Heather Sanders-Jacobs
- Listed as
- architect
- Firm
- Shelterwerkes Arch.
- Based in
- Oakland
- On San Francisco permits
- Mar 2011 to Apr 2026
42 permits since 2000 (architect on 42 permits): 27 completed, 1 in progress, 11 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 22, 2026 | Completed final sign-off Jul 2026 | 1155 Market St | Codesign Llc | interior t.i. project within an (e) suite occupying the 6th fl. scope includes modifications to (e) offices and confrence rooms to create additional private offices. construction of conference rooms to create additional private closet. project also includes reconfiguration of (e) open office areasDetails
interior t.i. project within an (e) suite occupying the 6th fl. scope includes modifications to (e) offices and confrence rooms to create additional private offices. construction of conference rooms to create additional private closet. project also includes reconfiguration of (e) open office areas | $200,000 |
| Feb 25, 2026 | Completed final sign-off Jun 2026 | 444 Townsend St | Codesign Llc | add light manufacturing use. interior renovation to (e) office space. 2 new conference rooms, new shop spaces for minor repairs to personal transportation vehicles, new accessible shower, new rollup door in (e) opening & minor paint/interior finish replacement. partial change of use to lab on 1st flDetails
add light manufacturing use. interior renovation to (e) office space. 2 new conference rooms, new shop spaces for minor repairs to personal transportation vehicles, new accessible shower, new rollup door in (e) opening & minor paint/interior finish replacement. partial change of use to lab on 1st fl | $900,000 |
| Nov 24, 2025 | Completed final sign-off Dec 2025 | 100 01st St | Codesign Llc | install (4) anchored phone booths - ref pa# 202509115108 - 25th floorDetails
install (4) anchored phone booths - ref pa# 202509115108 - 25th floor | $3,500 |
| Sep 11, 2025 | Completed final sign-off Oct 2025 | 100 01st St | Codesign Llc | 25/fl-interior renovation to (e) office suite to include (n) office, expand pantry area and update finishes. no change to occupancy, use, or egress. no structural or remodel of exteriorDetails
25/fl-interior renovation to (e) office suite to include (n) office, expand pantry area and update finishes. no change to occupancy, use, or egress. no structural or remodel of exterior | $391,853 |
| Jul 17, 2025 | Completed final sign-off Dec 2025 | 475 Sansome St | Codesign Llc | 11/f: tenant improvement project in an (e) suite partially occupying the 11th flr. project includes new offices, meeting rooms, break area. no structural work or exterior scope work.Details
11/f: tenant improvement project in an (e) suite partially occupying the 11th flr. project includes new offices, meeting rooms, break area. no structural work or exterior scope work. | $1,781,907 |
| Mar 18, 2025 | Completed final sign-off Jun 2025 | 724 Battery St | Wci-Gc Inc | 1st floor: revision (delta 3) to #2024-1230-7502: new glass partition btw meeting room and hallway. new infill wall at existing niche. mep deferred.Details
1st floor: revision (delta 3) to #2024-1230-7502: new glass partition btw meeting room and hallway. new infill wall at existing niche. mep deferred. | $11,500 |
| Mar 7, 2025 | In progress filed Mar 2025, not yet issued | 750 Howard St | remodel of e admin building at yerba buena gardens. renovation includes removal of e gwb partition and the creation of new private offices within the e suiteDetails
remodel of e admin building at yerba buena gardens. renovation includes removal of e gwb partition and the creation of new private offices within the e suite | $90,000 | |
| Dec 30, 2024 | Completed final sign-off Jun 2025 | 724 Battery St | Wci-Gc Inc | commercial ti of (e) showroom space on 1st fl. ti to include (n) meeting room & (n) junction boxes for future lighting. mep approvals defferedDetails
commercial ti of (e) showroom space on 1st fl. ti to include (n) meeting room & (n) junction boxes for future lighting. mep approvals deffered | $113,500 |
| Dec 17, 2024 | Completed final sign-off Feb 2025 | 333 Bush St | Codesign Llc | 21st fl - interior renovation of (e) tenant space. (n) paint, flooring (partial), cabinet/drawer fronts & glass sidelites on select offices. no change to occupancy, use or egress. no exterior, mep or structural scope of workDetails
