Alpha Construction & Solutions Inc.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2018 to Jul 2026
- Last 24 months
- 13 permits filed
42 permits since 2000: 37 completed, 5 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 29, 2026 | Completed final sign-off Sep 2026 | 1983 18th Av | revision to remodel permit 202410152905 to document field changes to floor plan. no exterior changes.Details
revision to remodel permit 202410152905 to document field changes to floor plan. no exterior changes. | |
| Jun 12, 2026 | In progress issued Jun 2026 | 149 Elsie St | in-kind remodeling of 2 bathroom(s) in 2nd fl, 3rd fl with 1 shower pan(s).Details
in-kind remodeling of 2 bathroom(s) in 2nd fl, 3rd fl with 1 shower pan(s). | $15,000 |
| May 6, 2026 | In progress issued May 2026 | 1313 24th Av | 1. repair or replace exterior stucco and associated framing damage due to vehicle impact. 2. replace damaged interior wall, replace in 'like-kind' onlyDetails
1. repair or replace exterior stucco and associated framing damage due to vehicle impact. 2. replace damaged interior wall, replace in 'like-kind' only | $18,000 |
| May 4, 2026 | In progress issued May 2026 | 1313 24th Av | addressing permit only: purpose of this permit is to link apn 1779/001 to 1313 24th ave. space is currently vacant.Details
addressing permit only: purpose of this permit is to link apn 1779/001 to 1313 24th ave. space is currently vacant. | |
| Apr 8, 2026 | In progress issued May 2026 | 527 22nd Av | 527, 3rd fl - remodel (e) kitchen, 1 full bath, & (1) half bath with same layout. replace 14 (e) aluminum window to vinyl window with same size & same location. add insulation per code, and install new sheetrock per code; 529, 2nd fl - replace 4 (e) aluminum window to vinyl window with same size,Details
527, 3rd fl - remodel (e) kitchen, 1 full bath, & (1) half bath with same layout. replace 14 (e) aluminum window to vinyl window with same size & same location. add insulation per code, and install new sheetrock per code; 529, 2nd fl - replace 4 (e) aluminum window to vinyl window with same size, | $80,000 |
| Oct 23, 2025 | Completed final sign-off Mar 2026 | 578 Athens St | construction a 3-fixtures bathrooms, relocate washer/dryer and laundry sink on 1st flr. remvoe fireplace on 2nd flr. no structural alteration.Details
construction a 3-fixtures bathrooms, relocate washer/dryer and laundry sink on 1st flr. remvoe fireplace on 2nd flr. no structural alteration. | $10,000 |
| Oct 17, 2025 | Completed final sign-off Feb 2026 | 578 Athens St | remodeling (e) kitchen (no wall moving) in-kind; add dishwasher. remodeling (e) bathroom. convert bathtub to shower. no moving walls. all fixture locations to remain the same. kitchen approx. 100 sq ft. bathroom approx 50 sq ft.Details
remodeling (e) kitchen (no wall moving) in-kind; add dishwasher. remodeling (e) bathroom. convert bathtub to shower. no moving walls. all fixture locations to remain the same. kitchen approx. 100 sq ft. bathroom approx 50 sq ft. | $50,000 |
| Sep 15, 2025 | Completed final sign-off Jul 2026 | 1899 Oakdale Av | voluntary structural improvements to existing 3 story wood frame building.Details
voluntary structural improvements to existing 3 story wood frame building. | $25,000 |
| Apr 14, 2025 | Completed final sign-off Aug 2025 | 1511 Birchwood Ct | restore water damage condo with one kitchen, one bathroom. one bedroom. replace 2 front window and one sliding door in kind.Details
restore water damage condo with one kitchen, one bathroom. one bedroom. replace 2 front window and one sliding door in kind. | $38,000 |
| Mar 24, 2025 | Completed final sign-off Sep 2026 | 1983 18th Av | revision to pa # 202410152905 (remodel) to allow fiberglass window type in -lieu of metal clad at rear and side elevations only.Details
