new boilers on existing penthouse. | $2,314,000 |
| Jun 21, 2022 | Never finaled issued Jun 2022, no final | 650 California St | Acco Engineered Systems Inc. Dba Acco En | 22nd fl: install new water-source heat pump in i.t. room.Details
22nd fl: install new water-source heat pump in i.t. room. | $50,000 |
| Jun 10, 2022 | Never finaled issued Jun 2022, no final | 1200 California St | Acco Engineered Systems Inc. Dba Acco En | installation of exhaust ductwork for maintenance of cogeneration unit.Details
installation of exhaust ductwork for maintenance of cogeneration unit. | $180,000 |
| May 16, 2022 | Completed final sign-off Dec 2022 | 185 Berry St | Hathaway Dinwiddie Co. | suite 1500: mechanical, electrical drawings. ref. bpa 202203149901.Details
suite 1500: mechanical, electrical drawings. ref. bpa 202203149901. | $145,000 |
| May 16, 2022 | Completed final sign-off Dec 2022 | 185 Berry St | Hathaway Dinwiddie Co. | suite 4815: mechanical, electrical drawings. ref. bpa 202202228467.Details
suite 4815: mechanical, electrical drawings. ref. bpa 202202228467. | $95,000 |
| May 11, 2022 | Completed final sign-off Sep 2023 | 135 Mississippi St | Lusardi Construction Co | mechanical, electrical & plumbing improvements. deferred from pa# 202109087915. ** maher: n/a ** no mechanical work or electrical work on roof under this permit. no site electrical or plumbing work.Details
mechanical, electrical & plumbing improvements. deferred from pa# 202109087915. ** maher: n/a ** no mechanical work or electrical work on roof under this permit. no site electrical or plumbing work. | |
| May 6, 2022 | Completed final sign-off Mar 2023 | 301 Howard St | Bcci Construction Company | 8/f-suite 800: mep submittal to support approved arch drawings. rework existing low side vav's to match new ti layout. ref permit 202108055858Details
8/f-suite 800: mep submittal to support approved arch drawings. rework existing low side vav's to match new ti layout. ref permit 202108055858 | $150,000 |
| May 6, 2022 | Completed final sign-off Aug 2022 | 650 California St | Marchetti Group | ste #2000- ref to t.i. 202202188311. install 1 new cooling only vav. rework lowside deckwork and rebalance vav's as req. install 1 new wshp to serve it room.Details
ste #2000- ref to t.i. 202202188311. install 1 new cooling only vav. rework lowside deckwork and rebalance vav's as req. install 1 new wshp to serve it room. | $34,100 |
| May 6, 2022 | Completed final sign-off Mar 2023 | 301 Howard St | Bcci Construction Company | 2/f-suite 200: mep submittal to support approved arch drawings. rework existing low side vav's to match new ti layout. ref permit 202106031596. in cludes architectural revisions - enlarge confrence & meeting rooms, remove break room walls & island.Details
2/f-suite 200: mep submittal to support approved arch drawings. rework existing low side vav's to match new ti layout. ref permit 202106031596. in cludes architectural revisions - enlarge confrence & meeting rooms, remove break room walls & island. | $150,000 |
| Nov 16, 2021 | Completed final sign-off May 2022 | 155 05th St | Field Construction Inc. | rebalance area of work. install new cooling only vav box and air distribution electrical work. permit application 2021-0914-8376 for referenceDetails
rebalance area of work. install new cooling only vav box and air distribution electrical work. permit application 2021-0914-8376 for reference | $55,000 |
| Aug 30, 2021 | Completed final sign-off Dec 2021 | 601 California St | Acco Engineered Systems Inc. Dba Acco En | 13th fl, ste 1300 - ti build out of suite with new terminal units, air distribution and transfer fansDetails
13th fl, ste 1300 - ti build out of suite with new terminal units, air distribution and transfer fans | $91,965 |
| Jul 15, 2021 | Completed final sign-off Feb 2022 | 795 Folsom St | Gci, Inc | 3rd fl: mechanical - demo grilles & ductwork in open office. install new ductwork & grilles. rebalance vavs & grilles. ref pa# 202106172675Details
3rd fl: mechanical - demo grilles & ductwork in open office. install new ductwork & grilles. rebalance vavs & grilles. ref pa# 202106172675 | |
