Nathan Tremblay
- License
- S6481
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S6481 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Oct 2020 to Oct 2022
3 permits since 2000 (engineer on 3 permits): 3 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Acco Engineered Systems Inc. Dba Acco En, Msr Mechanical Llc, Pacific Coast Trane Service Co.
- Engineers
- Amit Wadhwa, Robin Paul Roderick, Shahla Saiidnia, Xuong Quach
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 7, 2022 | Completed final sign-off May 2023 | 153 Townsend St | Acco Engineered Systems Inc. Dba Acco En | like for like replacement of 2 ac units. not visible from street.Details
like for like replacement of 2 ac units. not visible from street. | $996,000 |
| Feb 28, 2022 | Completed final sign-off May 2023 | 100 01st St | Msr Mechanical Llc | basement level: in-kind chiller replacementDetails
basement level: in-kind chiller replacement | $168,000 |
| Oct 17, 2020 | Completed final sign-off Nov 2021 | 425 Market St | Pacific Coast Trane Service Co. | 37th flr. upgrade of refrigerant purge system, (n) electrical feeders to support chiller retrofit, enlarge housekeeping pads to meet edge distance requirements of (n) anchorage etc, 2 (e) chillers, modify (e) spring vibration isolation system and anchors on chillersDetails
37th flr. upgrade of refrigerant purge system, (n) electrical feeders to support chiller retrofit, enlarge housekeeping pads to meet edge distance requirements of (n) anchorage etc, 2 (e) chillers, modify (e) spring vibration isolation system and anchors on chillers | $600,000 |