Simon Kwan
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Kwan Design Architects
- Based in
- San Francisco
- On San Francisco permits
- Mar 2003 to Sep 2026
187 permits since 2000 (architect on 177 permits, engineer on 4 permits, authorized agent-others on 3 permits, designer on 3 permits): 126 completed, 13 in progress, 21 never finaled, 27 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 187.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 10, 2026 | In progress filed Sep 2026, not yet issued | 1100 Van Ness Av | Chiang C M Construction Inc. | revision to pa# 202601153928. remove sloping walk and door handles.Details
revision to pa# 202601153928. remove sloping walk and door handles. | $1,000 |
| Aug 4, 2026 | In progress filed Aug 2026, not yet issued | 120 Brannan St | convert 120 brannan(previously bayside market) 140 brannan into a daycrare. provide non-structural walls. counter w/ sink & cabinets; office; breakroom; adult restroom; play area fence; children toilets & lavatories; new ceiling, lights,hvac & electrical.Details
convert 120 brannan(previously bayside market) 140 brannan into a daycrare. provide non-structural walls. counter w/ sink & cabinets; office; breakroom; adult restroom; play area fence; children toilets & lavatories; new ceiling, lights,hvac & electrical. | $800,000 | |
| Jul 27, 2026 | In progress filed Jul 2026, not yet issued | 1468 Clay St | reconfigure 1470 clay interior from 3 bedroom, 2 baths to 4 bedroom, 4 baths. reconfigure 1468 clay interior from 3 bedroom, 2.5 baths to 3 bedroom, 3 baths, remodel 2 kitchens, new shear walls, replace in kind all (e) windows, all new drywalls, lights & electricalDetails
reconfigure 1470 clay interior from 3 bedroom, 2 baths to 4 bedroom, 4 baths. reconfigure 1468 clay interior from 3 bedroom, 2.5 baths to 3 bedroom, 3 baths, remodel 2 kitchens, new shear walls, replace in kind all (e) windows, all new drywalls, lights & electrical | $800,000 | |
| Jun 29, 2026 | In progress filed Jun 2026, not yet issued | 261 Dolores St | P Jordan Builders Llc | reduce the number of bedrooms to make living areas bigger and remodel the kitchens in all 3 units.Details
reduce the number of bedrooms to make living areas bigger and remodel the kitchens in all 3 units. | $90,000 |
| Feb 24, 2026 | In progress issued Jun 2026 | 1100 Van Ness Av | Chiang C M Construction Inc. | suite 201:: t.i. for daycare including children less than 3 years old. provide counter with sink, storage cabinets, lighting, hvac & electrical.Details
suite 201:: t.i. for daycare including children less than 3 years old. provide counter with sink, storage cabinets, lighting, hvac & electrical. | $125,000 |
| Dec 17, 2025 | In progress issued Sep 2026 | 2900 Scott St | Andrew Vanni Builders Inc | convert storage to media room. reconfigure interiors of the lower 2 units. reconfigure interiors & horizontal addition of the upper unit with a roof deck. replace in kind all (e) windows. new drywall, lights & electrical.Details
convert storage to media room. reconfigure interiors of the lower 2 units. reconfigure interiors & horizontal addition of the upper unit with a roof deck. replace in kind all (e) windows. new drywall, lights & electrical. | $1,800,000 |
| Sep 24, 2025 | Completed final sign-off Sep 2026 | 369 18th Av | 1/f ste# 100: tenant improvement with office, meeting room, break room, restroom, lighting, and electrical. insurance agencyDetails
1/f ste# 100: tenant improvement with office, meeting room, break room, restroom, lighting, and electrical. insurance agency | $170,000 | |
| Sep 3, 2025 | In progress issued Sep 2025 | 200 04th Av | G M Building And Construction Inc | revision to pa# 202405242971 & 202412106484: remodel 5 bathrooms on 3/f; change 5 windows for egress; provide rated walls as shown; show reinforced floor joists and reduce beam span with new walsl and posts; replace wall heaters to furnace and tank to tankless water heaters; new drywall throughout,Details
revision to pa# 202405242971 & 202412106484: remodel 5 bathrooms on 3/f; change 5 windows for egress; provide rated walls as shown; show reinforced floor joists and reduce beam span with new walsl and posts; replace wall heaters to furnace and tank to tankless water heaters; new drywall throughout, | $200,000 |
| Jul 18, 2025 | In progress issued Jul 2026 | 136 Caine Av | Y D Construction Co. Inc. | vertical & horizontal addition at the back and reconfigure interior to 3 bedrooms and 3 baths.Details
vertical & horizontal addition at the back and reconfigure interior to 3 bedrooms and 3 baths. | $220,000 |
| May 12, 2025 | In progress filed May 2025, not yet issued | 51 Page St | 1st fl - add 2 new restroom and a demising wall; remove storefront window and change to entrance door. shop remain vacant and ti under separate permits. mep deferred.Details
