Dunros Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2014 to May 2026
- Last 24 months
- 15 permits filed
93 permits since 2000: 86 completed, 4 in progress, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 13, 2026 | In progress issued May 2026 | 778 44th Av | demo of (e) 1st fl slab on grade & footing, excavation of back area for lower slab. installation of (n) foundations & slab on grade @ a lower 1st fl.replacement of (e) exterior stairs in south lightwell of property. renovation of (e) kitchen & primary bath @ 2nd fl. no additional contitioned spaceDetails
demo of (e) 1st fl slab on grade & footing, excavation of back area for lower slab. installation of (n) foundations & slab on grade @ a lower 1st fl.replacement of (e) exterior stairs in south lightwell of property. renovation of (e) kitchen & primary bath @ 2nd fl. no additional contitioned space | $150,000 |
| Mar 9, 2026 | In progress issued Mar 2026 | 296 Santa Rosa Av | to comply w/ nov# 202534271, fix fire damage area at south side roughly 300 sqft of siding and framing. kitchen & bathroom remodel, everything stays in same location.Details
to comply w/ nov# 202534271, fix fire damage area at south side roughly 300 sqft of siding and framing. kitchen & bathroom remodel, everything stays in same location. | $50,000 |
| Mar 3, 2026 | Completed final sign-off Oct 2026 | 468 Dewey Bl | remodel (e) kitchenDetails
remodel (e) kitchen | $35,000 |
| Mar 2, 2026 | In progress issued May 2026 | 563 18th Av | rebuild (e) deteriorating exterior stair at rear of the building for life/safety purposes. rebuild (e) decks at each of the 3 floor levels in a revised configuration.Details
rebuild (e) deteriorating exterior stair at rear of the building for life/safety purposes. rebuild (e) decks at each of the 3 floor levels in a revised configuration. | $50,000 |
| Jan 23, 2026 | Completed final sign-off May 2026 | 2270 29th Av | kitchen and bathroom remodel 1st flr. new kitchen cabinets, stone and backsplash, replace 1 window facing light well. bathroom replace all fixtures, replace 1 window facing lightwell. no structual work.Details
kitchen and bathroom remodel 1st flr. new kitchen cabinets, stone and backsplash, replace 1 window facing light well. bathroom replace all fixtures, replace 1 window facing lightwell. no structual work. | $45,000 |
| Sep 10, 2025 | Completed final sign-off Nov 2025 | 734 21st Av | full bathroom remodel like for like, all current fixtures to remain in current locations, all walls to remain, new electrical in bathroom only. no change to floor layout. no change to wall layout. no structural work.Details
full bathroom remodel like for like, all current fixtures to remain in current locations, all walls to remain, new electrical in bathroom only. no change to floor layout. no change to wall layout. no structural work. | $15,000 |
| Jun 17, 2025 | Completed final sign-off Mar 2026 | 2910 26th Av | remodel a total of 3 bathrooms all fixtures to remain in current locations new fixtures throughout change locations of ressed cans.Details
remodel a total of 3 bathrooms all fixtures to remain in current locations new fixtures throughout change locations of ressed cans. | $40,000 |
| May 19, 2025 | Completed final sign-off Nov 2025 | 4270 Cesar Chavez St | revision to 202505055807. replace roughly 1,700 sqf of plywood siding with stucco on rear and sides of the house. not visible from street.Details
revision to 202505055807. replace roughly 1,700 sqf of plywood siding with stucco on rear and sides of the house. not visible from street. | $45,000 |
| May 7, 2025 | Completed final sign-off Jul 2025 | 734 21st Av | 50% bathroom remodel: new vanity, floor tile, new toilet and new electrical. everything in same location. no work in shower area.Details
50% bathroom remodel: new vanity, floor tile, new toilet and new electrical. everything in same location. no work in shower area. | $6,000 |
