Permit GraphShortlistSan Francisco building permits since 2000

Ramil Batiancila

License
E17943
Look the license up with the state
Listed as
engineer
Firm
M R Engineering Consultants
Based in
Fremont
On San Francisco permits
Jul 2013 to Aug 2026

26 permits since 2000 (engineer on 26 permits): 13 completed, 6 in progress, 6 never finaled, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Aug 12, 2026In progress
issued Sep 2026
303 02nd StBradshaw Group Incste - n115: ti project, renovation of (e) b occupancy space. no change in occupancy ref bpa: 201603182443 stamp new recive pages ibm
Details
Permit
202608126437
Status
issued
Filed
Aug 12, 2026
Permit issued
Sep 3, 2026
Declared cost
$140,000
Address
303 02nd St

ste - n115: ti project, renovation of (e) b occupancy space. no change in occupancy ref bpa: 201603182443 stamp new recive pages ibm

Open the permit page

$140,000
Aug 5, 2026In progress
filed Aug 2026, not yet issued
1852 10th Avexpansin on 1st floor to match upper floor footprint to add 3 bedrooms and 2 bathrooms interior remodeling of 2nd floor including relocating 2 stairs and bath and addition of 1/2 bath. proposed (n) stair to back yard from (e) deck proposed roof deck. complete structrual upgrade including (n)
Details
Permit
202608056097
Status
triage
Filed
Aug 5, 2026
Declared cost
$300,000
Address
1852 10th Av

expansin on 1st floor to match upper floor footprint to add 3 bedrooms and 2 bathrooms interior remodeling of 2nd floor including relocating 2 stairs and bath and addition of 1/2 bath. proposed (n) stair to back yard from (e) deck proposed roof deck. complete structrual upgrade including (n)

Open the permit page

$300,000
Aug 4, 2026In progress
filed Aug 2026, not yet issued
120 Brannan Stconvert 120 brannan(previously bayside market) 140 brannan into a daycrare. provide non-structural walls. counter w/ sink & cabinets; office; breakroom; adult restroom; play area fence; children toilets & lavatories; new ceiling, lights,hvac & electrical.
Details
Permit
202608046058
Status
triage
Filed
Aug 4, 2026
Declared cost
$800,000
Address
120 Brannan St

convert 120 brannan(previously bayside market) 140 brannan into a daycrare. provide non-structural walls. counter w/ sink & cabinets; office; breakroom; adult restroom; play area fence; children toilets & lavatories; new ceiling, lights,hvac & electrical.

Open the permit page

$800,000
Jul 2, 2026In progress
issued Jul 2026
883 Mission StXp Construction Llc.tenant improvement converting (e) pizza shop to sandwich shop. ref bpa: 200810204619
Details
Permit
202607024486
Status
issued
Filed
Jul 2, 2026
Permit issued
Jul 20, 2026
Declared cost
$125,000
Address
883 Mission St

tenant improvement converting (e) pizza shop to sandwich shop. ref bpa: 200810204619

Open the permit page

$125,000
Apr 22, 2026Completed
final sign-off Jul 2026
1155 Market StCodesign Llcinterior t.i. project within an (e) suite occupying the 6th fl. scope includes modifications to (e) offices and confrence rooms to create additional private offices. construction of conference rooms to create additional private closet. project also includes reconfiguration of (e) open office areas
Details
Permit
202604229870
Status
complete
Filed
Apr 22, 2026
Permit issued
May 11, 2026
Final sign-off
Jul 20, 2026
Declared cost
$200,000
Address
1155 Market St

interior t.i. project within an (e) suite occupying the 6th fl. scope includes modifications to (e) offices and confrence rooms to create additional private offices. construction of conference rooms to create additional private closet. project also includes reconfiguration of (e) open office areas