1st fl - add 2 new restroom and a demising wall; remove storefront window and change to entrance door. shop remain vacant and ti under separate permits. mep deferred. | $8,000 | |
| May 8, 2025 | In progress filed May 2025, not yet issued | 96 Gough St | remove non bearing wall in tenant space, no exterior workDetails
remove non bearing wall in tenant space, no exterior work | $2,000 | |
| Feb 28, 2025 | Completed final sign-off Jun 2025 | 42 Waller St | Silicon Valley General Builder Contracto | convert existing daycare from occupancy e to i-4 to care for children under 3 years old. convert one kids restroom to an adult restroom. provide additional ventilation and per health code article 38.Details
convert existing daycare from occupancy e to i-4 to care for children under 3 years old. convert one kids restroom to an adult restroom. provide additional ventilation and per health code article 38. | $50,000 |
| Feb 25, 2025 | Completed final sign-off Aug 2025 | 693 Sutter St | P Jordan Builders Llc | revision to 201708235690 & 202412136796 2nd to 6th fl. remove non bearing walls to combine small bedrooms into larger bedrooms; remove 4 full baths & 4 half baths @ 3rd, 4th, 5th & 6th floor; move kitchen to corner of lines 6 & a.5 from 2nd to 6th floorsDetails
revision to 201708235690 & 202412136796 2nd to 6th fl. remove non bearing walls to combine small bedrooms into larger bedrooms; remove 4 full baths & 4 half baths @ 3rd, 4th, 5th & 6th floor; move kitchen to corner of lines 6 & a.5 from 2nd to 6th floors | $500,000 |
| Jan 10, 2025 | In progress issued Feb 2025 | 381 Dellbrook Av | Euro Team Construction | 1st fl: convert storage area into a bedroom, bath and laundry. provide outdoor grill and sink. replace furnace and water heater. 2nd fl: rebuild stair. provide new ceiling beams and new deck at the back. replace front and back cladding to stucco.Details
1st fl: convert storage area into a bedroom, bath and laundry. provide outdoor grill and sink. replace furnace and water heater. 2nd fl: rebuild stair. provide new ceiling beams and new deck at the back. replace front and back cladding to stucco. | $145,000 |
| Dec 13, 2024 | Completed final sign-off Jan 2025 | 535 Lakeview Av | remove unpermitted metal fence and gate. install new metal fence and gate in response to dbi complaint 202429811Details
remove unpermitted metal fence and gate. install new metal fence and gate in response to dbi complaint 202429811 | $2,500 | |
| Jul 8, 2024 | Completed final sign-off Sep 2026 | 385 Maynard St | Triond Remodeling Inc, S A Baxter Inc. | kitchen remodel; replace gas furnace with multi split heat pump.Details
kitchen remodel; replace gas furnace with multi split heat pump. | $80,000 |
| Apr 26, 2024 | Expired or cancelled withdrawn Dec 2024 | 555 19th St | install non-electric single faced wall sign "robust intelligence"Details
install non-electric single faced wall sign "robust intelligence" | $5,500 | |
| Dec 1, 2023 | Completed final sign-off Apr 2025 | 4093 24th St | Vsa Construction | accessible business entrance program per ordinace 51-16, lever handles, contrasting strip @ stair & handraul extension. abe# 202001241253.Details
accessible business entrance program per ordinace 51-16, lever handles, contrasting strip @ stair & handraul extension. abe# 202001241253. | $6,000 |
| Dec 1, 2023 | Completed final sign-off Apr 2025 | 4091 24th St | Vsa Construction | accessible business entrance program per ordinace 51-16, provide lever handles, contrasting stripe @ stair & handrail extension, abe# 202001241252.Details
accessible business entrance program per ordinace 51-16, provide lever handles, contrasting stripe @ stair & handrail extension, abe# 202001241252. | $6,000 |
| Dec 1, 2023 | In progress issued Jan 2025 | 272 Wawona St | Euro Team Construction | vertical addition to add 2 bedroom and 1 bath.Details
vertical addition to add 2 bedroom and 1 bath. | $180,000 |
| Dec 1, 2023 | Completed final sign-off Apr 2025 | 4089 24th St | Vsa Construction | accessible business entrance program per ordinace 51-16, provide automatic door opener & ramp threshold. abe# 202001241257.Details
accessible business entrance program per ordinace 51-16, provide automatic door opener & ramp threshold. abe# 202001241257. | $10,000 |
| Oct 31, 2023 | Completed final sign-off Nov 2023 | 290 Divisadero St | Evan Palmer | revision to pa 202203291142 window relocation per inspector request to provide as built to show window move from 290 a to 290 b. not visible from streetDetails
revision to pa 202203291142 window relocation per inspector request to provide as built to show window move from 290 a to 290 b. not visible from street | |