| Jun 10, 2021 | Completed final sign-off May 2022 | 2 Folsom St | Swinerton Builders | 10/fl: select demo (e) partitions, kitchenette, ceilings, light fixs, & flr finish. const of new partitions, kitchenette, ceilings, flr fin & light fixs. restroom updates. conver of copy rm to mothers rm. lumi egress markings at egress stairs & exit passageways. fire alarm/sprink under sep permits.Details
10/fl: select demo (e) partitions, kitchenette, ceilings, light fixs, & flr finish. const of new partitions, kitchenette, ceilings, flr fin & light fixs. restroom updates. conver of copy rm to mothers rm. lumi egress markings at egress stairs & exit passageways. fire alarm/sprink under sep permits. | $300,000 |
| May 3, 2021 | Completed final sign-off Oct 2021 | 185 Berry St | Peacock Construction | ste 120: replace ductwork & grille. remove/relocate existing transfer fans. provide new lighting & branch circuiting to existing panel. provide additional new power branch circuiting.Details
ste 120: replace ductwork & grille. remove/relocate existing transfer fans. provide new lighting & branch circuiting to existing panel. provide additional new power branch circuiting. | $90,000 |
| Apr 27, 2021 | Completed final sign-off Nov 2021 | 2101 Mission St | Dome Construction Corp | ste #304, 3rd fl: interior tenant improvement. new non-load bearing partition, ceiling, lighting, & finishes.Details
ste #304, 3rd fl: interior tenant improvement. new non-load bearing partition, ceiling, lighting, & finishes. | $636,000 |
| Apr 26, 2021 | Expired or cancelled cancelled Jan 2026 | 2 Folsom St | Swinerton Builders | 6th fl: construction of new partitions, ceilings, floor finishes + light fixtures. conversion of (e) men's restroom to all gender restroom. update of all other restrooms. conversion of copy room to mother's room. luminous egress path. marrings at egress stairs + exit passage way.Details
6th fl: construction of new partitions, ceilings, floor finishes + light fixtures. conversion of (e) men's restroom to all gender restroom. update of all other restrooms. conversion of copy room to mother's room. luminous egress path. marrings at egress stairs + exit passage way. | $850,000 |
| Apr 22, 2021 | Expired or cancelled cancelled Jan 2026 | 2 Folsom St | Swinerton Builders | level 5: selective demolition of (e) partitions, ceilings, light fixtures, and flr finish. construction of new partitions, ceilings, flr finishes and ligth fixtures. convert (e) men's restrm to all gender restrm. update of all other restrooms. convert copy rm to mother's room.Details
level 5: selective demolition of (e) partitions, ceilings, light fixtures, and flr finish. construction of new partitions, ceilings, flr finishes and ligth fixtures. convert (e) men's restrm to all gender restrm. update of all other restrooms. convert copy rm to mother's room. | $900,000 |
| Apr 22, 2021 | Completed final sign-off May 2022 | 2 Folsom St | Swinerton Builders | level 4: selective demolition of (e) partitions, ceilings, light fixtures, and flr finish. construction of new partitions, ceilings, flr finishes and ligth fixtures. update of all restrooms per plan.Details
level 4: selective demolition of (e) partitions, ceilings, light fixtures, and flr finish. construction of new partitions, ceilings, flr finishes and ligth fixtures. update of all restrooms per plan. | $900,000 |
| Apr 5, 2021 | Completed final sign-off May 2022 | 2 Folsom St | Swinerton Builders | level 2 selective demo of (e) partitions, light fixtures & floor finish. construction of (n) partitions, ceilings, fl finishes, pantry upgrade, restroom upgrade, new mother's room & structural suppoert for high density storage. luminous egress markings at egress stairs & exit passageways.Details
level 2 selective demo of (e) partitions, light fixtures & floor finish. construction of (n) partitions, ceilings, fl finishes, pantry upgrade, restroom upgrade, new mother's room & structural suppoert for high density storage. luminous egress markings at egress stairs & exit passageways. | $1,204,000 |