revision to pa # 202410152905 (remodel) to allow fiberglass window type in -lieu of metal clad at rear and side elevations only. | |
| Mar 6, 2025 | Completed final sign-off Mar 2026 | 1320 Portola Dr | bathroom: replace shower, toilet, sink, new tile, dry wall & plumbing & electrical neededDetails
bathroom: replace shower, toilet, sink, new tile, dry wall & plumbing & electrical needed | $14,000 |
| Oct 15, 2024 | Completed final sign-off Sep 2026 | 1983 18th Av | remodel to the main level of the home. the lower level will be built out to add living room 2x bedrooms and 1 bathroomDetails
remodel to the main level of the home. the lower level will be built out to add living room 2x bedrooms and 1 bathroom | $80,000 |
| Oct 15, 2024 | Completed final sign-off Mar 2025 | 1546 24th Av | replace 3 (e) front windows. rev to 202408239341. max u-factor 0.30 or better. same size, same location.Details
replace 3 (e) front windows. rev to 202408239341. max u-factor 0.30 or better. same size, same location. | $10,000 |
| Aug 23, 2024 | Completed final sign-off Mar 2025 | 1546 24th Av | remodel (e) 2nd floor (1,493 sq.ft.) same layout by replacing sheetrock with 5/8" type x with 5d cooler nails @ 4" o.c. remodel existing bath (no shower pan work), 1/2 bath and kitchen with same lay out. new insulation. no struct work. replace (11) rear-facing windows in-kind. no moving walls.Details
remodel (e) 2nd floor (1,493 sq.ft.) same layout by replacing sheetrock with 5/8" type x with 5d cooler nails @ 4" o.c. remodel existing bath (no shower pan work), 1/2 bath and kitchen with same lay out. new insulation. no struct work. replace (11) rear-facing windows in-kind. no moving walls. | $80,000 |
| Jun 27, 2024 | Completed final sign-off Jul 2025 | 363 Princeton St | revision to bpa# 202312011786: repalce (e) gas furnace with (n) electric heat pump, split unit system. repalce (e) gas water heater with (n) electric heat pump, tank-type water heater. replace with new electric rangeDetails
revision to bpa# 202312011786: repalce (e) gas furnace with (n) electric heat pump, split unit system. repalce (e) gas water heater with (n) electric heat pump, tank-type water heater. replace with new electric range | $8,000 |
| Jun 24, 2024 | Completed final sign-off Jul 2024 | 172 Goettingen St | replace five (e) windows at same location. (at the rear location, 2 on the side). u=.30maxDetails
replace five (e) windows at same location. (at the rear location, 2 on the side). u=.30max | $5,000 |
| May 30, 2024 | In progress issued May 2024 | 883 34th Av | 883 34th ave - remodel existing bathroom with same layout.Details
883 34th ave - remodel existing bathroom with same layout. | $18,000 |
| Apr 2, 2024 | Completed final sign-off Mar 2025 | 269 San Jose Av | revision to 202312152619 remodel to gr fl unit 1. replace e windows front facade and one on side elevationDetails
revision to 202312152619 remodel to gr fl unit 1. replace e windows front facade and one on side elevation | $5,000 |
| Jan 19, 2024 | Completed final sign-off Mar 2025 | 269 San Jose Av | revision to bp# 202312152619 removal of some existing walls and related seismic improvmentsDetails
revision to bp# 202312152619 removal of some existing walls and related seismic improvments | |
| Dec 15, 2023 | Completed final sign-off Mar 2025 | 269 San Jose Av | ground floor unit #1. remodel in a 3 story residential bldg. removal of some extg walls and related seismic improvements.Details
ground floor unit #1. remodel in a 3 story residential bldg. removal of some extg walls and related seismic improvements. | $30,000 |
| Dec 11, 2023 | Completed final sign-off Mar 2024 | 75 Barcelona Av | kitchen and bath remodel; replace 4 windows within existing openings (not visible from the street).Details
kitchen and bath remodel; replace 4 windows within existing openings (not visible from the street). | $50,000 |
