Ramil Batiancila
- Listed as
- engineer
- Firm
- M R Engineering Consultants
- Based in
- Fremont
- On San Francisco permits
- Jul 2013 to Aug 2026
26 permits since 2000 (engineer on 26 permits): 13 completed, 6 in progress, 6 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 12, 2026 | In progress issued Sep 2026 | 303 02nd St | Bradshaw Group Inc | ste - n115: ti project, renovation of (e) b occupancy space. no change in occupancy ref bpa: 201603182443 stamp new recive pages ibmDetails
ste - n115: ti project, renovation of (e) b occupancy space. no change in occupancy ref bpa: 201603182443 stamp new recive pages ibm | $140,000 |
| Aug 5, 2026 | In progress filed Aug 2026, not yet issued | 1852 10th Av | expansin on 1st floor to match upper floor footprint to add 3 bedrooms and 2 bathrooms interior remodeling of 2nd floor including relocating 2 stairs and bath and addition of 1/2 bath. proposed (n) stair to back yard from (e) deck proposed roof deck. complete structrual upgrade including (n)Details
expansin on 1st floor to match upper floor footprint to add 3 bedrooms and 2 bathrooms interior remodeling of 2nd floor including relocating 2 stairs and bath and addition of 1/2 bath. proposed (n) stair to back yard from (e) deck proposed roof deck. complete structrual upgrade including (n) | $300,000 | |
| Aug 4, 2026 | In progress filed Aug 2026, not yet issued | 120 Brannan St | convert 120 brannan(previously bayside market) 140 brannan into a daycrare. provide non-structural walls. counter w/ sink & cabinets; office; breakroom; adult restroom; play area fence; children toilets & lavatories; new ceiling, lights,hvac & electrical.Details
convert 120 brannan(previously bayside market) 140 brannan into a daycrare. provide non-structural walls. counter w/ sink & cabinets; office; breakroom; adult restroom; play area fence; children toilets & lavatories; new ceiling, lights,hvac & electrical. | $800,000 | |
| Jul 2, 2026 | In progress issued Jul 2026 | 883 Mission St | Xp Construction Llc. | tenant improvement converting (e) pizza shop to sandwich shop. ref bpa: 200810204619Details
tenant improvement converting (e) pizza shop to sandwich shop. ref bpa: 200810204619 | $125,000 |
| Apr 22, 2026 | Completed final sign-off Jul 2026 | 1155 Market St | Codesign Llc | interior t.i. project within an (e) suite occupying the 6th fl. scope includes modifications to (e) offices and confrence rooms to create additional private offices. construction of conference rooms to create additional private closet. project also includes reconfiguration of (e) open office areasDetails
interior t.i. project within an (e) suite occupying the 6th fl. scope includes modifications to (e) offices and confrence rooms to create additional private offices. construction of conference rooms to create additional private closet. project also includes reconfiguration of (e) open office areas | $200,000 |
| Feb 25, 2026 | Completed final sign-off Jun 2026 | 444 Townsend St | Codesign Llc | add light manufacturing use. interior renovation to (e) office space. 2 new conference rooms, new shop spaces for minor repairs to personal transportation vehicles, new accessible shower, new rollup door in (e) opening & minor paint/interior finish replacement. partial change of use to lab on 1st flDetails
add light manufacturing use. interior renovation to (e) office space. 2 new conference rooms, new shop spaces for minor repairs to personal transportation vehicles, new accessible shower, new rollup door in (e) opening & minor paint/interior finish replacement. partial change of use to lab on 1st fl | $900,000 |
| Aug 10, 2025 | In progress issued Feb 2026 | 2737 Taylor St | Five Rivers Construction | interior tenant improvement to convert vacant space to an ice cream shop. new interior partition, new ada restroom, and new finishes throughout including mep work. fire and life safety will be deferred submittal.Details
interior tenant improvement to convert vacant space to an ice cream shop. new interior partition, new ada restroom, and new finishes throughout including mep work. fire and life safety will be deferred submittal. | $150,000 |
| Aug 5, 2025 | In progress issued Aug 2025 | 2571 Mission St | Maxg Construction Inc (Maxwell M Ghobadi | proposed revision to pa # 2022-1104-5905. change electric to gas for dwelling units.Details
proposed revision to pa # 2022-1104-5905. change electric to gas for dwelling units. | |
| Jul 18, 2025 | Completed final sign-off Apr 2026 | 155 05th St | Rcp Construction Llc | 6th fl: tenant improvement for uop audiology dept. relocating from the 1st fl to a portion of the 6th fl (10,580 ft). includes room repurposing and internal layout modifications. shared common area to provide access for uop & future tenant. access includes restrooms, electrical room & elevators.Details
6th fl: tenant improvement for uop audiology dept. relocating from the 1st fl to a portion of the 6th fl (10,580 ft). includes room repurposing and internal layout modifications. shared common area to provide access for uop & future tenant. access includes restrooms, electrical room & elevators. | $500,000 |
| Apr 1, 2025 | Completed final sign-off Nov 2025 | 250 Stockton St | Endora Builders | creating new non-bearing partition walls for reception & waiting area, 4 operatories, 1 procedure room, consult rm, photo room, office manager, steri,staff lounge & other support areas. new gyp board ceiling and soffits are proposed. or sinks & service sinks will be installedDetails
creating new non-bearing partition walls for reception & waiting area, 4 operatories, 1 procedure room, consult rm, photo room, office manager, steri,staff lounge & other support areas. new gyp board ceiling and soffits are proposed. or sinks & service sinks will be installed | $350,000 |