| Apr 2, 2021 | Completed final sign-off May 2022 | 2 Folsom St | Swinerton Builders | level 3: selective demolition of (e) partitions, light fixtures, and flr finish. construction of new partitions, flr finishes and ligth fixtures. crestroom upgrades, pantry upgrades, new structural supports for shelving,luminuous egress markings at egress stairs and exit passageways. mech and elecDetails
level 3: selective demolition of (e) partitions, light fixtures, and flr finish. construction of new partitions, flr finishes and ligth fixtures. crestroom upgrades, pantry upgrades, new structural supports for shelving,luminuous egress markings at egress stairs and exit passageways. mech and elec | $900,000 |
| Mar 22, 2021 | Never finaled issued May 2021, no final | 1 Post St | Peacock Construction | 23rd fl: mech - demo (e) diffusers & ductwork. install new slot diffusers, remote dampers, ductwork. electrical - gfci receptacles, lighting & controls. ref pa# 202012070395.Details
23rd fl: mech - demo (e) diffusers & ductwork. install new slot diffusers, remote dampers, ductwork. electrical - gfci receptacles, lighting & controls. ref pa# 202012070395. | |
| Mar 19, 2021 | Never finaled issued Aug 2021, no final | 185 Berry St | Peacock Construction | mech - install new wshp, install new duct work, grilles and louver connecting to new and existing wshps, elec - new lighting and branch circuiting to existing panel ref pa# 2020-1113-8822Details
mech - install new wshp, install new duct work, grilles and louver connecting to new and existing wshps, elec - new lighting and branch circuiting to existing panel ref pa# 2020-1113-8822 | |
| Mar 15, 2021 | Completed final sign-off Apr 2023 | 121 Steuart St | Acco Engineered Systems Inc. Dba Acco En | installation of 2 bard units in neigboring building elevator machine rooms with associated condensate piping. 1-ton bard unit.Details
installation of 2 bard units in neigboring building elevator machine rooms with associated condensate piping. 1-ton bard unit. | $32,000 |
| Mar 2, 2021 | Never finaled issued May 2021, no final | 301 Battery St | Acco Engineered Systems Inc. Dba Acco En | 7th fl: replace water source heat pump in electrical room.Details
7th fl: replace water source heat pump in electrical room. | $17,000 |
| Feb 12, 2021 | Completed final sign-off Jan 2023 | 444 De Haro St | Gci, Inc | ste 200: mechanical. install new vrf system with fan coils & restroom exhaust. new mechanical in reception, mailroom & lounge. ref pa# 202010227121. structural deferred.Details
ste 200: mechanical. install new vrf system with fan coils & restroom exhaust. new mechanical in reception, mailroom & lounge. ref pa# 202010227121. structural deferred. | |
| Jan 21, 2021 | Never finaled issued Feb 2021, no final | 185 Berry St | Peacock Construction | ste 170: title 24. electrical & mechanical work under pa# 202010076109.Details
ste 170: title 24. electrical & mechanical work under pa# 202010076109. | $115,000 |
| Dec 11, 2020 | Completed final sign-off Apr 2021 | 300 Mission St | Bcci Construction Company | 21-23 floors: mechanical only revision to pa#202001131758, 201912270760, 201912270762, to include smoke control report, fsd schedule and smoke control sequence of operations.Details
21-23 floors: mechanical only revision to pa#202001131758, 201912270760, 201912270762, to include smoke control report, fsd schedule and smoke control sequence of operations. | |
| Aug 20, 2020 | Completed final sign-off Jan 2021 | 4 Embarcadero Center | Source Planning And Construction Inc | 37th fl suite 3700 mechanical and electrical for 201912240445Details
37th fl suite 3700 mechanical and electrical for 201912240445 | $320,000 |
| Aug 20, 2020 | Never finaled issued Nov 2020, no final | 4 Embarcadero Center | Source Planning And Construction Inc | (25th fl, ste 2570) mech & electricl for pa# 202001151921Details
(25th fl, ste 2570) mech & electricl for pa# 202001151921 | $245,000 |
| Mar 5, 2020 | Completed final sign-off Dec 2020 | 415 Jackson St | Bcci Construction Company | 1st fl mep deferred submittal to tupport approved arch permit. new split systems and air distribution. ref 202002073854Details