21st fl - interior renovation of (e) tenant space. (n) paint, flooring (partial), cabinet/drawer fronts & glass sidelites on select offices. no change to occupancy, use or egress. no exterior, mep or structural scope of work | $178,500 |
| Nov 13, 2023 | Completed final sign-off Jan 2024 | 1118 Quintara St | revision to 202206226835. changes to hvac and location of 3rd bathroom at gr fl, remove 2/f bathtub.Details
revision to 202206226835. changes to hvac and location of 3rd bathroom at gr fl, remove 2/f bathtub. | ||
| Nov 16, 2022 | Completed final sign-off Aug 2023 | 2360 Polk St | Castillo Builders Inc | g/f: t.i. including new nonload bearing walls, plumbing fixtures, electrical/lighting, millwork. no structural work, change of use. bar to limited restaurant.Details
g/f: t.i. including new nonload bearing walls, plumbing fixtures, electrical/lighting, millwork. no structural work, change of use. bar to limited restaurant. | $90,000 |
| Oct 11, 2022 | Expired or cancelled cancelled Jan 2026 | 2360 Polk St | painted wall sign 0&Details
painted wall sign 0& | $355 | |
| Oct 11, 2022 | Expired or cancelled cancelled Jan 2026 | 2360 Polk St | electric projecting double faced signDetails
electric projecting double faced sign | $343 | |
| Sep 19, 2022 | Never finaled filed Sep 2022, never issued | 559 22nd Av | new upper level addition containing two bedrooms & two bathrooms, two roof decks(one front and one rear) to an (e)two story,single family residence.Details
new upper level addition containing two bedrooms & two bathrooms, two roof decks(one front and one rear) to an (e)two story,single family residence. | $415,000 | |
| Aug 15, 2022 | Completed final sign-off Mar 2023 | 221 04th St | Yerba Buena Builders Inc | ti including 5 new offices and 1 meeting room no structural or plumbing scope. change of use groud floorDetails
ti including 5 new offices and 1 meeting room no structural or plumbing scope. change of use groud floor | $73,604 |
| Jun 22, 2022 | Completed final sign-off Jan 2024 | 1118 Quintara St | lower level renovation includes new primary bedroom, bathroom, office & bonus room area. main level work includes new access stair to lower level. modifications to (e) closet space.Details
lower level renovation includes new primary bedroom, bathroom, office & bonus room area. main level work includes new access stair to lower level. modifications to (e) closet space. | $105,000 | |
| Oct 26, 2021 | Completed final sign-off Jan 2022 | 55 Hawthorne St | Codesign Llc | new image quality lab in an extg 5th floor suite. tenant tiDetails
new image quality lab in an extg 5th floor suite. tenant ti | $30,000 |
| Jul 15, 2021 | Completed final sign-off May 2022 | 1632 14th Av | H I & D Construction | replace (e) front solarium with standard construction including (n) window. remove rear solarium & replace with exterior balcony . new folding glass door at existing balcony.Details
replace (e) front solarium with standard construction including (n) window. remove rear solarium & replace with exterior balcony . new folding glass door at existing balcony. | $42,000 |
| Dec 1, 2020 | Never finaled filed Dec 2020, never issued | 66 Bishop St | to erect a type-vb, 2-story single family dwelling- no basements.Details
to erect a type-vb, 2-story single family dwelling- no basements. | $450,000 | |
| Dec 1, 2020 | Never finaled filed Dec 2020, never issued | 66 Bishop St | to demolish a type-v, 2-story, single family residence.Details
to demolish a type-v, 2-story, single family residence. | $450,000 | |
| Mar 3, 2020 | Never finaled issued Aug 2020, no final | 875 Howard St | R.M.R. Construction Company | remove non compliant exterior balconies and access doors. replace doors with in fill concrete wall, new storefront glazing to match existingDetails
remove non compliant exterior balconies and access doors. replace doors with in fill concrete wall, new storefront glazing to match existing | $50,000 |
| Aug 6, 2019 | Never finaled issued Aug 2019, no final | 55 02nd St | Codesign Llc | 15/f: add (1) interior window to (e) conference room.Details