| Oct 4, 2024 | Completed final sign-off Oct 2025 | 2051 Balboa St | Cy Lo Builder | ti of (e) fitness studioDetails
ti of (e) fitness studio | $50,000 |
| Jun 15, 2022 | Never finaled issued Mar 2023, no final | 641 Irving St | Greenberg Construction Co | partial cafe remodel at service/ dining area. new cabinetry, lighting, equipment, ada upgrades, exterior tile. electrical & plumbing, hvac & lighting upgrade. replace front to meet ada & new signage.Details
partial cafe remodel at service/ dining area. new cabinetry, lighting, equipment, ada upgrades, exterior tile. electrical & plumbing, hvac & lighting upgrade. replace front to meet ada & new signage. | $120,000 |
| Aug 30, 2021 | Never finaled issued Oct 2021, no final | 1355 Stockton St | George Line Construction | rev to pa202009083730: mep package - title 24 compliance for g/f commercial only.Details
rev to pa202009083730: mep package - title 24 compliance for g/f commercial only. | |
| Dec 4, 2020 | Never finaled issued Jun 2021, no final | 5169 Mission St | Golden Gate Solar, Boivin Environmental | new interior walls for new ada restroom. new mech, elec, plumb for (n) kitchen equipment.Details
new interior walls for new ada restroom. new mech, elec, plumb for (n) kitchen equipment. | $180,000 |
| Feb 11, 2020 | Completed final sign-off Jul 2020 | 953 Indiana St | Vantis Dba One Workplace Construction | demolition of non-loading bearing walls and ceiling soffit. new non-loading bearing partitions, carpet, paint, ceiling and lighting. there are no site improvements in this scope of work.Details
demolition of non-loading bearing walls and ceiling soffit. new non-loading bearing partitions, carpet, paint, ceiling and lighting. there are no site improvements in this scope of work. | $60,000 |
| Nov 7, 2019 | Completed final sign-off May 2021 | 3251 20th Av | W G Fritz Construction Inc. | suite 138: revision to pa#2019-0820-9376: revised tenant layout (art of reflexology). add glass to storefront tenant space is for massage service.Details
suite 138: revision to pa#2019-0820-9376: revised tenant layout (art of reflexology). add glass to storefront tenant space is for massage service. | $10,000 |
| Aug 29, 2019 | Never finaled issued Aug 2019, no final | 388 Beale St | North-West Pacific Builders Inc | electrical and mechanical work, t-24 associated with pa #201904107647 office areaDetails
electrical and mechanical work, t-24 associated with pa #201904107647 office area | $18,000 |
| Dec 21, 2018 | Expired or cancelled withdrawn Aug 2019 | 970 Tennessee St | Platinum Builders Inc | revision to pa #201807255461. office renovation w/accessory lab, accessible toilet rooms, conference room, lighting & hvac revised, no exterior changes.Details
revision to pa #201807255461. office renovation w/accessory lab, accessible toilet rooms, conference room, lighting & hvac revised, no exterior changes. | |
| Jun 8, 2018 | Never finaled issued Jan 2019, no final | 1184 Valencia St | interior electrical, lighting, and title 24. no duct, hvac, mechanical work. maher naDetails
interior electrical, lighting, and title 24. no duct, hvac, mechanical work. maher na | $12,500 | |
| Jan 30, 2018 | Completed final sign-off Oct 2018 | 500 Church St | Mendez-Ortiz Contractors | ti for creation of new cafe/bona fide eating establishemnt. new finishes, mech, plm, ele and partitions. ref cp-zoc app 2017009207cua. fire alarm upgrade permit #201710252172.Details
ti for creation of new cafe/bona fide eating establishemnt. new finishes, mech, plm, ele and partitions. ref cp-zoc app 2017009207cua. fire alarm upgrade permit #201710252172. | $80,000 |
| Mar 9, 2017 | Never finaled issued Apr 2017, no final | 345 03rd St | Deacon Construction Llc | remodel existing apartment leasing office, 428 sq.ft. addition and remodel to an existing concierge lounge.Details
remodel existing apartment leasing office, 428 sq.ft. addition and remodel to an existing concierge lounge. | $100,000 |
| Jul 15, 2016 | Completed final sign-off Aug 2017 | 1400 16th St | Skyline Construction | new non structural partitions new mechanical, plumbing and electrical. new finishes and fixtures. change of use from garment factory to laboratory. ** maher: n/a **Details
new non structural partitions new mechanical, plumbing and electrical. new finishes and fixtures. change of use from garment factory to laboratory. ** maher: n/a ** | $4,800,000 |
| Jan 6, 2016 | Completed final sign-off Apr 2016 | 490 Post St | Barber Construction | unit #1135: modification of lighting fixture to minimize wattage usage per allowable title 24 interior lighting compliances. revision to original permit #201511172830. n/a for maherDetails
unit #1135: modification of lighting fixture to minimize wattage usage per allowable title 24 interior lighting compliances. revision to original permit #201511172830. n/a for maher | |
| Nov 17, 2015 | Completed final sign-off Jun 2017 | 490 Post St | Barber Construction | electrical lighting reduction. title 24 modification. revision for pa#201507151577Details
electrical lighting reduction. title 24 modification. revision for pa#201507151577 | |
| Jan 30, 2015 | Completed final sign-off Nov 2015 | 708 Kearny St | Crown Plumbing & Construction | new prep area, new plumbing for sink, new electrical switch board, new lights, re-tile bathroom, re-finish restroom; maher n/aDetails
new prep area, new plumbing for sink, new electrical switch board, new lights, re-tile bathroom, re-finish restroom; maher n/a | $23,300 |
| Jul 31, 2013 | Completed final sign-off Oct 2015 | 967 Sutter St | remodeling of three residential dwelling units. legalize existing 3rd residential unit.Details
remodeling of three residential dwelling units. legalize existing 3rd residential unit. | $150,000 |