Back to kitchen remodel contractors
H I & D Construction
- Based in
- Concord
- On San Francisco permits
- Feb 2013 to Jul 2026
- Last 24 months
- 8 permits filed
19 permits since 2000: 16 completed, 1 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 3 completed, 1 in progress, 1 expired or cancelled. Typically 1 days from filing to permit and 66 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 8, 2025 | In progress issued May 2026 | 9 14th Av | addition of habitable space at the rear on the 1st fl. infill lightwell to the south fl 1 & 2. infill lightwell to the north 2nd fl only. remodel kitchen in unit 9 & 11 14th ave. remodel/reconfigure baths to units 9 & 11. all (n) interior finishes to replace (e) finishes. new deck at rear 3rd fl.Details
addition of habitable space at the rear on the 1st fl. infill lightwell to the south fl 1 & 2. infill lightwell to the north 2nd fl only. remodel kitchen in unit 9 & 11 14th ave. remodel/reconfigure baths to units 9 & 11. all (n) interior finishes to replace (e) finishes. new deck at rear 3rd fl. | $380,000 |
| Jun 24, 2025 | Completed final sign-off Oct 2025 | 283 Dellbrook Av | like for like kitchen remodel, center sink with window. replace knob and tube wiring. replace front door. paint interior house. install new baseboards and trim.Details
like for like kitchen remodel, center sink with window. replace knob and tube wiring. replace front door. paint interior house. install new baseboards and trim. | $70,000 |
| Mar 27, 2025 | Expired or cancelled expired Jul 2026 | 234 Monterey Bl | kitchen remodel like for like, new flooring, new cabinets, update electrical service, update electrical in kitchen and bath., change knob and tube wiring where exist. bathroom remodel, new shower, new tile new tub.Details
kitchen remodel like for like, new flooring, new cabinets, update electrical service, update electrical in kitchen and bath., change knob and tube wiring where exist. bathroom remodel, new shower, new tile new tub. | $70,000 |
| Sep 14, 2017 | Completed final sign-off Nov 2017 | 360 Guerrero St | install new sheet rock in closet, patch ceiling where needed. kitchen faucet and angel stop, p-trap replacement due leakage. relocate subpanel, install and replace (e) lights to led. run one circuit to electric heat.Details
install new sheet rock in closet, patch ceiling where needed. kitchen faucet and angel stop, p-trap replacement due leakage. relocate subpanel, install and replace (e) lights to led. run one circuit to electric heat. | $5,000 |
| Jul 19, 2013 | Completed final sign-off Sep 2013 | 360 Guerrero St | kitchen remodel - change cabinet & countertops, change existing appliances. no structural workDetails
kitchen remodel - change cabinet & countertops, change existing appliances. no structural work | $10,000 |