15/f: add (1) interior window to (e) conference room. | $3,500 |
| Jan 4, 2019 | Never finaled issued Mar 2019, no final | 201 Eddy St | D Kelly Construction Inc. | g/f: minor tenant improvement including one new non-load bearing partition, light fixtures, and interior finishes. no plumbing & no structural work.Details
g/f: minor tenant improvement including one new non-load bearing partition, light fixtures, and interior finishes. no plumbing & no structural work. | $116,118 |
| Oct 2, 2018 | Completed final sign-off Jan 2019 | 149 Taylor St | D Kelly Construction Inc. | ground floor t.i. including new non-load bearing parttions, light fixtures, and interior finishes. no structural and plumbing work.Details
ground floor t.i. including new non-load bearing parttions, light fixtures, and interior finishes. no structural and plumbing work. | $53,265 |
| Sep 10, 2018 | Completed final sign-off Oct 2019 | 560 Davis St | Novo Construction Inc | t.i. including new non-load bearing partitions, plumbing fixtures, light fixtures, and power outlets. no structural work. n/a for maherDetails
t.i. including new non-load bearing partitions, plumbing fixtures, light fixtures, and power outlets. no structural work. n/a for maher | $115,688 |
| Dec 19, 2017 | Completed final sign-off Aug 2018 | 57 Wool St | Shelter Cove Construction | convert existing closet to bathroom on 2nd floor.Details
convert existing closet to bathroom on 2nd floor. | $40,000 |
| Sep 19, 2017 | Completed final sign-off Nov 2017 | 225 Bush St | Novo Construction Inc | suite 400: tenant improvement including new non-load bearing partitions and interior finishes. no structural work. no plumbing work.Details
suite 400: tenant improvement including new non-load bearing partitions and interior finishes. no structural work. no plumbing work. | $87,221 |
| Sep 1, 2017 | Never finaled issued Dec 2017, no final | 210 Golden Gate Av | M C S Construction Services | replacement of exterior door into food distribution tenant spaceDetails
replacement of exterior door into food distribution tenant space | $6,500 |
| Aug 25, 2017 | Never finaled issued Jan 2018, no final | 360 Guerrero St | #213 - new bathroom including toilet, sink & shower within (e) closet area. no exterior work, no sturctural work.Details
#213 - new bathroom including toilet, sink & shower within (e) closet area. no exterior work, no sturctural work. | $7,500 | |
| Jun 22, 2017 | Completed final sign-off Feb 2018 | 210 Golden Gate Av | M C S Construction Services | ground fl ti. including new non-load bearing partitions, plumbing fixtures, millwork, light fixtures and interior finishes. no structural work. n/a for maher.Details
ground fl ti. including new non-load bearing partitions, plumbing fixtures, millwork, light fixtures and interior finishes. no structural work. n/a for maher. | $154,120 |
| Feb 9, 2017 | Completed final sign-off Apr 2019 | 349 Bacon St | Turley Construction | convert portion of garage to add bedroom, bathroom. replace 2 windows in-kind, replace window with door tankless water heater, new furnace, washer, dryerDetails
convert portion of garage to add bedroom, bathroom. replace 2 windows in-kind, replace window with door tankless water heater, new furnace, washer, dryer | $23,000 |
| Jan 24, 2017 | Completed final sign-off Mar 2017 | 660 03rd St | Novo Construction Inc | 2nd flr: minor ti - new non load bearing partitions, lighting & interior finishes, no exterior and no structural work maher naDetails
2nd flr: minor ti - new non load bearing partitions, lighting & interior finishes, no exterior and no structural work maher na | $188,090 |
| Jan 3, 2017 | Completed final sign-off Jan 2020 | 135 Webster St | Darc Ventures Inc Dba Spl Construction S | horizontal addition to rear of property at 1st & 2nd level. renovation of (e) interior. addition includes (2) new bathrooms & (2) bedrooms. no change to existing garage.Details
horizontal addition to rear of property at 1st & 2nd level. renovation of (e) interior. addition includes (2) new bathrooms & (2) bedrooms. no change to existing garage. | $90,000 |
| Dec 1, 2016 | Never finaled issued Jan 2017, no final | 270 Brannan St | M C S Construction Services | tenant improvement of a ground floor cafe. scope includes new non-load bearing partitions, lighting, plumbing fixtures, millwork and interior finishes. n/a for the maher.Details
