Permit GraphSan Francisco building permits since 2000

Block 3721, lot 001

100 01st St

The 200 most recent permits filed for this property.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Apr 24, 2026In progress
issued Apr 2026
100 01st StNovo Construction Inc6,7,9,14 & 15th fl - installation of 14 new prior booths (3) on floor 5; (4) on floor 6, (2) on floor 7 (1) on the floor 8, (2) on floor 14 and (2) on floor 15$50,000
Dec 18, 2025Completed
final sign-off Mar 2026
100 01st StNovo Construction Inc15th floor: 1000 sf interior t.i. at office suite to include demolition of non-structural partitions replacement of finishes and fixtures in kind.$145,000
Dec 18, 2025Completed
final sign-off Mar 2026
100 01st StNovo Construction Inc14th floor: 1063 sf interior t.i. consisting of demolition of non-structural partitions finishes upgrades and addition of lighting. mechanical work included.$199,000
Nov 24, 2025Completed
final sign-off Dec 2025
100 01st StCodesign Llcinstall (4) anchored phone booths - ref pa# 202509115108 - 25th floor$3,500
Oct 16, 2025Completed
final sign-off Oct 2025
100 01st StBilcor Inc25th fl - relocate (2) ceiling mount speaker strobes. arch ref#: 202509115108.$1,332
Oct 1, 2025In progress
issued Oct 2025
100 01st StFire Stop Sprinkler Company25/fl- relocate 3 pendent heads$7,672
Sep 11, 2025Completed
final sign-off Oct 2025
100 01st StCodesign Llc25/fl-interior renovation to (e) office suite to include (n) office, expand pantry area and update finishes. no change to occupancy, use, or egress. no structural or remodel of exterior$391,853
Jul 21, 2025Completed
final sign-off Jun 2026
100 01st StEmcor Services/Mesa Energy Systems Incproject consists of the replacement of 1 chiller, chilled waterpump and condenser water pump in the basement. mechanical and electrical capacity will match the existing equipment. weight of the new equipmet are equal or less in weight than the existing equipment.$856,000
Aug 13, 2024Completed
final sign-off Aug 2024
100 01st StBilcor Incinstall 1 duct detector, install 1 control relay ref pa 202403208233$1,332
Mar 20, 2024Completed
final sign-off Sep 2024
100 01st StRichlen Constructionrestaurant tenant improvement. take out restaurant includes new prep & dishwashing, new electrical and plumbing, mechanical systems, finishes & equipment. no exterior changes$75,000
Jan 30, 2024In progress
filed Jan 2024, not yet issued
100 01st StNovo Construction Inc14/f: installation of (2) phone booths and (2) double phone booths. 13/f: installation of (1) phone booth and (1) nook.$50,000
Nov 2, 2023Completed
final sign-off Dec 2023
100 01st StTrue North Signs & Graphic Servicesinstall (5) evacuation plans for the 13th fl. all work is indoors.$2,000
Aug 22, 2023Completed
final sign-off Sep 2023
100 01st StSabah International Incorporated14/f: f/a t.i., ref bpa#202306139924$18,999
Aug 11, 2023Completed
final sign-off Dec 2024
100 01st StPioneer Fire Inc.14/f: relocate (11) sprinkler heads. ref ti permit 202306139924$1,527
Jul 21, 2023Completed
final sign-off Oct 2023
100 01st StPioneer Fire Inc.13/f: relocate (52) pendent heads, add (2) pendent heads, (5) upgrights, convert (78) heads to upright. ref bpa#202305308779$19,200
Jun 13, 2023Completed
final sign-off Nov 2023
100 01st StNovo Construction Inc14/f: t.i., open office area, meeting rooms, storage area. sprinkler & f/a deferred$400,000
May 30, 2023Completed
final sign-off Dec 2023
100 01st StNovo Construction Inc13/f: interior t.i., open office area, meeting rooms, break area and training room. mep included. fire alarm/sprinklers deferred.$2,500,000
Oct 18, 2022Completed
final sign-off Feb 2023
100 01st StPioneer Fire Inc.26th fl: relocate (46) pendents, (7) uprights, add (4) pendents, (16) uprights, convert (11) uprights, (13) pendents, remove (6) pendents, (1) upright gfci# 202208251245. install (n) pre-action for it rm#2643.$55,545
Aug 25, 2022Completed
final sign-off Apr 2023
100 01st StField Construction Inc.26/f: interior demo of partitions, doors, finishes, ceilings, lighting, mechanical/electrical. new constr of partitions, lighting, ceilings, mechanical/electrical, plumbing & finishes. life safety/sprinkler permits deferred.$2,217,200
Aug 19, 2022Never finaled
issued Aug 2022, no final
100 01st StPioneer Fire Inc.13/f: relocate 47 (e) pendent sprinlker using 1in outlet due to new wall & ceiling configuration. reloc 81 to uprights. total 128 heads. ref t.i. pa 202205124064.$9,400
May 12, 2022Never finaled
issued Jun 2022, no final
100 01st StNovo Construction Incdemo of (e) partitions, ceilings, mech and elec. construction of new partitons, ceilings, mechanical and elec life saety fire sprinkler under sep permit$2,100,000
Feb 28, 2022Completed
final sign-off May 2023
100 01st StMsr Mechanical Llcbasement level: in-kind chiller replacement$168,000
Sep 29, 2020Completed
final sign-off Dec 2020
100 01st StTrue North Signs & Graphic Servicesevacuation plaques interior to the building(not visible from exterior)$1,400
Sep 28, 2020Completed
