H I & D Construction
- Based in
- Concord
- On San Francisco permits
- Feb 2013 to Jul 2026
- Last 24 months
- 8 permits filed
19 permits since 2000: 16 completed, 1 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 2, 2026 | Completed final sign-off Jul 2026 | 234 Monterey Bl | to obtain final inspection for work approved under pa# 202503273194. all work is approved.Details
to obtain final inspection for work approved under pa# 202503273194. all work is approved. | |
| Dec 8, 2025 | In progress issued May 2026 | 9 14th Av | addition of habitable space at the rear on the 1st fl. infill lightwell to the south fl 1 & 2. infill lightwell to the north 2nd fl only. remodel kitchen in unit 9 & 11 14th ave. remodel/reconfigure baths to units 9 & 11. all (n) interior finishes to replace (e) finishes. new deck at rear 3rd fl.Details
addition of habitable space at the rear on the 1st fl. infill lightwell to the south fl 1 & 2. infill lightwell to the north 2nd fl only. remodel kitchen in unit 9 & 11 14th ave. remodel/reconfigure baths to units 9 & 11. all (n) interior finishes to replace (e) finishes. new deck at rear 3rd fl. | $380,000 |
| Oct 17, 2025 | Completed final sign-off Jan 2026 | 3083 California St | remove existing siding from right side of the house. install 1/3 cdx plywood, install blue skin water proofing membrane. install new v-shape hardy side like to like.Details
remove existing siding from right side of the house. install 1/3 cdx plywood, install blue skin water proofing membrane. install new v-shape hardy side like to like. | $35,000 |
| Jul 9, 2025 | Completed final sign-off Oct 2025 | 3075 California St | common area - siding replacement one small side only. west side top story. remove wood siding. install 1/2" cdx plywood and hardie plank siding and paint. approx. 200 sq ft.Details
common area - siding replacement one small side only. west side top story. remove wood siding. install 1/2" cdx plywood and hardie plank siding and paint. approx. 200 sq ft. | $12,000 |
| Jun 24, 2025 | Completed final sign-off Oct 2025 | 283 Dellbrook Av | like for like kitchen remodel, center sink with window. replace knob and tube wiring. replace front door. paint interior house. install new baseboards and trim.Details
like for like kitchen remodel, center sink with window. replace knob and tube wiring. replace front door. paint interior house. install new baseboards and trim. | $70,000 |
| Mar 27, 2025 | Expired or cancelled expired Jul 2026 | 234 Monterey Bl | kitchen remodel like for like, new flooring, new cabinets, update electrical service, update electrical in kitchen and bath., change knob and tube wiring where exist. bathroom remodel, new shower, new tile new tub.Details
kitchen remodel like for like, new flooring, new cabinets, update electrical service, update electrical in kitchen and bath., change knob and tube wiring where exist. bathroom remodel, new shower, new tile new tub. | $70,000 |
| Jan 9, 2025 | Completed final sign-off Apr 2025 | 430 Funston Av | repair and replace wet rot at rear facade and popout. window and siding at same locationDetails
repair and replace wet rot at rear facade and popout. window and siding at same location | $2,500 |
| Dec 13, 2024 | Completed final sign-off Apr 2025 | 432 Funston Av | rev 202402055215- unit 432-first floor unit- add (n) window at north wall in powder room. relocate toilet and sink powder room. remove (n) lower cabinet at work room. (n) sink location. repair and replace wet rot at entire rear facade and popout. window and siding at same locationDetails
rev 202402055215- unit 432-first floor unit- add (n) window at north wall in powder room. relocate toilet and sink powder room. remove (n) lower cabinet at work room. (n) sink location. repair and replace wet rot at entire rear facade and popout. window and siding at same location | |
| Sep 19, 2024 | Completed final sign-off Feb 2025 | 159 14th Av | replace existing deck railing in kind.Details
replace existing deck railing in kind. | $6,000 |
| Jun 11, 2024 | Completed final sign-off Feb 2025 | 159 14th Av | redo deck surface including water proofing and changing 2 skylights. walkable skylightDetails
redo deck surface including water proofing and changing 2 skylights. walkable skylight | $30,000 |
| Feb 5, 2024 | Completed final sign-off Apr 2025 | 432 Funston Av | interior non structural alteration unit 432. 1st fl: add powder room and potting sink in e storage rm. exit door access to rear yard. 4th fl replace 2 windows and infill 2 windows. main bedroom replace e finishes with new finishes.Details
interior non structural alteration unit 432. 1st fl: add powder room and potting sink in e storage rm. exit door access to rear yard. 4th fl replace 2 windows and infill 2 windows. main bedroom replace e finishes with new finishes. | $68,000 |
| Sep 23, 2022 | Completed final sign-off Nov 2022 | 667 09th Av | to comply with physical inspection report # cc8458. all work is completed under 2020-1024-7321Details
to comply with physical inspection report # cc8458. all work is completed under 2020-1024-7321 | |
| Jul 15, 2022 | Completed final sign-off Sep 2022 | 667 09th Av | front window replacement - 12 total. street visible. no change in size or location.Details
front window replacement - 12 total. street visible. no change in size or location. | $10,000 |
| Jul 16, 2021 | Never finaled issued Jul 2021, no final | 1839 15th St | bathroom remodel like to like, new tub new tile. no wall alteration.Details
bathroom remodel like to like, new tub new tile. no wall alteration. | $35,000 |
| Jul 15, 2021 | Completed final sign-off May 2022 | 1632 14th Av | replace (e) front solarium with standard construction including (n) window. remove rear solarium & replace with exterior balcony . new folding glass door at existing balcony.Details
replace (e) front solarium with standard construction including (n) window. remove rear solarium & replace with exterior balcony . new folding glass door at existing balcony. | $42,000 |
| Oct 24, 2020 | Completed final sign-off Oct 2022 | 667 09th Av | remodel of 2 (e) units & share garage. minor addition to garage level. no changes to footprint. no facade changes. no work in public right-of-way.Details
remodel of 2 (e) units & share garage. minor addition to garage level. no changes to footprint. no facade changes. no work in public right-of-way. | $450,000 |
| Sep 14, 2017 | Completed final sign-off Nov 2017 | 360 Guerrero St | install new sheet rock in closet, patch ceiling where needed. kitchen faucet and angel stop, p-trap replacement due leakage. relocate subpanel, install and replace (e) lights to led. run one circuit to electric heat.Details
install new sheet rock in closet, patch ceiling where needed. kitchen faucet and angel stop, p-trap replacement due leakage. relocate subpanel, install and replace (e) lights to led. run one circuit to electric heat. | $5,000 |
| Jul 19, 2013 | Completed final sign-off Sep 2013 | 360 Guerrero St | kitchen remodel - change cabinet & countertops, change existing appliances. no structural workDetails
kitchen remodel - change cabinet & countertops, change existing appliances. no structural work | $10,000 |
| Feb 21, 2013 | Completed final sign-off Apr 2013 | 360 Guerrero St | new tub, new cabinet in bathroom, painting, no alteration of partition wall.Details
new tub, new cabinet in bathroom, painting, no alteration of partition wall. | $5,000 |