| May 6, 2025 | Completed final sign-off Dec 2025 | 557 Noe St | unit legalization pursuant to planning approval 2024-009054prj. legalize one 642 sqft unauthorized dwelling unit per planning code 207.3. new 4-burner stove in (e) kitchenette, range hood and kitchen cabinets (e) unpermitted kitchen.Details
unit legalization pursuant to planning approval 2024-009054prj. legalize one 642 sqft unauthorized dwelling unit per planning code 207.3. new 4-burner stove in (e) kitchenette, range hood and kitchen cabinets (e) unpermitted kitchen. | $15,000 |
| May 5, 2025 | Completed final sign-off Nov 2025 | 4270 Cesar Chavez St | replace siding, dryrot at the rear of house, roughly 70 sqft.Details
replace siding, dryrot at the rear of house, roughly 70 sqft. | $8,000 |
| Feb 13, 2025 | Completed final sign-off Feb 2025 | 245 Santa Paula Av | remove water damaged sheating on rof parapit wall and replace with same t11 sheatingDetails
remove water damaged sheating on rof parapit wall and replace with same t11 sheating | $5,000 |
| Feb 13, 2025 | Completed final sign-off May 2025 | 468 Dewey Bl | change out 2 windows in kind on side of building. remove stucco and patch stucco around after installation wood aluminum clad windowsDetails
change out 2 windows in kind on side of building. remove stucco and patch stucco around after installation wood aluminum clad windows | $2,000 |
| Dec 9, 2024 | In progress issued Dec 2024 | 1633 Sanchez St | emergency in kind repair of (e) 3 story rear structrue correct floor slope replace floor sheating repair dry rot damaged wall studs/floor joists posts, foundation repair. kitchen/bath remodel at 2nd/3rd floor due to repair. under 50% repair or rear structureDetails
emergency in kind repair of (e) 3 story rear structrue correct floor slope replace floor sheating repair dry rot damaged wall studs/floor joists posts, foundation repair. kitchen/bath remodel at 2nd/3rd floor due to repair. under 50% repair or rear structure | $96,000 |
| Oct 29, 2024 | Completed final sign-off Oct 2024 | 145 Casitas Av | remove and replace sheetrock after new electrical upgrades throughout. repair in kind.Details
remove and replace sheetrock after new electrical upgrades throughout. repair in kind. | $5,000 |
| Sep 13, 2024 | Completed final sign-off Mar 2025 | 244 Whitney St | remodel kitchen remove all cabinets and install new cabinets. in kindDetails
remodel kitchen remove all cabinets and install new cabinets. in kind | $15,000 |
| Aug 28, 2024 | Completed final sign-off Mar 2025 | 244 Whitney St | remodel bathroom keep all fixture locations in same place. remove counter top and tile backsplash in kitchen and replace in kind no structural work to be completed.Details
remodel bathroom keep all fixture locations in same place. remove counter top and tile backsplash in kitchen and replace in kind no structural work to be completed. | $12,000 |
| Aug 22, 2024 | Completed final sign-off Dec 2024 | 1737 Sutter St | replace approximately 25 lineal feet of guardrail @ 2nd fl walkway not visible from street. new guardrail to replace existing non-compliant guardrail.Details
replace approximately 25 lineal feet of guardrail @ 2nd fl walkway not visible from street. new guardrail to replace existing non-compliant guardrail. | $30,000 |
| Jul 11, 2024 | Completed final sign-off Oct 2024 | 145 Casitas Av | remodel one bathroom at 3rd floor. replace one bedroom door at 3rd floorDetails
remodel one bathroom at 3rd floor. replace one bedroom door at 3rd floor | $20,000 |
| Jun 6, 2024 | Completed final sign-off Dec 2024 | 993 Tennessee St | unit #2 interior remodel of 1,511 sqft condo. remodel to include 2 in kind full baths on upper level and 1.5 bath on the lower level. in kind kitchen remodel on lower level. (n) laundry machines will be installed to a cabinet in the kitchenDetails