final sign-off Oct 2020
100 01st StAyoob & Peery Plumbing Co Inc16th flr add 7 and change out 146 sprinklers to conform with the new wall/ceiling layout of the ti. job #20-603$36,525
Aug 5, 2020Completed
final sign-off Oct 2020
100 01st StArrow Sign Companyinstall new bracket at sign connection as extg bracket interferes with window washing equipment. ref app#201804206963$4,800
Mar 10, 2020Completed
final sign-off Aug 2020
100 01st StTrue North Signs & Graphic Services24th fl: (4) evacuation signs - all work indoors.$1,400
Feb 10, 2020Completed
final sign-off Aug 2020
100 01st StAyoob & Peery Plumbing Co Inc17th fl add 87, relocate 36, plug 6 sprinklers to conform with the new wall ceiling layout of ti ref 201912230293$53,775
Feb 10, 2020Completed
final sign-off Oct 2020
100 01st StAyoob & Peery Plumbing Co Inc12th floor: add relocate, plug, change out sprinklers per tenant improvement. 1 add, 35 change outs, 3 relocates, 10 plugs, ref 202002053557$9,079
Feb 10, 2020Never finaled
issued Feb 2020, no final
100 01st StAyoob & Peery Plumbing Co Inc16th fl relocate add remove sprinklers per ti. 86 relocates, 74 adds, 29 removes$58,200
Feb 6, 2020Completed
final sign-off Apr 2020
100 01st StPioneer Fire Inc.fire sprinkler for 24th fl: relocate 13 pendents, 2 uprights, add 1 pendent. ti 201912169599$8,000
Feb 5, 2020Completed
final sign-off Oct 2020
100 01st StNovo Construction Increv to pa# 201912230290; revision to demo
Feb 5, 2020Completed
final sign-off Oct 2020
100 01st StNovo Construction Incpartial floor interior demo 12th fl ab-017$22,000
Dec 23, 2019Never finaled
issued Jan 2020, no final
100 01st StNovo Construction Incfull fl ti on 16th fl to include partitions, ceiling, lighting and finishes. new mothers room, new cafeteria w/no prep. mep included.$1,755,675
Dec 23, 2019Completed
final sign-off Sep 2020
100 01st StNovo Construction Incfull floor tenant improvement on the 17th fl to oinclude new partitions, ceiling, lighting, finishes. new caferteria w no prep mep inc$1,755,675
Dec 23, 2019Never finaled
issued Feb 2020, no final
100 01st StNovo Construction Incpartial floor ti on the 12th fl - to include new partitions, ceiling, lighting, finishes. mep included.$1,755,675
Dec 16, 2019Completed
final sign-off Aug 2020
100 01st StNovo Construction Inct.i. improvement to include finishes, ligthing furniture power/data$150,000
Nov 26, 2019Never finaled
issued Dec 2019, no final
100 01st StMc Millan Security Systems Incproposed installation of delayed egress hardware on new card reader door$5,500
Oct 15, 2019Never finaled
issued Oct 2019, no final
100 01st StNovo Construction Increvision to pa# 201810163342: to show new location of air transfer duct
Aug 5, 2019Completed
final sign-off Mar 2020
100 01st StSabah International Incorporated6th & 8th flr - as built for 201811216526 show (e) in duct smk det at (e) fsd not shown on original package
Jul 18, 2019Completed
final sign-off Aug 2019
100 01st StNovo Construction Increvision to pa #201810163342 to add fsd. 6th floor
Apr 19, 2019Completed
final sign-off Jun 2019
100 01st StSabah International Incorporatedfire alarm as built for 201812178468. add 2 smoke detectors for mag hold opens outside elevator lobby.
Apr 19, 2019Completed
final sign-off Jun 2019
100 01st StSabah International Incorporatedfire alarm as builts for 201812178467 add 2 smoke detectors for hold-opens at elevator lobby doors.
Apr 10, 2019Completed
final sign-off Jun 2019
100 01st StSabah International Incorporatedas built submittal to 201812249061. add 2 smoke detectors at elevator lobby doors and 1 duct detector for new fsd along wi 1 dual monitor module to monitor open and closed status
Mar 21, 2019Completed
final sign-off Mar 2020
100 01st StSabah International Incorporatedprovide a new 2 way emergency comm system 4th fl - 2018-0807-6647, 5th - 2018-0711-4230, 6th fl - 2018-0827-8372, 7th fl - 2018-0807-6656, 8th fl - 2018-0827-8375, 9th fl - 2018-0907-9414, 10th 2018-0711-4231, 11th fl - 2018-0914-0234, 14th - 2018-0312-3385, 15th fl - 2018-0807-6649$27,000
Dec 24, 2018Completed
final sign-off Jun 2019
100 01st StSabah International Incorporatedref pa# 201808076649; modify (e) fire alarm system, add 1 booster power supply, 4 smoike detectors, 18 duct smoke detectores, 17 high power control relays, 4 single input modules, 2 synchronization modules, 56 ceiling speaker/strobes, 5 speaker, 4 fire smoke dampers$23,693
Dec 17, 2018Completed
final sign-off Jun 2019
100 01st StSabah International Incorporated4th fl - add 1 booster power supply, 13 photo smoke duct detectors, 14 control relays, 2 sync output modules, 62 speakers/strobes, 3 speakers(repl existing). ref pa 2018-0807-6647$23,693
Dec 17, 2018Completed
final sign-off Aug 2019
100 01st StSabah International Incorporated7th fl - add 1 booster power supply, 13 photo smoke duct detectors, 1 pull station, 14 control relays, 2 sync output modules, 58 speakers/strobes, 4 speakers (repl existing). ref pa 2018-0807-6656$23,693
Dec 5, 2018Completed