| Sep 28, 2023 | Never finaled filed Sep 2023, never issued | 2248 Mission St | for accessbile business entrance per ordinance#: 51-16, abe202301066015; re-pave recessed entry to provide smooth transition and ramp at the interior. provide power door operator and push plates to open door automatically.Details
for accessbile business entrance per ordinance#: 51-16, abe202301066015; re-pave recessed entry to provide smooth transition and ramp at the interior. provide power door operator and push plates to open door automatically. | $10,000 | |
| Sep 22, 2023 | Expired or cancelled withdrawn Nov 2025 | 646 Mission St | for accessible business entrance: provide automatic door opener and lower intercom. abe# 202309228715Details
for accessible business entrance: provide automatic door opener and lower intercom. abe# 202309228715 | $10,000 | |
| Sep 22, 2023 | Completed final sign-off Jan 2025 | 2127 Broderick St | G-Man Construction | replace interior (e) stair railings, handrail, finish treads & finish riser (interior stair)Details
replace interior (e) stair railings, handrail, finish treads & finish riser (interior stair) | $50,000 |
| Sep 22, 2023 | Completed final sign-off Jul 2024 | 2333 Funston Av | Alpha Construction & Solutions Inc., Zhongwei Construction, Wynn L Builders Inc. | convert portion of garage to home office & bedroom, reconfigure 3-bedrooms/2-bath to 4/bedroom/3.5-bath, remodel kitchen, new interior stair, replace iwndows, provide heat pump water heater, ductless multi-split heating/cooling, upgrade electrical panel 200ampDetails
convert portion of garage to home office & bedroom, reconfigure 3-bedrooms/2-bath to 4/bedroom/3.5-bath, remodel kitchen, new interior stair, replace iwndows, provide heat pump water heater, ductless multi-split heating/cooling, upgrade electrical panel 200amp | $400,000 |
| Jun 30, 2023 | Completed final sign-off Sep 2025 | 886 25th Av | Y D Construction Co. Inc. | convert gr fl storage to guestroom and bath. remodel gr fl media room with counter, sink, and 2 heating elements. no oven.Details
convert gr fl storage to guestroom and bath. remodel gr fl media room with counter, sink, and 2 heating elements. no oven. | $150,000 |
| Jun 7, 2023 | Completed final sign-off Jan 2025 | 2127 Broderick St | G-Man Construction | reconfigure interior from 4 bedroom, 4.5 bath to 4 bedroom, 5.5 bath. remodel kitchen and all baths. new interior finishes, casework, flooing, plumbing fixures and light fixtures. (no ext. changes. existing heating and hot water system to remain)Details
reconfigure interior from 4 bedroom, 4.5 bath to 4 bedroom, 5.5 bath. remodel kitchen and all baths. new interior finishes, casework, flooing, plumbing fixures and light fixtures. (no ext. changes. existing heating and hot water system to remain) | $35,000 |
| May 2, 2023 | Completed final sign-off Jun 2023 | 260 Glenview Dr | Frederic Grasset Design-Build | deck replacement in response to complaints 202305846 and 202306957. str workDetails
deck replacement in response to complaints 202305846 and 202306957. str work | $12,000 |
| Feb 24, 2023 | In progress issued Aug 2024 | 577 02nd St | to comply with accessible business entrance program per ord 51-16. ref abe 201812313644. provide automatic gate opener, change hardware. provide a lift to the lobby & new entry door.Details
to comply with accessible business entrance program per ord 51-16. ref abe 201812313644. provide automatic gate opener, change hardware. provide a lift to the lobby & new entry door. | $124,000 | |
| Feb 2, 2023 | Completed final sign-off Mar 2026 | 1201 43rd Av | Yao Star Construction | legalize 2nd fl un-permitted rear bathroom addition in connection w/ adu pa #202212168535. in response to dbi comment for a ground fl adu permit. a 75 sqft 2nd fl rear bathroom appears to be constructed between 2004-2007 & w/o permit records. this is a hybrid proj w/ needed aduDetails
legalize 2nd fl un-permitted rear bathroom addition in connection w/ adu pa #202212168535. in response to dbi comment for a ground fl adu permit. a 75 sqft 2nd fl rear bathroom appears to be constructed between 2004-2007 & w/o permit records. this is a hybrid proj w/ needed adu | $50,000 |
| Dec 16, 2022 | Completed final sign-off Jul 2026 | 4201 Lincoln Wy | Yao Star Construction | state adu program: legalize ground floor un-permitted unit to a state adu (per government code section 65852.2) in response to dbi violation # 202179935.Details
state adu program: legalize ground floor un-permitted unit to a state adu (per government code section 65852.2) in response to dbi violation # 202179935. | $150,000 |
| Dec 15, 2022 | Completed final sign-off Jun 2023 | 5011 Geary Bl | Ng's Landmark Bldg & Engineering | provide automatic door opener, change door hardware & remove metal gate. to with comply with acessible business entrance program abe 202208283330Details