unit #2 interior remodel of 1,511 sqft condo. remodel to include 2 in kind full baths on upper level and 1.5 bath on the lower level. in kind kitchen remodel on lower level. (n) laundry machines will be installed to a cabinet in the kitchen | $150,000 |
| May 31, 2024 | Completed final sign-off Oct 2024 | 376 Marietta Dr | 3x bathroom remodel- in kind no wall removal or structural work.Details
3x bathroom remodel- in kind no wall removal or structural work. | $35,000 |
| May 31, 2024 | Completed final sign-off Apr 2025 | 528 Stanyan St | interior remodel to convert (e) full bath and half bath into 2 full baths; add 1 new window in existing lightwell (not visible from street)Details
interior remodel to convert (e) full bath and half bath into 2 full baths; add 1 new window in existing lightwell (not visible from street) | $50,000 |
| May 21, 2024 | Completed final sign-off Aug 2024 | 20 Cotter St | revision to 202404220439 to change contractor of record and remove 1 window and replace one window in kind at 2nd fk bathroom. not visible from street.Details
revision to 202404220439 to change contractor of record and remove 1 window and replace one window in kind at 2nd fk bathroom. not visible from street. | $100 |
| May 9, 2024 | Completed final sign-off Aug 2024 | 467 Gates St | covert existing full bath into half bath and laundryDetails
covert existing full bath into half bath and laundry | $20,000 |
| Apr 22, 2024 | Completed final sign-off Jan 2025 | 20 Cotter St | remodel bathroom. no structural. replace 3 rear windows in kind (not visible from the street)Details
remodel bathroom. no structural. replace 3 rear windows in kind (not visible from the street) | $30,000 |
| Mar 14, 2024 | Completed final sign-off Aug 2024 | 1735 39th Av | revision to 202309196916: g/f layout change - wet bar, bathroom, & hallwayDetails
revision to 202309196916: g/f layout change - wet bar, bathroom, & hallway | |
| Sep 22, 2023 | Completed final sign-off Nov 2023 | 350 Valley St | replace wall cedar shingles at the front and right side roughly 500 sf for new cedar shingles, like for like.Details
replace wall cedar shingles at the front and right side roughly 500 sf for new cedar shingles, like for like. | $5,000 |
| Sep 19, 2023 | Completed final sign-off Aug 2024 | 1735 39th Av | interior alter on 1st fl: (n) conditioned entertaiment rm, wet bar, bath, new rear sliding dr. reconfig entry wall. upgrade eletrical panel. 247 sf of conditioned spaceDetails
interior alter on 1st fl: (n) conditioned entertaiment rm, wet bar, bath, new rear sliding dr. reconfig entry wall. upgrade eletrical panel. 247 sf of conditioned space | $45,000 |
| Aug 22, 2023 | Completed final sign-off Jan 2024 | 2634 Bush St | kitchen remodel with everything staying in the same location. replace 2 new windows in extg opening at the back(same size, same location, max u-factor 0.30; not visible from street)Details
kitchen remodel with everything staying in the same location. replace 2 new windows in extg opening at the back(same size, same location, max u-factor 0.30; not visible from street) | $30,000 |
| Jun 6, 2023 | Completed final sign-off Jul 2023 | 32 Forest Side Av | replace (3) double hung windows & (1) fixed window @ front of house, replace (1) double hung on south facing side, aluminium clad on all windows. uf<0.3Details
replace (3) double hung windows & (1) fixed window @ front of house, replace (1) double hung on south facing side, aluminium clad on all windows. uf<0.3 | $7,000 |
| Jun 2, 2023 | Completed final sign-off Nov 2023 | 745 El Camino Del Mar | replace in kind (3) double hung windows, (18) casement windows, (1) set of french ext doors, and (1) exterior door.Details
replace in kind (3) double hung windows, (18) casement windows, (1) set of french ext doors, and (1) exterior door. | $65,000 |