| Dec 1, 2023 | Completed final sign-off Jul 2025 | 363 Princeton St | 1st/f remodel: add 2 bedrooms, bathroom, kitchenette, entertainment rm. change (e) half bath to full bath. new habitable space 467 sfDetails
1st/f remodel: add 2 bedrooms, bathroom, kitchenette, entertainment rm. change (e) half bath to full bath. new habitable space 467 sf | $50,000 |
| Sep 29, 2023 | Completed final sign-off Dec 2023 | 885 34th Av | remodeling (e) bathroom with same layout.Details
remodeling (e) bathroom with same layout. | $12,000 |
| Sep 22, 2023 | Completed final sign-off Jul 2024 | 2333 Funston Av | convert portion of garage to home office & bedroom, reconfigure 3-bedrooms/2-bath to 4/bedroom/3.5-bath, remodel kitchen, new interior stair, replace iwndows, provide heat pump water heater, ductless multi-split heating/cooling, upgrade electrical panel 200ampDetails
convert portion of garage to home office & bedroom, reconfigure 3-bedrooms/2-bath to 4/bedroom/3.5-bath, remodel kitchen, new interior stair, replace iwndows, provide heat pump water heater, ductless multi-split heating/cooling, upgrade electrical panel 200amp | $400,000 |
| Apr 20, 2023 | Completed final sign-off Aug 2023 | 3723 Anza St | remodel 1-kitchen & 1-bathroom with same location at the unit.Details
remodel 1-kitchen & 1-bathroom with same location at the unit. | $25,000 |
| Feb 27, 2023 | Completed final sign-off Aug 2026 | 1899 Oakdale Av | comply w/ nov #202292335. 1820 sq ft of fire dmg repair & 200 sq ft remodel. remodel: new bedrm & closet at 2/fl unit. repair as follows: remove & replace damaged roofing, roof sheathing, framing, windows, doors, siding, drywall, insulation, test electrical, remove & replace damaged elec.Details
comply w/ nov #202292335. 1820 sq ft of fire dmg repair & 200 sq ft remodel. remodel: new bedrm & closet at 2/fl unit. repair as follows: remove & replace damaged roofing, roof sheathing, framing, windows, doors, siding, drywall, insulation, test electrical, remove & replace damaged elec. | $400,000 |
| Jan 17, 2023 | Completed final sign-off Apr 2023 | 43 Lisbon St | remodel bath on 2nd fl like for like. no wall changes, no layout changes.Details
remodel bath on 2nd fl like for like. no wall changes, no layout changes. | $25,000 |
| Dec 27, 2022 | Completed final sign-off Jun 2023 | 261 Arleta Av | remodel kitchen on 2/f. like to like, counter replacement new tiles, new plumbing fixtures & appliances.Details
remodel kitchen on 2/f. like to like, counter replacement new tiles, new plumbing fixtures & appliances. | $15,000 |
| Oct 26, 2022 | Completed final sign-off May 2023 | 1400 25th Av | to comply w/nov#202294522, emergency repair to front of building, rebuild wall/foundation in foyer on g/f in-kind per plan, new stucco where damaged in-kind to match front elevation. no other work performed.Details
to comply w/nov#202294522, emergency repair to front of building, rebuild wall/foundation in foyer on g/f in-kind per plan, new stucco where damaged in-kind to match front elevation. no other work performed. | $2,000 |
| Sep 22, 2022 | Completed final sign-off Feb 2023 | 51 Rosewood Dr | remodeling one bathroom at 2nd floor non structuralDetails
remodeling one bathroom at 2nd floor non structural | $12,000 |
| Sep 14, 2022 | Completed final sign-off Jun 2023 | 261 Arleta Av | reroofing.Details
reroofing. | $12,000 |
| Sep 14, 2022 | Completed final sign-off Jun 2023 | 261 Arleta Av | install new ceiling insulation, r-38.Details
install new ceiling insulation, r-38. | $2,000 |
| Jun 6, 2022 | Completed final sign-off Sep 2022 | 1339 10th Av | apt #3: (1) remodeling of existing kitchen cabinets with same layout. no electrical and plumbing change. remodeling existing bathroom with same layout. no electrical and plumbing change.Details