final sign-off Aug 2019
100 01st StNovo Construction Inc4th fl - revision to pa 2018-0807-6647 to change storage to utility closet 426. ref pa 2018-0807-6647
Nov 26, 2018Completed
final sign-off May 2019
100 01st StNovo Construction Inc1st flr. led display wall installation incl structural supports at ground floor building lobby. no exterior work.$24,000
Nov 21, 2018Completed
final sign-off Nov 2019
100 01st StSabah International Incorporatedmodify existing fire alarm system. add(2) booster power supplies,(10)smoke detectors,(35)duct smoke detectors,(30) high power control relays,(11)dual input modules,(4) synch medules,(113) ceiling speakers/strobes,add(7)ceiling speakes,(9) fire smoke dampers.ref #201808278372 & 201708278375$47,625
Nov 16, 2018Never finaled
issued Nov 2018, no final
100 01st StTrue North Signs & Graphic Servicesinstall 36 evacuation maps$12,600
Oct 31, 2018Completed
final sign-off Jan 2020
100 01st StNovo Construction Inc6th flr, t.i - electrical, mechanical, plumbing, ref pa#201808278372$250,000
Oct 29, 2018Completed
final sign-off Mar 2019
100 01st StNovo Construction Inc8th flr, fitness room. structural work for trx support ref: pa# 201808278375$2,000
Oct 26, 2018Completed
final sign-off Jan 2019
100 01st StGci, Inc24/f:demo of (e) partitions, ceiling, lighting, finishes, & any associated mep in a full floor unoccupied office space. per ab-017, space will remain unoccupied.f/s sep permit pa201810052403. maher n/a.$40,000
Oct 19, 2018Expired or cancelled
cancelled Jan 2026
100 01st StNovo Construction Incstructural work on the 15th fl
Oct 16, 2018Completed
final sign-off Feb 2019
100 01st Ststructural work only. stregthening (e) beams under 5th flr, "all hands room"$10,000
Oct 16, 2018Completed
final sign-off Aug 2019
100 01st StNovo Construction Inc14th flr. elevator lobby upgrade. removal of (e) lobby doors access control devices. (n) 1-hour rated glass doors, (n) access control and emergency door release$50,000
Oct 16, 2018Completed
final sign-off Jan 2020
100 01st StNovo Construction Inc8th flr. mechanical and electrical, electrical, mechanical and plumbing for tenant improvement
Oct 5, 2018Completed
final sign-off Dec 2018
100 01st StAyoob & Peery Plumbing Co Inc24th fl - add 4, relocate 20, change out (43) and plug (8) sprinklers to conform with the new wall ceiling layout of ti$16,175
Oct 3, 2018Completed
final sign-off Aug 2019
100 01st StNovo Construction Incmechanical, electrical, & plumbing for tenant improvement on 5th fl. ref arch #201807114230.
Oct 1, 2018Completed
final sign-off Jul 2019
100 01st StAyoob & Peery Plumbing Co Inc8th flr - add 52, relocate 119, and plug 45 sprinklers in order to conform to the new wall/ceiling layout of the ti ref 201808278375$54,075
Oct 1, 2018Completed
final sign-off Dec 2018
100 01st StAyoob & Peery Plumbing Co Inc6th flr - add 98, relocate 106, and plug 20 sprinklers. install 2 new fhu's in order to conform to the new wall/ceiling layout of the ti ref 201808278372$75,300
Sep 25, 2018Completed
final sign-off Aug 2019
100 01st StNovo Construction Incmechanical and electrical plumbing for tenant improvemnt 15th fl ref 201808076649
Sep 25, 2018Completed
final sign-off Aug 2019
100 01st StNovo Construction Incmechanical and electrical plumbing for tenant improvemnt 7th fl ref 201808076656
Sep 24, 2018Completed
final sign-off Dec 2018
100 01st StAyoob & Peery Plumbing Co Inc15th flr. add 99, relocate 100 and plug 59 sprinklers to conform w/ new wall / ceiling layout of t.i.$74,500
Sep 24, 2018Completed
final sign-off Dec 2018
100 01st StAyoob & Peery Plumbing Co Inc7th flr. add 120, relocate 120 and plug 54 sprinklers to conform w/ new wall / ceiling layout of t.i$90,000
Sep 24, 2018Completed
final sign-off Nov 2018
100 01st StAyoob & Peery Plumbing Co Inc4th flr. add 124, relocate 199 and plug 50 sprinklers to conform w/ new wall / ceiling layout of t.i$91,775
Sep 24, 2018Completed
final sign-off Mar 2019
100 01st StNovo Construction Inctenant improvement of existing interstitial stairs between floors 5th and 6th. to include new guard rails, handrails finishes. structural scope is limited to support of new glass guardrail.$47,952
Sep 24, 2018Completed
final sign-off Mar 2019
100 01st StNovo Construction Inctenant improvement of existing interstitial stairs between floors 14th and 15th. to include new guard rails, handrails finishes. structural work to support of new glass guardrail.$147,952
Sep 14, 2018Completed
final sign-off Jul 2019
100 01st StAyoob & Peery Plumbing Co Inc5th fl - add 104, relocate 114 and plug 16 sprinklers. tie in 2 new fhv into the existing standpipes in order to conform with the new wall/ceiling layout of the ti ref pa 2018-0711-4231 #18-671$80,250
Sep 14, 2018Completed
final sign-off Oct 2018
100 01st StAyoob & Peery Plumbing Co Inc10th fl - add 105, relocate 106 and 24 sprinklers in order to conform with the new wall/ceiling layout of the ti. ref pa 2018-0711-4231 #18-671$78,975
Sep 14, 2018Completed
final sign-off Oct 2018