Open the permit page

$200,000
Feb 25, 2026Completed
final sign-off Jun 2026
444 Townsend StCodesign Llcadd light manufacturing use. interior renovation to (e) office space. 2 new conference rooms, new shop spaces for minor repairs to personal transportation vehicles, new accessible shower, new rollup door in (e) opening & minor paint/interior finish replacement. partial change of use to lab on 1st fl
Details
Permit
202602256523
Status
complete
Filed
Feb 25, 2026
Permit issued
Apr 17, 2026
Final sign-off
Jun 8, 2026
Declared cost
$900,000
Address
444 Townsend St

add light manufacturing use. interior renovation to (e) office space. 2 new conference rooms, new shop spaces for minor repairs to personal transportation vehicles, new accessible shower, new rollup door in (e) opening & minor paint/interior finish replacement. partial change of use to lab on 1st fl

Open the permit page

$900,000
Aug 10, 2025In progress
issued Feb 2026
2737 Taylor StFive Rivers Constructioninterior tenant improvement to convert vacant space to an ice cream shop. new interior partition, new ada restroom, and new finishes throughout including mep work. fire and life safety will be deferred submittal.
Details
Permit
202507150793
Status
issued
Filed
Aug 10, 2025
Permit issued
Feb 3, 2026
Declared cost
$150,000
Address
2737 Taylor St

interior tenant improvement to convert vacant space to an ice cream shop. new interior partition, new ada restroom, and new finishes throughout including mep work. fire and life safety will be deferred submittal.

Open the permit page

$150,000
Aug 5, 2025In progress
issued Aug 2025
2571 Mission StMaxg Construction Inc (Maxwell M Ghobadiproposed revision to pa # 2022-1104-5905. change electric to gas for dwelling units.
Details
Permit
202508052321
Status
issued
Filed
Aug 5, 2025
Permit issued
Aug 21, 2025
Address
2571 Mission St

proposed revision to pa # 2022-1104-5905. change electric to gas for dwelling units.

Open the permit page

Jul 18, 2025Completed
final sign-off Apr 2026
155 05th StRcp Construction Llc6th fl: tenant improvement for uop audiology dept. relocating from the 1st fl to a portion of the 6th fl (10,580 ft). includes room repurposing and internal layout modifications. shared common area to provide access for uop & future tenant. access includes restrooms, electrical room & elevators.
Details
Permit
202507181191
Status
complete
Filed
Jul 18, 2025
Permit issued
Oct 22, 2025
Final sign-off
Apr 15, 2026
Declared cost
$500,000
Address
155 05th St

6th fl: tenant improvement for uop audiology dept. relocating from the 1st fl to a portion of the 6th fl (10,580 ft). includes room repurposing and internal layout modifications. shared common area to provide access for uop & future tenant. access includes restrooms, electrical room & elevators.

Open the permit page

$500,000
Apr 1, 2025Completed
final sign-off Nov 2025
250 Stockton StEndora Builderscreating new non-bearing partition walls for reception & waiting area, 4 operatories, 1 procedure room, consult rm, photo room, office manager, steri,staff lounge & other support areas. new gyp board ceiling and soffits are proposed. or sinks & service sinks will be installed
Details
Permit
202504013508
Status
complete
Filed
Apr 1, 2025
Permit issued
May 7, 2025
Final sign-off
Nov 7, 2025
Declared cost
$350,000
Address
250 Stockton St

creating new non-bearing partition walls for reception & waiting area, 4 operatories, 1 procedure room, consult rm, photo room, office manager, steri,staff lounge & other support areas. new gyp board ceiling and soffits are proposed. or sinks & service sinks will be installed

Open the permit page

$350,000
Oct 4, 2024Completed
final sign-off Oct 2025
2051 Balboa StCy Lo Builderti of (e) fitness studio
Details
Permit
202410042324
Status
complete
Filed
Oct 4, 2024
Permit issued
Nov 7, 2024
Final sign-off
Oct 22, 2025
Declared cost
$50,000
Address
2051 Balboa St

ti of (e) fitness studio

Open the permit page

$50,000
Jun 15, 2022Never finaled
issued Mar 2023, no final
641 Irving StGreenberg Construction Copartial cafe remodel at service/ dining area. new cabinetry, lighting, equipment, ada upgrades, exterior tile. electrical & plumbing, hvac & lighting upgrade. replace front to meet ada & new signage.
Details
Permit
202206156404
Status
issued
Filed
Jun 15, 2022
Permit issued
Mar 1, 2023
Declared cost
$120,000
Address
641 Irving St

partial cafe remodel at service/ dining area. new cabinetry, lighting, equipment, ada upgrades, exterior tile. electrical & plumbing, hvac & lighting upgrade. replace front to meet ada & new signage.

