Shelter Cove Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2017 to Jun 2021
- Last 24 months
- 0 permits filed
9 permits since 2000: 7 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 28, 2021 | Completed final sign-off Jul 2021 | 160 Eastwood Dr | repair of deck guard railing located at back of building. less than 50% of repaires to deck.Details
repair of deck guard railing located at back of building. less than 50% of repaires to deck. | $4,500 |
| May 12, 2021 | Never finaled issued May 2021, no final | 2118 46th Av | remove and install laminate flooring in hallway & bedroom. replace back door in-kind.Details
remove and install laminate flooring in hallway & bedroom. replace back door in-kind. | $12,000 |
| Apr 23, 2021 | Completed final sign-off Oct 2021 | 1219 14th Av | revision to no-plan permit 202006309364. kitchen, laundry and bath renovation at (e) locations. relocate 2 (e) openings in non structural walls. replace in kind 4 windows in lightwells. no structural work.Details
revision to no-plan permit 202006309364. kitchen, laundry and bath renovation at (e) locations. relocate 2 (e) openings in non structural walls. replace in kind 4 windows in lightwells. no structural work. | |
| Feb 27, 2020 | Completed final sign-off Nov 2020 | 3244 Folsom St | change kitchen cabinets, upgrade kitchen electrical, change bathroom vanity.Details
change kitchen cabinets, upgrade kitchen electrical, change bathroom vanity. | $20,000 |
| Jan 16, 2020 | Completed final sign-off Feb 2021 | 1558 23rd Av | add entryway to basement. widen door at street facade to access entryway.Details
add entryway to basement. widen door at street facade to access entryway. | $25,000 |
| Jan 3, 2019 | Never finaled issued Jan 2019, no final | 57 Wool St | replace 3 windows with same style, configuration and operation as existing street facing. wood clad windows.Details
replace 3 windows with same style, configuration and operation as existing street facing. wood clad windows. | $6,500 |
| Nov 26, 2018 | Completed final sign-off Oct 2019 | 1571 Shotwell St | repalce windows, replace cabinets in kitchen, lights & outlets in kitchenDetails
repalce windows, replace cabinets in kitchen, lights & outlets in kitchen | $37,000 |
| Jun 18, 2018 | Completed final sign-off Jul 2020 | 815 30th Av | new lightwell infill, new exterior entry door, new skylights (4), new opening at lower level rear, facade change at front. all work within extg bldg area.Details
new lightwell infill, new exterior entry door, new skylights (4), new opening at lower level rear, facade change at front. all work within extg bldg area. | $300,000 |
| Dec 19, 2017 | Completed final sign-off Aug 2018 | 57 Wool St | convert existing closet to bathroom on 2nd floor.Details
convert existing closet to bathroom on 2nd floor. | $40,000 |