provide automatic door opener, change door hardware & remove metal gate. to with comply with acessible business entrance program abe 202208283330 | $10,000 |
| Dec 15, 2022 | Never finaled filed Dec 2022, never issued | 1565 Kirkwood Av | legalize storage areas/mezzanine at the back of gr fl garage area in response to notice of violation 202288926. remove half bath. maher not reqDetails
legalize storage areas/mezzanine at the back of gr fl garage area in response to notice of violation 202288926. remove half bath. maher not req | $25,000 | |
| Nov 3, 2022 | Expired or cancelled withdrawn Jun 2024 | 3110 Laguna St | convert existing ground floor storage rooms to a state adu.Details
convert existing ground floor storage rooms to a state adu. | $90,000 | |
| Oct 18, 2022 | Expired or cancelled expired Sep 2026 | 24 Presidio Av | A M V Construction | remove extg deck to replace roof under deck and rebuild deck. also, reroof class a membrane roof under deck to be replaced.Details
remove extg deck to replace roof under deck and rebuild deck. also, reroof class a membrane roof under deck to be replaced. | $35,000 |
| Oct 6, 2022 | Never finaled issued Jun 2023, no final | 674 Douglass St | Pattani Construction Co Inc | change of an existing roof to a roof deck at the back.revision to pa# 201906173589.Details
change of an existing roof to a roof deck at the back.revision to pa# 201906173589. | $20,000 |
| Sep 7, 2022 | Completed final sign-off Apr 2023 | 2415 Van Ness Av | K And D Construction Inc | kitchen and bath remodel in kind. change walk-in close to home office.Details
kitchen and bath remodel in kind. change walk-in close to home office. | $100,000 |
| Jun 2, 2022 | Completed final sign-off Jul 2024 | 2320 Vicente St | legalize permitted ground floor space to 2nd unit per zoning rh-2.Details
legalize permitted ground floor space to 2nd unit per zoning rh-2. | $55,000 | |
| Mar 29, 2022 | Completed final sign-off Nov 2023 | 290 Divisadero St | Evan Palmer | units 290-a, 290-b, 290-c: kitchen, bath remodel & window replacement. reconfigure 2nd & 3rd fl to 3 dwelling units to match unit count in 3-r report & assessor card. add a exterior stair.Details
units 290-a, 290-b, 290-c: kitchen, bath remodel & window replacement. reconfigure 2nd & 3rd fl to 3 dwelling units to match unit count in 3-r report & assessor card. add a exterior stair. | $500,000 |
| Aug 17, 2021 | Expired or cancelled withdrawn Mar 2026 | 1880 Page St | P Jordan Builders Llc | reconfigure layout to provide (10) nontransient residential hotel rooms, and (8) apartments to comply with dbi complaints 201835893, 201865031, 201920706, 201957181, 202015291, 202173572.Details
reconfigure layout to provide (10) nontransient residential hotel rooms, and (8) apartments to comply with dbi complaints 201835893, 201865031, 201920706, 201957181, 202015291, 202173572. | $700,000 |
| Jul 30, 2021 | Expired or cancelled cancelled Sep 2024 | 1053 Kansas St | vertical & horizontal addition. add one additional unit (per zoning rh-2).Details
vertical & horizontal addition. add one additional unit (per zoning rh-2). | $600,000 | |
| Jun 23, 2021 | Never finaled issued Jun 2022, no final | 1445 47th Av | stair replacement at the backDetails
stair replacement at the back | $18,000 | |
| Mar 17, 2021 | Never finaled issued Nov 2021, no final | 24 Presidio Av | Buzzer 9 Development Inc | demo plaster & drywall to studs. remove cabinetry & fireplace as required. add 91 can lights. upgrade electrical in kitchen & baths. new drywall throughout. new molding/base/case/crown. new cabinetry & custom closets. new bath fixtures, tile & hardwood.Details
demo plaster & drywall to studs. remove cabinetry & fireplace as required. add 91 can lights. upgrade electrical in kitchen & baths. new drywall throughout. new molding/base/case/crown. new cabinetry & custom closets. new bath fixtures, tile & hardwood. | $600,000 |
| Mar 12, 2021 | Completed final sign-off Jan 2022 | 1823 10th Av | remodel 1st floor bathroom & family room. provide low wall at 2nd fl stair landing.Details
remodel 1st floor bathroom & family room. provide low wall at 2nd fl stair landing. | $35,000 | |
| Nov 25, 2020 | Completed final sign-off Feb 2023 | 1876 Funston Av | Chl Construction Company | reconfigure kitchen & bathroom to add 2nd bathroom & 3rd bedroom; replace siding, windows, skylight & entry door.Details
reconfigure kitchen & bathroom to add 2nd bathroom & 3rd bedroom; replace siding, windows, skylight & entry door. | $180,000 |
| Nov 25, 2020 | Completed final sign-off Nov 2022 | 2566 35th Av | Buzzer 9 Development Inc | 2/f:reconfigure (e) bathroom, closet & add 2nd bathroom. 1/f: add full bathroom & recessed entry door. replace windows, skylights, lights & electrical.Details
