Back to bathroom remodel contractors
H I & D Construction
- Based in
- Concord
- On San Francisco permits
- Feb 2013 to Jul 2026
- Last 24 months
- 8 permits filed
19 permits since 2000: 16 completed, 1 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 1 completed, 1 in progress, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 67 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 8, 2025 | In progress issued May 2026 | 9 14th Av | addition of habitable space at the rear on the 1st fl. infill lightwell to the south fl 1 & 2. infill lightwell to the north 2nd fl only. remodel kitchen in unit 9 & 11 14th ave. remodel/reconfigure baths to units 9 & 11. all (n) interior finishes to replace (e) finishes. new deck at rear 3rd fl.Details
addition of habitable space at the rear on the 1st fl. infill lightwell to the south fl 1 & 2. infill lightwell to the north 2nd fl only. remodel kitchen in unit 9 & 11 14th ave. remodel/reconfigure baths to units 9 & 11. all (n) interior finishes to replace (e) finishes. new deck at rear 3rd fl. | $380,000 |
| Mar 27, 2025 | Expired or cancelled expired Jul 2026 | 234 Monterey Bl | kitchen remodel like for like, new flooring, new cabinets, update electrical service, update electrical in kitchen and bath., change knob and tube wiring where exist. bathroom remodel, new shower, new tile new tub.Details
kitchen remodel like for like, new flooring, new cabinets, update electrical service, update electrical in kitchen and bath., change knob and tube wiring where exist. bathroom remodel, new shower, new tile new tub. | $70,000 |
| Jul 16, 2021 | Never finaled issued Jul 2021, no final | 1839 15th St | bathroom remodel like to like, new tub new tile. no wall alteration.Details
bathroom remodel like to like, new tub new tile. no wall alteration. | $35,000 |
| Feb 21, 2013 | Completed final sign-off Apr 2013 | 360 Guerrero St | new tub, new cabinet in bathroom, painting, no alteration of partition wall.Details
new tub, new cabinet in bathroom, painting, no alteration of partition wall. | $5,000 |