100 01st StAyoob & Peery Plumbing Co Inc11th fl - add 89, relocate 117, and plug 9 sprinklers to conform with the new wall/ceiling layout of the ti ref pa 2018-0711-4231 #18-671$73,050
Sep 7, 2018Completed
final sign-off Dec 2018
100 01st StAyoob & Peery Plumbing Co Inc9th fl - add 105, relocate 109 and plug 16 sprinklers in order to conform with new wall/ceiling layout of the ti. ref pa 2018-0711-4234 #18-671$79,650
Aug 27, 2018Completed
final sign-off Jan 2020
100 01st StNovo Construction Inc8th flr -full flr ti: new partitions, ceiling and finishes, new gender neutral restroom, new 2-hr fire rated horizontal exit for egress compliance. mep/fire/life safety under sep permit$1,448,928
Aug 27, 2018Completed
final sign-off Jan 2020
100 01st StNovo Construction Inc6th flr -full flr ti: new partitions, ceiling and finishes, new gender neutral restroom, new 2-hr fire rated horizontal exit. mep/fire/life safety under sep permit add a-2 occupancy dining area$1,734,534
Aug 22, 2018Completed
final sign-off Aug 2019
100 01st StNovo Construction Inc9th fl - mechanical, electrical & plumbing. ref pa 2018-0711-4234
Aug 22, 2018Completed
final sign-off Aug 2019
100 01st StNovo Construction Inc10th fl - mechanical, electrical and plumbing for tenant improvement. ref pa 2018-0711-4231
Aug 17, 2018Completed
final sign-off Aug 2018
100 01st StGolden Gate Fire Protection Inc2nd flr fire sprinkler only -relocate 1 pendent for new restroom. ref 201806071283$530
Aug 17, 2018Completed
final sign-off Aug 2018
100 01st StSabah International Incorporatedti# 201807194932. add 1 ceiling speaker/strobe. remove 1 ceiling speaker. remove 1 wall mount strobe. add 1 wall mount strobe$8,000
Aug 17, 2018Completed
final sign-off Sep 2018
100 01st StGolden Gate Fire Protection Inc22nd flr fire sprinkler only -relocate 16 pendent for suite 2200. ref 201807195028$8,000
Aug 7, 2018Completed
final sign-off Aug 2019
100 01st StNovo Construction Incfull floor tenant improvement on 4th fl, new partitions, ceiling, lighting and finishes. mep deferred. fire alarm and sprinklers under separate permit.$1,250,000
Aug 7, 2018Completed
final sign-off Aug 2019
100 01st StNovo Construction Inc7th flr. full floor tenant improvement. new partitions, ceilings, lights, and finishes. mep and fire life safety under separate permit$1,250,000
Aug 7, 2018Completed
final sign-off Aug 2019
100 01st StNovo Construction Incfull floor tenant improvement on 15th fl, new partitions, ceiling, lighting and finishes. mep & fire life safety under sep permit.$1,250,000
Aug 2, 2018Completed
final sign-off Oct 2018
100 01st StM C S Construction Services10th flr - restroom accessibility improvement - toilet, partition modifications, reinstall (e) plm fixtures & accessories to ada compliant locations$21,016
Aug 2, 2018Completed
final sign-off Oct 2018
100 01st StM C S Construction Services4th flr - restroom accessibility improvement - toilet, partition modifications, reinstall (e) plm fixtures & accessories to ada compliant locations$16,502
Aug 2, 2018Completed
final sign-off Oct 2018
100 01st StM C S Construction Services5th flr - restroom accessibility improvement - toilet, partition modifications, reinstall (e) plm fixtures & accessories to ada compliant locations$19,016
Aug 2, 2018Completed
final sign-off Oct 2018
100 01st StM C S Construction Services8th flr - restroom accessibility improvement - toilet, partition modifications, reinstall (e) plm fixtures & accessories to ada compliant locations$19,445
Aug 2, 2018Completed
final sign-off Oct 2018
100 01st StM C S Construction Services9th flr - restroom accessibility improvement - toilet, partition modifications, reinstall (e) plm fixtures & accessories to ada compliant locations$17,702
Aug 2, 2018Completed
final sign-off Oct 2018
100 01st StM C S Construction Services6th flr - restroom accessibility improvement - toilet, partition modifications, reinstall (e) plm fixtures & accessories to ada compliant locations$19,105
Aug 2, 2018Completed
final sign-off Oct 2018
100 01st StM C S Construction Services15th flr - restroom accessibility improvement - toilet, partition modifications, reinstall (e) plm fixtures & accessories to ada compliant locations$21,525
Aug 2, 2018Completed
final sign-off Oct 2018
100 01st StM C S Construction Services11th flr - restroom accessibility improvement - toilet, partition modifications, reinstall (e) plm fixtures & accessories to ada compliant locations$18,582
Aug 2, 2018Completed
final sign-off Oct 2018
100 01st StM C S Construction Services7th flr - restroom accessibility improvement - toilet, partition modifications, reinstall (e) plm fixtures & accessories to ada compliant locations$18,781
Jul 25, 2018Completed
final sign-off Jul 2018
100 01st StGolden Gate Fire Protection Incfire sprinklers: relocate 1 pendent sprinkler and add 1 pendent sprinkler on 3rd floor. t.i. 201-07-19-4932.$2,000
Jul 23, 2018Completed
final sign-off Aug 2019
100 01st StNovo Construction Incmep for ti on 11th fl. relocate existing. ref pa #201807114240.