2/f:reconfigure (e) bathroom, closet & add 2nd bathroom. 1/f: add full bathroom & recessed entry door. replace windows, skylights, lights & electrical. | $150,000 |
| Nov 9, 2020 | Completed final sign-off Jun 2022 | 1040 Geary St | Chiang C M Construction Inc. | tenant improvement for day care. adult restrooms, child restrooms, coffee counter, (n) lighting & hvacDetails
tenant improvement for day care. adult restrooms, child restrooms, coffee counter, (n) lighting & hvac | $300,000 |
| Jul 23, 2020 | Expired or cancelled withdrawn May 2021 | 320 Alabama St | tenant improvement for day care: reception, adult & children restrooms, coffee counter & plumbing.Details
tenant improvement for day care: reception, adult & children restrooms, coffee counter & plumbing. | $200,000 | |
| Jul 19, 2020 | Completed final sign-off Nov 2021 | 272 Wawona St | Euro Team Construction | remodel kitchen, add half bath & window replacement. no other worksDetails
remodel kitchen, add half bath & window replacement. no other works | $90,000 |
| Feb 28, 2020 | Completed final sign-off Oct 2022 | 390 Kansas St | Shell Door Service Inc | provide automatic door opener to provide accessible entrance programmDetails
provide automatic door opener to provide accessible entrance programm | $30,000 |
| Feb 28, 2020 | Completed final sign-off Nov 2020 | 2021 Fillmore St | United California Access & Security Sys | provide automatic door opener and hardware for accessible business entrance.Details
provide automatic door opener and hardware for accessible business entrance. | $20,000 |
| Dec 27, 2019 | Expired or cancelled cancelled Jan 2026 | 601 Columbus Av | tenant improvement for day care reception, adult restroom, child restrooms, office & storage, new ligting and hvacDetails
tenant improvement for day care reception, adult restroom, child restrooms, office & storage, new ligting and hvac | $420,000 | |
| Dec 27, 2019 | Completed final sign-off May 2021 | 1167 Valencia St | Evan Palmer | revert 1167 valencia on 2nd fl back to a 2 family dwelling in response to complaints 2019020084 for planning, 201995750 for buildingDetails
revert 1167 valencia on 2nd fl back to a 2 family dwelling in response to complaints 2019020084 for planning, 201995750 for building | $50,000 |
| Dec 27, 2019 | Completed final sign-off Oct 2020 | 322 08th St | Evan Palmer | g/f - 1st time tenant improvement for day care. reception/office, coffee counter, adult restrooms, child restrooms. new lighting and hvac. ref 201307303137Details
g/f - 1st time tenant improvement for day care. reception/office, coffee counter, adult restrooms, child restrooms. new lighting and hvac. ref 201307303137 | $260,000 |
| Dec 6, 2019 | Completed final sign-off Oct 2020 | 2054 34th Av | Buzzer 9 Development Inc | kitchen remodel. relocate 1 bath at 2nd fl. re-configure bedrooms and add full master bath. replace 2 front windows & 3 rear windows and water heater. add drywall at ground fl. remove rear patio & construction new rear stair,Details
kitchen remodel. relocate 1 bath at 2nd fl. re-configure bedrooms and add full master bath. replace 2 front windows & 3 rear windows and water heater. add drywall at ground fl. remove rear patio & construction new rear stair, | $150,000 |
| Sep 27, 2019 | Never finaled issued May 2020, no final | 36 01st St | S Hall Builders Inc | sandwich cafe- tenant improvements non structural wall, lights & hvacDetails
sandwich cafe- tenant improvements non structural wall, lights & hvac | $200,000 |
| Aug 21, 2019 | Completed final sign-off Mar 2020 | 49 Page St | First Restaurant Builders | t.i. improvement for a day care, child restroom, lighting and hvac. n/a for maherDetails
t.i. improvement for a day care, child restroom, lighting and hvac. n/a for maher | $170,000 |
| Jun 26, 2019 | Expired or cancelled cancelled Jan 2026 | 51 Page St | ti permit. revision to app#201609077010. provide raised floor, sloping walk, ada restrooms. space to remain as non~encrypt&-condition shell for future t.i. n/a for maherDetails
ti permit. revision to app#201609077010. provide raised floor, sloping walk, ada restrooms. space to remain as non~encrypt&-condition shell for future t.i. n/a for maher | $80,000 | |
| Jun 26, 2019 | Completed final sign-off Oct 2019 | 49 Page St | First Restaurant Builders | tenant improvement for day care; reception/office coffee, restrooms, child restroom, lighting and hvac. n/a for maherDetails
tenant improvement for day care; reception/office coffee, restrooms, child restroom, lighting and hvac. n/a for maher | $200,000 |
| Jun 17, 2019 | Never finaled issued Jan 2022, no final | 674 Douglass St | Pattani Construction Co Inc, Vsa Construction | upper unit. kitchen and bath remodel. reconfigure bedrooms, add dormers. replace all existing windows & add 2 windows at the front with aluminum clad wood windows.Details