1st fl mep deferred submittal to tupport approved arch permit. new split systems and air distribution. ref 202002073854 | $50,000 |
| Jan 16, 2020 | Never finaled issued Jan 2020, no final | 575 Market St | M C S Construction Services | ste 2500 - ref pa 2019-1122-7968 (n) non structural partitions. lighting and mech. no change in occupancy use or areaDetails
ste 2500 - ref pa 2019-1122-7968 (n) non structural partitions. lighting and mech. no change in occupancy use or area | $387,537 |
| Jan 16, 2020 | Never finaled issued Jan 2020, no final | 575 Market St | M C S Construction Services | ste 2550 - ref pa 2019-1122-7966 demo new lighting controls and overhead mechanical. no change in occupancy use or areaDetails
ste 2550 - ref pa 2019-1122-7966 demo new lighting controls and overhead mechanical. no change in occupancy use or area | $258,141 |
| Dec 27, 2019 | Completed final sign-off Apr 2021 | 300 Mission St | Bcci Construction Company | 23nd fl - mep submittal to support approved arch set. new vav boxes ductwork, wshps, booster pump, and transfer fan. ref pa #201911147260. maher naDetails
23nd fl - mep submittal to support approved arch set. new vav boxes ductwork, wshps, booster pump, and transfer fan. ref pa #201911147260. maher na | $200,000 |
| Dec 27, 2019 | Completed final sign-off Apr 2021 | 300 Mission St | Bcci Construction Company | 22nd fl - mep submittal to support approved arch set. new vav boxes ductwork, wshps, booster pump, and transfer fan. ref pa #201911217838. maher naDetails
22nd fl - mep submittal to support approved arch set. new vav boxes ductwork, wshps, booster pump, and transfer fan. ref pa #201911217838. maher na | $200,000 |
| Oct 25, 2019 | Never finaled issued Oct 2019, no final | 64 Townsend St | Truebeck Construction | installation of duct work and exhaust fan on roof. in-wall rough-inDetails
installation of duct work and exhaust fan on roof. in-wall rough-in | $32,000 |
| Oct 21, 2019 | Completed final sign-off Dec 2019 | 555 California St | Bcci Construction Company | 52nd fl - deferred mechanical submittal for approved architectural set. install new dual duct and balance. ref pa 2019-0719-6353Details
52nd fl - deferred mechanical submittal for approved architectural set. install new dual duct and balance. ref pa 2019-0719-6353 | $7,500 |
| Jul 29, 2019 | Never finaled issued Jul 2019, no final | 855 Battery St | Acco Engineered Systems Inc. Dba Acco En | demo (e) fan coil and condensing units, install new fan coil and condensing unit, reconnect condensateDetails
demo (e) fan coil and condensing units, install new fan coil and condensing unit, reconnect condensate | $132,000 |
| Jul 29, 2019 | Completed final sign-off Nov 2019 | 101 Montgomery St | Acco Engineered Systems Inc. Dba Acco En | 11th flr. addition of 2 ton ac unit to serve idf room w/ condensate by acco and electrical hook-ups. remove (e) grilles. rebalancing air distribution throughout entire.Details
11th flr. addition of 2 ton ac unit to serve idf room w/ condensate by acco and electrical hook-ups. remove (e) grilles. rebalancing air distribution throughout entire. | $55,000 |
| Jul 26, 2019 | Completed final sign-off Mar 2021 | 300 16th St | Dome Construction Corp | suite 10: 1st time ti of (e) ground fl tenant space for new restaurant. (dumpling time) scope of work to include: new bar, new kitchen, and new equipment, new finishes, new lighting, and new accessible restrooms. maher naDetails
suite 10: 1st time ti of (e) ground fl tenant space for new restaurant. (dumpling time) scope of work to include: new bar, new kitchen, and new equipment, new finishes, new lighting, and new accessible restrooms. maher na | $90,000 |
| Jun 17, 2019 | Completed final sign-off Oct 2019 | 49 Stevenson St | Rudolph Commercial Interiors Inc, Rci | 7th flr. mechanical work for pa 201904117705. demo lowside duct work, piping and equipment. install (n) vav boxes and ductwork. add one fsd and dsd to rated penetration in the lobby.Details
7th flr. mechanical work for pa 201904117705. demo lowside duct work, piping and equipment. install (n) vav boxes and ductwork. add one fsd and dsd to rated penetration in the lobby. | $193,000 |