Jul 11, 2018Completed
final sign-off Aug 2019
100 01st StNovo Construction Inc5/f: tenant improvement to include new partitions, ceilings, lighting, finishes, new gender neutral restroom, and new assembly occupancy spaces. new 2 hour rated exit provided for egress compliance. mep, fire life safety under sep permit$3,000,000
Jul 11, 2018Completed
final sign-off Aug 2019
100 01st StNovo Construction Inc9th fl - full floor arch ti to include new partitions, ceiling, lighting and finishes. mep & fire life safety under separate permit, to include two-way communication systems, also deferred; mep & fire life safety under seperate permit$3,300,000
Jul 11, 2018Completed
final sign-off Aug 2019
100 01st StNovo Construction Inctenant improvement on the 10th fl to include new paritions, ceiling lighting,finishes. mep and fine life safety under sep permit$3,300,000
Jul 11, 2018Completed
final sign-off Aug 2019
100 01st StNovo Construction Inctenant improvement on the 11th fl. improvements include new partitoins, ceiling, lighting, finishes. mep and fire ls under sep permit$3,300,000
Jul 11, 2018Expired or cancelled
cancelled Jan 2026
100 01st StNovo Construction Inc14th fl - partial ti to single floor tenant removal of existing elevator lobby doors, removal of access control devices and installation of new 1 hr fire rated glass doos at elevator lobby with access control device. will comply with 10.10.1.9.2$5,000
Jun 4, 2018Completed
final sign-off Jul 2018
100 01st StTrue North Signs & Graphic Services(4) evacuation plaques$1,400
May 9, 2018Completed
final sign-off Jun 2018
100 01st StR L H Fire Protection Inc14th flr - fire sprinkler permit relocate 60 pendents & 26 uprights, install 40 new pendents and 20 new uprights, delete 18 pendents and 16 uprights. add 2 new 3" hose values at new horizontal exits ref 201803123385$48,000
Apr 20, 2018Completed
final sign-off May 2019
100 01st StArrow Sign Companyinstall 2 illminated letter sets on building exterior wall mounted single faced. "okta"$9,000
Apr 12, 2018Completed
final sign-off Jun 2018
100 01st StPribuss Engineering Inc1st floor: fire sprinkler t.i. total relocated sprinklers = 1 at 514.00. ref app#201802121005$514
Apr 10, 2018Completed
final sign-off Sep 2018
100 01st StNovo Construction Incmechanical & electrical for ti on the 14th fl. ref pa 2018-0312-3385
Mar 12, 2018Completed
final sign-off Sep 2018
100 01st StNovo Construction Inc14th fl - ti to include 2 hour separation and horizontal existing new partitions, ceiling finishes. new gender neutral restrooms and break room. mep sep permit$3,300,000
Feb 26, 2018Completed
final sign-off Aug 2018
100 01st StNovo Construction Inc14/f: full floor demo excluding building core and restrooms//refer sprinkler demo permit #201611152693. per ab-017.$10,000
Feb 12, 2018Completed
final sign-off Oct 2018
100 01st StField Construction Inc.ste 145. install new exam room in exsisting un-used space of exsisting optometry office.$25,000
Dec 1, 2017Completed
final sign-off Feb 2018
100 01st StTrue North Signs & Graphic Services25th flr: 4 evac plaques$1,400
Oct 11, 2017Never finaled
issued Oct 2017, no final
100 01st StCommercial Interior Builders Inc25th fl: installation of 3 new fan powered boxes with electric heat, 2 new coding only vavs and new low pressure ductwork. one new fire smoke damper. ref 201608316421 & 201706300796.$99,958
Oct 11, 2017Completed
final sign-off Dec 2017
100 01st StCommercial Interior Builders Inc25/f- elevator lobby lighting and controls. ref 201706300796$15,000
Jan 9, 2017Completed
final sign-off Mar 2017
100 01st StCommercial Interior Builders Inc22nd floor: lighting, power, and signal wiring, lighting and receptacle controls. modification of (e) hvac systems to match the new arch. layout. scopes includes new vav box and water source heat pump for the idf closet. new fire smoke damper. ref. arch #2016-1017-0404.$60,000
Jan 4, 2017Never finaled
issued Jan 2017, no final
100 01st StTrue North Signs & Graphic Services25th fl - 4 evac maps$1,200
Nov 9, 2016Never finaled
issued Nov 2016, no final
100 01st StGolden Gate Fire Protection Inc25/f- fire sprinkler only, relocate 45 pendents, add 3 pendents (48 heads). t.i. pa#201608316421$14,100
Oct 17, 2016Completed
final sign-off Mar 2017
100 01st StCommercial Interior Builders Inc22nd floor suite 2250 - partition demolition & finish removal. new non-structural partitions, glazing, doors, ceiling & tiles, less than 10% lighitng additoins, millwork & finishes. mep/life safety/sprinklers deferred.$200,000
Oct 12, 2016Completed
final sign-off Mar 2017
100 01st StCommercial Interior Builders Incste. #300: lighting and mechanical work per title 24 ref pa 2016-0921-8339 for architectural. no new fire smoke dampers$176,748
Oct 12, 2016Completed
final sign-off Dec 2017
100 01st StCommercial Interior Builders Incelectrical work per title 24. ref pa 2016-0831-6421$120,000
Oct 5, 2016Completed
final sign-off Oct 2016
100 01st StGolden Gate Fire Protection Inc3rd floor fire srpinkler only - relocate 19 pendents, add 3 pendents for pix (3rd floor). ref pa 2016-0622-0596$11,550
Sep 21, 2016Completed
final sign-off Mar 2017
100 01st StCommercial Interior Builders Inc3rd fl #300 - re-work of demising partition between (2) suites. demo of (e) lights, ceilings, partitions, finishes. non-structural partitions, glazing, doors, ceilings, lights, millwork and finishes. mep under separate permit$800,000
Aug 31, 2016Completed
final sign-off Dec 2017
100 01st StCommercial Interior Builders Incdemo of existing lights, ceilings, partitoins, finishes. new non structural partitions, glazing, doors, ceilings,light fixtures, millwork, finishes and new smoke guard at elevator doors complying with dbi info sheet fs-07.lobby in high rise.$725,000