Open the permit page

$120,000
Aug 30, 2021Never finaled
issued Oct 2021, no final
1355 Stockton StGeorge Line Constructionrev to pa202009083730: mep package - title 24 compliance for g/f commercial only.
Details
Permit
202108307397
Status
issued
Filed
Aug 30, 2021
Permit issued
Oct 15, 2021
Address
1355 Stockton St

rev to pa202009083730: mep package - title 24 compliance for g/f commercial only.

Open the permit page

Dec 4, 2020Never finaled
issued Jun 2021, no final
5169 Mission StGolden Gate Solar, Boivin Environmentalnew interior walls for new ada restroom. new mech, elec, plumb for (n) kitchen equipment.
Details
Permit
202012040248
Status
issued
Filed
Dec 4, 2020
Permit issued
Jun 16, 2021
Declared cost
$180,000
Address
5169 Mission St

new interior walls for new ada restroom. new mech, elec, plumb for (n) kitchen equipment.

Open the permit page

$180,000
Feb 11, 2020Completed
final sign-off Jul 2020
953 Indiana StVantis Dba One Workplace Constructiondemolition of non-loading bearing walls and ceiling soffit. new non-loading bearing partitions, carpet, paint, ceiling and lighting. there are no site improvements in this scope of work.
Details
Permit
202002114068
Status
complete
Filed
Feb 11, 2020
Permit issued
Mar 10, 2020
Final sign-off
Jul 20, 2020
Declared cost
$60,000
Address
953 Indiana St

demolition of non-loading bearing walls and ceiling soffit. new non-loading bearing partitions, carpet, paint, ceiling and lighting. there are no site improvements in this scope of work.

Open the permit page

$60,000
Nov 7, 2019Completed
final sign-off May 2021
3251 20th AvW G Fritz Construction Inc.suite 138: revision to pa#2019-0820-9376: revised tenant layout (art of reflexology). add glass to storefront tenant space is for massage service.
Details
Permit
201911076686
Status
complete
Filed
Nov 7, 2019
Permit issued
Dec 11, 2019
Final sign-off
May 10, 2021
Declared cost
$10,000
Address
3251 20th Av

suite 138: revision to pa#2019-0820-9376: revised tenant layout (art of reflexology). add glass to storefront tenant space is for massage service.

Open the permit page

$10,000
Aug 29, 2019Never finaled
issued Aug 2019, no final
388 Beale StNorth-West Pacific Builders Incelectrical and mechanical work, t-24 associated with pa #201904107647 office area
Details
Permit
201908290250
Status
issued
Filed
Aug 29, 2019
Permit issued
Aug 29, 2019
Declared cost
$18,000
Address
388 Beale St

electrical and mechanical work, t-24 associated with pa #201904107647 office area

Open the permit page

$18,000
Dec 21, 2018Expired or cancelled
withdrawn Aug 2019
970 Tennessee StPlatinum Builders Increvision to pa #201807255461. office renovation w/accessory lab, accessible toilet rooms, conference room, lighting & hvac revised, no exterior changes.
Details
Permit
201812218976
Status
withdrawn
Filed
Dec 21, 2018
Address
970 Tennessee St

revision to pa #201807255461. office renovation w/accessory lab, accessible toilet rooms, conference room, lighting & hvac revised, no exterior changes.