| May 3, 2019 | Completed final sign-off Nov 2019 | 201 California St | Peacock Construction | title 24 mechanical for 1st flr, ref pa 201903215866.Details
title 24 mechanical for 1st flr, ref pa 201903215866. | $2,000 |
| Apr 22, 2019 | Completed final sign-off Oct 2019 | 101 California St | Principal Builders Inc. | mep title 24 to install new lighting and mech systems 46th fl. ref 201904036983 maher not req.Details
mep title 24 to install new lighting and mech systems 46th fl. ref 201904036983 maher not req. | $108,900 |
| Apr 10, 2019 | Completed final sign-off May 2019 | 135 Main St | Acco Engineered Systems Inc. Dba Acco En | 18th fl: rework duct/rebalance grilles to new tenant layout. ref ti #201810163277.Details
18th fl: rework duct/rebalance grilles to new tenant layout. ref ti #201810163277. | $30,000 |
| Feb 1, 2019 | Completed final sign-off Jun 2020 | 1355 Market St | Acco Engineered Systems Inc. Dba Acco En | 9th fl: install new air distribution for tenant build out. relocate dishwasher hood exhaust locations. install new condenser water lines to serve new walk in cooler. ref pa #201811135075.Details
9th fl: install new air distribution for tenant build out. relocate dishwasher hood exhaust locations. install new condenser water lines to serve new walk in cooler. ref pa #201811135075. | $127,700 |
| Feb 1, 2019 | Completed final sign-off Jun 2020 | 1355 Market St | Acco Engineered Systems Inc. Dba Acco En | 10th fl: demo ductwork, relocate thermostats and co2 sensors. install new vav box, co2 sensor an dgrilles for new altered zones. air balance altered zones. ref pa #201811286834.//refrigerant piping for new freezer included in these plansDetails
10th fl: demo ductwork, relocate thermostats and co2 sensors. install new vav box, co2 sensor an dgrilles for new altered zones. air balance altered zones. ref pa #201811286834.//refrigerant piping for new freezer included in these plans | $59,164 |
| Nov 14, 2018 | Completed final sign-off Oct 2019 | 762 Fulton St | Acco Engineered Systems Inc. Dba Acco En | replace (e) duct heater w/ (n) heaters on roof. 5 new dsd'sDetails
replace (e) duct heater w/ (n) heaters on roof. 5 new dsd's | $10,000 |
| Oct 16, 2018 | Never finaled issued Oct 2018, no final | 1390 Market St | Bcci Construction Company | 12th floor - mep to support approved architectural. ref #201808157426.Details
12th floor - mep to support approved architectural. ref #201808157426. | $76,000 |
| Sep 27, 2018 | Completed final sign-off Dec 2018 | 101 California St | Rossi Builders Inc. | ste 800: mechanical hvac - extend existing lowside duct to match new added private office. ref #201808288508. maher naDetails
ste 800: mechanical hvac - extend existing lowside duct to match new added private office. ref #201808288508. maher na | $15,000 |
| Sep 24, 2018 | Completed final sign-off Apr 2019 | 701 03rd St | Charles Pankow Builders Ltd | revision to pa 2016-0512-7267, update hvac equipment schedule and riser diagram. add updated smoke control matrix and smoke control panel. correct cad error showing mechanical piping and ductwork outside of shaft. update electrical drawing to reflect changesDetails
revision to pa 2016-0512-7267, update hvac equipment schedule and riser diagram. add updated smoke control matrix and smoke control panel. correct cad error showing mechanical piping and ductwork outside of shaft. update electrical drawing to reflect changes | |
| Jul 23, 2018 | Completed final sign-off May 2019 | 1455 Market St | Novo Construction Inc | 6th fl: mep for tenant improvement. demo existing ductwork & vav box, new vav box duct work & diffusers. new electrical work. ref pa #201807104082. maher naDetails
6th fl: mep for tenant improvement. demo existing ductwork & vav box, new vav box duct work & diffusers. new electrical work. ref pa #201807104082. maher na | $15,000 |
| May 4, 2018 | Never finaled issued May 2018, no final | 208 Utah St | M C S Construction Services | mep upgrades. non-structural work, electrical, mechanical, plumbing. ref ti# 201802272377. maher naDetails