| May 8, 2023 | Completed final sign-off Nov 2023 | 245 Santa Paula Av | replace (e) balcony in-kind due to significant dry-rot damage, replace balcony joists. replace metal guardrails in kind. finish with tile. new balcony to be reduced in size to comply with setback requirement.Details
replace (e) balcony in-kind due to significant dry-rot damage, replace balcony joists. replace metal guardrails in kind. finish with tile. new balcony to be reduced in size to comply with setback requirement. | $30,000 |
| Apr 12, 2023 | Completed final sign-off Nov 2023 | 787 Faxon Av | interior remodel kitchen, addition of new sky light. fire sprinklers no req.Details
interior remodel kitchen, addition of new sky light. fire sprinklers no req. | $100,000 |
| Mar 9, 2023 | Completed final sign-off Nov 2023 | 245 Santa Paula Av | remove tile on back balcony and repair dryrot on balcony, remove and damaged framing and repair and return to original state remove two doors off top balcony and install new doors in kind. repair under 50%.Details
remove tile on back balcony and repair dryrot on balcony, remove and damaged framing and repair and return to original state remove two doors off top balcony and install new doors in kind. repair under 50%. | $25,000 |
| Mar 9, 2023 | Completed final sign-off Mar 2023 | 47 Melrose Av | change out 1 (e) window at the front of the building above garage with glider triple sash marvin window. aluminum clad on the exterior.Details
change out 1 (e) window at the front of the building above garage with glider triple sash marvin window. aluminum clad on the exterior. | $4,500 |
| Mar 2, 2023 | Completed final sign-off Mar 2023 | 2612 20th St | to comply with complaint: 202304297: repair framing where car hit side of garage doors. replace approx 20sqft of stucco. reconnect garage door.Details
to comply with complaint: 202304297: repair framing where car hit side of garage doors. replace approx 20sqft of stucco. reconnect garage door. | $1,500 |
| Feb 3, 2023 | Completed final sign-off Apr 2023 | 372 Marietta Dr | 2 bathroom remodels with evrything staying in same location. no moving walls, approx 50 sf each.Details
2 bathroom remodels with evrything staying in same location. no moving walls, approx 50 sf each. | $30,000 |
| Oct 20, 2022 | Completed final sign-off Jan 2023 | 2195 Green St | apt #4: remodeling one kitchen and 2 bathrooms and everything staying in the same location. adding washer/dryer in hallway closet.Details
apt #4: remodeling one kitchen and 2 bathrooms and everything staying in the same location. adding washer/dryer in hallway closet. | $75,000 |
| Sep 14, 2022 | Completed final sign-off Jul 2023 | 1737 Sutter St | 20 sqft of dryrot back of the buildingDetails
20 sqft of dryrot back of the building | $3,000 |
| Jun 30, 2022 | Completed final sign-off Sep 2022 | 1737 Sutter St | 2 baths remodel in kindDetails
2 baths remodel in kind | $35,000 |
| Jun 10, 2022 | Completed final sign-off Apr 2023 | 255 Chenery St | revision to 202204212679. hvac changed from forced air system to hydronic system, 2 interior (e) stairs will be replaced w/new code complaint stairs. (e) door from (e) stair #1 to the breezeway will be replaced w/ new door @ backyard.Details
revision to 202204212679. hvac changed from forced air system to hydronic system, 2 interior (e) stairs will be replaced w/new code complaint stairs. (e) door from (e) stair #1 to the breezeway will be replaced w/ new door @ backyard. | $15,000 |
| May 31, 2022 | Completed final sign-off Feb 2023 | 665 05th Av | convert (e) attic to habitable space, add dormers, add interior stairs connecting attic to 3rd floor - replace 3rd floor tub with shower, enlarge 3rd floor between living and dining. -Details
convert (e) attic to habitable space, add dormers, add interior stairs connecting attic to 3rd floor - replace 3rd floor tub with shower, enlarge 3rd floor between living and dining. - | $120,000 |