tenant improvement of a ground floor cafe. scope includes new non-load bearing partitions, lighting, plumbing fixtures, millwork and interior finishes. n/a for the maher. | $71,086 |
| Oct 21, 2016 | Expired or cancelled cancelled Jan 2026 | 274 Brannan St | Data Processing Air Corp. | suite 315, 3rd floor - demo several wallsDetails
suite 315, 3rd floor - demo several walls | $10,000 |
| May 19, 2016 | Never finaled issued May 2016, no final | 145 Taylor St | Field Construction Inc. | 1) 145 taylor basement: retrofit extg hvac/electrical. 2)149 taylor street ground floor: new power recepticles. provide new lighting/power as required. ref app#201604074191Details
1) 145 taylor basement: retrofit extg hvac/electrical. 2)149 taylor street ground floor: new power recepticles. provide new lighting/power as required. ref app#201604074191 | $8,000 |
| Apr 28, 2016 | Never finaled issued Apr 2016, no final | 1 California St | Accurate Contracting Inc.Dba Unispace Co | 8th floor: work related to approved bldg permit #201604134657. (partial foor t.i. include office space, breakroom, and restrooms). fire/life safety/sprinklers shall be design build under seperate permits. two way communication on fire alarm.Details
8th floor: work related to approved bldg permit #201604134657. (partial foor t.i. include office space, breakroom, and restrooms). fire/life safety/sprinklers shall be design build under seperate permits. two way communication on fire alarm. | |
| Apr 13, 2016 | Completed final sign-off Aug 2016 | 1 California St | Accurate Contracting Inc.Dba Unispace Co | 6th, 7th & 8th floors partial tenant improvement includ. demo/construction of partitoins, restroom upgrades, no structural work. mep, fire/life safety under separate permit.Details
6th, 7th & 8th floors partial tenant improvement includ. demo/construction of partitoins, restroom upgrades, no structural work. mep, fire/life safety under separate permit. | $1,254,770 |
| Apr 5, 2016 | Completed final sign-off Aug 2016 | 1 California St | Accurate Contracting Inc.Dba Unispace Co | 5th flr: ti - full flr icludes restroom upgrades, new furniture, partitions demo & construction, no structural. mep/fire/alarms under sep permit. compliance with maher ordinance no 155-13 not required.Details
5th flr: ti - full flr icludes restroom upgrades, new furniture, partitions demo & construction, no structural. mep/fire/alarms under sep permit. compliance with maher ordinance no 155-13 not required. | $1,700,000 |
| Apr 24, 2015 | Completed final sign-off Dec 2015 | 501 02nd St | Opi Commercial Builders | 7/f: ti- minor/limited demo, interior partitions & glass wall system, construct, relocate/add lighting fixtures, alterations of (e) mech system, alter/add of life safety devices. limited structural work related to operable partition, plumbing for coffee maker. new finishes & incidental workDetails
7/f: ti- minor/limited demo, interior partitions & glass wall system, construct, relocate/add lighting fixtures, alterations of (e) mech system, alter/add of life safety devices. limited structural work related to operable partition, plumbing for coffee maker. new finishes & incidental work | $110,000 |
| Mar 6, 2015 | Completed final sign-off Jun 2015 | 650 Townsend St | Conscious Construction | partial ti suite 425. the scope inculdes addition of non load bearing partitions, soft seating, finishes and millwork. no structural work. maher - not req'dDetails
partial ti suite 425. the scope inculdes addition of non load bearing partitions, soft seating, finishes and millwork. no structural work. maher - not req'd | $203,040 |
| Mar 11, 2011 | Completed final sign-off May 2012 | 611 San Bruno Av | interior remodel to the ground floor (garage) of an (e) single family home. (e) space is non habitable, renovation will create a garage, separate habitable space with bathroom, hallway, living room & closets.Details
interior remodel to the ground floor (garage) of an (e) single family home. (e) space is non habitable, renovation will create a garage, separate habitable space with bathroom, hallway, living room & closets. | $50,000 |