May 27, 2016Completed
final sign-off Jul 2016
100 01st StWolverine Fire Protection Corelocate 63, add 12, and delete 3 sprinklers in office ti on the 12th floor. ref pa 2016-0429-6118$30,000
May 9, 2016Completed
final sign-off Aug 2016
100 01st StNovo Construction Incmechanical & electrical work for ti at ste 1250$20,000
Apr 29, 2016Completed
final sign-off Aug 2016
100 01st StNovo Construction Inc12th flr, suite 1250 tenant improvement to include new partitions ceiling, path of travel upgrades and finishes, mep, life safety and fire sprinkler under separate permit.$150,000
Mar 9, 2016Completed
final sign-off Mar 2016
100 01st StGolden Gate Fire Protection Inc22nd floor - fire sprinkler only, relocate 5 pendents for simon kucher & partners 22nd floor. ref pa 2015-1211-4852$2,500
Feb 17, 2016Completed
final sign-off Apr 2016
100 01st StGolden Gate Fire Protection Incfire sprinkler ti only. relocate 24 sprinkler pendents, add 1 head total 24 heads for 3rd floor corridor$12,500
Jan 22, 2016Never finaled
issued Jan 2016, no final
100 01st StTrue North Signs & Graphic Services4 evacuation plaques$1,400
Dec 3, 2015Completed
final sign-off Jan 2016
100 01st StGolden Gate Fire Protection Incfire sprinklers; relocate 5 pendent sprinklers on the 12th floor. ref ti 2014-1223-4367$2,575
Nov 4, 2015Completed
final sign-off Nov 2015
100 01st StGolden Gate Fire Protection Incturn up sprinkler head; change pendents to uprights 64 heads total for the 25th floor. ref pa 2015-0805-3358$32,000
Oct 21, 2015Never finaled
issued Oct 2015, no final
100 01st StGolden Gate Fire Protection Incfire sprinkers, relocate 28 pendents sprinklers on the 3rd fl. relocate 32 upright sprinklers$30,900
Mar 24, 2015Never finaled
issued Mar 2015, no final
100 01st StTrue North Signs & Graphic Services(4) evauation signs for 12th floor.$1,500
Mar 4, 2015Completed
final sign-off Mar 2015
100 01st StGolden Gate Fire Protection Incfire sprinkler only. relocate 27 sprinkler pendents, add 4, [plug off 10. total 31 sprinkler pendents for the 12th fl$15,500
Jan 9, 2015Completed
final sign-off Mar 2015
100 01st Strevision appl. 2014.1210.3484. provide one additional sign.$345
Dec 10, 2014Never finaled
issued Dec 2014, no final
100 01st St26th floor - to create & produce evacuation maps.$1,100
Nov 3, 2014Completed
final sign-off Mar 2015
100 01st StTrue North Signs & Graphic Servicesprovide 8 evacuation signs (4 ea on 5th and 7th floor)$2,400
Oct 31, 2014Completed
final sign-off May 2015
100 01st StAura Fire Safety Incupgrade fire system for hood and duct in the kitchen area to meet ul 300 standards$2,000
Sep 30, 2014Completed
final sign-off Sep 2014
100 01st StSabah International Incorporated26th floor - as built per field inspester for approval appl 2014.0731.2727. revise sequence of operation to show idf room smoke detectors unlock elevator lobby doors.
Sep 9, 2014Completed
final sign-off Mar 2015
100 01st StTrue North Signs & Graphic Services(4) evacuation signs for 11th flr$710
Aug 25, 2014Never finaled
issued Nov 2014, no final
100 01st StNovo Construction Inctenant improvement on 13th flr to build new glass partition at reception area, mep on separate permit.$10,000
Jul 31, 2014Completed
final sign-off Sep 2014
100 01st StGolden Gate Fire Protection Inc26th floor:relocate 55 pendent sprinkler heads. relocate 28 upright sprinklers. upgrade earthquake bracing. ref app#201406047444.$44,805
Jul 31, 2014Never finaled
issued Sep 2014, no final
100 01st StSabah International Incorporated26th floor: provide a modification of the existing fire alarm system. add 23 new ceiling speaker/strobes. demolish 30 existing strobes. demolish 17 existing speakers. relocate 8 smoke detectors. ref. appl 2014.0604.7444.$9,149
Jul 2, 2014Never finaled
issued Jul 2014, no final
100 01st StTrue North Signs & Graphic Servicesreplace 4 evacuation signs on 10th floor. compliance with ordinance no 155-13 not reuqired.$710
Jun 24, 2014Never finaled
issued Jun 2014, no final
100 01st StPacific Neon Companywork in suite 110: erect an electric single faced sign on existing light trough structure.$6,500
Jun 24, 2014Never finaled
issued Jun 2014, no final
100 01st StPacific Neon Companysuite 110: erect an electric double faced projecting sign.$1,800
Jun 3, 2014Completed
final sign-off Jun 2014
100 01st StGolden Gate Fire Protection Increlocate 125 pendent sprinklers on the 10th floor, upgrade end of line bracing & earthquake bracing. t.i. #2014.0408.2696$64,375
Mar 10, 2014Never finaled
issued Mar 2014, no final
100 01st StParamount Sign Contractorspainted wall sign$500
Mar 5, 2014Completed
final sign-off Feb 2015
100 01st StParamount Sign Contractorserect sign - indirect electric wall sign$28,000
Jan 7, 2014Completed
final sign-off Jan 2014
100 01st StSabah International Incorporated8th floor:provide a modification of the extg fire alarm system for the 8th floor. the addition shall consist of the following: 18 speaker strobes, one control relay for door holders, 9 duct smoke detectors for fsd's, 4 new smoke detectors, 3 door holders. ref app#201310169371$17,000
Dec 18, 2013Completed
final sign-off Jan 2014
100 01st StGolden Gate Fire Protection Inc8th floor - relcoate 47 pendent sprinkler heads. relocate 6 upright sprinklers, upgrade end of line bracing. t.i. #2013.10.16.9371$28,840
Jul 17, 2013Completed
final sign-off Jul 2013
100 01st StPribuss Engineering Inc1st floor-fire sprinkler t.i-relocate 12 sprinklers, plug 3$6,175
Apr 22, 2013Never finaled
issued Apr 2013, no final
100 01st StR L H Fire Protection Inc2nd floor suite 279 fire sprinkler permit - remove 44 pendents, add 43 pendents & 23 uprights. ref t.i. #2013.02.26.0979$33,000