| Apr 21, 2022 | Completed final sign-off Apr 2023 | 255 Chenery St | remodel the (e) 1st story and 2nd story, relocate (e) plumbing, create a hallway to have the residence separated from the garage on the 1st story, remove the (e) half bath on the 1st story, replace the (e) hvac system with energy star rated equipment reconfigure the (e) plumbing on the 2nd storyDetails
remodel the (e) 1st story and 2nd story, relocate (e) plumbing, create a hallway to have the residence separated from the garage on the 1st story, remove the (e) half bath on the 1st story, replace the (e) hvac system with energy star rated equipment reconfigure the (e) plumbing on the 2nd story | $450,000 |
| Apr 18, 2022 | Completed final sign-off Apr 2022 | 1218 42nd Av | replace 2 (e) dryer vents that where not up to code and bring up to code with 2 (n) vents and 2 booster fans. to comply with complaint 202289548Details
replace 2 (e) dryer vents that where not up to code and bring up to code with 2 (n) vents and 2 booster fans. to comply with complaint 202289548 | $2,000 |
| Mar 23, 2022 | Completed final sign-off Jul 2022 | 990 Burnett Av | 2 bath rooms and kitchen remodel: everything is staying in same location.Details
2 bath rooms and kitchen remodel: everything is staying in same location. | $65,000 |
| Feb 18, 2022 | Completed final sign-off Jun 2022 | 60 Dawnview Wy | replace 3 windows at the rear of the house. remove existing stucco, approx 200 sq. ft., and add new stucco (200 sq ft). new windows will be vinyl milguard.Details
replace 3 windows at the rear of the house. remove existing stucco, approx 200 sq. ft., and add new stucco (200 sq ft). new windows will be vinyl milguard. | $20,000 |
| Feb 18, 2022 | Completed final sign-off May 2022 | 150 Riverton Dr | bathroom remodel in-kindDetails
bathroom remodel in-kind | $22,000 |
| Nov 8, 2021 | Completed final sign-off Mar 2022 | 305 Chenery St | minor revision to pa 2021-0902-7727 addition of a bedroom closetDetails
minor revision to pa 2021-0902-7727 addition of a bedroom closet | $500 |
| Sep 2, 2021 | Completed final sign-off Mar 2022 | 305 Chenery St | minor interior remodel projects, including new closets and new electrical fixtures.Details
minor interior remodel projects, including new closets and new electrical fixtures. | $20,000 |
| Jun 22, 2021 | Completed final sign-off Oct 2021 | 160 Lenox Wy | new stair at rear yard. new french door.Details
new stair at rear yard. new french door. | $9,000 |
| May 12, 2021 | Completed final sign-off Jul 2021 | 1026 Clayton St | 2 street facing aluminum clad windowsDetails
2 street facing aluminum clad windows | $2,000 |
| May 7, 2021 | Completed final sign-off Jul 2021 | 1026 Clayton St | bathroom remodel with new replacement window - street facing. like for like, no changesDetails
bathroom remodel with new replacement window - street facing. like for like, no changes | $19,000 |
| May 7, 2021 | Completed final sign-off Oct 2021 | 160 Lenox Wy | bathroom remodel and new kitchen countertops (like for like, no changes)Details
bathroom remodel and new kitchen countertops (like for like, no changes) | $20,000 |
| Feb 5, 2021 | Completed final sign-off Apr 2021 | 216 Lily St | work on unit 216 a: remodel 2 bathrooms on first flr. change bathtub out, replace vanity and toilets. no electrical work to be preformed. no new wall and no existing wall relocation. new lighting, shall comply w/ cec 150.0.(k)3 & (k) sDetails
work on unit 216 a: remodel 2 bathrooms on first flr. change bathtub out, replace vanity and toilets. no electrical work to be preformed. no new wall and no existing wall relocation. new lighting, shall comply w/ cec 150.0.(k)3 & (k) s | $15,000 |
| Nov 19, 2020 | Completed final sign-off Jul 2021 | 25 Brentwood Av | remodel bathroom. all walls to be unchanged.Details
remodel bathroom. all walls to be unchanged. | $20,000 |