Open the permit page

Jun 8, 2018Never finaled
issued Jan 2019, no final
1184 Valencia Stinterior electrical, lighting, and title 24. no duct, hvac, mechanical work. maher na
Details
Permit
201806081414
Status
issued
Filed
Jun 8, 2018
Permit issued
Jan 23, 2019
Declared cost
$12,500
Address
1184 Valencia St

interior electrical, lighting, and title 24. no duct, hvac, mechanical work. maher na

Open the permit page

$12,500
Jan 30, 2018Completed
final sign-off Oct 2018
500 Church StMendez-Ortiz Contractorsti for creation of new cafe/bona fide eating establishemnt. new finishes, mech, plm, ele and partitions. ref cp-zoc app 2017009207cua. fire alarm upgrade permit #201710252172.
Details
Permit
201801309929
Status
complete
Filed
Jan 30, 2018
Permit issued
May 31, 2018
Final sign-off
Oct 24, 2018
Declared cost
$80,000
Address
500 Church St

ti for creation of new cafe/bona fide eating establishemnt. new finishes, mech, plm, ele and partitions. ref cp-zoc app 2017009207cua. fire alarm upgrade permit #201710252172.

Open the permit page

$80,000
Mar 9, 2017Never finaled
issued Apr 2017, no final
345 03rd StDeacon Construction Llcremodel existing apartment leasing office, 428 sq.ft. addition and remodel to an existing concierge lounge.
Details
Permit
201703091118
Status
issued
Filed
Mar 9, 2017
Permit issued
Apr 17, 2017
Declared cost
$100,000
Address
345 03rd St

remodel existing apartment leasing office, 428 sq.ft. addition and remodel to an existing concierge lounge.

Open the permit page

$100,000
Jul 15, 2016Completed
final sign-off Aug 2017
1400 16th StSkyline Constructionnew non structural partitions new mechanical, plumbing and electrical. new finishes and fixtures. change of use from garment factory to laboratory. ** maher: n/a **
Details
Permit
201607152520
Status
complete
Filed
Jul 15, 2016
Permit issued
Dec 27, 2016
Final sign-off
Aug 11, 2017
Declared cost
$4,800,000
Address
1400 16th St

new non structural partitions new mechanical, plumbing and electrical. new finishes and fixtures. change of use from garment factory to laboratory. ** maher: n/a **

Open the permit page

$4,800,000
Jan 6, 2016Completed
final sign-off Apr 2016
490 Post StBarber Constructionunit #1135: modification of lighting fixture to minimize wattage usage per allowable title 24 interior lighting compliances. revision to original permit #201511172830. n/a for maher
Details
Permit
201601066428
Status
complete
Filed
Jan 6, 2016
Permit issued
Jan 6, 2016
Final sign-off
Apr 19, 2016
Address
490 Post St

unit #1135: modification of lighting fixture to minimize wattage usage per allowable title 24 interior lighting compliances. revision to original permit #201511172830. n/a for maher

Open the permit page

Nov 17, 2015Completed
final sign-off Jun 2017
490 Post StBarber Constructionelectrical lighting reduction. title 24 modification. revision for pa#201507151577
Details
Permit
201511172830
Status
complete
Filed
Nov 17, 2015
Permit issued
Nov 17, 2015
Final sign-off
Jun 21, 2017
Address
490 Post St

electrical lighting reduction. title 24 modification. revision for pa#201507151577

Open the permit page

Jan 30, 2015Completed
final sign-off Nov 2015
708 Kearny StCrown Plumbing & Constructionnew prep area, new plumbing for sink, new electrical switch board, new lights, re-tile bathroom, re-finish restroom; maher n/a
Details
Permit
201501307152
Status
complete
Filed
Jan 30, 2015
Permit issued
Mar 30, 2015
Final sign-off
Nov 24, 2015
Declared cost
$23,300
Address
708 Kearny St

new prep area, new plumbing for sink, new electrical switch board, new lights, re-tile bathroom, re-finish restroom; maher n/a

Open the permit page

$23,300
Jul 31, 2013Completed
final sign-off Oct 2015
967 Sutter Stremodeling of three residential dwelling units. legalize existing 3rd residential unit.
Details
Permit
201307313198
Status
complete
Filed
Jul 31, 2013
Permit issued
Jan 29, 2014
Final sign-off
Oct 1, 2015
Declared cost
$150,000
Address
967 Sutter St

remodeling of three residential dwelling units. legalize existing 3rd residential unit.

Open the permit page

$150,000
Ramil Batiancila, license E17943 | Permit Graph