apt #3: (1) remodeling of existing kitchen cabinets with same layout. no electrical and plumbing change. remodeling existing bathroom with same layout. no electrical and plumbing change. | $28,000 |
| Mar 23, 2022 | Completed final sign-off Feb 2025 | 467 Naples St | to comply w/nov 202286014 dated 1/31/2022. remove iron bar/iron gate door @front entry/windows. install iron bar balgony on the front of house. install balcony @2/f front levl. iron gate door @side door. (n)garage door. (n)front windows. widen driveway/remove wall supporting stair framingDetails
to comply w/nov 202286014 dated 1/31/2022. remove iron bar/iron gate door @front entry/windows. install iron bar balgony on the front of house. install balcony @2/f front levl. iron gate door @side door. (n)garage door. (n)front windows. widen driveway/remove wall supporting stair framing | $11,000 |
| Dec 28, 2021 | Completed final sign-off Nov 2022 | 487 16th Av | revision to 202106041705: in 1st fl add a wet bar in family rm.Details
revision to 202106041705: in 1st fl add a wet bar in family rm. | $2,000 |
| Sep 27, 2021 | Completed final sign-off May 2024 | 151 Margaret Av | comply with nov# 202178816. new deck at rear of property. legalize 1st floor bathroomDetails
comply with nov# 202178816. new deck at rear of property. legalize 1st floor bathroom | $10,000 |
| Jun 4, 2021 | Completed final sign-off Nov 2022 | 487 16th Av | interior remodel on 1/f: relocate (e) bedroom, family room and bathroom, add a media room. 2/f:remodel (e) kitchen & bathroom, remodel (e) interior stairs. 3/f: remodel (e) bathroom.Details
interior remodel on 1/f: relocate (e) bedroom, family room and bathroom, add a media room. 2/f:remodel (e) kitchen & bathroom, remodel (e) interior stairs. 3/f: remodel (e) bathroom. | $100,000 |
| Mar 24, 2021 | Completed final sign-off Jun 2021 | 391 Winding Wy | remodel kitchen and only one bathroom on the 2/f-no layout change. upgrade new elect for 2/f only. upgrade (e) elec panel to 125 amp.Details
remodel kitchen and only one bathroom on the 2/f-no layout change. upgrade new elect for 2/f only. upgrade (e) elec panel to 125 amp. | $40,000 |
| Dec 18, 2020 | Completed final sign-off May 2021 | 1295 32nd Av | 2nd floor re-layout 2 bedrooms and closet.Details
2nd floor re-layout 2 bedrooms and closet. | $30,000 |
| Aug 13, 2020 | Completed final sign-off Jan 2022 | 261 Arleta Av | g/f: add one gym room, one guest room, one home office and 1 powder room. relocate laundry area, water heater & furnace. repair (e) damaged wooden stairscase at rear. to comply with complaint 2020022757.Details
g/f: add one gym room, one guest room, one home office and 1 powder room. relocate laundry area, water heater & furnace. repair (e) damaged wooden stairscase at rear. to comply with complaint 2020022757. | $20,000 |
| Aug 7, 2020 | Completed final sign-off Sep 2020 | 686 Broadway | comply with his complaint 202043181: item 2. provide handrails at middle stairs; item 3. provide handrails at back stairs; item 4. provide guardrails at back stairs; item 5. provide galvanized metal or masonry lining, and self-closing, tight-fitting lined door only.Details
comply with his complaint 202043181: item 2. provide handrails at middle stairs; item 3. provide handrails at back stairs; item 4. provide guardrails at back stairs; item 5. provide galvanized metal or masonry lining, and self-closing, tight-fitting lined door only. | $5,000 |
| Nov 7, 2018 | Completed final sign-off Dec 2019 | 4033 Ortega St | add unit ord 95-17. legalization of one unit installed without permit. legalize kitchen, studio room, one full bathroom. all work at ground flr.Details
add unit ord 95-17. legalization of one unit installed without permit. legalize kitchen, studio room, one full bathroom. all work at ground flr. | $32,000 |