Apr 17, 2013Never finaled
issued Apr 2013, no final
100 01st StPrincipal Builders Inc.mech work for t.i on the 2nd fl to demo ducts & install new fans, diffusers, exhausts fans and thermostat. pls ref to pa# 201302260979 for t.i reference.$280,000
Apr 16, 2013Completed
final sign-off Sep 2013
100 01st StField Construction Inc.#145- non structural interior remodel for optometry office consisting of optical retail, exam rooms, work,contact training &pre-test areas$68,800
Feb 26, 2013Completed
final sign-off Jun 2013
100 01st StPrincipal Builders Inc.2nd floor:demolition and construction of non load bearing partitions walls, finishes, doors and ceiling for ti on multi tennant floor. med, sprinkler, life safety on seperate permit.$250,000
Nov 19, 2012Completed
final sign-off Nov 2013
100 01st StParamount Sign Contractorsto erect 3 single faced projecting signs$45,000
Nov 19, 2012Completed
final sign-off Nov 2013
100 01st StParamount Sign Contractors7 electric wall projecting signs$95,000
Sep 21, 2012Completed
final sign-off Oct 2012
100 01st StR L H Fire Protection Incfire sprinkler. relocate 8 and add 2 pendent heads.$7,000
Aug 23, 2012Completed
final sign-off Oct 2012
100 01st StCommercial Interior Builders Inc27th floor:provide 2 vav boxes, ductwork and grilles and electrical title 24 work. ref: app#201206293779 for arch. permit.$35,000
Aug 23, 2012Completed
final sign-off Apr 2013
100 01st StNovo Construction Inctenant improvement to consists of demo of non load bearing partitions associated electrical power/lighting associated mechanical. fire alarm/sprinkler seperate permit.$850,000
Aug 15, 2012Completed
final sign-off Feb 2013
100 01st StSabah International Incorporated27th floor-provide a modification of (e) f.a system for partial tenant build out-addition shall consist of providing the following:add 1 genesis strobe, 5 atlas speakers, relocate 5 (e) strobes, 1 speaker, 1 smoke detector$10,667
Aug 1, 2012Completed
final sign-off Sep 2012
100 01st StR L H Fire Protection Incground floor fire sprinkler - 11 relocated & 3 added uprights, 2 relocated & 1 added pendents. seismic calc's, adding end of line restraints.$8,500
Jul 25, 2012Completed
final sign-off Sep 2012
100 01st StSabah International Incorporatedprovide modication of the existing fa system for partial tenant build out on partial 1st fl. add 1 duct detector, 1 control relay 3 speaker strobes, remove 1 existing strobe, 1 duct det, 2 ceiling speakers$6,900
Jul 10, 2012Never finaled
issued Jul 2012, no final
100 01st StR L H Fire Protection Incfire sprinkler only- relocate 1 sprinkler head; add a head and plug off one head, 2 heads total for adr on 27th floor.$1,000
Jun 29, 2012Completed
final sign-off Aug 2012
100 01st StCommercial Interior Builders Incsuite #2700 -minor tenant improvement to add offices/rooms. includes partitions, framing, doors, glazing. electrical at new walls, light relocations to be design build under sep permit. mech rebalance under sep permit$77,653
May 30, 2012Never finaled
issued May 2012, no final
100 01st StR L H Fire Protection Inc1st and 2nd floor floor-fire sprinkler only-relocate 7 heads, 3 delete & add 1 head-$9,000
May 24, 2012Completed
final sign-off Nov 2012
100 01st StThe Whiting-Turner Contracting Companyoffice t.i. on the 1st floor. work to include non rated and non structural walls. new finishes, new lighting and mechanical.$56,580
Mar 14, 2012Never finaled
issued Mar 2012, no final
100 01st StR L H Fire Protection Incground floor fire sprinkler work - relcoate the fdc's on the n.w. & s.e. corners, relcoate 1 & add 1 pendent sprinkler.$11,500
Mar 1, 2012Never finaled
issued Mar 2012, no final
100 01st Ststreetspace
Feb 14, 2012Completed
final sign-off Feb 2013
100 01st StThe Whiting-Turner Contracting Companyexterior and interior remodel. new walk off mats, new exterior lighting, metal portal construction at mission street entrance, curtain wall entry replacemen, column base embellishment modification and planter box construction. (sep. mep.)$432,000
Feb 6, 2012Completed
final sign-off Apr 2012
100 01st StSabah International Incorporatedpartial 2nd floor provide a modification of the existing fire alarm system for partial tenant build out, add (1) new genesis strobe, relocate (1) existing strobe.$3,244
Jan 4, 2012Completed
final sign-off Feb 2012
100 01st StAyoob & Peery Plumbing Co Inc22nd floor - relocate and remove fire sprinkler heads per tenant improvement, 22 relocate, 6 remove$11,308
Nov 10, 2011Completed
final sign-off Jan 2012
100 01st StR L H Fire Protection Incfire sprinkler only - relocate 61 heads, add 9 heads, remove 8 heads; total 70 heads. spec suite on the 27th floor.$35,000
Sep 14, 2011Completed
final sign-off Oct 2011
100 01st StSabah International Incorporatedmodify fire alarm system for partial tenant build out on partial 2nd fl. remove 1 wall mounjt stobe. install 1 new ceiling mount strobe. existing circuits will be reused. arch pa 2011-06017141$6,500
Sep 12, 2011Completed
final sign-off May 2012
100 01st StThe Whiting-Turner Contracting Company5 new exterior windows on ground floor$35,000
Aug 18, 2011Never finaled
issued Aug 2011, no final
100 01st StParamount Sign Contractorsinterior illuminated wall sign. kilroy realty corp.on mezannine btn 1st and 2nd floor$13,000
Aug 4, 2011Completed
final sign-off Sep 2011
100 01st StAyoob & Peery Plumbing Co Incadd, relocate and removed fire sprinkler heads on the 3rd floor. 1 add, 2 remove and 7 relocate$2,000
Jul 25, 2011Completed
final sign-off Sep 2011
100 01st StPrincipal Builders Inc.#360:demo full height walls, paint and carpet.$261,600