| Nov 17, 2020 | Never finaled issued Apr 2021, no final | 306 Sanchez St | rear porch upgrade: structural work only. existing rear staircase to be repaired in-kind.Details
rear porch upgrade: structural work only. existing rear staircase to be repaired in-kind. | $5,000 |
| Sep 11, 2020 | Expired or cancelled cancelled Jan 2026 | 66 Belcher St | unit 2: there was a water leak. need to demo out the tile. install new tile. re connect the toilet and sink. sheetrock patching and painting and re- install base boardDetails
unit 2: there was a water leak. need to demo out the tile. install new tile. re connect the toilet and sink. sheetrock patching and painting and re- install base board | $8,000 |
| Mar 9, 2020 | Expired or cancelled withdrawn Mar 2022 | 355 Hermann St | kitchen remodel with new skylight.Details
kitchen remodel with new skylight. | $32,000 |
| Mar 4, 2020 | Completed final sign-off Jul 2020 | 2462 24th Av | remodel 1st fl bathroom in kind all fixtures to remain in same locationDetails
remodel 1st fl bathroom in kind all fixtures to remain in same location | $12,000 |
| Feb 12, 2020 | Completed final sign-off May 2020 | 2634 Bush St | fix front exterior stair trends and risers (9 steps in total). work less than 50%.Details
fix front exterior stair trends and risers (9 steps in total). work less than 50%. | $2,000 |
| Nov 27, 2019 | Completed final sign-off Mar 2020 | 4326 Cesar Chavez St | replacing 300 sf sheetrock in utility room ground floor due to water damagedDetails
replacing 300 sf sheetrock in utility room ground floor due to water damaged | $2,000 |
| Sep 27, 2019 | Completed final sign-off Aug 2020 | 66 Belcher St | remodel kitchen new cabinets, appliances all same location. remodel bathroom 80 sq ft, all same location. repair water damage on floor in hallway.Details
remodel kitchen new cabinets, appliances all same location. remodel bathroom 80 sq ft, all same location. repair water damage on floor in hallway. | $17,000 |
| Sep 23, 2019 | Completed final sign-off Feb 2021 | 372 Marietta Dr | remodel & expand kitchen into adjacent room, convert portion of garage for (n) bathroom at 1st fl.Details
remodel & expand kitchen into adjacent room, convert portion of garage for (n) bathroom at 1st fl. | $64,193 |
| Aug 30, 2019 | Completed final sign-off Oct 2019 | 1115 Kansas St | dry rot repair on siding back of building not visible from streetDetails
dry rot repair on siding back of building not visible from street | $5,000 |
| Aug 30, 2019 | Completed final sign-off May 2020 | 2632 Bush St | remodel bathroom & kitchen, no structural work, approx. 250 sq. ft.Details
remodel bathroom & kitchen, no structural work, approx. 250 sq. ft. | $35,000 |
| Jul 31, 2019 | Completed final sign-off Apr 2020 | 467 Gates St | rev to pa# 201906274521 remove (e) perimeter foundation & shift new retaining wall to line with perimeter wall above. remodel (e) ground floor bathroom in kind. replace drywall and insulation in family room.Details
rev to pa# 201906274521 remove (e) perimeter foundation & shift new retaining wall to line with perimeter wall above. remodel (e) ground floor bathroom in kind. replace drywall and insulation in family room. | |
| Jul 18, 2019 | Completed final sign-off Oct 2019 | 2208 Mission St | remove and replace approximately 2600 sqft of stucco, in kind. street facing and side.Details
remove and replace approximately 2600 sqft of stucco, in kind. street facing and side. | $50,000 |
| Jul 18, 2019 | Completed final sign-off Sep 2019 | 66 Belcher St | repair damaged sheetrock and hardwoord floor ; 150 sf flooring, sheetrock in hallway and bedroomDetails
repair damaged sheetrock and hardwoord floor ; 150 sf flooring, sheetrock in hallway and bedroom | $2,500 |
| Jun 27, 2019 | Completed final sign-off Apr 2020 | 467 Gates St | add new foundation along existing north property foundation. add drainage @ north & east property wallsDetails