upper unit. kitchen and bath remodel. reconfigure bedrooms, add dormers. replace all existing windows & add 2 windows at the front with aluminum clad wood windows. | $300,000 |
| May 29, 2019 | Expired or cancelled withdrawn Sep 2023 | 2365 Chestnut St | for accessible business entrance program. provide level sidewalk, automatic door and ramp. n/a for maherDetails
for accessible business entrance program. provide level sidewalk, automatic door and ramp. n/a for maher | $20,000 | |
| May 29, 2019 | Completed final sign-off Sep 2019 | 2666 21st Av | Vintage Construction | revision to app#201711073380 to change 3x8 joists to 5 1/4 x 5 1/4 pslDetails
revision to app#201711073380 to change 3x8 joists to 5 1/4 x 5 1/4 psl | $10,000 |
| Mar 19, 2019 | Expired or cancelled withdrawn May 2019 | 4971 17th St | add units per ord 162-16 at (e) ground floor storage become 4 units. see 2016-0527-8561 for legalization permit from 2 units to 3 units.Details
add units per ord 162-16 at (e) ground floor storage become 4 units. see 2016-0527-8561 for legalization permit from 2 units to 3 units. | $60,000 | |
| Nov 15, 2018 | Completed final sign-off Mar 2019 | 370 Mangels Av | Pattani Construction Co Inc | kitchen & bath remodel; add family room , home office & bathroom at ground floor, replace windowsDetails
kitchen & bath remodel; add family room , home office & bathroom at ground floor, replace windows | $100,000 |
| Oct 19, 2018 | Never finaled issued Jan 2022, no final | 674 Douglass St | Pattani Construction Co Inc | lower unit. reconfigure bedrooms, lower ground fl & backyard patio. unit legalization on ground floor per zoning district density.Details
lower unit. reconfigure bedrooms, lower ground fl & backyard patio. unit legalization on ground floor per zoning district density. | $100,000 |
| Sep 11, 2018 | Completed final sign-off Sep 2019 | 1629 Jackson St | Buzzer 9 Development Inc | to comply with accessible business entrance ordinance 51-16. provide ramp & door buttonsDetails
to comply with accessible business entrance ordinance 51-16. provide ramp & door buttons | $20,000 |
| Aug 31, 2018 | Completed final sign-off Sep 2019 | 1629 Jackson St | Buzzer 9 Development Inc | commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential soft story under pa 201808318959Details
commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential soft story under pa 201808318959 | $60,000 |
| Aug 31, 2018 | Completed final sign-off Sep 2019 | 1627 Jackson St | Buzzer 9 Development Inc | residential - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial soft story under pa 201808318958Details
residential - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial soft story under pa 201808318958 | $60,000 |
| Jul 11, 2018 | Never finaled issued Jul 2018, no final | 233 Broad St | revision to permit app. #2015.0424.4549 to revise description of work only to "salvage & repair (e) front original building. replace (e) middle portion for a new 1 story addition. (e) back building to remain & no work"Details
revision to permit app. #2015.0424.4549 to revise description of work only to "salvage & repair (e) front original building. replace (e) middle portion for a new 1 story addition. (e) back building to remain & no work" | ||
| Jul 6, 2018 | Completed final sign-off Aug 2019 | 2240 Lombard St | to comply with accessible business entrance program, provide recessed enrty door & automatic door operators. ord 51-16Details
to comply with accessible business entrance program, provide recessed enrty door & automatic door operators. ord 51-16 | $8,000 | |
| May 23, 2018 | Completed final sign-off Jul 2019 | 1314 08th Av | K And D Construction Inc | provide shell tenant improvement with ada restroom, coffee counter, hvac & lighting.Details
provide shell tenant improvement with ada restroom, coffee counter, hvac & lighting. | $84,000 |
| May 23, 2018 | Expired or cancelled expired May 2023 | 1314 08th Av | K And D Construction Inc | replace storefront & entrance for accessible business entrance program.Details
replace storefront & entrance for accessible business entrance program. | $50,000 |
| May 23, 2018 | Completed final sign-off Jul 2019 | 2835 Clay St | Dmsquare Construction | dry rot repair at right side.Details
dry rot repair at right side. | $20,000 |
| Apr 18, 2018 | Completed final sign-off Mar 2022 | 30 Constanso Wy | Purev General Contracting | to comply with complaint 201720423 - remodel portion of familly room to bedroom suite. reconfigure (e) bath to accesible bath. change laundry area to laundry roomDetails
to comply with complaint 201720423 - remodel portion of familly room to bedroom suite. reconfigure (e) bath to accesible bath. change laundry area to laundry room | $50,000 |