Jul 20, 2011Completed
final sign-off Sep 2011
100 01st Stadd, relocate and remove fire sprinkler heads per tenant improvements on 2nd floor. 1 add, 45 relocate, 9 remove$17,000
Jul 20, 2011Completed
final sign-off Sep 2011
100 01st StSabah International Incorporatedmodify fire alarm system for tenant buildout 2nd fl. 1 new phto smk detector, 6 new photo duct smk det, 6 new control relay, 1 manual pull station, 2 ceiling strobes, 8 ceiling speaker/strobes, relocate 1 pull station$14,198
Jun 1, 2011Completed
final sign-off Sep 2011
100 01st StPrincipal Builders Inc.tenant improvment on 2nd floor office space. build out offices, conference room$300,000
Mar 30, 2011Completed
final sign-off Apr 2011
100 01st StAnderson, Rowe & Buckley, Inc.23rd floor-t.i. to (e) fire sprinkler system-4 added sprinklers, 10 relocated sprinklers, 2 removed sprinklers$2,800
Mar 11, 2011Completed
final sign-off Jan 2012
100 01st StTurner Construction Coexisting ti, space 2300 construction on non load bearing partitions, new door,sidelights, new ceiling grid, new and relocate lights fixtures, mill work, new finishes, mech and elec. fire sprinkler and life safety alarm under separate permit. work to core ("core improvement") as noted on plans.$510,000
Mar 9, 2011Completed
final sign-off Feb 2012
100 01st StAyoob & Peery Plumbing Co Inc20th & 21st floor add, relcoate & remove fire sprinkler heads per tenant improvement, 20th floor: add 28, relcoate 88, remove 1. 21st floor: add 23, relocate 96, remove 8.$117,500
Mar 9, 2011Completed
final sign-off Jan 2012
100 01st StAyoob & Peery Plumbing Co Inc18th & 19th floor add, relocate & remove fire sprinkler heads per tenant improvements, 18th floor: add 30, relcoate 139, remvoe 17. 19th floor: add 19, relcoate 104, remove 6.$146,000
Mar 9, 2011Completed
final sign-off Feb 2012
100 01st StAyoob & Peery Plumbing Co Inc23rd floor add, relocate & removed fire sprinkler heads per tenant improvements, add 19, relocate 76, remove 4.$38,000
Mar 9, 2011Completed
final sign-off Jan 2012
100 01st StAyoob & Peery Plumbing Co Inc24th floor add, relcoate & removed fire sprinkler heads per tenant improvements, add 22, relcoate 68, remove 2.$34,000
Mar 8, 2011Completed
final sign-off Apr 2011
100 01st StSan Francisco Commercial Builders Incfloor 3 - new office addition including new prtitions, new door & relocated lighting, patch ceiling & finishes to match existing, mep & life safety & mep to be design build under separate permit.$12,000
Mar 4, 2011Never finaled
issued Apr 2011, no final
100 01st StTurner Construction Cooffice ti on the 23rd floor incl. construction of nonload bearing walls, new doors, frames, side lights , new ceiling grid and acoustical tile, new millwork and finishes. mep under separate permit.$53,000
Mar 4, 2011Completed
final sign-off Jan 2012
100 01st StTurner Construction Co24th floor-t.i.-construction of non load bearing partitions, new doors, relocation og light fixtures & new finishes. mechanical, electrical, fire sprinkler, life safety alarm under seperate permit$900,000
Mar 3, 2011Completed
final sign-off Jan 2012
100 01st StTurner Construction Coexisting ti, space 2100. construction of non load bearing parititons, new doors, relocation o f light fixtures and new finishes, mechanical, elec. fire sprikler and life safety alarm under sep permit$900,000
Mar 2, 2011Completed
final sign-off Jan 2012
100 01st StTurner Construction Coextg ti, space 2000 construction of non load bearing partitions, new doors, relocation of light fixtures and new finishes,mechanical and electrical. fire sprinkler and life safety alarm under separate permit.$900,000
Mar 1, 2011Completed
final sign-off Jan 2012
100 01st StTurner Construction Coextg t.i. space 1900 construction of non load bearing partitions, new doors, relocation of light fixtures and new finishes, mechanical and electrical fire sprinkler & life safety alarm under seperate permit.$1,000,000
Feb 15, 2011Completed
final sign-off Mar 2011
100 01st StTurner Construction Co18th floor space 1800 existing t.i., construction of non-load bearing partitions, new office doors & side lights, new ceiling grid & tile, new & relocated light fixtures, new millwork, new finishes, mechanical & electrical. fire sprinkler & life safety under separate permit.$1,500,000
Dec 21, 2010Completed
final sign-off Dec 2010
100 01st StAyoob & Peery Plumbing Co Inc11th floor-relocate fire sprinkler heads per tenant improvements, 2 relocated$1,200
Jul 22, 2008Completed
final sign-off Jul 2008
100 01st Strenew pa# 2007/12/04/9542 for final inspection only.
Mar 25, 2008Completed
final sign-off Sep 2008
100 01st StPribuss Engineering Incti for fire sprinler on the 14th floor. add 66 new sprinkler heads and relocate 163 heads.$49,100
Feb 26, 2008Completed
final sign-off Sep 2008
100 01st St14th floor: tenant improvement build new offices and support facilities. install open office workstations.$625,000
Jan 10, 2008Completed
final sign-off Dec 2008
100 01st StSkyline Construction16th floor-fire sprinkler work-147 relocates, 26 removed. ref pa# 200712261320$120,000
Dec 26, 2007Completed
final sign-off Dec 2008
100 01st Sttenant improvement on 16th floor, new partitions, architectural work only m.e.p., sprinkler, fire alarm under separate permit.$631,000
Dec 20, 2007Expired or cancelled
expired Dec 2008
100 01st Stinterior non-structural demolition of 16th floor. demo interior office partitions. ti under seperate permit.$15,000
Dec 4, 2007Expired or cancelled
expired Jul 2008
100 01st Stto renew app #200408272728
Nov 6, 2007Completed
final sign-off Mar 2009
100 01st Stinstall new marquee on first street side of building at front entrance.$80,000