add new foundation along existing north property foundation. add drainage @ north & east property walls | $50,000 |
| May 28, 2019 | Completed final sign-off Jun 2019 | 1003 Clayton St | replace 2 exterior sliding doors with 2 new sliding doors. size roughly 10 feet each. keeping existing opening and not changing. non-street facing, not visible.Details
replace 2 exterior sliding doors with 2 new sliding doors. size roughly 10 feet each. keeping existing opening and not changing. non-street facing, not visible. | $2,500 |
| May 2, 2019 | Completed final sign-off Oct 2019 | 2208 Mission St | exploratory demo concrete in garage to evaluate water intrusion.Details
exploratory demo concrete in garage to evaluate water intrusion. | $400 |
| Apr 10, 2019 | Completed final sign-off Apr 2020 | 467 Gates St | relocate kitchen within building area. remodel 3rd fl bath. no change to footprint, no change to exteriorDetails
relocate kitchen within building area. remodel 3rd fl bath. no change to footprint, no change to exterior | $60,000 |
| Mar 6, 2019 | Completed final sign-off Mar 2019 | 3960 Folsom St | dryrot window leaks repair dryrot & install original windows work not visible to street at the rearDetails
dryrot window leaks repair dryrot & install original windows work not visible to street at the rear | $2,000 |
| Dec 20, 2018 | Completed final sign-off Apr 2019 | 2204 Green St | replace kitchen cabinets and install new island in kitchen. 200sfDetails
replace kitchen cabinets and install new island in kitchen. 200sf | $12,500 |
| Nov 2, 2018 | Completed final sign-off Aug 2020 | 642 Rockdale Dr | construct (n) deck on grade & (n) deck @ 2nd flr w/ connecting stair @ rear of bldg. add (2) sliding doors @ 2nd flr deck.Details
construct (n) deck on grade & (n) deck @ 2nd flr w/ connecting stair @ rear of bldg. add (2) sliding doors @ 2nd flr deck. | $45,000 |
| Sep 19, 2018 | Completed final sign-off Feb 2020 | 2446 20th Av | 2-story addition @ rear of home approx 5' deep. addition of approx 5' shed dormer @ upper level of south side residence. renovation of kitchen, powder room @ main level, renovation of master bedroom @ upper level, addition of master bath @ upper levelDetails
2-story addition @ rear of home approx 5' deep. addition of approx 5' shed dormer @ upper level of south side residence. renovation of kitchen, powder room @ main level, renovation of master bedroom @ upper level, addition of master bath @ upper level | $100,000 |
| Jun 18, 2018 | Completed final sign-off Dec 2018 | 47 Melrose Av | add bathroom to ground floor rear bedroom. legalize 117 sq. ft. extg living space on ground floor.Details
add bathroom to ground floor rear bedroom. legalize 117 sq. ft. extg living space on ground floor. | $50,000 |
| Mar 16, 2018 | Completed final sign-off May 2018 | 2462 24th Av | remodel bathroom no structural changes. replace all fixtures same location. approx 40 sq. st. lighting per cenc 150.0(k)Details
remodel bathroom no structural changes. replace all fixtures same location. approx 40 sq. st. lighting per cenc 150.0(k) | $12,500 |
| Mar 6, 2018 | Completed final sign-off Jun 2018 | 2235 Mission St | sheetrock repair in 6 units roughly 9 patchen per unit. approx 200 sf per unit for plumbing inspection total 1200 sf. 5/8 sheetrock type xDetails
sheetrock repair in 6 units roughly 9 patchen per unit. approx 200 sf per unit for plumbing inspection total 1200 sf. 5/8 sheetrock type x | $7,000 |
| Dec 1, 2017 | Completed final sign-off Dec 2018 | 270 Cresta Vista Dr | remodel 1 bathroom & kitchen ; in kind. no removal of walls.Details
remodel 1 bathroom & kitchen ; in kind. no removal of walls. | $20,000 |
| Nov 8, 2017 | Completed final sign-off Jun 2018 | 2235 Mission St | repair the cracks in the stucco front building and back and paint the same color repair in-kindDetails
repair the cracks in the stucco front building and back and paint the same color repair in-kind | $25,000 |