mep upgrades. non-structural work, electrical, mechanical, plumbing. ref ti# 201802272377. maher na | $500,000 |
| Apr 26, 2018 | Completed final sign-off Sep 2018 | 101 Mission St | Field Construction Inc. | suite #2050: mechanical and electrical work for ti. rework ductwork and rebalance. install new exhaust fans. ref pa #201803133502. maher naDetails
suite #2050: mechanical and electrical work for ti. rework ductwork and rebalance. install new exhaust fans. ref pa #201803133502. maher na | $90,000 |
| Feb 20, 2018 | Completed final sign-off Jun 2018 | 101 02nd St | Source Planning And Construction Inc | 12th fl suites 1200/1275 mech and electrical permit 201712186753Details
12th fl suites 1200/1275 mech and electrical permit 201712186753 | $300,000 |
| Jan 26, 2018 | Completed final sign-off Jun 2018 | 400 Montgomery St | Field Construction Inc. | 6th and 8th fl mechanical and electrical for 201710121088 and revision to womens restroom layout, location of drinking fountain maher not reqDetails
6th and 8th fl mechanical and electrical for 201710121088 and revision to womens restroom layout, location of drinking fountain maher not req | $500,000 |
| Jan 23, 2018 | Completed final sign-off Nov 2018 | 405 Howard St | Bcci Construction Company | 4th flr #400 - mechanical & electrical work to support approved arch ti ref 201712126222 maher naDetails
4th flr #400 - mechanical & electrical work to support approved arch ti ref 201712126222 maher na | $78,000 |
| Dec 1, 2017 | Completed final sign-off Aug 2018 | 37 Grove St | The Furnace Man | selective demo of (e) duct work, (n) duct work w/difussers, rebalance (e) rooftop package units, (n) exhaust fans for bathoroms,renovation of mechanical systems. ref. pa #201710232010.Details
selective demo of (e) duct work, (n) duct work w/difussers, rebalance (e) rooftop package units, (n) exhaust fans for bathoroms,renovation of mechanical systems. ref. pa #201710232010. | $85,000 |
| Sep 28, 2017 | Completed final sign-off Aug 2018 | 71 Stevenson St | Source Planning And Construction Inc | 10th fl - ref pa 2017-0828-6027- mechanical and electrical permitDetails
10th fl - ref pa 2017-0828-6027- mechanical and electrical permit | |
| Jul 28, 2017 | Completed final sign-off May 2019 | 300 Clay St | Gci, Inc | mechanical-replace existing supply return and exhaust grilles within scope area. change style and relocate grilles in lobby to match. ref #2017-07-12-1615, maher n/aDetails
mechanical-replace existing supply return and exhaust grilles within scope area. change style and relocate grilles in lobby to match. ref #2017-07-12-1615, maher n/a | |
| Mar 6, 2017 | Completed final sign-off Dec 2017 | 123 Townsend St | Novo Construction Inc | mechanical & electrical work for tenant improvement on the 3rd floor. ref pa 2016-1230-6268Details
mechanical & electrical work for tenant improvement on the 3rd floor. ref pa 2016-1230-6268 | $75,000 |
| Jan 17, 2017 | Completed final sign-off Mar 2017 | 44 Montgomery St | Source Planning And Construction Inc | 36th floor - mechanical & electrical for pa #201610281441. n/a maher ordinanceDetails
36th floor - mechanical & electrical for pa #201610281441. n/a maher ordinance | $17,000 |
| Jan 5, 2017 | Completed final sign-off Jun 2017 | 2500 16th St | Plant Construction Co, Lp | package unit & hot water plant for reheat vav system. two floors served with vav boxes. scope includes boxes & distribution duct. exhaust fans for toilets. ref pa #201408184035 & ref rev bldg permit # 201612205422. n/a maher ordinance. n/a maherDetails
package unit & hot water plant for reheat vav system. two floors served with vav boxes. scope includes boxes & distribution duct. exhaust fans for toilets. ref pa #201408184035 & ref rev bldg permit # 201612205422. n/a maher ordinance. n/a maher | $90,000 |
| Jun 9, 2016 | Completed final sign-off Sep 2016 | 120 Kearny St | Principal Builders Inc. | 26th floor - t-24 mechanical for existing tenant space. no new architectural work. n/a maher ordinanceDetails
26th floor - t-24 mechanical for existing tenant space. no new architectural work. n/a maher ordinance | $136,000 |