Back to kitchen remodel contractors
Alpha Construction & Solutions Inc.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2018 to Jul 2026
- Last 24 months
- 13 permits filed
42 permits since 2000: 37 completed, 5 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
13 kitchen remodel permits: 12 completed, 1 in progress. Typically 1 days from filing to permit and 129 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 8, 2026 | In progress issued May 2026 | 527 22nd Av | 527, 3rd fl - remodel (e) kitchen, 1 full bath, & (1) half bath with same layout. replace 14 (e) aluminum window to vinyl window with same size & same location. add insulation per code, and install new sheetrock per code; 529, 2nd fl - replace 4 (e) aluminum window to vinyl window with same size,Details
527, 3rd fl - remodel (e) kitchen, 1 full bath, & (1) half bath with same layout. replace 14 (e) aluminum window to vinyl window with same size & same location. add insulation per code, and install new sheetrock per code; 529, 2nd fl - replace 4 (e) aluminum window to vinyl window with same size, | $80,000 |
| Oct 17, 2025 | Completed final sign-off Feb 2026 | 578 Athens St | remodeling (e) kitchen (no wall moving) in-kind; add dishwasher. remodeling (e) bathroom. convert bathtub to shower. no moving walls. all fixture locations to remain the same. kitchen approx. 100 sq ft. bathroom approx 50 sq ft.Details
remodeling (e) kitchen (no wall moving) in-kind; add dishwasher. remodeling (e) bathroom. convert bathtub to shower. no moving walls. all fixture locations to remain the same. kitchen approx. 100 sq ft. bathroom approx 50 sq ft. | $50,000 |
| Apr 14, 2025 | Completed final sign-off Aug 2025 | 1511 Birchwood Ct | restore water damage condo with one kitchen, one bathroom. one bedroom. replace 2 front window and one sliding door in kind.Details
restore water damage condo with one kitchen, one bathroom. one bedroom. replace 2 front window and one sliding door in kind. | $38,000 |
| Aug 23, 2024 | Completed final sign-off Mar 2025 | 1546 24th Av | remodel (e) 2nd floor (1,493 sq.ft.) same layout by replacing sheetrock with 5/8" type x with 5d cooler nails @ 4" o.c. remodel existing bath (no shower pan work), 1/2 bath and kitchen with same lay out. new insulation. no struct work. replace (11) rear-facing windows in-kind. no moving walls.Details
remodel (e) 2nd floor (1,493 sq.ft.) same layout by replacing sheetrock with 5/8" type x with 5d cooler nails @ 4" o.c. remodel existing bath (no shower pan work), 1/2 bath and kitchen with same lay out. new insulation. no struct work. replace (11) rear-facing windows in-kind. no moving walls. | $80,000 |
| Dec 11, 2023 | Completed final sign-off Mar 2024 | 75 Barcelona Av | kitchen and bath remodel; replace 4 windows within existing openings (not visible from the street).Details
kitchen and bath remodel; replace 4 windows within existing openings (not visible from the street). | $50,000 |
| Dec 1, 2023 | Completed final sign-off Jul 2025 | 363 Princeton St | 1st/f remodel: add 2 bedrooms, bathroom, kitchenette, entertainment rm. change (e) half bath to full bath. new habitable space 467 sfDetails
1st/f remodel: add 2 bedrooms, bathroom, kitchenette, entertainment rm. change (e) half bath to full bath. new habitable space 467 sf | $50,000 |
| Sep 22, 2023 | Completed final sign-off Jul 2024 | 2333 Funston Av | convert portion of garage to home office & bedroom, reconfigure 3-bedrooms/2-bath to 4/bedroom/3.5-bath, remodel kitchen, new interior stair, replace iwndows, provide heat pump water heater, ductless multi-split heating/cooling, upgrade electrical panel 200ampDetails
convert portion of garage to home office & bedroom, reconfigure 3-bedrooms/2-bath to 4/bedroom/3.5-bath, remodel kitchen, new interior stair, replace iwndows, provide heat pump water heater, ductless multi-split heating/cooling, upgrade electrical panel 200amp | $400,000 |
| Apr 20, 2023 | Completed final sign-off Aug 2023 | 3723 Anza St | remodel 1-kitchen & 1-bathroom with same location at the unit.Details
remodel 1-kitchen & 1-bathroom with same location at the unit. | $25,000 |
| Dec 27, 2022 | Completed final sign-off Jun 2023 | 261 Arleta Av | remodel kitchen on 2/f. like to like, counter replacement new tiles, new plumbing fixtures & appliances.Details
remodel kitchen on 2/f. like to like, counter replacement new tiles, new plumbing fixtures & appliances. | $15,000 |
| Jun 6, 2022 | Completed final sign-off Sep 2022 | 1339 10th Av | apt #3: (1) remodeling of existing kitchen cabinets with same layout. no electrical and plumbing change. remodeling existing bathroom with same layout. no electrical and plumbing change.Details
apt #3: (1) remodeling of existing kitchen cabinets with same layout. no electrical and plumbing change. remodeling existing bathroom with same layout. no electrical and plumbing change. | $28,000 |
| Jun 4, 2021 | Completed final sign-off Nov 2022 | 487 16th Av | interior remodel on 1/f: relocate (e) bedroom, family room and bathroom, add a media room. 2/f:remodel (e) kitchen & bathroom, remodel (e) interior stairs. 3/f: remodel (e) bathroom.Details
interior remodel on 1/f: relocate (e) bedroom, family room and bathroom, add a media room. 2/f:remodel (e) kitchen & bathroom, remodel (e) interior stairs. 3/f: remodel (e) bathroom. | $100,000 |
| Mar 24, 2021 | Completed final sign-off Jun 2021 | 391 Winding Wy | remodel kitchen and only one bathroom on the 2/f-no layout change. upgrade new elect for 2/f only. upgrade (e) elec panel to 125 amp.Details
remodel kitchen and only one bathroom on the 2/f-no layout change. upgrade new elect for 2/f only. upgrade (e) elec panel to 125 amp. | $40,000 |
| Nov 7, 2018 | Completed final sign-off Dec 2019 | 4033 Ortega St | add unit ord 95-17. legalization of one unit installed without permit. legalize kitchen, studio room, one full bathroom. all work at ground flr.Details
add unit ord 95-17. legalization of one unit installed without permit. legalize kitchen, studio room, one full bathroom. all work at ground flr. | $32,000 |