| Nov 7, 2017 | Completed final sign-off Sep 2019 | 2666 21st Av | Vintage Construction | revision to pa #201512225777 - replace ktichen cabient, revised skylights & windows, re-configure backyard lower patio, raised sill on north side, framing clarification at bedroom #1, foundation & framing coordination at bedroom #3 addition. excavation less than 10 cubic yard and less than 4 feetDetails
revision to pa #201512225777 - replace ktichen cabient, revised skylights & windows, re-configure backyard lower patio, raised sill on north side, framing clarification at bedroom #1, foundation & framing coordination at bedroom #3 addition. excavation less than 10 cubic yard and less than 4 feet | $35,000 |
| Aug 23, 2017 | Completed final sign-off Aug 2025 | 693 Sutter St | Y D Construction Co. Inc., M L S Builder Inc. | this permit is to consolidate all architectural permits per dbi request for conversion of office building to residential. permits to include 200208194350, 200409174492, 200508241157, 200712241222, 200804290902,200804290904, 200912243842, 201106107871, 201311262876, 201501206130.Details
this permit is to consolidate all architectural permits per dbi request for conversion of office building to residential. permits to include 200208194350, 200409174492, 200508241157, 200712241222, 200804290902,200804290904, 200912243842, 201106107871, 201311262876, 201501206130. | |
| Aug 23, 2017 | Completed final sign-off Sep 2019 | 2666 21st Av | Vintage Construction | chemical grout under the (e) foundation. ref pa#201512225777.Details
chemical grout under the (e) foundation. ref pa#201512225777. | $6,900 |
| May 23, 2017 | Completed final sign-off Sep 2025 | 1409 Masonic Av | K And D Construction Inc | rear unit - legalize ground floor room as 5th apartment per sec 207.3 of sf planning code.Details
rear unit - legalize ground floor room as 5th apartment per sec 207.3 of sf planning code. | $2,500 |
| Mar 2, 2017 | Completed final sign-off Aug 2017 | 389 Crestlake Dr | Baseline Homes | replace existing windows & stucco alum clad wood windows. no structural work.Details
replace existing windows & stucco alum clad wood windows. no structural work. | $50,000 |
| Oct 17, 2016 | Completed final sign-off May 2018 | 2000 Oakdale Av | Huey Const Mngmt Co Inc - Dba M H Const. | interior t.i. for d.p.w. materials testing lab relocation.Details
interior t.i. for d.p.w. materials testing lab relocation. | $1,300,000 |
| Sep 14, 2016 | Never finaled filed Sep 2016, never issued | 38 Rose St | convert one parking space & portion of garage to commercial space; ada restrom; janitor closet & regular restroomDetails
convert one parking space & portion of garage to commercial space; ada restrom; janitor closet & regular restroom | $30,000 | |
| Sep 7, 2016 | Completed final sign-off Oct 2019 | 49 Page St | First Restaurant Builders | provide raised floor, stairs, ada lift, ada restrooms & coffee area. new louvers at rose street. (space remain as shell). n/a maher ordinanceDetails
provide raised floor, stairs, ada lift, ada restrooms & coffee area. new louvers at rose street. (space remain as shell). n/a maher ordinance | $60,000 |
| Sep 7, 2016 | Never finaled issued Sep 2016, no final | 2000 Oakdale Av | Huey Const Mngmt Co Inc - Dba M H Const. | exterior work - new recessed entry & exit with ada ramp & stair. provide path of travel from security gate to ada ramp. trench for utility feeds to transformer. n/a maher ordinanceDetails
exterior work - new recessed entry & exit with ada ramp & stair. provide path of travel from security gate to ada ramp. trench for utility feeds to transformer. n/a maher ordinance | $30,000 |
| May 27, 2016 | Completed final sign-off Jan 2022 | 4971 17th St | Evan Palmer | legalization of 2nd floor unit per ordinance# 43-14. legalize kitchen, upgrade lighting & switches, provide hydronic heating. provide separate meters for gas, electrical and water.Details
legalization of 2nd floor unit per ordinance# 43-14. legalize kitchen, upgrade lighting & switches, provide hydronic heating. provide separate meters for gas, electrical and water. | $70,000 |
| May 4, 2016 | Completed final sign-off Nov 2016 | 52 Homestead St | Pattani Construction Co Inc | revision to 201205049828. omit elevator, reconfigure kitchen, baths, closets.reconfigure porch layout & replace guardrail. realign exterior windows and skylightsDetails
revision to 201205049828. omit elevator, reconfigure kitchen, baths, closets.reconfigure porch layout & replace guardrail. realign exterior windows and skylights | $25,000 |
| Apr 19, 2016 | Completed final sign-off Mar 2018 | 290 Parnassus Av | Logan Lane Construction | boa#15-203, dated 03/29/2016. reduce roof garden area by eliminated a west portion from the approved permit #201508315632. increase beam sizes to accommodate additional planters.Details