| Oct 23, 2017 | Completed final sign-off Mar 2018 | 642 Rockdale Dr | remodel bathroom fixtures to remain in current locations. no change in wall & opening layout.Details
remodel bathroom fixtures to remain in current locations. no change in wall & opening layout. | $12,500 |
| Jun 20, 2017 | Completed final sign-off Dec 2017 | 4270 Cesar Chavez St | remodel existing bathroom, relocate shower & vanity, in kind bathroom remodel, same sizeDetails
remodel existing bathroom, relocate shower & vanity, in kind bathroom remodel, same size | $18,000 |
| Mar 22, 2017 | Completed final sign-off Apr 2018 | 60 Belcher St | add new stair to rear of property, stair connects existing rea yard to existing balcony off rear of 2nd fl unit. stair for yard access only, not means of egress. add new 10' fence to rear yardDetails
add new stair to rear of property, stair connects existing rea yard to existing balcony off rear of 2nd fl unit. stair for yard access only, not means of egress. add new 10' fence to rear yard | $20,000 |
| Mar 13, 2017 | Completed final sign-off Sep 2017 | 2019 Lawton St | remodel kitchen. new appliances & fixtures in same location. replace (e) window in kitchen, same size in-kind.Details
remodel kitchen. new appliances & fixtures in same location. replace (e) window in kitchen, same size in-kind. | $22,000 |
| Jan 25, 2017 | Completed final sign-off May 2017 | 516 Belvedere St | remove dry rot and replace exterior siding at side of house, not visable from street, replace in kind, extension of pa#201701116948 due to field conditions.Details
remove dry rot and replace exterior siding at side of house, not visable from street, replace in kind, extension of pa#201701116948 due to field conditions. | |
| Jan 11, 2017 | Completed final sign-off May 2017 | 516 Belvedere St | kitchen remodeling, replace cabinets & countertop in kitchen , replace lighting refinish floors, no change in walls, & opening layout, min 50% watage to be high efficiency lightingDetails
kitchen remodeling, replace cabinets & countertop in kitchen , replace lighting refinish floors, no change in walls, & opening layout, min 50% watage to be high efficiency lighting | $30,000 |
| Nov 18, 2016 | Completed final sign-off May 2017 | 150 Page St | demo non bearing interior partition walls. remodel bathroom.Details
demo non bearing interior partition walls. remodel bathroom. | $18,000 |
| Oct 11, 2016 | Completed final sign-off Nov 2017 | 133 Westgate Dr | replace 10 windows with 10 aluminum clad wood windows with divided lites. three windows are located on the front façade.Details
replace 10 windows with 10 aluminum clad wood windows with divided lites. three windows are located on the front façade. | $22,500 |
| Aug 31, 2015 | Completed final sign-off Mar 2018 | 290 Parnassus Av | provide private roof deck garden & remodel kitchen & baths. replace windows. provide fire sprinklers under sep permit. no work visible from streetDetails
provide private roof deck garden & remodel kitchen & baths. replace windows. provide fire sprinklers under sep permit. no work visible from street | $150,000 |
| Aug 3, 2015 | Completed final sign-off Oct 2015 | 2036 Santiago St | repair in kind 50% of exterior stairs front of house approx 50%Details
repair in kind 50% of exterior stairs front of house approx 50% | $10,000 |
| Jun 16, 2015 | Completed final sign-off Sep 2015 | 627 Masonic Av | remodeling bathroom and powder room at the 3rd floor and replace window in the bathroom not visible from the street.Details
remodeling bathroom and powder room at the 3rd floor and replace window in the bathroom not visible from the street. | $30,000 |
| Jan 7, 2014 | Completed final sign-off Jan 2014 | 521 Laidley St | stucco repair at front to correct automobile damage to left of garage door.Details
stucco repair at front to correct automobile damage to left of garage door. | $2,000 |