boa#15-203, dated 03/29/2016. reduce roof garden area by eliminated a west portion from the approved permit #201508315632. increase beam sizes to accommodate additional planters. | $2,000 |
| Mar 7, 2016 | Completed final sign-off Dec 2017 | 1615 Oakdale Av | Trim Fit Constr. - O'reilly Engineering | legalization of in-law unit per ord 43-14 provide gas & ele meters. fire sprinkler under separate permit.Details
legalization of in-law unit per ord 43-14 provide gas & ele meters. fire sprinkler under separate permit. | $50,000 |
| Feb 25, 2016 | Completed final sign-off Apr 2017 | 387 Fair Oaks St | Pattani Construction Co Inc, Seamus Collins Construction, Inc. | to comply with nov#201600622 to correct deck described as existing on pa#201405226450 to read as "proposed"under seperate permit.Details
to comply with nov#201600622 to correct deck described as existing on pa#201405226450 to read as "proposed"under seperate permit. | |
| Feb 12, 2016 | Completed final sign-off Oct 2016 | 2240 Lombard St | Baseline Homes | provide shear walls at ground floor per sfbc chapter 34b soft story retrofit program, engineering design criteria per 2012 iebc appendix a-4. n/a for maherDetails
provide shear walls at ground floor per sfbc chapter 34b soft story retrofit program, engineering design criteria per 2012 iebc appendix a-4. n/a for maher | $40,000 |
| Jan 8, 2016 | Completed final sign-off Apr 2017 | 190 King St | O'keeffe Construction Inc | change of use. tenant improvement for showroom & retail.Details
change of use. tenant improvement for showroom & retail. | $200,000 |
| Dec 22, 2015 | Completed final sign-off Sep 2019 | 2666 21st Av | Vintage Construction | horizontal back addition & reconigure the interiors from 2 bedrooms, 1 bath to 4 bedrooms, 3 baths. add fully sprinklered.Details
horizontal back addition & reconigure the interiors from 2 bedrooms, 1 bath to 4 bedrooms, 3 baths. add fully sprinklered. | $250,000 |
| Dec 18, 2015 | Completed final sign-off Jan 2017 | 2835 Clay St | Dmsquare Construction | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. provide shear walls & moment frame at ground for soft story retrofitDetails
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. provide shear walls & moment frame at ground for soft story retrofit | $90,000 |
| Dec 18, 2015 | Completed final sign-off Aug 2017 | 389 Crestlake Dr | Baseline Homes | reconfigure (e) 2.5 baths to 3.5 baths. add family room & home office at garageDetails
reconfigure (e) 2.5 baths to 3.5 baths. add family room & home office at garage | $80,000 |
| Dec 18, 2015 | Completed final sign-off Jul 2016 | 2339 California St | Ng's Landmark Bldg & Engineering | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. provide shear walls at ground floor. maher naDetails
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. provide shear walls at ground floor. maher na | $70,000 |
| Nov 2, 2015 | Completed final sign-off Jun 2016 | 649 Irving St | K And D Construction Inc | 2/f - remove interior partition, patch and replair drywall, replace light fixtures with led, and install ceiling joists, add electrical outlets, provide ada entry, restroom and coffee counter.Details
2/f - remove interior partition, patch and replair drywall, replace light fixtures with led, and install ceiling joists, add electrical outlets, provide ada entry, restroom and coffee counter. | $160,000 |
| Sep 30, 2015 | Completed final sign-off Aug 2017 | 1134 Stanyan St | Aurora Builders | kitchen remodel. replace windows and siding at lightwell. strengthen gr fl walls at lightwellDetails
kitchen remodel. replace windows and siding at lightwell. strengthen gr fl walls at lightwell | $80,000 |
| Aug 31, 2015 | Completed final sign-off Jan 2016 | 1943 Page St | Vsa Construction | soft story : provide shear walls at ground floor for sofe story per 2012 iebc appendix a-4Details
soft story : provide shear walls at ground floor for sofe story per 2012 iebc appendix a-4 | $50,000 |
| Aug 31, 2015 | Completed final sign-off Mar 2018 | 290 Parnassus Av | Dunros Construction | provide private roof deck garden & remodel kitchen & baths. replace windows. provide fire sprinklers under sep permit. no work visible from streetDetails
provide private roof deck garden & remodel kitchen & baths. replace windows. provide fire sprinklers under sep permit. no work visible from street | $150,000 |
| Aug 31, 2015 | Completed final sign-off Feb 2016 | 1937 Page St | Vsa Construction | soft story : provide shear walls at ground floor for soft story retrofit per 2012 iebc appendix a-4Details
soft story : provide shear walls at ground floor for soft story retrofit per 2012 iebc appendix a-4 | $60,000 |